Sub: Schedule of Rates as per Revised Standard Data for the year 2013-14 – Irrigation
& CAD works (part-1), Road & Bridge Works (Part-2) and Drinking water supply
schemes (part-4) - approved- Printing & Communication of SoRs – Reg.
The Engineer-in-Chief, Panchayat Raj Department has furnished draft rates for Road &
Bridge Works items vide ref 2nd cited.
The Engineer-in-Chief, Public health Department has furnished draft rates for Public
Health Work Items and Public Health materials vide ref 3rd cited.
The ENC(R&B) Department has not furnished the SoR as per A.P.Revised
Standard Data.
For Irrigation & CAD Work Items, the regional Superintending Engineers of Irrigation
Circles of Hyderabad, Chittoor & Dowlaiswaram in charge of Telangana, Rayalaseema and
Andhra regions respectively have submitted the draft basic rates of materials. The
Superintending Engineer, Mechanical Circle, Hyderabad has furnished draft rates of mechanical
and workshop items. Accordingly, the draft rates for Irrigation & Command Area Development
are prepared.
The BoCE has recommended to delete the Seiniorage Charges from the
material rates and to add the Seigniorage Charges to the Unit rate of work Item
while preparing the estimate. Accordingly, Seiniorage Charges are deducted from
the material rates in Part-I of the SoR 2013-14.
The minimum wages are calculated from the index points obtained from the
Commissioner, labour department vide reference 4th cited for finalizing the rates for SoR 2013-
14.
Based on the proposals, the draft Schedule of Rates for the year 2013-14 were reviewed
and finalized in the annual Board of Chief Engineers meeting held on 27-5-2012.
The Procedure for the adoption of Irrigation work items, lead & lift charges (Common to
all departments) is incorporated in the Annexure-A of SoR.
The approved basic rates are applicable to the datas as per A.P.Revised Standard Data
approved by the Government vide G.O. 1st cited. The Government approval is necessary to adopt
any other data (i.e) MORT&H Data for adopting the Road & Bridge Works (Part-2).
The Lead & Lift Charges are common to all Engineering Departments. The detailed
calculations are incorporated in the Lead & Lift chapter in the I&CAD works (Part-I) of A.P.
Revised Standard Data
One hard copy & compact disc containing Schedule of Rates is here with communicated.
No other items other than the items communicated by this Office shall be introduced in the SoR.
The Heads of Department and Officers mentioned below are authorized to print the
Schedule of Rates for the year 2013-14. The unauthorized printing & selling of the SoR is strictly
prohibited. The Schedule of Rates for 2013-14 will be in force until the new SoR comes in to
force.
Any discrepancies found (or) corrections required in SoR 2013-14 may be brought to
the notice of undersigned for issuing corrections.
The revised rates will come into force from 1st June of 2013.
Encl: SoR 2013-14 containing Part-I(Irrigation & Works), Part-II (Road & Bridge Works) and
Part-IV (Public Health Items)
6) Copy of C.D containing Schedule of Rates 2013-14 & Standard data, part-1 (Irrigation & CAD
works) to all Engineers-in-Chief, Chief Engineers of Irrigation & CAD Department for favour
of information.
II) Copy to the Superintending Engineer, Irrigation Circle, Irrigation & CAD Department,
ANNEXURE- A
1) The SPIU(Irrigation), Centre for Good Governance (CGG), Hyderabad has developed
soft ware package linking the basic input data of Irrigation with approved data of
Irrigation work items.
2) The lead and lift charges are common to all Engineering Departments. The detailed
calculations are incorporated in the Lead &Lift charges chapter in the I&CAD works
(Part-1) of A.P. Revised standard data.
The Leads for Steel and Cement shall be from the nearest market place to
the Project area
3) Further, the CGG has also developed estimate preparation package to use in the
preparation of estimates duly making provision for incorporation of applicable lead &
lift for different materials, Area allowances for labour, Dewatering charges and VAT as
additional.
4) For Gates & Hoist works, the excise duty on the fabrication of work (other than
materials) shall be added as per the Government Orders issued from time to time while
preparing the estimate.
5) The estimate sanctioning authority shall physically verify each and every Irrigation
work item data incorporated in the estimate with basic input data before sanction of the
estimate. Any lapses or arithmetic errors arising in the sanction of data’s /
estimate due to adoption of the software package lies entirely on the
concerned estimate sanctioning authority only.
