Professional Documents
Culture Documents
Tolitoli Bitung
Ternate Buli Cape
Gorontalo
Labuo
0°
0°
Gebe Island
Pantoloan Manokwari
Sorong
Kasim Marine Terminal Biak
Tubang Misool Marine Terminal Salawati
Bintuni
Jayapura
Malili
Belang-Belang
Bula
Palopo Waisarisa Fak-Fak
Kendari
Wamsesi
Ambon
INDONESIA
Pare-Pare
Pomalaa
Biringkasi
5° S
5° S
Amamapare
Makassar
Bima
Merauke
10° S
10° S
EAST
120°
© Shipping Guides E Reigate, United Kingdom
Ltd, 125° E 130° E 135° E 140° E
Country Plan
Sabang
Malahayati
Lhokseumawe Langsa Venture
Lhoknga Anoa Marine Terminal
BRUNEI DARUSSALAM
5° N
5° N
Pontianak
INDONESIA Santan Terminal
Samarinda
Kuala Enok Telok Ayer
Teluk Bayur Senipah Terminal
Teluk Bungus Balikpapan
Lawi Lawi
Jambi Muntok Tanah Merah
Pangkal Balam
Sampit
Ramba
Tanjung Pandan
Plaju Tanjung Pemancingan
Palembang
Banjarmasin
INDONESIA Bengkulu
Sebuku
Mekar Putih
WEST Jorong Anchorage
Widuri Terminal
5° S
5° S
95° E
© Shipping Guides Ltd, Reigate, United Kingdom 100° E 105° E 110° E 115° E
AMAMAPARE
Note X
A buoy reported to be in position 4° 55’ 17” S. 136° 42’ 59” E.
but found by observation to be 239°(T) by 4.82 n.m. from Tg. Aika Lt.
structure making its position 04° 54.9’ S, 136° 40’.6 E.
30 ft.
No. 6
22 ft.
22 ft.
T) No. 7
9’(
20 ft.
0°2
30 ft. 05
20 ft. 20 ft.
A 22 ft.
No. 2
No. 4
090°(T)
© Shipping Guides Ltd., Reigate, United Kingdom "Plan Supplied by Ship's Master"
Approach Channel (1)
AMAMAPARE INDONESIA
No. 10
Range A
Unlit 26/1/95
)
(T
5°
03
Y Y
No. 8
30 ft. Dries
No. 9
No. 6
22 ft. Dries
) 22 ft.
’(T
29
6°
05
AMAMAPARE
20 ft.
APPROACH CHANNEL (2)
No. 7
20 ft.
20 ft.
No. 4
0 1
No. 5
nautical mile
X
© Shipping Guides Ltd., Reigate, United Kingdom "Plan Supplied by Ship's Master"
Approach Channel (2)
P908
AMAMAPARE INDONESIA
Range B
30 ft.
Native Village
Explosives 30 ft.
Port
Anchorage Site
No. 14 Fixed Red
30 ft.
) No. 15 101° 38 No. 12 )
’ (T ’(T) 072°(T
09 Quarantine R
2° 087° 50’(T)
Anchorage
05
Native Village
)
30’(T
013°
30 ft.
AMAMAPARE
APPROACH CHANNEL (3)
General
Anchorage
No. 10
0 1
Y Range A Y nautical mile
© Shipping Guides Ltd., Reigate, United Kingdom "Plan Supplied by Ship's Master"
Approach Channel (3)
AMAMAPARE INDONESIA
AMAMAPARE
AMAMAPARE WHARF
5 Shackles
0 100
metres
© Shipping Guides Ltd., Reigate, United Kingdom "Plan Supplied by Ship's Master"
Amamapare Wharf
P909
AMBON INDONESIA
AMBON
Depths in metres
15 15
10
5 10
3
Transit 5
Shed 3
Passenger Transit
Terminal Shed
1
Open
Transit
Storage
Shed Open
Transit
Shed Transit Storage
Shed
Port
Office
0 100
metres
Layout
ES
AL
O
S
D
IA
IN
IA
YS
ES
Kepitang Oilfield
LA
ON
MA
IND
Obstructions
NATUNA SEA 51° 16’ N 51° 16’ N
Platform
Matak Island
2° 30’N
77.4m
so.f.cy.
SINGAPORE
Bintan Island
INDONESIA
51° 12’ N 51° 12’ N
0 50 100 150 200 250
repositioned at Stern
Support Vessel
Mooring Master onboard Tanker
Export Tanker
Support Vessel
dy
MOORING PROCEDURE
rea
ine
rL ge
sen
Diagram 1
Diagram 2
s
Me
Floating Hose
FPSO
Tied Off
Mooring Procedure
ANYER INDONESIA
106°E
JAVA
SUMATRA SEA
Terumbu Gosal
P. Tempurung
P. Merak Merak
P. Sangiang
SUNDA
STRAITS
Cilegon
6°S 6°S
P. Ular Cigading
To Jakarta
Safe Anchorage Ciwandan
two nautical miles
SW from P.Ular
ANYER Anyer
Anyer Kidul
JAVA
Location
P911
ANYER INDONESIA
ANYER
CHANDRA ASRI PETROCHEMICAL CENTRE
BERTHS
BERTH B BERTH A
BERTH C A
Draft: 7m B
Depth: 8.3m; Height of Jetty (above mean sea level) 2.4m.
Capacity: 10,000 tonnes
Products Handled: Pygas, Hexene-1, N-Hexane, Butane-1, Isobutane,
LPG, Diesel Oil, Wash Oil, LP Ethylene, MFO, Raw C4
Berths
ANYER INDONESIA
ANYER
CHANDRA ASRI PETROCHEMICAL CENTRE
BERTH A
3 to 4 shackles
To LPG Berth
Jetty B
© Shipping Guides Ltd, Reigate, United Kingdom "Plan supplied by Ship's Master"
Jetty A
P912
ANYER INDONESIA
300m
60,000 dwt
10,000 dwt
50m
0m
11
Jetty A
20m
BD 4 BD 3 BD 2 BD 1
Loading Platform
d wt
00
3,0
t
dw
00 MD 4 MD 3
1,0 BD 5
MD 2 MD 1
Jetty B 50m
45m
BD 6
m
71.8m
33
125m
Causeway
MD 5
ANYER
CHANDRA ASRI PETROCHEMICAL CENTRE
JETTY A AND B
Jetty A and B
ANYER INDONESIA
ANYER
CHANDRA ASRI PETROCHEMICAL CENTRE
JETTY C
70m (approx.)
M4 Operations Stage M5
Substation
198.5m
Jetty C
P913
ANYER INDONESIA
ANYER
PT. ASAHIMAS CHEMICAL Co.
