Drive End Hot end/Drive end to be Grease/Oil Lubricated & Cold end to be vacuum
Jacketed.
NPSH-R ≤ 2 meter.
Electric Motor Continuous duty Flame proof 3 phase/~415V/50HZ TEFC Electric motor
(With belt drive and guard) suitable for Zone1, gas group II B, T4 and
shall be ATEX/PESO Approved.
Testing Before dispatch Vendor shall have pump test bed with all the calibrated instruments for
the functional testing of pump.
Each pump is required to be functionally tested with Liquid
Nitrogen/LNG.
Based on the functional test vendor shall submit the details for, Head,
Capacity & efficiency of pump.
Functional test result shall be in compliance with this specification.
IOCL reserve the right to visit the test facility, asked for detailed function
test procedure from vendor before placement of order or witness the
functional testing of pump before delivery of pump.
Prepared By :- Authorized By :-
P &ID and GA diagram of pump along with motor and base frame.
Foundation Load data along with foundation foot print drawing.
Temperature set point table for: - Loss of prime shutdown temperature
sensor (On delivery line), Suction return temperature sensor for starting
pump, Seal/Gland leak temperature sensor & crank drive temperature
control.
Recommended set point for Pressure switch.
Performance curve of Pump.
Pump and Motor datasheet.
Recommended and optional list of instrumentations or valves to be
fitted on the pump for reliable operation of pump.
Electrical logic diagram.
List of recommended spares.
Certificate of Functional Test
Prepared By :- Authorized By :-
Marking Pump shall carry following marking in a durable and legible manner on a
firmly attached plate Identification of manufacturer.
Year of manufacturing
Unique identification of the pump like serial number.
Essential process data such as design pressure, Temperature, rated
power in kW (kilowatts) and supply voltage in V (Volts).
Warning and special condition for safe use.
Motor/system shall carry name plate with PESO approval number.
Packing Complete assembly to be supplied with polyethylene wrapping to
prevent the ingress of any moisture, oil and dust during transport and
storage at IOCL premises.
Prepared By :- Authorized By :-