You are on page 1of 24

Banyu Urip

from Indonesia, for Indonesia


ExxonMobil in Indonesia
ExxonMobil is the world’s largest publicly-traded integrated
petroleum and natural gas company. Our company and its
affiliates are present on a global scale.

We have been in Indonesia for more than 115 In 2005, the Cepu Block Production Sharing
years. Since 1968, ExxonMobil operates the Contract (PSC) was signed. A Joint Operating
Arun field in Aceh Province as a Production Agreement (JOA) was entered into by the
Sharing Contract (PSC) Contractor of the contractor parties. Mobil Cepu Ltd., an
Government of Indonesia. At its peak, the ExxonMobil subsidiary, serves as the operator
Arun field produced about 3.4 billion cubic of the Cepu Block PSC on behalf of the
feet of gas per day and about 130,000 barrels Contractors.
of condensate per day.

Learn more about ExxonMobil


at www.exxonmobil.co.id

Exxon Mobil Corporation has numerous affiliates in Indonesia, e.g. ExxonMobil Oil Indonesia
Inc. and Mobil Cepu Ltd., many with names that include ExxonMobil, Exxon, Esso and Mobil. For
convenience and simplicity in this publication, those terms and the terms corporation, company,
our, we and its are sometimes used as abbreviated references to specific affiliates or affiliate
groups. Similarly, ExxonMobil has business relationship with thousands of customers, suppliers,
governments and others. For convenience and simplicity, words like venture, joint venture,
partnership, co-venturer and partner are used to indicate business relationships involving common
activities and interests, and those words may or may not indicate precise legal relationships.
Cepu Block

SU
KALIMANTAN

M
AT
RA
SULAWESI

PAPUA

Cepu Block

JAVA
Lengo Jati
INDONESIA
Cepu Block

EAST JAVA

CENTRAL JAVA EAST JAVA

BANYU URIP
Lengo Urip PROJECT

W E

S
Kedung Keris Sukowati

Banyu Urip

Cendana Nampak

Alas Tua West


Alas Tua East
Cepu PSC

3D seismic survey

DISCOVERIES
Oil & Gas
Jambaran Tiung Biru
r
ve

Oil
Ri
lo
So

Gas kilometers

0 5 100

The Cepu Block Production Sharing Contract government enterprises. The Cepu PSC will
(PSC) was signed on 17 September 2005 continue until 2035.
and covers the Cepu Contract Area in Central
and East Java. ExxonMobil affiliates [Mobil A Joint Operating Agreement (JOA) was
Cepu Ltd. (MCL) and Ampolex (Cepu) Pte. entered into by the contractor parties. MCL
Ltd.], PT Pertamina EP Cepu [an affiliate serves as the operator of the Cepu KKS on
of PT Pertamina (Persero)] and four local behalf of the Contractors.
government companies: PT Sarana Patra
Hulu Cepu (Central Java Province), PT Asri Apart from Banyu Urip, there are other fields
Dharma Sejahtera (Bojonegoro Regency), PT in the Cepu Block. They are Alas Tua East,
Blora Patragas Hulu (Blora Regency) and PT Alas Tua West and Kedung Keris fields; and
Petrogas Jatim Utama Cendana (East Java Cendana and Jambaran fields.
Province) together comprise the contractors
under the Cepu PSC. Through increased economic output, job
creations and community development
ExxonMobil affiliates and PT Pertamina EP programs, Cepu Block project development
Cepu equally hold 45 percent of the total and production will have multiplier effects on
participating interest in the Cepu Block, other industries and local communities.
while the remaining is held by the four local

02
Foreword
The Banyu Urip project is a joint
effort to meet Indonesia’s growing
energy needs—an effort that will
benefit Indonesia’s economy and
transfer technology and industrial
values to the country.