BERTHS No. 1 AND No. 2
25
228°/048°(T) .8m
10
Berth No. 1 m
25
m
MD3
10
22.2m
Conveyor m
25
MD1 MD2 MD4 8°/
MD5 07 30
Be 8°( m
rth T)
No
.2
135m 10m 40m
40m 10m
MD6
MD7
0 100
metres
© Shipping Guides Ltd, Reigate, United Kingdom
ARDJUNA INDONESIA
107° 20’ E LTA Tripod 107° 40’ E
Gas Line
MX B Tripod
MX A Tripod MY 1
Platform LA
LLA Tripod 2
MQ 1 Platform LB
MZ 1
MQ 2 MM Junction Caisson
Gas Line
Flare Caisson
LTC Tripod
6° 00’ S
Ga
Coordinates
sL
ine
Restricted Area:
(A) Platforms 1.0 Nautical Mile Radius
(B) S.B.M.’s 1.75 Nautical Mile Radius
(C) Submarine Pipeline 1.0 Nautical Mile Radius
Designated Area:
2
For all Installations 500 Metres Radius
ARDJUNA
Restricted Area (No Anchoring in this Area) (1)
West Layout
P914
ARDJUNA INDONESIA
Recommended Anchorage Area
A 5° 52’ 36“ S. 107° 41’ 36” E.
C
B 5° 50’ 57“ S. 107° 40’ 57” E.
C 5° 50’ 06“ S. 107° 42’ 40” E.
B D 5° 51’ 24“ S. 107° 43’ 19.5” E.
D
SBM 3
1 A SBM 6 Junction/Quarter Platform
SBM 5 & Gas Facilities
SBM 4 SBM 2
Platform BG
Platform BC SBM 1
12 in. Pipeline - 12 Nautical Miles Platform EA
Platform EC ED Tripod
Platform BF
BH Tripod
Platform EB
Platform BA EE Tripod
Platform BE Platform BB
Platform BD
6 in. Pipeline - 6.5 Nautical Miles
10 in. Pipeline
16
8 Nautical Miles
in.
FNA Tripod
6° 00’ S
Pip
elin
FN
e-
ESA Tripod
13
Platform KA
Na
KC Tripod
utic
Platform KB
s
al M
Mile
iles
Platform UA
tical
2.3
Nau
Na
uti FA Tripod
- 20
FB Tripod FC Tripod
ca
Platform UB
lM
line
ile
Pipe
iles
FD Tripod
Nauti ipeline
FE Tripod
cal M
Gas
P
1
6 in.
Tail
16 in
. Pipe
line 2
.
0 Nau
12/1
32 in
tical M
5.25
iles
ARDJUNA FFA Tripod
(2)
Also see Plan (1)
107° 40’ E
© Shipping Guides Ltd., Reigate, United Kingdom 108° 00’ E
East Layout
ARDJUNA INDONESIA
ARDJUNA
GAS TANKER
1 Forward Spring
2 Breast Lines
S.B.M.
"ARDJUNA SAKTI"
Note: The 3 head lines must be rope (Nylon or Polyprop without Wire Combination)
Note: 3 Rope Head Lines and 3 Stern Lines to be sent after the Ship is in position.
P916
ARDJUNA B Workboat
Approach Line W
Pulling Hoses SBM SBM
PREPARATIONS ON FORECASTLE
ARDJUNA
ARDJUNA
Floating
Loading Hoses
Approach Line
3 4
SBM
Preparations
Windlass
Mooring Procedure
Export Tanker
heaving up
terminal mooring
lines until chains
pass halfway inboard
through Fair Leads
Final Securing
of an Export
Tanker to the
SBM
Export Tanker
BALIKPAPAN
Depths in metres
4
6
8
2
10
4
12
Semayang Pier
6 14
10
12
14
50
Scale in metres
Layout
BALONGAN INDONESIA
N
SBM No. 1
06°17’17.8”S
108°27’47.2”E
SBM No. 2
06°17’05”S
108°23’26”E
CBM
06°18’00”S
108°25’26.8”E
)
°(T
6.6
23
Harbour
BALONGAN
0 1 2 3 n.m.
Layout
P917
N
P918
Kolam
BALONGAN
BATU AMPAR
© Shipping Guides Ltd, Reigate, United Kingdom
BATU AMPAR
Warehouse Warehouse
Layout
Harbour
LPG Jetty
Timsco Timsco
BALONGAN
100m
N
Container
Terminal
IKD
Wharf
Citra Wharf
Mooring Buoys
Belawan Lama
Pertamina Tank Farm
BELAWAN
r
ve
Ri
li
De
0 1,000
metres
Layout
KALIMANTAN
Natuna
Ikan Pari Field
Udang
Field
Matak
Base
BELIDA
SUMATRA
Location
P919
BELIDA MARINE TERMINAL INDONESIA
MALAYSIA INDONESIA
Ikan Pari
CONOCO
Kerisi
BELIDA CONOCO
94 n.m.
Sembilang
Udang
43 n.m.
BELIDA MARINE TERMINAL
112 n.m.
OIL FIELDS
725 n.m.
217 n.m.
Matak
Singapore
© Shipping Guides Ltd, Reigate, United Kingdom Jakarta
Oil Fields
INSTALLATION COORDINATES
AA. Drilling/Production Platform. (DPPA) Radius 350m JJ
Layout
P920
BELIDA MARINE TERMINAL INDONESIA
MPV
Mooring Master
Onboard Tanker
EXPORT TANKER
Turret FSO
Moorings
BENGKULU INDONESIA
N
Banda
Aceh INDIAN OCEAN
Le
Kuala
ad
Lumpur
ing
Medan
Lin
e1
Singapore
45
°3
0’(
T)
0°
Padang
Benkulu
100°E
Pertamina Terminal
Local
3m
Domestic
7m
10m
Ocean Going Wharf
BENGKULU
PULAU BAAI
0 0.25 0.5 n.m.
Pulau Baai
P921
BENOA INDONESIA
N
BENOA
205m
Pertamina wharves
BIAK INDONESIA
BIAK
Pertamina Jetty
Penumpang
Terminal
142m
Reef
Layout
P922
BIMA MARINE TERMINAL
Work boat
SBM SBM
line
© Shipping Guides Ltd, Reigate, United Kingdom
Floating loading
Des
hoses
igna
Port line
BIMA MARINE TERMINAL
BIMA MARINE TERMINAL
Port mooring
ted A
45.71m
rea
Restricted Area
Support buoys to ship’s messenger
PE
PD
BIMA MARINE TERMINAL
PB
Anti-chafe chain
PA
Mooring launch De
Approach line
sig
na
ted
Ar
ea
Export tanker
Mooring launch
Process Platform (PCP)
Fig. 1 Fig. 2
Location
Moorings
Both lines connected and ship SBM
heaving up terminal moorings
A
in fairleads.
