You are on page 1of 1

TEST REQUISITION CONTRACT – CONCRETE

P.O. Box 98937


Contractor HASSAN SALMEEN BUILDING CONTRACTING LLC Telephone no. 04-2677909
Fax no. 04-2677926
Client SAEED SAIF SAEED NASIR ALKHUROOSI

Consultant SABAT ARCHITECTURAL ENGINEERING

Project Name G+1 VILLA

Project no. 336


Plot no. 617-2752
Project Location NAD AL SHIBA 4TH

Sample Description Casting Date 07-04-2020


Source GULF READY MIX Casting Time 02.00 PM

Structure Reference VILLA 1ST FLOOR SLAB Batching Date &Time 07-04-2020
Specified Strength C40/20 Sampling Method MANUAL
Concrete Mix Design OPC+60TO70% GGBS Sampling Certificate 0
Sampled by CONTRACTOR Place of Sampling SITE
Cert. of Spec. prepn.
Client Reference No
& Sampling
Sample brought in by CONTRACTOR Lot no./ Lot Size 03@7DAYS + 03@28DAYS

Method of Compaction Sample Size 150MM * 150MM * 150MM


Equipment Used Air Content
Required Age of Test Slump / Temperature 180 mm

Required Date of Test

SI Test Method No of
Test Required NL Sample No
No. British Standard Others Test
1 Compressive strength of cube (7 Days) 1881: Part 116: 1983 3
Compressive strength of cube (28 Days) 1881: Part 116: 1983 3
2 Compressive strength of core 1881: Part 120: 1983
3 Flexural strength of beam 1881: Part 118: 1983
4 Transverse strength of Kerb 7263 -1: 2001
5 Water absorption of Kerb 7263 -1: 2001
Air Dry
6 Initial surface absorption (ISAT) 1881: Part 208: 1996 Oven Dry
7 Water Permeability EN 12390: Part 8: 2009
8 Water absorption 1881: Part 122: 2011
9 Rapid chloride ion permeability C1202:2012
10 Chloride content 1881: Part 124: 1988, cl. 10.2
11 Sulphate content 1881: Part 124: 1988, cl. 10.3
12 Original water content of concrete 1881: Part 124: 1988, cl. 7
13 Compressive Strength of Masonry Blocks 6073: Part 2: 2008
14 Dimension of Masonry Blocks 6073: Part 1: 2008
15 Compressive Strength of Paving Blocks 6717: Part 1: 2001
16 Dimension of Paving Blocks 6717: Part 1: 2001
17 Depth of Carbonation
18 Compressive strength of Grout Cubes C 579: 1996
19 Flexural Strength of Grout Cubes C 580: 1996

Note:
1. For Water Permeability Test BS EN 12390: Part 8 the Client/Contractor should conduct surface preparation immediately after demoulding of specimen using wire brush.
2. Sample Retention for Concrete Specimen will not be kept in the Laboratory after test, otherwise Client will request for storage.
3. All Records shall be retained in Laboratory for a minimum of five (5) years.

Contractor signature MR-UDAY KUMAR NL Project no.


Mob. No. 0565466745

Consultant signature NL TR No

National Laboratory Date Received


Date:
Resource Reviewed by Time Received

Request Reviewed & Date:


Received by
Remark :__________________________________________________________________________

Form #: NLRF-04 Issue no. 01 Issued on:April 1st ,2015 Rev. no.: 05 Rev Date 18/09/2017 Authorized By Alaa Bary

You might also like