Development of the Banyu Urip


field demonstrates how Indonesia The Banyu Urip project is truly
possesses high potential, not only a partnership. Throughout the
from her natural resources, but also her people. construction phase, we have
been working hand-in-hand
However, this project is about more than developing the with many stakeholders, from
Banyu Urip field. This project is helping to develop the the Government of Indonesia, PT
people of Indonesia, and create long-term benefits for Pertamina EP Cepu and the Cepu
Indonesian people. Block Cooperation Body, to our
neighbors adjacent to the project.
We are focusing our efforts on skills and knowledge Together, we contribute to the success of our project.
development by training and hiring nationals, including
our neighbors from around the project. We are We have worked with thousands of talented Indonesians
developing both national and local suppliers. Together who have dedicated their efforts for the success of this
with the community, we support programs which will project. They have shown their willingness to learn and
enhance the quality of life where we all live and work. to contribute their skills, knowledge and experience to
the project.
During project execution, we maintain focus on
our core-values in safety, integrity, community The project is being built by five Indonesia-led
empowerment and environmental protection. These consortium companies. Together, we gain precious
values are the foundation which guides us in decision- experience which will be useful for projects in the future.
making and work execution. The consortium companies have distributed work to
other national and local companies, creating a multiplier
I am proud of our contribution to Indonesia. Today, we effect for local suppliers.
celebrate our efforts in building a prosperous Indonesia.
What has been most exciting for me is when I see first-
hand how the project contributes to the community’s
Jon M. Gibbs quality of life—our neighbors now have access to a
better education in classrooms that are better suited
President and General Manager
to educate students. Women are entrusted with micro
ExxonMobil Indonesia
loans. Clean water runs to local homes. These examples
and many more have made me proud of what our
partnership has achieved.

I am honored to be part of building a strong foundation


for the future of Indonesia.

Daniel L. Wieczynski
Senior Vice President and General Manager
Mobil Cepu Ltd.

03
Foreword
Banyu Urip project in Cepu Block
is a large Indonesia’s oil and gas
development project. With peak
production of 165,000 barrel of
oil per day, this project has been
long waited to support national oil
production.

During the project, PT Pertamina


EP Cepu has been partnering with
ExxonMobil through its subsidiary, Mobil Cepu Ltd. and
Cepu Block Cooperation Body with strong work ethics, To participate in the Cepu Block
planning, cost, procurement, operations, quality control Cooperation Contract has made us
and safety. more appreciative that oil and gas
project is heavy on technology and
During the project execution, our experts from PT capital. The fact that the project is
Pertamina EP Cepu are involved and collaborate with onshore in a densely-populated
the experts from Mobil Cepu Ltd. in every aspect, from area has added the challenges even
EPC-1 to EPC-5, Drilling, Subsurface and its supporting more.
works. PT Pertamina EP Cepu is also involved in
supporting Mobil Cepu Ltd. on land settlement, social But we are aware; the cooperation
aspect, security, permits as well as regulation and policy. contract­—the first which incorporate the local
The collaboration in every aspect in project execution government enterprises—will benefit local people.
has facilitated a good knowledge sharing between us. Because, local governments were given the opportunity
to invest and give inputs to the project. Local people
The project has also enabled the EPC contractors to can also reap the benefits, in addition to the return from
execute a big scale project with international standards. central government.
The experience can be a benchmark which can be
applied to other similar projects in Indonesia. On the other hand, I see how our community adjacent
to the project benefit from the project.
I am proud that PT Pertamina EP Cepu is actively
involved in this project preparation and development. I But most importantly, apart from physical development;
hope the project can support Indonesia’s energy needs. community’s skills and knowledge are also being
developed.

Amril T. Mandailing Teachers, midwives, farmers and the community


President Director are trained and have better knowledge. It is us who
PT Pertamina EP Cepu repair the road; but it is our knowledge that repairs
us. Simultaneously while the project is being built, the
community has become empowered.

I do hope that the project can be a good example to the


other project in Indonesia.