Storage Tanker SBM (No. 7)
Export SBM (No. 8)
Export SBM (No. 9)
Chafe chains
D
Anchorage
B
A
D
C
0
C
05°44’20”S
05°42’50”S
05°41’30”S
05°43’00”S
De
rr ick
miles
Export tanker
Hoses
107°07’28”E
107°08’37”E
107°07’10”E
107°06’00”E
Work boat
1
Fig. 3 Fig. 4
© Shipping Guides Ltd, Reigate, United Kingdom
INDONESIA
INDONESIA
P923
BIMA MARINE TERMINAL INDONESIA
Bow Tie Up
BITUNG INDONESIA
l
Coasta
irs
Repa
Bulk
Con
Ferry
tain
er
Pertamina
BITUNG
0 150 300 450m
PULAU LEMBEH
Layout
P924
BITUNG INDONESIA
N
Cement
f
har
lW
sta
Coa
A sphalt
il Facility
Palm O
Wharf 7
ier
er P
tain
Con
r
Wharf 6 Nusantara Pie
Conta
iner Y Wharf 5
ard A
Transit Shed D
Tran
BITUNG
s it Sh
ed C
C1 C2 Wharf 4
(Chemical)
HARBOUR
Passenger Container
Terminal Yard
0 50 100 150m
Wharf
1
Wharf 2 Wharf 3
Samudera Pie
r
Lambeh Strait
Harbour
BUNYU INDONESIA
BUNYU
New Concrete Jetty
Old Wooden Jetty
Layout
P925
113° 00’ E 113° 05’ E
P926
CAMAR MARINE TERMINAL
CIGADING
LOCATION AND LAYOUT
DL-I
150m
POSITIONS
Satellite Platform
PROHIBITED AREA
Conveyor 500m 1,7
50
m
DL-II
150m
06° 15’ S 06° 15’ S
ne
eli
Pip
Anchorage
Conveyor
1,250m
1,854m
1,250m
RESTRICTED AREA
DD-I
121m
1,250m
75m
2,5
Barge Berth
00m
1,2
955m
50
m
DL-III
270m
Layout
1,
Location
75
0m
CIGADING
PROHIBITED AREA
Storage Vessel
500m
DD-II
122m
Pipeline
1,250m
Production
Platform
0m
5
1,7
142m
DD-III
06° 20’ S RESTRICTED AREA 06° 20’ S
DL-V
240m
Bawean Island
LOCATION
l
143m
DD-IV
385m
Oi
DL-IV
105° E 120° E se
pr i
n ter
E
Storage
0° Kalimantan 0° Satellite Platform
Vessel
Production Platform
Sumatra
5° S 5° S
Madura
Java
105° E 120° E JAVA
Penyu
Teluk
CILACAP
IB
Groyne
aC
min
Area 70
ta
Per
a Pertamina
min
ta
Per
Storage
Tugu Putih
Product
Wijayapura
Area 60
Pertamina
t
ea e n
Ar p m
l o
ve
De er
n Riv es
Dona rv
Nusantara
ha
Semen
Wharfs
W
Penyeberangan
Wharf
Layout
CILACAP INDONESIA
Jojok
Perhutani Jetty
CILACAP
r
Rive Ferry Wharf
n an EXISTING PORT
Do Oil Wharf
Jetty No. 1
Antara Jetties 1 and 2 PERTAMINA
Jetty No. 2
Jetty No. 3
Jetty No. 4
Pusri Jetty
Jetty No. 5
Jetty No. 6
Pandu Jetty
PERTAMINA
Layout
P927
CILACAP IRON SAND INDONESIA
130m 155m
180m
23,239 dwt
Nett Ton: 8,135.05
40° 25° 20°
Gross Ton: 13,549.8 (38,384.42 cu. m) 45°
m
50
50
Platform
m
D1 D2 D3 D4 D5 D6
70m
70m
B4
B1 35m 25m 15m 20m 25m 35m
125m
B2 B3
80m 110m
CILACAP
IRON SAND LOADING FACILITY
CINTA TERMINAL
19 in.
MOORING LAYOUT
30 in. dia. Pile 17 in.
18 in. Submarine Pipelines
Typical 4 Places
SBM 05°25’25”S
106°14’09”E
Ship’s Manifold
Ship’s Manifold
Cross Connection
Mooring Arrangements
P928
CINTA TERMINAL INDONESIA
CINTA TERMINAL
12 in. circumference polypropylene pick-up rope
SPM MOORING
th ends
h eyes at bo
wire rope wit
x 25 ft. long
2 in. diameter
Bitts
Bitts
SPM Mooring
Cam
HOSE CONNECTION
D1
D2
Flange
ID
OD
O Ring
CAMLOCK FLANGE
Diameter OD ID D1 D2
Inches 19 12 17 22.93 CINTA TERMINAL
Hose Connection
P929
CIREBON INDONESIA
e
nc
tra
En
CIREBON
Dry dock
BASIN I
Nujarati II
BASIN II
255m
Layout
CIWANDAN INDONESIA
105°56’E
Port Hand
NOTES Buoy
6°S
Anchorage Area
Ular (Leneng)
Cigading Berth
CIGADING
CIWANDAN
Isolated
0 1 Danger Mark
Chemical Jetty
nautical miles
A
B
ASAHIMAS
BATA BARA
Chemical Jetty TRIPOLITA
ANYER
© Shipping Guides Ltd, Reigate, United Kingdom "Plan Supplied by Ship's Master"
Shipmaster's Report
P930
CIWANDAN INDONESIA
CIWANDAN
11.6
Depths in metres
10.2
0m
12
o ut
Ab
10 CIWANDAN
CIGADING
Coal Berth
Jetty under 2 cranes
Storage
construction
Godown
BATU BARA
Security
ASAHIMAS Gate
n
CHEMICAL il ego
PLANT To C
ANYER
© Shipping Guides Ltd, Reigate, United Kingdom Plan Supplied by Ship's Master
Shipmaster's Report
DUMAI INDONESIA
15
10
Customs Jetty
New Wharf
(Multi purpose)
Coast 15
Navigation Guard
Seismic Jetty Old Wharf Passenger
Jetty Jetty (General Cargo) Wharf
Inter-island
Wharf
DUMAI
Development
P931
DUMAI INDONESIA
Customs Office
Pertamina
Port Administration Office
Shipping
Office
Immigration Office
Pertamina
Hospital
Fire and Safety
Refinery Area DUMAI
Station
Head Office OIL BERTHS
Telecommunications
Oil Berths
DUMAI INDONESIA
OUTER JETTY
Berth No. 1
100,000 dwt
10,000 dwt
Loading
Arm
Watch Room
10,500 dwt
Berth No. 2
INNER JETTY
e
elin
DUMAI
Pip
PERTAMINA JETTY
Pertamina Jetty
P932
DUMAI INDONESIA
Petro
le um P
roduc
ts
Berth
No. 3
35,00
0 dwt
Moori
ng Do
lphins
Breas
ting D
olphin Petro
s le um P
roduc
ts
Trestl Berth
e 3 Conve No. 5
yor an 35,00
Track d pipe 0 dwt
2
s for u lines
tle
nload
es
ing ga
ntry
Tr
Berth
No. 4
25,00
0 dwt
Berth
Coke No.6
s
ne
LPG
eli
3,000
Service Platform
pip
dwt
d
an
or
ey
nv
Co
1
tle
es
DUMAI
Tr
PRODUCTS PIER
0 100
metres
© Shipping Guides Ltd, Reigate, United Kingdom
Products Pier
DUMAI INDONESIA
CARGO SHIP
A E
37 ft. 36 ft. 39 ft. 42 ft. 39 ft. 37 ft. 37 ft. 38 ft. 38 ft. 39 ft.
A B
B 39 ft. C C 43 ft.
37 ft. 39 ft.
35 ft. 38 ft.
35 ft.
32 ft. D D 40 ft.
32 ft. C Cargo Wharf No. 1 40 ft.
35 ft. C 40 ft.
A Three Headlines
B Three Breastlines
C Two Springlines
D Two Breastlines
Three Sternlines
DUMAI E
10,000 dwt
105m
DUMAI
CARGO WHARF No. 2
DUMAI INDONESIA
t
.
63.0
71 ft. 3 in
67.5
65.2
67.2
68.9
A
70.2
69.8
40 ft.