6) Any discrepancies / corrections required for improper basic input data appearing in the
approved data’s of Irrigation work items in the software package and hard copy of SoR
& Standard data’s (part-1) may be brought to the notice of undersigned for issuing
corrections.
PART-I
Sl. No. Description Page No.
From To
1 Part-I (Irrigation & CAD Works)
Preamble 1 4
Labour Rates 5 9
Basic input data for Irrigation
work items & materials not 10 35
covered in basic input data
Conveyance Charges of
36 40
Materials
Hire Charges of Machinery 41 44
IRRIGATION & CAD WORKS
Part I-Preamble-Common SoR 2013-14
PREAMBLE
1
Part I-Preamble-Common SoR 2013-14
PREAMBLE
a) (i) 25% extra over the rates on labour component of works is allowed in all
Municipal Corporation Limits of Andhra Pradesh except Greater Hyderabad,
Greater Visakhapatnam and Vijayawada municipal corporations (up to a belt of 12
Kms. from Municipal Corporation limits) and other corporations as notified by the
Government from time to time.
(ii) 40% extra over the rates on labour component of works for Greater Hyderabad,
Greater Visakhapatnam and Vijayawada Municipal Corporation (up to a belt of 12
Kms. from Municipal Corporation limits).
b) Allow 20% extra over basic rates on labour component of works in all District
Headquarters and the remaining Municipal limits (up to a belt of 12 Kms from
Municipal limits).
c) For works at Tirumala Hills in Chittoor District, 40% extra over the basic rates of
labour component is allowed.
d) For works at Horsely hills in Chittoor District, 30% extra over the basic rates of
labour component is allowed.
e) For works located inside Tirumala Temple, 20% extra over the basic rate of labour
component specified for Tirumala Hills is allowed.
f) For Works located inside T.T.D Temples of Sri Padmavathi Ammavari Temple,
Tiruchanoor, Sri Govindaraja Swamy Temple at Tirupathi, Sri Kapleswara Swamy
Temple, Kapilatheerthm, Tirupathi and Sri Kalyana Venkateswara Swamy Temple,
Srinivasa Mangapuram , 20% extra over the basic rates of labour component for
Tirupathi Municipal Corporation is allowed.
B) JAIL COMPOUNDS:
20% extra is allowed over labour rates for the work in the Jail compounds. Only
equivalent number of Man Mazdoor shall be provided in the Jail premises and no
women Mazdoor are allowed inside.
C) INDUSTRIAL AREA:
a. 20% over basic rates on labour component works allowed for works situated
within 10Kms belt of Industrial area of, Jeedimetla, Lingampally,
Ibrahimpatnam,Tandur in Ranga Reddy District, Ibrahimpatnam, Vuyyuru,
Jaggaiahpeta in Krishna District, Macherla, Gurajala, Challapalli in Guntur
District Garividi in Vijayanagaram District, Kothur in Mahabubnagar District,
Patancheru, Ramachandrapur in Medak District, Bibinagar in Nalgonda District,
Ramagundam and Godavarikhani in Karimnagar District, Renigunta in Chittoor
District and Yerraguntla & Mangampet in Kadapa District, Manchiryal,
Mandamarri, Bellampalli in Adilabad District, Sarpaka, Kothagudem, Paloncha,
Manguguru, Singareni Collieries in Khammam District, Kamalapur, Bhoopalpally
of Warangal District, Wadepally of Nalgonda District, Nagapally(Centenary
Colony, Begumpet “X” roads),Takkelapally of Karimnagar District, Hindupur,
Tadipatri, Anantapur, Guntakal, Rayalcheruvu, Yadiki of Anantapur District and
2
Part I-Preamble-Common SoR 2013-14
b) 40% extra is allowed for the works located within the interior Agency / Tribal limits,
i.e. for the works located beyond 16 KMs from any all weather route inside Agency /
Tribal.
E) GHAT ROADS:
For Ghat Roads steeper than 1 in 20, the length of the road may be taken as 1.5
times the existing length of the road for the purpose of leads only for conveyance of
materials based on the certificate for the Ghat Road given by the Superintending
Engineer concerned.
Foot Note: Under compelling circumstances, the concerned Chief Engineer can
adopt the equivalent length of road as 2 ½ times of actual length.
A. TRIAL TRENCHES:
3
Part I-Preamble-Common SoR 2013-14
B. TRIAL PITS:
II) For pipe lines where the depth is less … 75% extra
than 1.5 times the width
Note: 1) The extra percentage is allowed over Common item for all earth works (COM-MWRK-
Manual Works) for corresponding soil and Standard data items. It includes the
charges for all lifts and initial lead but does not include dewatering charges if any
in respect of all the items under (A) and (B) above.
