Balance work for Two laning with paved shoulder of Dindigul – Theni section from Km 2.750 to Km 73.

400 of NH-45 (Extn.) and Theni - Kumili section of NH-220 from Km 215.500 to Km
273.600 in the State of Tamil Nadu under item rate contract
SUMMARY FOR REQUEST FORM OF INSPECTION & APPROVAL
SUBMISSION DATE : 11/25/2019 INSPECTION DATE 11/26/2019

Type of
Sno RFI No Time FROM TO SIDE DESCRIPTION BOQ No Status Engineer Remarks
Structure

STRUCTURE
1 2238 3:00 PM 71+250 BC BHS Construction of Flexible Apron -Upstream Side&Downstream side 5.09 Mr.Shanmugam

2 2239 3:00 PM 71+250 BC BHS Construction of Rigid Apron -Upstream Side&Downstream side 5.10 Mr.Shanmugam

3 2240 9:30 AM 75+168 ROB BHS Checking of Reinforcement and concrete pouring for RE Wall Precasting M35 Grade. 8.16(a) Mr.Shanmugam

4 2241 12:30 PM 76+073 MNB BHS Checking of Reinforcement for Internal Precast IG7 Girder 6.06.C Mr.Shanmugam
Checking of Shuttering and Concrete pouring for Internal Precast IG7 Girder RCC M35
5 2242 12:30 PM 76+073 MNB BHS 6.08 Mr.Shanmugam
Grade

6 2243 9:30 AM 64+452 BC BHS Checking of Reinforcement for B/C A1&A2 Retaing wall Top Lift (U/S & D/S) 5.06 Mr.Shanmugam

Providing & Fixing of Weep holes 100mm dia pipe in B/C A1&A2 Retaing wall Top Lift (U/S
7 2244 9:30 AM 64+452 BC BHS 5.08 Mr.Shanmugam
& D/S)
Checking of Shuttering and Concrete pouring for B/C A1&A2 Retaing wall Top Lift M25
8 2245 9:30 AM 64+452 BC BHS 5.05 Mr.Shanmugam
RCC grade (U/S & D/S)

9 2246 10:30 AM 60+010 BC BHS Checking of Reinforcement for B/C A1&A2 Retaing wall Top Lift (U/S & D/S) 5.06 Mr.Shanmugam
Providing & Fixing of Weep holes 100mm dia pipe in B/C A1&A2 Retaing wall Top Lift (U/S
10 2247 10:30 AM 60+010 BC BHS 5.08 Mr.Shanmugam
& D/S)
Checking of Shuttering and Concrete pouring for B/C A1&A2 Retaing wall Top Lift M25
11 2248 10:30 AM 60+010 BC BHS 5.05 Mr.Shanmugam
RCC grade (U/S & D/S)
12 2249 1:30 PM 238+192 BC BHS Checking of Reinforcement for deck slab 5.06 Mr.Pallavan

13 2250 1:30 PM 238+192 BC BHS Checking of shuttering and M25 concrete work for deck slab 5.05(a) Mr.Pallavan

14 2251 3:20 PM 249+580 BC BHS OGL checking and Excavation for Flexible Apron 5.01 Mr.Prabhakaran

15 2252 3:20 PM 249+580 BC BHS Construction of flexible apron 5.09 Mr.Prabhakaran

16 2253 2:45 PM 246+953 BC BHS Checking of Reinforcement for Culvert wall 5.06 Mr.Prabhakaran

17 2254 2:45 PM 246+953 BC BHS Checking of shuttering and M25 concrete work for Culvert wall 5.05(a) Mr.Prabhakaran

18 2255 4:15 PM 247+356 BC BHS OGL checking and Excavation for Curtain wall 5.01 Mr.Prabhakaran

19 2256 4:15 PM 247+356 BC BHS Checking of shuttering and M15 concrete for Curtain wall PCC 5.04 Mr.Prabhakaran

20 2257 9:00 AM 248+140 BC BHS Checking of Reinforcement for Return wall A1&A2 1st lift 5.06 Mr.Prabhakaran

21 2258 9:00 AM 248+140 BC BHS Providing & Fixing of Weep holes 100mm dia pipe in Return wall A1&A2 1st lift 5.08 Mr.Prabhakaran

22 2259 9:00 AM 248+140 BC BHS Checking of shuttering and M25 concrete work for Return wall A1&A2 1st lift 5.05(a) Mr.Prabhakaran

Page 1 of 7
SUMMARY FOR REQUEST FORM OF INSPECTION & APPROVAL
SUBMISSION DATE : 11/25/2019 INSPECTION DATE 11/26/2019

Type of
Sno RFI No Time FROM TO SIDE DESCRIPTION BOQ No Status Engineer Remarks
Structure

HIGHWAY
1 597 4:15 PM 64+420 64+670 SG BHS Subgrade Top Layer level checking & FDD testing 2.03 Mr.Karmegam

2 598 3:30 PM 60+180 60+320 SG BHS Subgrade Top Layer level checking & FDD testing 2.03 Mr.Karmegam

3 599 10:00 AM 64+180 64+260 EMB BHS Earth filling embankment 6th layer & FDD testing 2.02 Mr.Karmegam

4 600 2:30 PM 64+180 64+260 EMB BHS Earth filling embankment 7th layer & FDD testing 2.02 Mr.Karmegam

6 601 1:10 PM 61+380 61+760 SG BHS Subgrade Top Layer level checking & FDD testing 2.03 Mr.Karmegam