69.5
65.9
B
67.2
62.6
63.9
Intermediate Mooring D
307 ft. 7 in E B
Mooring Dolphin . Dolphin Mooring D
380 ft. Dolphin
E
Mooring C
480 ft. Dolphin 40 ft.
DUMAI
OIL WHARF No. 1
Depths in feet
A Three Headlines
B Three Breastlines
C Three Sternlines
D Two Springlines
E One Cross Springline
59.8
63.0
63.1
63.1
64.1
62.1
63.1
64.1
61.5
61.5
61.5
61.5
65.4
61.8
62.8
62.1
62.1
61.5
61.5
58.9
62.5
65.4
A E
C C
D D
B 80 ft. 80 ft. B
Mooring Mooring
Dolphin Dolphin
No. 1 Oil Wharf No. 2 Oil Wharf
Mooring Dolphin Mooring Dolphin
372.87 ft. 160 ft. 200 ft. 250 ft. 160 ft.
DUMAI INDONESIA
56.9 59.5 58.2 58.9 59.9 61.5 60.3 60.3 61.0 61.0 62.3 62.3 62.3 61.0 60.3 62.1 61.5 61.5 60.2 58.9 61.5
B D C
230 ft. 200 ft. 115 ft. 155 ft. 200 ft. 230 ft.
Depths in feet
55.1
54.1
53.1
54.1
50.2
51.5
54.1
56.1
51.5
53.5
52.2
51.8
51.8
52.5
53.5
51.2
58.4
50.5
55.4
54.8
56.7
52.2
51.5
54.8
52.8
58.4
51.2
50.5
49.5 53.5
47.6 53.5
42.6 53.5
40.3
35.4 53.1
40 ft. 38.0 53.5 40 ft.
38.0
33.5
Mooring Dolphin 353 ft. 150 ft. 150 ft. 353 ft. Mooring Dolphin
DUMAI
OIL WHARF No. 4
Depths in feet
FAK-FAK INDONESIA
N
FAK-FAK
x.
pro
ap
m 0
10
Passenger
Terminal
Port office
Layout
P936
GEBE ISLAND INDONESIA
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa t
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa Fro
n
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa Mi
ne
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa To
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa 15 5
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa 25
35
nt
o
45
Fr
e
in
Stock Yard
M
To
Jetty 3
00° 03' 56" S 45 Jetty 2
Jetty 1 MAIN PORT GEBE Crusher
35
25
5 Stock Yard
To Kapalao
ANTAM's Warehouse
GEBE
Depths in Metres ANTAM's Workshop
00° 04' 16" S
Port Tanah Merah
Cape Oeboelie
aaaaaaaaaaaa
aaaaaaaaaaaa
aaaaaaaaaaaa 0° 00' aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Gebe Island aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Cape Oeboelie aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Joe Island aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa 0 500
Fau Island
aaaaaaaaaaaa Scale in Metres
aaaaaaaaaaaa
aaaaaaaaaaaa
© Shipping Guides Ltd., Reigate, United Kingdom
Layout
GORONTALO INDONESIA
Transit
shed
Office
building
Transit
r
enge shed
Pass inal
term
and e rf
offic Transit ha
Por t shed W
Office
building
arf
Wh
GORONTALO
Office
building 0 100
metres
©
© Shipping
Shipping Guides
Guides Ltd,
Ltd.,Reigate,
Reigate,United
UnitedKingdom
Kingdom
Layout
P937
GRESIK INDONESIA
Mooring Dolphin
7m
N
54.
Berthing Dolphin
t
dw
000
10,
um
M axim m
m 210
624
w t
00 0d
30,
um
.5m Ma
xim
339
Pump Station
Boat Landing
dwt
000
10,
Conveyor
um
Maxim
GRESIK
Pipe Rack
Layout
JAKARTA INDONESIA
N
JAKARTA
New Breakwater
Slipway
Basin I
Container Terminal
Basin II
Basin III
Shipyard
Nusantara II
Oil Basin
Services Harbour
ra I
Nusanta
Layout
P938
MALAYSIA
KAKAP NATUNA MARINE TERMINAL
GENERAL MOORING PROCEDURE
MA
LA
YS
IN IA
DO
NE
SIA
IND
Anambas Island
KH FIELD
ON
TNA
FPSO TANKER
M
NATUNA SEA
ESIA
LOCATION PLAN
Tied Off Messenger Line Ready
IND
ONE
SIA
VIE
TNA
MPV M
Kalimantan
Standby
Location
5° 00’ N
5° 05’ N
FPSO TANKER
Lim
it o
Pick-Up Line passed to Tanker f KH
using Tanker’s Messenger
Fie
ld
Repositioned at Stern
SPM
FPSO TANKER 1,
Limit of KH Field
75
MPV 0
m
.
FPSO
Derrick on Tanker
Floating Hose ready to receive hose
1,
AREA
60
9
m
.
ANCHORAGE
PROHIBITED AREA
ANCHORAGE AND PROHIBITED AREA
106° 00’ E
© Shipping Guides Ltd., Reigate, United Kingdom
INDONESIA
INDONESIA
P939
KAKAP NATUNA MARINE TERMINAL INDONESIA
DETAIL
Pick-Up Line
Cha
fe C
hain
Chafe Chain
Pick-Up Ropes
FPSO
to Winch
Nylon Hawser
Panama Lead
Snotter
Mooring Arrangements
Tg. Pacinan
20
10 5
KALBUT
Tg. Pasir
GUMUK
GELUNGLOR
PARAS
5 20
BUGUR
Tg. Pecaron
20 LANDANGAN 1.5
5 10
PANARUKAN 5 8.3
Tg. Pasirputih 0
KLALAKAN
R. Sampe Situbondo
an
Peg Ringgit
Malang LAMONGAN
ARJASA
BUNGATAN
Silanga
Location
P940
KASIM MARINE TERMINAL
KENDARI
MOORING
r th
m
Fro
KENDARI
Permanent Camp
228m
Wharf
da A
o un cted
B tri
s
Re
Layout
Mooring
Meters
Tidal Tanks
Direction
Indicator
Bo
un
da
ry
o
f re
str
ic
ted
Terminal
are
Passenger
a
P941
KENDARI INDONESIA
8m
48m
Slipway
PERTAMINA WHARF
KENDARI
Pertamina Wharf
KIJANG INDONESIA
Riau
Ngalih
Dendang
Angkut
Mana
Siulung
Adjup
KIJANG Bulat
Selat
Kijang
Pilot Station
(Tanjung Tillie)
KIJANG
LOCATION
BINTAN
Location
P942
KIJANG INDONESIA
S. Bunker N. Bunker
Oil Tanks
Crane
Stacker Stacker
Breakwater D.7 Jetty
D.5 Jetty
D.6 D.1
D.4 D.3 D.2
KIJANG
LOADING BERTH Bollard
Dolphin
Loading Berth
KIJANG INDONESIA
KIJANG
Minimum of 1m clearance between stack in
highest position and any mast or other obstruction.
SHIP LOADER
m
.79
47
Min. 7m
Max. 9m
Max. 12m
Jetty Dolphin
Pivot
HWS (13.9m)
LWS (11.5m)
11m
Shiploader
P943
5
Enok
Kuala
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
P944
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaa
New Jetty
291°(T)
KUALA ENOK
RUPAT
103°25’E
Pos Pemeriksaan
0
277°(T)
MA
Airtawar
LA
CC
AS
313°(T)
Depths in metres
5
20 m.
