DATE WORK

I went to cumbum plant


security room side light fitting work and
1/1/2019 cable laying work.
and support for mechanical team ready for
breaker.
I went to lower camp
Dewatering pump suction hose , delivery
hose and football changing in position for
motor. And diesel airlock release.
1/2/2019 5kva generator oil leakage arrested and oil
level top up.
And vibrator maintenance work.
and earth hammer accelerator cable
Idamage
went to so changing
cumbum work.
plant
Steel rod unloading work.
and water tank side spray pipe fitting work.
1/3/2019
and water tank vehicle sidemirror fitting
work.
I went to cumbum plant
Steel rod unloading work.
1/4/2019 plant side material conveyor motor damage
so check and remove work.
and ready for spear motor and fitting work.
I went to cumbum plant
material conveyor bucket fitting work.
1/5/2019
office room side ethernet cable laying and
casing caping fitting work.
I went to palayam site
vibrator machine not working properly so
check and correcting work.
1/6/2019
and generator general checkup at site.
and water pump motor general checkup at
site.
I went to cumbum plant
steel rod loading work at plant.
and I went to palayam site unloading for
1/7/2019
steel rod at site.
and went to Chinnamanur nursery loading
for concrete pipe.
I went to cumbum plant
steel rod loading work.
and new compressor received at plant
1/8/2019 support for unloading.
and JCB vehicle front bucket loading work
for gudalur site.
and material conveyor bucket motor fitting
work at plant.
1/9/2019 leave
1/10/2019 leave
1/11/2019 leave
1/12/2019 leave
1/13/2019 leave
1/14/2019 pongal leave
1/15/2019 pongal leave
1/16/2019 pongal leave
1/17/2019 pongal leave
1/18/2019 leave
1/19/2019 leave
I went to cumbum plant
DG general checkup at plant.
1/20/2019 and I went to palayam employee room side
no electrical supply so check and correcting
work.
I went to gudalur site
dewatering pump shifting for plant side.
and I went to EB office complaint for
electrical problems.
and I went to palayam site
1/21/2019 DG general checkup at site.
and vibrator machine damage so check and
take over the plant.
and went to cumbum site night work going
on so focus light fitting work and generator
start at running condition.
I went to cumbum plant
diesel filling work for 12KVA generator at
plant.
and focus light fitting work for office room
side purpose of tree view.
1/22/2019 and creador blat unloading for store room.
and 3phase welding machine input cable
laying and termination work purpose of
bucket welding work.
And today EB shutdown so generator
starting and maintain work.
I went to cumbum plant
EB supply energy meter reading noted.
and I went to palayam site
2 focus light remove and take over the
plant.
1/23/2019 and I went to gudalur site
3 focus lights are fitting and cable laying
work.
and I went to palayam old labour set
remove the 1 fan and wire shifting the new
labour set and fan fitting work.
I went to cumbum plant
EB supply energy meter reading noted.
support for mechanic in vibrator needle
service at plant.
and support for steel loading at plant.
12.5 KVA generator diesel filling work at
plant.
and welding machine shifting for plant side
1/24/2019 so input supply remove and shifting work.
at the same time plant side welding
machine input cable laying and termination
work.
and I went to gudalur site
3 focus lights are fitting and cable laying
work.
and the generator position changing work.
I went to cumbum plant
EB supply energy meter reading noted.
welding machine shifting at plant to
entrance gate side so welding machine
input cable disconnect and reconnect in
gate entrance side.
and support for welder in tractor vehicle
side hammer work.
1/25/2019 and 5 KVA generator loading work for
cumbum site purpose of steel rod cutting
work.
and I went to gudalur site
switch box damage so check and ready for
switch box.
and 3 focus light fitting and cable laying
work.
I went to cumbum plant
EB supply energy meter reading noted.
1/26/2019 DG general checkup at plant.
extension cable fitting work for drilling
machine in carpenter working area side.
I went to cumbum plant
EB supply energy meter reading noted.
and I went to electrical store for purchasing night work
1/27/2019 work meterial used for gudalur site labour 6:00 pm to
set. 12:30 am
and I went to gudalur site labour set fan
light fitting work and cable laying work.
and night duty for maintenance work.
I went to cumbum plant
EB supply energy meter reading noted.
and I went to gudalur site
vibrator machine maintenance work, night work
1/28/2019 operating work. 6:00 pm to
and generator maintenance work, operating 12:00 am
work.
and night work 4 focus light fitting work.
and night work completed time remove the
focus light and handover the labour set.
I went to cumbum plant
EB supply energy meter reading noted.
and EB 3 phase supply side 1phase not
1/29/2019 coming so changing the line in 2 phase side
at plant.
and generator operating work at plant.
and I went to palayam site
vibrator using water pump service work.
I went to cumbum plant
EB supply energy meter reading noted.
and ready for separate 3phase line in water
1/30/2019 pump motor at plant.
and Chinnamanur site visit for maintenance
work.
and generator operating work.
I went to cumbum plant
EB supply energy meter reading noted.
12.5 KVA generator operating work.
cable laying and termination work for cutting
1/31/2019 machine at plant to working area.
plant side support for meterial bucket fitting
work.
and I went to gudalur site
cable laying and termination work for 4
focus light fitting work.