5 602 4:15 PM 61+450 61+610 GSB BHS GSB Laying, Levelling and FDD checking 3.01 Mr.Karmegam

7 603 4:45 PM 64+670 64+870 SG BHS Subgrade Top Layer level checking & FDD testing 2.03 Mr.Karmegam

Page 2 of 7
Balance work for Two laning with paved shoulder of Dindigul – Theni section from Km 2.750 to Km 73.400 of NH-45 (Extn.) and Theni - Kumili section of NH-220 from Km 215.500 to Km 273.600 in the State of Tamil Nadu under
item rate contract

SUMMARY FOR REQUEST FORM OF INSPECTION & APPROVAL


SUBMISSION DATE : 09.03.2020 INSPECTION DATE 10.03.2020

Sno RFI No Time FROM TO Type of Structure SIDE DESCRIPTION BOQ No Status Engineer Remarks

STRUCTURE

1 6071 9.00AM 57+489 MNB BHS Checking of Reinforcement for MNB Abutment A2 side Wall 4th Lift 6.06.C Mr.Shanmugam

Checking of Shuttering and Concrete pouring for MNB Abutment A2 side wall 4th Lift
2 6072 9.00AM 57+489 MNB BHS 6.08 Mr.Shanmugam
RCC M35 Grade
Checking of Shuttering and Concrete pouring for Curtain wall U/S&D/S 1st Lift M15 PCC
3 6073 9.30AM 76+699 BC BHS 5.04 Mr.Shanmugam
grade

4 6074 9.30AM 75+168 ROB BHS Checking of Reinforcement and concrete pouring for RE Panel Precasting M35 Grade. 8.16(a) Mr.Shanmugam

5 6075 10.00AM 229+031 BC BHS Checking of shuttering,weep holes and M25 concrete work for Return wall A1 &A2 1st lift 5.05(a) & 5.08 Mr.Elamurugan

6 6076 10.00AM 230+651 BC BHS Earth Work Excavation for Rigid Apron 5.01 Mr.Elamurugan

7 6077 10.00AM 230+651 BC BHS PCC laying M15 grade for Rigid Apron 5.04 Mr.Elamurugan

Page 3 of 7
Balance work for Two laning with paved shoulder of Dindigul – Theni section from Km 2.750 to Km 73.400 of NH-45 (Extn.) and Theni - Kumili section of NH-220 from Km 215.500 to Km 273.600 in the State of
Tamil Nadu under item rate contract

SUMMARY FOR REQUEST FORM OF INSPECTION & APPROVAL


SUBMISSION DATE : 09.03.2020 INSPECTION DATE 10.03.2020

Sno RFI No Time FROM TO SIDE DESCRIPTION BOQ No Status Engineer Remarks

HIGHWAY

1 1711 9.00AM 38+100 41+000 BHS Construction of Earthern Shoulder &FDT Test 2.03 Mr.Ramamoorthy

2 1712 3.00 PM 38+100 41+000 BHS Construction of Unlined Drain 12.05 Mr.Ramamoorthy

Providing and applying tack coat with bitumen emulsion (RS1) at the rate of 0.20
3 1713 12.00PM 260+000 263+200 LHS 4.02,4.04 Mr.Srinivasan
kg per sqm & laying Bitumious Concrete

Page 4 of 7
Balance work for Two laning with paved shoulder of Dindigul – Theni section from Km 2.750 to Km 73.400 of NH-45 (Extn.) and Theni - Kumili section of NH-220 from Km 215.500 to Km 273.600 in the
State of Tamil Nadu under item rate contract

SUMMARY FOR REQUEST FORM OF INSPECTION & APPROVAL


SUBMISSION DATE : 09.03.2020 INSPECTION DATE 10.03.2020

Sno RFI No Time FROM TO SIDE DESCRIPTION BOQ No Status Engineer Remarks

SURVEY

1 120 9.00AM 75+165 BHS RE Panel A2 side OGL & Layout marking Mr.Murugan

Page 5 of 7
Balance work for Two laning with paved shoulder of Dindigul – Theni section from Km 2.750 to Km 73.400 of NH-45 (Extn.) and Theni - Kumili section of NH-220 from Km 215.500 to Km 273.600 in
the State of Tamil Nadu under item rate contract

SUMMARY FOR REQUEST FORM OF INSPECTION & APPROVAL


SUBMISSION DATE : 09.03.2020 INSPECTION DATE 10.03.2020

Sno RFI No Time FROM TO SIDE DESCRIPTION BOQ No Status Engineer Remarks

QA/QC
1 74 9.00AM 16+010 19+000 BHS Checking for Surface regularity BC 4.02 Mr.Rajababu
2 75 3.00PM 16+010 19+000 BHS Core Cutting & Testing BC 4.04 Mr.Rajababu

Page 6 of 7
Balance work for Two laning with paved shoulder of Dindigul – Theni section from Km 2.750 to Km 73.400 of NH-45 (Extn.) and Theni - Kumili section of NH-220 from Km 215.500 to
Km 273.600 in the State of Tamil Nadu under item rate contract

SUMMARY FOR REQUEST FORM OF INSPECTION & APPROVAL


SUBMISSION DATE : 09.03.2020 INSPECTION DATE 10.03.2020

BOQ
Sno RFI No Time FROM TO SIDE DESCRIPTION Status Engineer Remarks
No
QC
1 55 249+500 RHS Sampling for Barrow area no 2F- Lead 6.00Km Mr.Rajababu

Page 7 of 7