KUALA ENOK
Shoals
338°(T)
5
0
103°30’E
To Dumai Shoals
5
0
20 m.
20 m.
273°(T)
0
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa
10
aaaaaaaaaaaaaaaaaaaaaaaaaaaaa
BENGKALIS
20 m.
SUMATRA
Approaches
Approaches
0
S. Buluh
103°35’E
Kampunghuluh
BENGKALIS
(See Plan)
0
5
0
10
SUNGAI PAKNING
20 m.
PADANG
103°40’E
APPROACHES SPM
5
Banyarsero
Pipeline
To Pakanbaru/Siak/Buatan
"Plan supplied by Ship's Master"
0°35’S
0°30’S
0°25’S
BENGKALIS
PADANG
Beacons in Line
LAYOUT
Prohibited
Area
Restricted
Area
ne
SPM
Pipeli
TERMINAL
LALANG
MARINE
g
Selat Lalan
Sungai Pakning Beacons in Line
Bengkalis
Layout
Manifold
Plan View
EXPORT TANKER
Storage Barge
P945
LAWI LAWI INDONESIA
BALIKPAPAN
LAWI LAWI
Balikpapan Bay
Depths in metres
SESUMPU
Makassar Strait
12 24
Oil production platforms
1°30’S
Ships must not move west of this line without a pilot
Layout
LAWI LAWI
SINGLE BUOY MOORING
Open links
50 ton (+) shackles
Plaited 10 in. polypropylene approach rope fitted to Open Links
SBM
Buoy rope
SBM
P946
LAWI LAWI
LEMBAR
MANIFOLD AND FLANGE DIMENSIONS
LAWI LAWI
Dia. 2
Dia. 1
Dia. 2
164
Layout
A 16 40.64 23.50 59.69 21.25 53.98 16 1.000 2.54
Flanges
B 12 30.50 19.00 48.26 17.00 43.18 12 1.000 2.54
C 10 25.40 16.00 40.64 14.25 36.19 12 0.875 2.23
D 8 20.32 13.50 34.29 11.75 29.85 8 0.875 2.23
Dia. 1
Dia. 1
LCM Quay
Dia. 2
Dia. 2
LEMBAR
B C
Ferry berth
150 ASA FLANGE TEMPLATES
N
P947
LHOKSEUMAWE INDONESIA
42m
SPM max 280,000 dwt
20
1 n.m. Condensate 63m Gas Anchorage
Anchorage LNG Anchorage
42m 66m
20
MBM Max. LOA 275m
Draft 23m
DWT 100,000
Krueng Geukueh Harbour
Pipeline
20
Blanglancang Harbour
Hagu
LHOKSEUMAWE
ANCHORAGES AND HARBOURS
Lhokseumawe
20
Depths in metres
Anchorage
20m
LHOKSEUMAWE INDONESIA
East Breakwater
West Breakwater
Leading Lights 187°(T)
Berth A
10
Berth B 10
LHOKSEUMAWE
KRUENG GEUKUEH HARBOUR
10
Depths in metres
Public Berth
10
LHOKSEUMAWE
BLANG LANCANG HARBOUR
West Breakwater East Breakwater
Cargo Berth
Max. Size
LOA: 180m
Draft: 6.5m
LHOKSEUMAWE INDONESIA
LHOKSEUMAWE
BLANG LANCANG HARBOUR
LNG BERTH No. 2 (BOW IN)
376m
148.38m
X DBL
C/L Berth
Remarks: DBL = Double Quick Release Hooks
TPL = Triple Quick Release Hooks
Capstans: Line Pull Capacity: 2 Metric Tons at speed 30 metres per minute – Denoted by a X
LHOKSEUMAWE
BLANG LANCANG HARBOUR
LNG BERTH No. 3 (BOW OUT)
1 16
23
15
4 8 X
5,6 7 9
X 10 X
X 14
X DBL
DBL DBL 11 12 13
X
DBL
X X X X
C/L Berth
Remarks: DBL = Double Quick Release Hooks
TPL = Triple Quick Release Hooks
Capstans: Line Pull Capacity: 2 Metric Tons at speed 30 metres per minute – Denoted by a X
LHOKSEUMAWE INDONESIA
LHOKSEUMAWE
BLANG LANCANG HARBOUR
BERTH No. 4 – 40,000 CU.M. LPG TANKER
C/L Platform
+ 3.5m
4m
2.0m
22m
10
4 5 11
32.5m
12,13,14
6 8 14m
1,2,3 7 9
A B
Notes
Line No. Description
C/L Manifold 1,2,3 Mooring Line
Length of Vessel Approx. 175m 4,5 Mooring Line
10,11 Mooring Line
12,13,14 Mooring Line
6,7 Spring Line
8,9 Spring Line
A Fender
B Fender
Berth No. 4
P950
LHOKSEUMAWE INDONESIA
LHOKSEUMAWE
BLANG LANCANG HARBOUR
BERTH No. 4 – 70,000 CU.M. L.P.G. TANKER
C/L Platform
+ 3.5m
4m
2.0m
22m
4 5 10
11
32.5m
8 14.0m 12,13,14
1,2,3 6
7 A B 9
Notes
Line No. Description
C/L Manifold 1,2,3 Mooring Line
Length of Vessel Approx. 225m 4,5 Mooring Line
10,11 Mooring Line
12,13,14 Mooring Line
6,7 Spring Line
8,9 Spring Line
A Fender
B Fender
Berth No. 4
LHOKSEUMAWE INDONESIA
LHOKSEUMAWE
BLANG LANCANG HARBOUR
BERTH No 4 – 100,000 CU.M. L.P.G. TANKER
C/L Platform
+ 3.5m
4m
2.0m
22m
32.5m
4 5 10 11 12,13,14
6 8 14.0m
7 A B 9
1,2,3
Notes
Line No. Description
C/L Manifold 1,2,3 Mooring Line
Length of Vessel Approx. 255m 4,5 Mooring Line
10,11 Mooring Line
12,13,14 Mooring Line
6,7 Spring Line
8,9 Spring Line
A Fender
B Fender
Berth No. 4
P951
LHOKSEUMAWE INDONESIA
LHOKSEUMAWE
SPM
nsate
onde
MT C
Light
SPM Buoy
Dimensions 9.6m x 9.6m x 4.6m
Hose Particulars
White LIghts 1 x 950 ft. x 20 in. - 12 in. Hose
1 x 915 ft. x 20 in. - 12 in. Hose
360° Outer
Buoy Body
Rotation
Floating Hoses
Node BuoyancyTank
Underbuoy
SPM
LHOKSEUMAWE INDONESIA
20 10 5
LHOKSEUMAWE
20
10
Blanglancang
Fl. 5s
10
No. 7
Pelabuhan Blanglancang
No. 8
05°
No. 6
ts 2
No. 5
igh
gL
din
No. 1 No. 4
Lea
No. 2
10
No.3
0 500 1000
metres
20 10 5
© Shipping Guides Ltd, Reigate, United Kingdom
Layout
P952
LHOKSEUMAWE INDONESIA
Buoy No. 7
Buoy No. 6
Berth Heading
15
055°(T) Shore wire 42 mm.
