FACADE AUDIT

AVIDA TOWERS SOUTHPOINT


Facade Audit: Avida Towers SouthPoint Makati City

AVIDA TOWERS SOUTHPOINT – MAKATI

Project Name : AVIDA TOWERS SOUTHPOINT


Scope of Service : FACADE AUDIT
Owner : Avida Land Corp.
Project Developer : Ayala Land Inc. :
Location : Chino Roces Avenue, Makati City
Date : October 2022

2 FACADE AUDIT: October 5, 2022


Facade Audit: AVIDA TOWERS SOUTHPOINT-Makati

1. Inspection Photos – Leak Test

Below are the inspection photos taken during the Façade Works Inspection conducted last
OCTOBER 5, 2022.

Item Photo Content Issues / Observation Recommendations


A.
A.1 Leak Test Inspected Leak observed during AAMA 501.2 @ upper
@ Drop 19 operable , and subsill, FAILED

A.2 Leak Test Inspected Leak observed during AAMA 501.2 RETEST @
@ Drop 19 upper operable , fixed glass FAILED

A.3 Leak Test Inspected Leak observed during AAMA 501.2 RETEST @
@ Drop 19 upper frame and lower fixed glasss , FAILED
3 FACADE AUDIT: October 5, 2022
Facade Audit: AVIDA TOWERS SOUTHPOINT-Makati

Item Photo Content Issues / Observation Recommendations


A.
A.4 Leak Test Inspected Leak observed during AAMA 501.2 @ upper
@ Drop 19 operable , upper frame fixed glass , FAILED

A.5 Leak Test Inspected Leak observed during AAMA 501.2 RETEST @
@ Drop 19 lower hor fame fixed glass and subsill, FAILED

A.6 Leak Test Inspected Leak observed during AAMA 501.2 RETEST @
@ Drop 19 Lower operable , subsill fixed glass , FAILED

4 FACADE AUDIT: October 5, 2022


Facade Audit: AVIDA TOWERS SOUTHPOINT-Makati

2. Inspection Photos – Leak Test

Below are the inspection photos taken during the Façade Works Inspection conducted last
OCTOBER 13, 2022.

Item Photo Content Issues / Observation Recommendations


A.
A.7 Leak Test Inspected Leak observed during AAMA 501.2 @ upper
@ Drop 19 operable , FAILED

A.8 Leak Test Inspected Leak observed during AAMA 501.2 @ upper
@ Drop 19 operable , FAILED

A.9 Leak Test Inspected Leak observed during AAMA 501.2 @


@ Drop 19 operable , FAILED

5 FACADE AUDIT: October 5, 2022


Facade Audit: AVIDA TOWERS SOUTHPOINT-Makati

Item Photo Content Issues / Observation Recommendations


A.
A.10 Leak Test Inspected Leak observed during AAMA 501.2 RETEST @
@ Drop 1 operable, fixed glass and subsill, FAILED

A.11 Leak Test Inspected eak observed during AAMA 501.2, @ subsill
@ Drop 1 and fixed glasss , FAILED

A.12 Leak Test Inspected No fiber mesh, incomplete sealant at Precast


@ Drop 10 to precast gap

6 FACADE AUDIT: October 5, 2022


Facade Audit: AVIDA TOWERS SOUTHPOINT-Makati

3. Inspection Photos – PC Wall

Below are the inspection photos taken during the Façade Works Inspection conducted last
OCTOBER 18, 2022.

Item Photo Content Issues / Observation Recommendations


A.
A.1 PCW Sealant No sealant on miter joint connection of
Inspected @ Drop 1 window frame external

A.2 PCW Sealant No sealant on miter joint connection of


Inspected @ Drop 1 window frame external

A.3 PCW Sealant No fiber mesh, incomplete sealant at Precast


Inspected @ Drop 1 to precast gap

7 FACADE AUDIT: October 5, 2022


Facade Audit: AVIDA TOWERS SOUTHPOINT-Makati

4. Inspection Photos – Leak Test

Below are the inspection photos taken during the Façade Works Inspection conducted last
OCTOBER 20, 2022.

Item Photo Content Issues / Observation Recommendations


A.
Leak observed during AAMA 501.2 @ Fixed
A.1 Leak Test @ Drop 19 Glass, FAILED

Leak observed during AAMA 501.2 @ fixed


A.2 Leak Test @ Drop 1 glass and operable, FAILED

Leak observed during AAMA 501.2 @ upper


A.3 Leak Test @ Drop 19 frame fixed glass, FAILED

8 FACADE AUDIT: October 5, 2022


Facade Audit: AVIDA TOWERS SOUTHPOINT-Makati

Prepared By:

QAQC Structural Engineer / Façade Engineer

Project Architect / Façade Engineer

Approved By:

Project Manager (PM)

9 FACADE AUDIT: October 5, 2022