Hadi Ismoyo
Chairman
Cepu Block Cooperation Body

04
Project overview
The Banyu Urip project is the first development under the Cepu Block
Contract Area and involves the development of the Banyu Urip oil field.
The Banyu Urip field discovery was announced in April 2001 and is
estimated to contain approximately 450 million barrels of oil. At planned
peak production, Banyu Urip is expected to produce as much as 165,000
barrels of oil per day.

05
First oil production from the Banyu Urip field and Offloading (FSO) Facility as well as the
initially commenced in December 2008. In supporting facilities. The CPF, situated about
August 2009, the Early Production Facility (EPF) 10 km southeast of Cepu and 20 km southwest
was established with a production capacity of of Bojonegoro in the center of the oil field, will
20,000 barrel of oil per day. Recent expansions process and treat the crude oil produced.
to the EPF have now increased production to
nearly 30,000 barrels of oil per day. The treated oil will be transported through a
new 20 inch pipeline to the coast of Tuban and
Full Field Development consists of Central thereafter through a subsea pipeline to the FSO
Processing Facilities (CPF), onshore and facility, located 23 km from Tuban coastline.
offshore pipelines and Floating Storage

06
Personal Protective Equipments are always used at project locations.

07
Health and safety

Safety is more than just a priority at the Banyu Urip project—it is a


core value and business driver, one that shapes decision-making at
every level. With a workforce drawn together from diverse cultures,
backgrounds and experience, the Project provides programs and
services to help our workforce perform in a safe and healthy manner.

The programs identify, assess and mitigate


the risks associated with our operations. Over
We equip workers with the knowledge and
tools to execute their work activities safely
and strive to prevent all accidents, injuries
and occupational illnesses through active
thousand
participation of all employees. Job Safety Analysis
We implemented ExxonMobil's Operations conducted
Integrity Management System (OIMS),
which guides the activities of each of
our employees as well as our third-party
contractors. It is embedded in our everyday
work processes at all levels, and we strive for Over
continuous improvement.

The Project’s safety philosophy is an ongoing


commitment to create a work environment times,
where “Nobody Gets Hurt.”
employees and
contractor workers
Achieved more than trained on safety

million work- “When a friend of mine acted


hours with a world- carelessly, our supervisor immediately
reminded us. Initially, it annoyed
class safety results us; but then I realized that if we
keep on acting like that, we will get
injured—or worse, ‘go home with just
a name’.”

—Ahmad, local contractor

08
A glimpse of
EPC-1, EPC-5 and Drilling

The Central Processing Facilities


which being built by EPC-1
contractor can process and drill rigs, the first
produce 165.000 barrel of crude built in Indonesia are
oil per day from 3 well pads.
utilized in the drilling
48 wells will be drilled from the well pads program
utilizing the first two drilling rigs build in
Indonesia: Discoverer 8 and Discoverer 9. The
rigs have drilled more than 38 kilometers—
about the distance from Bojonegoro to
Cepu—with the drilled hole sizes from 60 to 15
centimeters.
Drilled more than
Supporting facilities built by the EPC-5
contractor consist of 29 buildings, a fly-over kilometers, about
crossing the Bojonegoro-Cepu main road and
railroad and the water injection basin. The the distance from
basin will take its water from Bengawan Solo
in the rainy season. Bojonegoro to Cepu

barrels
of oil per day will be
produced from
wells
drilled from
well pads

09
Central Processing Facility (CPF)

The fly-over crosses the Bojonegoro-Cepu


road and the rail road.

The first Indonesian-built drilling rigs are used


on the project's drilling campaign.