0m
0m
15
Ship’s ropes
0m
Buoy No. 5
15
Shore wire 42 mm.
Buoy No. 8
Ship’s ropes
5m
13
10
0,0
00
dw
t
LO
A=
27
5m
Buoy No. 4
125m
0m
MOORING ARRANGEMENT
20
MULTIPLE BUOY MOORING Ship’s ropes
BERTH NO. 1 Stern Buoy
Please Note: Buoy No. 2
Mooring Buoys No. 1,2,5,6 are equipped with
42 mm. wires to supplement ship’s moorings.
Buoy No. 3
© Shipping Guides Ltd, Reigate, United Kingdom
MAKASSAR INDONESIA
Quay
arno
Soek
uoys
Hasannudin Quay
ng B
Moori
Sea Wall
Lesser Lae-Lae Island
UJUNG PANDANG
MAKASSAR
e
Lin
ing
ad
Le
r
a te
akw
Bre
on
water
Break
Layout
P953
MALILI INDONESIA
Malili
02°38’40”S
121°04’20”E
MALILI
S. Malili
MANGKASA
MALILI/MANGKASA LOCATION
S. Cerekohg
S. Usu
Ujung Pandang
Belatan
© Shipping Guides Ltd, Reigate, United Kingdom
Layout
MALILI INDONESIA
Barge
Sinker
Sinker
Mooring buoy
MALILI
Mooring buoy
MANGKASA
OFFSHORE OIL TERMINAL
(MOORING ARRANGEMENTS)
300 ft.
Marker buoy
t
20,000 dw
Manifold
20 in. su
bmarine
pipeline
300 ft.
Release line
Mooring buoy
Mooring buoy
Sinker
Sinker
Transit Shed
Passenger
Terminal
14
0m
MANOKWARI
Layout
Anchorage
Shiploader
04°01.07’S 04°01.07’S
116°00.45’E 0.5 mile 116°02.04’E
2780m
1.5 miles Barge wharf
MEKAR PUTIH
SOUTH PULAU LAUT COAL TERMINAL
MEKAR PUTIH
SOUTH PULAU LAUT COAL TERMINAL
Conveyor to future
loader 80,000 dwt
Original Fresh
Causeway
St 2a
barge wharf water
oc
dam
kp
ile
Inshore export Interim
35
St 000
wharf floating barge
oc to
0,
200,000 dwt
kp nn
unloader
ile es
35
121.5m
St 0 0 0
13
Barge
0,
243m
oc to
2
kp n n
2500 tph 12 unloader
ile es
Shiploaders 121.5m
1
14 Future wharf extension
15
sto
Fu kpil
Future
tu e 4
c
outload Site
re
wharf Office
sto
Fu kpil
tu e 3
c
re
7
288m
Walkway
Centre line
MERAUKE INDONESIA
Wharf
MERAUKE
Transit
Shed
Passenger
Terminal
0 50
metres
Layout
P956
OYONG MARINE TERMINAL INDONESIA
N
Sinker buoy for hose Mooring for crew boat Logindo Sparrow
0 0.5 1 n.m.
Mooring Master
17°19’S
113°18.3’E
Layout
PAGERUNGAN INDONESIA
PGE 1
Restricted Area
a
Are
ted
hibi
Pro PGE 2
Prohibited Area
d Area
Restricte a Restricted Area
ited Are SPM
Prohib
rong
ipeline to Po
Gas P a
ted Are
Restric
Position of:
SBM : 06°58’14.00”S : 115°57’23.00”E
PGE - 1: 06°56’47.89”S : 115°57’51.71”E
PGE - 2: 06°57’26.88”S : 115°57’40.46”E
PAGERUNGAN
MARINE TERMINAL FACILITY
SBM
Workboat
PALEMBANG
Pulling Hoses
PAGERUNGAN
SBM
Shed A & B
Loading
Shed C
Conventional Wharf
Support
370m
Buoy
Anti Chafe Chain Workboat
Shed D & E
Export
Approach Line Tanker
Shed H
Customs
2. Approach of Export Tanker to SBM.
1. Terminal SBM ready to receive an Export Tanker Mooring launch connects ship's lines
with the approach line.
River Musi
PAGERUNGAN
BOOM BARU
Boom Baru
SBM Tie Up
MARINE TERMINAL FACILITY
Shed I
PALEMBANG
and CFS
SBM TIE-UP
SBM
Yard
Container
Containe
r Wharf
366m
Mosque
Export
Tanker
Export Manifold
Tanker
Derrick
Workboat
3. Export tanker heaving up terminal
N
PANGKAL BALAM
Baturasa River
ina
m
Wharf I
ta
r
Wharf
Pe
A
B
280m
PT Timah
Syahbandar
Layout
KP3
BPP
PALEMBANG
Yuka
PT Djakarta Lloyd
Bea Cukai
PANGKAL BALAM
Pangkal Balam
Port Administration
Gesuri Lloyd
P959
PANJANG INDONESIA
D
ay
2m
Qu
17
A
Pertamina
th
ay
ng
0m
Qu
Le
40
th
ng
P T Dasaad
Le
Qu
Le ay
ng C Pertamina Oil Jetty
th
13
8m
PTP. X Length 20m
(Palm-oil Tanks)
PANJANG
0 200
metres
© Shipping Guides Ltd, Reigate, United Kingdom
Layout
PANTOLOAN INDONESIA
N
Port Control
Terminal Lama
Storage
Area
Storage
Area
Storage
Area
Storage
Area
1 1
0
0
5
5
10 10
250m
15
15
20
20
PANTOLOAN 0 100
Depths in metres metres
©
© Shipping
Shipping Guides
Guides Ltd,
Ltd.,Reigate,
Reigate,United
UnitedKingdom
Kingdom
Layout
P960
PARE-PARE INDONESIA
PARE–PARE
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Wharf
aaaaaa
Transit Shed
aaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Pass Port Office aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
en
Term ger aaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
inal aaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Transit
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Shed aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Transit Shed
Transit
Shed
0 100
Scale in Metres
Layout
PLAJU INDONESIA
A
PLAJU
(SUNGAI GERONG)
P. Kemaro
B S. Lais
D
1
2
aaaaaaaaaaaaaaaaaa 3
aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaa aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa 5
4
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
6A
RPA 12
6B
A 11 10 9
8 7 PTA
8 bis 7 bis
Sungai Ko
mering
Sungai Gerong
Plaju
Layout
P961
45 121°30’E 121°35’E
40
P962
56
Kolaka
50 Kolaka Reef
POMALAA
POMALAA
(T)
48 Line 262°
43 50 Leading
41 KOLAKA
48 Bingkoka Reef
46 11
eak line nd 40
SE P Lambasina in
t., da marang Isla 38 Pomalaa Pilot Station
G ak of Pa 47
E Pe 36
with N 4°05’S
39 S 1
Bn we
pt 7 MANY REEFS AND ROCKS
37 Ar
e 4.5 NORTHWARD OF SWEPT AREA
a 32
11
36 29
Padamarang 28 30
Lemo 26 27 19 Padamarang
Bn 11
22
25 20
24 19
POMALAA
19 15
5.25 6.5
TANJUNG LEPEE 14
16
Soundings in metres MANY REEFS AND ROCKS 13 10 Ore-loading Anchorage
SOUTHWARD OF SWEPT AREA
Bn 11
(134)
9 POMALAA
9 12 Loading Berth
20 14
13
4°10’S
2.5 30 10 11 Maniang
8 Ore-loading Anchorage
Kokosan Pilot Station TG. LEPEE
1.5
POMALAA
1
1
Approaches
Tanjung Lepee
37 Bn 7