2) The above extra percentages in respect of excavation in hard rock for restricted
places are to be allowed for (2/3) rd of the cost and shall not to be allowed in
respect of items involving blasting component which may be taken as 1/3 of the
cost.
3.0 SEIGNIORAGE CHARGES:
Note:
The rates of the materials indicated in the SOR are exclusive of Seigniorage Charges.
Appropriate Seigniorage Charges for relevant materials are to be added to the Unit
rate of work item in the estimates as fixed by the Government in G.O.Ms.No.198
(Industries and Commerce Dept.) dt:13.08.2009. In case of revision, the revised rates
as fixed by Mines and Geology Department have to be adopted.
4
Part I - Labour Rates-Common SoR 2013-14
LABOUR RATES
5
Part I - Labour Rates-Common SoR 2013-14
LABOUR RATES
S. Rate
Sl
CATEGORY OF WORKER for
No.
2013-14
1 2 3
I. SKILLED CATEGORY:
1 Bar bender 370
2 Black smith / Tin smith / Rivetor 350
3 Blaster 400
4 Carpenter Cl- I 350
5 Electrician ( Licensed ) 400
6 Fitter Cl- I 350
7 Floor Polisher / Tile Layer 350
8 Foreman 400
9 Gauge reader 335
Maistry / Work Inspector with Non-technical Qualification 335
10 SSLC/SSC/HSC
11 Mason Cl- I / Brick layer Cl- I 350
12 Mechanic Cl- I 350
13 Operator Air compressor / DG set 350
14 Operator Batching plant 400
15 Operator Bus/Ambulance/ Lorry/ Tanker 400
16 Operator Concrete / Asphalt mixer 350
17 Operator Concrete / Asphalt paver 350
18 Operator Concrete pump / Placer/ ice plant 350
19 Operator Core drilling machine 400
20 Operator Crane/ Tower crane/ Cable way 400
21 Operator Drilling jumbo / Loco / Winch 350
22 Operator Grouting/ Guniting/ Shotcreting 350
23 Operator Jackhammer/Pneumatic tamper 350
24 Operator Pump / Ventilation fan 350
25 Operator Lathe/Drilling/Shearing machine 400
26 Operator Bending / Planing machine 350
27 Operator Road roller 350
6
Part I - Labour Rates-Common SoR 2013-14
S. Rate
Sl
CATEGORY OF WORKER for
No.
2013-14
1 2 3
28 Operator Shovel / Scraper / Dozer 400
29 Operator Spillway / Sluice gate 350
30 Operator Crusher / Conveyor / Mucker 350
31 Operator Tipper / Dumper / Transit mixer 400
32 Operator Concrete vibrator 350
33 Operator Vibratory plain / pad foot roller 350
34 Operator Wagon drill / Drifter 400
35 Painter Cl- I 400
36 Plumber / Pipe fitter 400
37 Sarang / Khalasi 350
38 Spun pipe moulder 350
39 Stone chiseller CI- I / Stone cutter Cl- l 350
40 Struct. steel Fabricator / Marker / Erector 400
41 Welder / Gas Cutter 350
42 Welder (X-ray quality) 400
7
Part I - Labour Rates-Common SoR 2013-14
S. Rate
Sl
CATEGORY OF WORKER for
No.
2013-14
1 2 3
320
15 Helper Bus/ Ambulance/ Lorry/ Tanker
320
16 Helper Bending/Shearing/Planing machine
320
17 Helper Carpenter
320
18 Helper Concrete / Asphalt mixer
320
19 Helper Concrete / Asphalt paver
320
20 Helper Core drilling machine
320
21 Helper Crane/ Tower crane/ Cable way
320
22 Helper Drilling jumbo / Loco / Winch
320
23 Helper Fitter / Fabrication/Electrician
320
24 Helper Grouting/ Guniting/ Shotcreting
320
25 Helper Jack hammer / Pneumatic tamper
320
26 Helper Laboratory / Instrumentation
320
27 Helper Road roller
320
28 Helper Shovel / Scraper / Dozer
320
29 Helper Crusher / Conveyor / Mucker
320
30 Helper Tipper / Dumper/ Transit mixer
320
31 Helper Vibrator
320
32 Helper Vibratory plain/ pad foot roller
320
33 Helper Wagon drill/ Drifter
320
34 Lineman Electric / Telephone
320
35 Mason Cl- ll / Brick layer Cl-II
320
36 Mechanic Cl- II
320
37 Painter Cl- II
320
38 Patkari / Neeraganti / Sowdy
39 Stone Chiseller Cl- II 320
40 Stone breaker / Hammer man 320
41 Valve man / Canal sluice operator 320
III. UN-SKILLED CATEGORY:
1 Cement / Asphalt handling mazdoor 280
2 Civic worker 280
3 Man mazdoor 280
8
Part I - Labour Rates-Common SoR 2013-14
S. Rate
Sl
CATEGORY OF WORKER for
No.
