Jitesh Patel QAQC REJECTION LIST

DATE AND TIME Project Name STAGE

10-04-2017, 1:21PM ACME AVENUE SALE TOWER-2 KANDIVALI-3667 GFC 3

23-06-2017, 4:44PM AL-FARA-DADAR-REVISED 2-3740 GFC 2

07-04-2017, 5:41PM KIRAN ASHAR ULKA CHSL-3744 GFC 2

06-05-2017, 4:00PM SATRA-PROPERTY-MATUNGA-3894 GFC 3

08-06-2017, 4:45PM SATRA-PROPERTY-MATUNGA-3894 GFC 4

08-06-2017, 4:25PM SATRA-PROPERTY-MATUNGA-3894 GFC 4


Stage Item Remark Popup Remark

GFC Drawings 50% of super structure main steel provided in distribution steel and distri

Model comments in review and discussion.


many mistakes
GFC Drawings upto ground 7-4-2017
R/f insufficient (fails). as improper load considered
many deficiency found as model not done as per concept.
8-6-2017
GFC Drawings 50% of super structure pls revise and make correction
approved
GFC Drawings superstructure balance 8-6-2017
R/f insufficient (fails). as improper load considered
GFC Drawings superstructure balance 8-6-2017
Popup Path

\\192.168.0.200\5project\ACME AVENUE SALE TOWER-2 KANDIVALI-3667\QAQC\DWG\STRUCT\Staircase

\\192.168.0.200\5project\AL FARA-DADR-REVISED-3740\QAQC\DESIGN\ETAB MODEL\ALT 3

\\dc01\5PROJECT\KIRAN ASHAR ULKA CHSL-3744\QAQC\DWG\STRUCT

\\192.168.0.200\5project\SATRA-PROPERTY-MATUNGA-3894\QAQC\DWG\STRUCT\2nd floor

\\192.168.0.200\5project\SATRA-PROPERTY-MATUNGA-3894\QAQC\DWG\STRUCT\Staircase

\\192.168.0.200\5project\SATRA-PROPERTY-MATUNGA-3894\QAQC\DWG\STRUCT\Staircase
67\QAQC\DWG\STRUCT\Staircase

\ETAB MODEL\ALT 3

G\STRUCT\2nd floor

G\STRUCT\Staircase

G\STRUCT\Staircase
Nikhil Shah(Dummy) QAQC REJECTION LIST

DATE AND TIME Project Name

11-05-2017, 11:31AM test by test25

11-05-2017, 11:31AM test by test25


STAGE Stage Item

GFC 2 Arch Drawing

GFC 2 Load data sheets


Remark Popup Remark
Popup Path