Maniang Chimney
6 34
5 Tandjung Lepee Pilot Station
Bn
1.5 1 1.5 1.25
32 1.5
21
1
1.5 34 34 1.75 Bn 21
30 Bn
34 43 Bn 5.1
0.5
4.5 36 21
37 20
37 Bn
Bn 5
36 4
46 48
29 11.4
© Shipping Guides Ltd, Reigate, United Kingdom Plan Supplied by Ship's Master © Shipping Guides Ltd, Reigate, United Kingdom
INDONESIA
INDONESIA
POMALAA INDONESIA
Reef
Reef
Bn
Bn
POMALAA
TANJUNG LEPEE
27 Depths in metres
35
Approx 2m
11.4 Reef
Reef
Bn Bn
30
33
36
Beacons 27
34 28
38 25
11.4 4°14’S (Approx)
25 Bn
37 27 11.4
Bn
Reef 22
Reef
38 Numerous reefs exist inside 20m contour
a line
se tre Bn
m me
o 20
Fr 31 Area swept to 11.4m in 1966
34 Bn
Tg. Paker Barge Loader
35 TG. LEPEE
Sto
11.4 ckp
ile
30 metres
4°15’S
28
Reef
© Shipping Guides Ltd, Reigate, United Kingdom 121°32’E Plan Supplied by Ship's Master
Tanjung Lepee
SABANG INDONESIA
Fishing Berth
10.4
8.6
7.8
10.2
98°19’00”
42
9.1
38
41
Commercial Wharf
11.6
Oil Jetty
SABANG
7.3
Depths in metres
Naval Base
Tanks
Peunimpun
e
M
o
Lho Me Light House
Lh
g
jun U
Flag
46
Klah Island
Bay
bang
ann el Sa
anc e Ch
Entr
5°54’00”
5°53’00”
5°52’00”
Layout
P963
SALAWATI INDONESIA
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Process Barge
Utility Barge
SALAWATI 10
Salawati
Depths in metres
Marine
Terminal Vogelkop
12 in. dia. Pipeline
10
20
20
Storage Tanker
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Export Tanker
20
Layout
SALAWATI INDONESIA
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
120,000 dwt Vessel
85,000 dwt Vessel
Pipeline
EXPORT TANKER
60,000 dwt vessel
365.74m
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
SALAWATI
BREASTING AND MOORING DOLPHINS
Oil a
nd G
as P
ipeli
ne
8
20 Attaka
SAMARINDA
SAMARINDA
10
11
0 Oil Field
0
12
T Marangkayu
12.5
10
5 Restricted Area
13
0
ra
a
Sungaiparepak 10 5
Storage Ar
Mu
eas
0 5
n
lata
SAMARINDA
anji
au
TP
T Lerung
Ber
Concrete W
APPROACHES
harf
T Kaeli 20
Depths in metres
13.5
0
metres
Samarinda
5
T Pelai
100
Layout
Su 10
nga
i Ku
Approaches
tei
0 20
Anchorage Area
Area 1
T Kayumojara
SENIPAH
Pilots
0 Muara Bayor
Nubi
T Bayor
Area 2
Area 3
P
Area 4
Da
M tu
ua
ra
Be
ka
pa
i
Area 5
6
10 0
11
T Timbangongot
SAMARINDA
T Pegah 20
Muara Pegah
Muara Jawa
Senipah
© Shipping Guides Ltd, Reigate, United Kingdom Plan Supplied by Ship's Master
SAMARINDA
INDONESIA
INDONESIA
P965
aaaaaaaaaaaaaaaaaa
P966
aaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaa
SEBUKU
Berangas
SANTAN TERMINAL
Sebuku Island
buku
Se
lat
aaaaaaaaaaaaaaaa
Se
aaaaaaaaaaaaaaaa
Loading Platform
aaaaaaaaaaaaaaaa No. 13
aaaaaaaaaaaaaaaa
10
20
aaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaa
10
aaaaaaaaaaaaaaaa
T. Santan
Palau
Laut
P. Halaban
Santan
Terminal
20
P. Kaluang Oil
10
Oil a
20
Office and
Gas
20
Pipe
nd G
line
Stock Pile Loading Point for Handy Size:
as P
SEBUKU 03° 41' 00" S.
ipeli
Conveyor 116° 22' 00" E.
Layout
ne
Draft 9 m. – 11 m.
5
Oil
Tg. Ouku
an
dG
a
P. Kapak
sP
P. Kapak Kecil
Tg. Alang Alang
Loading Point for Panamax Size:
03° 42' 00" S.
116° 24' 00" E.
Draft 15 m.
No. 8
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Santa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Depths in metres
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
n App
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
roach
s e
SANTAN TERMINAL
Platforms
Entry Restricted
APPROACHES AND ANCHORAGES
Tanjung Seloka
© Shipping Guides Ltd., Reigate, United Kingdom "Plan Supplied by Ship's Master"
INDONESIA
INDONESIA
SEMARANG INDONESIA
N
l
ana
water ir C
Break
j
East Ban
ast
dE te
oca
Rel
ter
kwa
SEMARANG
DEVELOPMENT
rea
th B
Nor
Container
Ocean Going
Yard
rf
ha
Wharf
m
3.5
495m
rf
605m
ha
W
KC
Basin
W
Access Channel 7m LPG
West Breakwater
ater
t Breakw Wes
Existing
Layout
Buoy 5
5
Anchorage Prohibited
ge Prohi
ar y
Navigation Channel
01°03’05”S
und
117°13’13”E
Anchora
l Bo
01°03’18”S
117°14’37”E Peciko Field Peciko Field Restricted Area
Tota
Restricted Area
SPM 1 1 00°59’19”S 117°23’38”E
cal-
2 01°04’46”S 117°22’48”E
Uno
3 NA NA
4 01°05’36”S 117°19’04”E
01°04’34”S 2 5 01°00’58”S 117°21’11”E
01°05’00”S
117°13’09”E
117°23’27”E 6 00°59’08”S 117°23’18”E
Recommended
4
Anchorage
0 10,000
Position not available
metres
Layout
P967
SORONG INDONESIA
SORONG
Depths in metres
Sto
rag
eA
rea
10
30 20
25
0 100
metres
30
© Shipping Guides Ltd, Reigate, United Kingdom
Layout
SURABAYA INDONESIA
N International
Container
Terminal
Utara
Jamrud
Tambatan Perak
ru
n
r lia
Be ara Pantai Perak
Pa
Ut
nta
iK
ali
Tam
Tambatan Mirah
Pe
Be
rak
bat
rlia
Tam
an
nT
Ber
Tambatan Mirah
imu
bat
an
lian
r
Nil
Ba r
Ka
am
at
li P
Intan
era
SURABAYA
k
Container
Yard
Layout
P968
TANJUNG BARA INDONESIA
Aquatic Centre
30
5
20 No 5 Bn
10
No 10 Bn
Coal Terminal
Berth and No 15 Bn
Shiploader
No 6 Bn Anchorage
B
Anchorage
No 16 Bn C
Coal No 8 Bn
Barge No 13 Bn
Berth
General
Service
Wharf Anchorage
No 4 Bn A
Inshore Radar Beacon
MB 2 No 12 Bn
MB 1
MB 3
Anchorage
D
TANJUNG BARA
Inner Shoal
South Channel Mark COAL TERMINAL APPROACHES
Anchorage
5 E
10 30
20
© Shipping Guides Ltd, Reigate, United Kingdom
TANJUNG PANDAN
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa BELITUNG
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa D–05
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
100 m.