10
A glimpse of
EPC-2, EPC-3 and EPC-4

The crude oil processed in the


Central Processing Facility will
flow to Palang coast, Tuban. Total
EPC-2 contractor built the kilometers
72-kilometer onshore pipeline. of pipeline which will
Four large valve stations are
placed along the 20-inch diameter deliver the crude oil from
and insulated pipeline. the central processing
From Palang coast, Tuban, the pipe is facility in Bojonegoro to
connected to another 23 kilometer offshore
pipeline that leads to the mooring tower. The
Tuban offshore
mooring tower’s 1,200 ton support structure
will be anchored into the seabed in 33 meters
of water. It has a large swiveling assembly
that includes a yoke which permits a moored
Floating Storage and Offloading vessel to The Floating Storage and
swivel or "weathervane" with shifting winds,
waves, and currents without disrupting the Offloading facility is the
flow of oil coming from the pipeline.
size of
The Floating Storage and Offloading (FSO)
vessel will be moored to the mooring tower.
soccer fields and
The vessel can be filled with 1.7 million barrels weighing the equivalent of
of crude oil from the Central Processing
Facility through the pipeline. The vessel is
about the size of 3 soccer fields and weighing
the equivalent of 60,000 elephants. elephants

11
The Floating Storage and Offloading (FSO) vessel.

The onshore 72-kilometers pipeline.


The pipeline will be planted underground.

The valve station near Palang coast, Tuban.

12
Local contractors are given the
Approaching Others safety skills training.

13
Employment and training
At its peak employment, the Banyu Urip project employed more than 9,000
Indonesian workers. Almost 60 percent of that number is local workers,
especially from Bojonegoro and Tuban regions. Despite the challenge
of finding skilled workers from the regions, we were able to maximize
construction phase employment opportunities for those regions.

One of the ways to address the challenge was


to equip selected youths from our neighboring
Over
villages to be trained and become skilled
workers. More than 1,000 youths adjacent to
our project, especially from Bojonegoro and million training
Tuban, were equipped with skills in welding,
plumbing, carpentry, forklift operation and hours provided to
electrical installation.
nationals through
To fully-operate the project in production
phase, more than 100 operations and
more than
maintenance technicians have been trained,
establishing the future workforce for the
project. Some of them have undergone on- courses
the-job training in our Aceh operations as
well as our operations in Angola, Cameroon,
Malaysia, Nigeria and the United States before
returning to join their fellow graduates and to
support the project.
More than
At its peak thousand
construction phase, attendance of national
more than employees and
contractors in the
trainings
national workers
are employed with
almost “Coming from Begadon village,
% Bojonegoro—I’m lucky to learn from
the best mentor; from North Aceh to
coming from the US.”

Bojonegoro and —Erik Setiawan, trainee


Tuban regions

14
Supplier development
The challenge for the Project is to ensure that the employment and
procurement opportunities generated by our project can help improve local
economy.
The development of reliable and competitive
supply chain can contribute to overall At its peak construction
efficiency of our project and operations. The
industries with the best opportunities are
phase, more than
those with low entry barrier and start-up costs,
such as small construction, transportation and
catering. national
The project strives to optimize the use of companies supported the
domestic content within the project. That
is why our Engineering, Procurement and project as subcontractors
Construction (EPC) contractors consist of five
Indonesian-led consortium companies. At its to
peak construction level, there were more than
450 national companies who supported the
Indonesian-led
consortiums as subcontractors. More than
85 percent of those national subcontractors
EPC consortiums
originate from neighboring area, especially
from Bojonegoro and Tuban.

We have worked side-by-side with them,


assisting them to enhance their engineering
services, their procurement services, and their
More than
quality control services to help them be able to
handle a project of this magnitude, and more
importantly to work on future projects within local companies
the country to deliver them more efficiently.
and cooperatives from
More than 150 local companies and
cooperatives from Bojonegoro have attended
Bojonegoro attended
the Procurement Process Familiarization
training. The training objective is to
the Procurement Process
inform local businesses about the project
procurement standards and how to get
Familiarization training.
involved in bidding process.