2013-14
1 2 3
4 Woman mazdoor 280
5 Watchman 280
Note: - 1)The wage should not be less than the minimum wages of schedule of employment,
subject to out turn. 2) 25% extra over the corresponding labour rates in respect of the work to be
done during night time subject to issue of certificate accordingly by the concerned estimate
sanctioning authority for providing in the data and by concerned Executive Engineer in charge of
the work for payment. The night time allowance is applicable only to the works done under Greater
Hyderabad Municipal Corporation, Greater Visakhapatnam Municipal Corporation and
Vijayawada Municipal Corporation limits only.
9
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
10
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
1 Average of the prevailing market rates, ignoring freak rates, is the criteria for
Fixing market rates for materials.
2 The rates for materials is inclusive of all taxes, duties and other local levies.
3 The rates for materials are exclusive of Seigniorage charges wherever applicable.
4 The rates for materials, except those for which lead charges are admissible as per the
Statement of lead charges is for all leads.
5. The rates provided for useful rubble / stone chips from excavation shall be at dump
yard.
S. Rate
Sl
DESCRIPTION OF MATERIAL UNIT for
No.
2013-14
1 2 3 4
1 Acetylene gas cum 320
2 Asphalt 80/100 Grade Kg 40
Binding wire Kg 70
3
4 Burnt stone slab 10 cm thick sqm 280
Cement 43 Gr (including loading charges) 4100
5 Note: As per Monthly rate fixed by Sub- tonne (Rate for
Committee. 5/2013)
6 Chequered plate Kg 60
Coarse aggregate 10-4.75 mm(excluding Seigniorage
7 cum 830
charges)
Coarse aggregate 20-10 mm(excluding Seigniorage
8 cum 1150
charges)
Coarse aggregate 40-20 mm(excluding Seigniorage
9 cum 1090
charges)
Coarse aggregate 80-40 mm(excluding Seigniorage
10 cum 605
charges)
The aggregate rates mentioned above (from Sl.No.7 to
Sl.No.10) are exclusive of Seigniorage charges but
including blasting charges of Rs.70/cum and 25%
machine crushing charges. However, if the metal is
obtained from hand broken, the blasting and crushing
charges shall be deducted. The aggregate shall be HB
Stone of Granite, Dolamite, Dolerite and Trap.
(Quartzite and Basalt with aggregate impact of less
than 20)
S. Rate
Sl
DESCRIPTION OF MATERIAL UNIT for
No.
2013-14
1 2 3 4
12 Copper sheet 16 SWG kg 665
Coursed rubble stone 30 x 30 x 45 cm(excluding
13 Each 18
Seigniorage charges)
Coursed rubble stone 30 x 30 x 60 cm(excluding
14 Each 21
Seigniorage charges)
15 Curing Compound Ltr 125
16 D – cord Rm 16
17 Delay - noiseless trunk Each 21
18 Detonating fuse coil Rm 11
19 Detonating shock tube / Cord relays Rm 65
20 Detonator delay type Each 23
21 Detonator electric Each 13
22 Detonator ordinary Each 9
23 Empty cement bag Each 4.5
24 Explosive ANFO kg 40
25 Explosive ANFO high strength booster kg 75
26 Explosive small dia ( Kelvex-220 or equivalent) kg 70
12
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
S. Rate
Sl
DESCRIPTION OF MATERIAL UNIT for
No.