D–01 D–06
35 m.
D–07
D–
45 m.
02
60 m.
D–04
D–03
40 m.
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa D–08
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Belitung
P969
TANJUNG PEMANCINGAN INDONESIA
116°16’E 116° 17’ E 116° 18’ E 116°19’E 116°20’E
3°12’S
1 mile
(T
)
Tanjung
Pemancingan Tugs
3°13’S
Coal stockpile
Le
ad
si
n
lin
e MINED AREA
30
Buildings 8°
(T
)
So , lea
uth st
MINED AREA Ea de
Numerous Fishing st pth
Ch 1
Platforms an 8.4
ne m
l ,w
idt
h
40
0m
3°14’S
MINED AREA
TANJUNG PEMANCINGAN
NORTH PULAU LAUT COAL TERMINAL
APPROACHES MINED AREA
TANJUNG PEMANCINGAN
NORTH PULAT LAUT COAL TERMINAL
SHIPLOADER
HAT + 3.020m
TANJUNG UBAN
TANJUNG UBAN
HANDY TYPE VESSELS 180m LOA
No. 1 JETTY
LPG
BD 1 BD 2 BD 3 BD 4 BD 5 BD 6
TANJUNG PEMANCINGAN
2 MD 1 MD 2 MD 3 MD 4
2HC
TANJUNG PEMANCINGAN
2HC
Dries at LW
NORTH PULAU LAUT COAL TERMINAL
DISPOSITION OF MOORING LINES
Pump
Butane – Vapour
Butane – Liquid
Trestle
85m
Propane – Liquid PANAMA TYPE VESSELS 220m LOA
Propane – Vapour
No. 1 Jetty
BD 1 BD 2 BD 3 BD 4 BD 5 BD 6
MD 1 MD 2 MD 3 MD 4
2HC
North Pulau Laut Coal Terminal
2HC
CAPE TYPE VESSELS 280m LOA
3
BD 1 BD 2 BD 3 BD 4 BD 5 BD 6
MD 1 MD 2 MD 3 MD 4
3HC
LPG
Disposition of Mooring Lines
© Shipping Guides Ltd, Reigate, United Kingdom Plan Supplied by Ship's Master © Shipping Guides Ltd, Reigate, United Kingdom
INDONESIA
INDONESIA
P971
TANJUNG WANGI INDONESIA
Pertamina Jetty
N
DMK Jetty
Pusri Jetty
BALI STRAITS
General Jetty
300m
TANJUNG WANGI
100
LOCATION
0
Layout
276m
0m
44
Terlena
34
5m
TELUK BAYUR
Layout
P972
TELUK BUNGUS INDONESIA
TELUK BUNGUS
PERTAMINA JETTY
220
m.
287
° Tru
e
Jett Beacon BRB
y No
.1 Flashing Light
Jett
y No
220 .2
m .
Five
sho
re s
ide
acro tanks a
ss h t
ighw a dista
ay to nce o
main f app
town roxim
of P ate
ada ly 1,10
ng 0m
.
© Shipping Guides Ltd., Reigate, United Kingdom "Plan Supplied by Ship’s Master”
Pertamina Jetty
TERNATE INDONESIA
25
25
25
Coral
20
20
15
15
10
10 15
10
10
5
10 15
Port Authority
5
Pilot Office
Office
Depths in metres
Layout
P973
TUBAN INDONESIA
TUBAN
BERTH No. 3
STANDARD MOORING ARRANGEMENT
NOTES ON BERTH
Acceptable ship’s DWT: up to 10,000
Range of ship’s LOA: 91m to 140m
Water depth: 13.5m
Maximum draft: 9.8m
NOTES ON MANIFOLD
Manifold standard: ANSI B 16.5 CLASS 150
y 52m W
wa a lk
a lk wa
y
W
Walkway Walkway
TUBAN INDONESIA
TUBAN
BERTH No. 4 AND No. 5
STANDARD MOORING ARRANGEMENT
NOTES ON BERTH
Acceptable ship’s DWT: up to 40,000
Range of ship’s LOA: 76m to 187m
Water depth: 13.5m
Maximum draft: 10.6m
NOTES ON MANIFOLD
Manifold standard: ANSI B 16.5 CLASS 150
Up to 4,000 dwt
25m
y 65m W
wa alk
a lk wa
W y
Walkway Walkway
Sea Level
Messenger Line Ready
SPM
PLEM
Mooring Yoke
MPV
Helideck
Floating Hose
End Float
to Tanker using
Standard Submarine Hose
Tied Off
FSO Cilacap
MPV
Stand By
Mooring Position
Mooring Procedure
Starboard Derrick on Tanker
Floating Loading Hose
P975
TUBAN MARINE TERMINAL INDONESIA
Snotter
ire
rW
Snotter
te
ot
Sn
DETAIL
Snotter
Pick–up Rope
Panama Leads
Mooring Arrangements
TUBANG INDONESIA
TUBANG
Ma
ng
ro
ve
s
Discoloured Water
112
°–
292 Mangro aaaaaaaaaaaaaaaaaaaaaaa
° ves
aaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaa
096° – 27
6°
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa Anchorage
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
Wooden Pier
Man
grov
e s
Tubang Sawmill
Log Ponds
TUBANG
© Shipping Guides Ltd., Reigate, United Kingdom "Plan Supplied by Ship's Master"
Layout
P976
WAINGAPU
Depths in metres
0
5
WAINGAPU
WAISARISA
10 10
20 20
Te
luk
Li 5
an
g
Eastern Limit
of Port Limits
120°16’E
Sand
0.5
Nautical Mile
5
WAISARISA
20
10
20
10
5
1
9°38’S
Layout
Layout
Log
Poo
ls
Pier
5 20
10
10 20 5
Tanks
Nusantara
Chimney
Pertamina
Pelayaran
WAISARISA
Rakyat
WAINGAPU
Sa Pertamina
nd
120°15’E
P977
WIDURI TERMINAL INDONESIA
N
Indiri A
Widuri A Chessy
SPM 1
Mooring Master
SPM 2
Waiting Anchorage
Widuri E
Le
ad
ing
lig
hts
WIDURI TERMINAL
Aida
APPROACHES
Approaches
15 in. circ.
nylon rope
Floats
Export
Tanker
Bitts Bitts
Ships manifold
WIDURI TERMINAL
SBM Positions Bitts Bitts
No 1. 4°40’11.68”S 106°39’49.99”E
No 2. 4°41’36.09”S 106°38’48.99”E LAYOUT AND MOORING PLAN
Mooring Plan
P978