“I’m grateful for the project initiative


to conduct this workshop. We, local
companies, have gained knowledge
to comply with the project standard of certificates and
procedure in providing services.”
standards need to be
—Gunawan, Chairman of Koperasi Lima
Dua Kaliglonggong – Temlokorejo.
complied with to perform
the project work

15
As part of our supplier development
initiative, local suppliers from
Bojonegoro regions participate in the
Procurement Familiarization Training.

16
Improving our
neighbors' health

One of our focuses to improve the quality of life of our neighbors is


health. Health is a basic human need. We facilitate local health providers
to be able to increase their health service.
Fact and figure
More than 100 midwives have been trained
on how to be a safe birth assistant. They
More than
also have the knowledge about mother and
infant nutrients. With the support from local
government, the program will take part in
decreasing the number of mother-infants
mortality index. community members
In 2008, the project initiated a water and benefited from the
sanitation program that has benefited
more than 25,000 community members water and sanitation
in 18 villages in Bojonegoro, Tuban and
Blora regencies. Apart from the facilities
program
maintenance, water fee net-margins were
contributed back to villages.

“Thanks to the program, we are no


longer having clean water shortage.
More than Also, we’d like to thank Ibu Surisah who
midwives have been gave her land for the water installation.”

trained on how to be —Warjoyo, Ngimbang village, Tuban

a safe birth assistant

17
Running clean water in our neighbor's house.
More than 25,000 community members have
benefited from the water and sanitation program.

18
Growing our
neighbors' economy

Another focus is to develop the economy of our neighbors. We


understand that health is the basis, while economy is for daily livelihood
and education is for the future of our neighbors.

The project initiated a microfinance program


for women. Many researches said that when More than
we invest in women, we invest in society—
women will invest their income back to their
children’s health and education. Rp
Fact and figure billion in

Since 2008, the project has invested more than revolving fund have
Rp 4.5 billion to microfinance program. To
date, more than 10,000 women have received been provided
up to Rp 16 billion in loans and have deposited
more than Rp 1.3 billion in funds; with an
average performing loan ratio of almost 100
percent.
Almost %
of loans are fully-paid
More than back as per program
terms

women have benefited “For me, every profit I made is a


from the microfinance blessing. I used a portion of it to add
my capital for the stall. I can help my
program husband.”

—Parmi, Dander village, Bojonegoro

19
Weekly-meetings (minggon) are held where women
groups can pay back their loans as per program terms,
learn organizational skills and share their experiences.

20
Schoolchildren adjacent to our project now enjoy
better equipped classrooms, with an improved
teaching methods from qualified, trained teachers.

21
Developing education

We believe that students are Indonesia’s most promising resource and


the key to Indonesia’s future. Our goal is to give them the opportunity
they need to become tomorrow’s leaders.

Our endeavors in education initiatives revolve


around how we can enhance the learning More than
process. We have been targeting teachers and
school management to make learning a fun,
joyful and active endeavor. students
Almost 3,000 teachers in Bojonegoro, Blora have benefited from
and Tuban have benefited from our education
programs. These teachers are from pre- the enhanced learning
schools to elementary and high schools.
process
More than 33,000 students have been
reached by our programs. They also have
better schools now—equipped with better
classrooms, toilets with sanitation, labs and More than
libraries. More than 90 schools have been
refurbished.

These students are the seeds we need schools have


to nurture in order for them to become
Indonesia’s future leaders. been refurbished

Almost
“I want to be a governor someday. I

teachers dream of a better Bojonegoro where


children can have a decent education. I
have been trained to would like to be of service to others.”

enhance the students —Siti Nur Azizah, Pungpungan village,


Bojonegoro
learning process

22
ExxonMobil Indonesia
Wisma GKBI
Jalan Jenderal Sudirman No. 28
Jakarta 10210, Indonesia
62 21 574 0707 Telephone
62 21 574 0606 Facsimile
exxonmobil.co.id
@ExxonMobil_ID

You might also like