security room side light fitting work and 1/1/2019 cable laying work. and support for mechanical team ready for breaker. I went to lower camp Dewatering pump suction hose , delivery hose and football changing in position for motor. And diesel airlock release. 1/2/2019 5kva generator oil leakage arrested and oil level top up. And vibrator maintenance work. and earth hammer accelerator cable Idamage went to so changing cumbum work. plant Steel rod unloading work. and water tank side spray pipe fitting work. 1/3/2019 and water tank vehicle sidemirror fitting work. I went to cumbum plant Steel rod unloading work. 1/4/2019 plant side material conveyor motor damage so check and remove work. and ready for spear motor and fitting work. I went to cumbum plant material conveyor bucket fitting work. 1/5/2019 office room side ethernet cable laying and casing caping fitting work. I went to palayam site vibrator machine not working properly so check and correcting work. 1/6/2019 and generator general checkup at site. and water pump motor general checkup at site. I went to cumbum plant steel rod loading work at plant. and I went to palayam site unloading for 1/7/2019 steel rod at site. and went to Chinnamanur nursery loading for concrete pipe. I went to cumbum plant steel rod loading work. and new compressor received at plant 1/8/2019 support for unloading. and JCB vehicle front bucket loading work for gudalur site. and material conveyor bucket motor fitting work at plant. 1/9/2019 leave 1/10/2019 leave 1/11/2019 leave 1/12/2019 leave 1/13/2019 leave 1/14/2019 pongal leave 1/15/2019 pongal leave 1/16/2019 pongal leave 1/17/2019 pongal leave 1/18/2019 leave 1/19/2019 leave I went to cumbum plant DG general checkup at plant. 1/20/2019 and I went to palayam employee room side no electrical supply so check and correcting work. I went to gudalur site dewatering pump shifting for plant side. and I went to EB office complaint for electrical problems. and I went to palayam site 1/21/2019 DG general checkup at site. and vibrator machine damage so check and take over the plant. and went to cumbum site night work going on so focus light fitting work and generator start at running condition. I went to cumbum plant diesel filling work for 12KVA generator at plant. and focus light fitting work for office room side purpose of tree view. 1/22/2019 and creador blat unloading for store room. and 3phase welding machine input cable laying and termination work purpose of bucket welding work. And today EB shutdown so generator starting and maintain work. I went to cumbum plant EB supply energy meter reading noted. and I went to palayam site 2 focus light remove and take over the plant. 1/23/2019 and I went to gudalur site 3 focus lights are fitting and cable laying work. and I went to palayam old labour set remove the 1 fan and wire shifting the new labour set and fan fitting work. I went to cumbum plant EB supply energy meter reading noted. support for mechanic in vibrator needle service at plant. and support for steel loading at plant. 12.5 KVA generator diesel filling work at plant. and welding machine shifting for plant side 1/24/2019 so input supply remove and shifting work. at the same time plant side welding machine input cable laying and termination work. and I went to gudalur site 3 focus lights are fitting and cable laying work. and the generator position changing work. I went to cumbum plant EB supply energy meter reading noted. welding machine shifting at plant to entrance gate side so welding machine input cable disconnect and reconnect in gate entrance side. and support for welder in tractor vehicle side hammer work. 1/25/2019 and 5 KVA generator loading work for cumbum site purpose of steel rod cutting work. and I went to gudalur site switch box damage so check and ready for switch box. and 3 focus light fitting and cable laying work. I went to cumbum plant EB supply energy meter reading noted. 1/26/2019 DG general checkup at plant. extension cable fitting work for drilling machine in carpenter working area side. I went to cumbum plant EB supply energy meter reading noted. and I went to electrical store for purchasing night work 1/27/2019 work meterial used for gudalur site labour 6:00 pm to set. 12:30 am and I went to gudalur site labour set fan light fitting work and cable laying work. and night duty for maintenance work. I went to cumbum plant EB supply energy meter reading noted. and I went to gudalur site vibrator machine maintenance work, night work 1/28/2019 operating work. 6:00 pm to and generator maintenance work, operating 12:00 am work. and night work 4 focus light fitting work. and night work completed time remove the focus light and handover the labour set. I went to cumbum plant EB supply energy meter reading noted. and EB 3 phase supply side 1phase not 1/29/2019 coming so changing the line in 2 phase side at plant. and generator operating work at plant. and I went to palayam site vibrator using water pump service work. I went to cumbum plant EB supply energy meter reading noted. and ready for separate 3phase line in water 1/30/2019 pump motor at plant. and Chinnamanur site visit for maintenance work. and generator operating work. I went to cumbum plant EB supply energy meter reading noted. 12.5 KVA generator operating work. cable laying and termination work for cutting 1/31/2019 machine at plant to working area. plant side support for meterial bucket fitting work. and I went to gudalur site cable laying and termination work for 4 focus light fitting work.