2013-14
1 2 3 4
37 G I Pipe 80 mm dia B Class Rm 490
38 G.I Bolts / Nuts and Washers kg 106
39 G.I sheet ( plain ) tonne 66000
40 Hariyala turfing sods sqm 28
41 Hectometer stone one line dressed Each 230
42 Hemp yarn kg 72
43 Honne wood planks cum 54000
44 Hume pipe with collar 150 mm dia Rm 320
45 Hume pipe with collar 300 mm dia Rm 630
46 J- Bolts 30 cm long Each 33
47 Jungle wood planks cum 21000
48 Khandki stone 15 to 20 cm height Each 11
49 Khandki stone 20 to 25 cm height Each 13
50 Khandki stone 25 to 30 cm height Each 16
51 Kilometer stone one line dressed Each 430
52 LDPE sheet ( Geo membrane ) 500 micron thick sqm 85
53 LDPE sheet ( Geo membrane ) 750 micron thick sqm 125
54 LDPE sheet ( Geo membrane ) 1000 micron thick sqm 175
55 M S Bolts / Nuts / Washers kg 85
Murum(including loading charges but excluding
56 cum 103
Seigniorage charges )
57 Oxalic acid Ltr 74
58 Oxygen gas cum 50
59 PVC sealing strip Rm 44
60 PVC water stopper 310 mm wide Rm 485
61 PVC pipe of 100 mm dia Rm 175
Reinforcement steel (including loading charges)
43,000
(HYSD/TMT )
62 tonne (Rate for
Note: As per Monthly rate fixed by Sub-Committee
5/2013)
13
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
S. Rate
Sl
DESCRIPTION OF MATERIAL UNIT for
No.
2013-14
1 2 3 4
14
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
S. Rate
Sl
DESCRIPTION OF MATERIAL UNIT for
No.
2013-14
1 2 3 4
83 Wire mesh 20 gauge sqm 212
84 Zinc chromate red oxide primer paint Ltr 170
85 inorganic zinc silicate Ltr 650
86 solvent less coal tar epoxy paint Ltr 256
87 Zinc phosphate primer Ltr 210
88 Allkyd based iron oxide paint Ltr 185
a) Cost of hdpe (80mm dia)
Rm 620
15
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
GUIDE LINES:
a. For cast steel / Alloy steel / Forged steel / Bronze, aluminum alloy components the rates shall
be inclusive of cost of basic metal for these components, casting / forging charges, machining
charges and applicable excise duty on finished alloy component.
b. For other materials the rates shall be prevailing market rates.
S. Rate
Sl No. DESCRIPTION OF MATERIAL UNIT for
2013-14
1 2 3 4
1 Alloy steel ( IS : 1570-carbon steel ) shafts Kg 195
420
2 Alloy steel ( IS : 1570-stainless steel ) pins Kg
16
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
S. Rate
Sl No. DESCRIPTION OF MATERIAL UNIT for
2013-14
1 2 3 4
Rubber corner seal ( Teflon claded )
20 Rm 4100
( IS : 11855 )
21 Rubber corner seal ( un claded ) ( IS : 11855 ) Rm 3400
22 Stainless steel plates / flats Kg 275
Welding electrode 4 mm dia x 450 mm (
23 Each 18
radiographic low hydrogen )
Welding electrode 4 mm dia x 450 mm (
24 Each 26
stainless steel )
25 Wire rope 6x37 constn ( IS : 2266 ) Kg 250
26 Zinc Kg 165
27 Zinc rich ( zinc content : 90 % ) epoxy primer Ltr 650
S. Rate
Sl
Description of Material Unit for
No.
2013-14
1 Electric pole with fixtures Each
2 Flood light 500 W Each For
establishing
3 Flood light set Each
Electrical Sub-
4 Flouscent tube light 40 W Each Stations at the
Project Sites
5 Flouscent tube light set Each wherever
6 HT / LT Circuit breaker with accessories Set necessary, the
rates approved
7 HT / LT Line conductor 1000 m by
PVC Armoured cable 10 sqmm and APTRANSCO
8 Rm may be
below
followed.
9 PVC Armoured cable 16 sqmm Rm
10 PVC Armoured cable 25 sqmm Rm
11 PVC Armoured cable 70 sqmm Rm
17
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
1 The Capital cost of machinery / equipment shall be for new machinery / equipment and
shall be inclusive of all taxes, duties, other levies.
2 The cost of transport vehicles / equipment shall be exclusive of cost of tyres and tubes.
3 The cost of drill rods / drill bits / air hose / water hose / road tax / insurance charges and
other consumable accessories shall not be included in the capital cost.
4 In cases, where the current capital cost of machinery / equipment could not be collected
through enquiries, the capital cost considered for previous year may be updated on the basis of
average percentage increase / decrease in the index for machinery published in the R.B.I Bulletin.
S. Rate
Sl
DESCRIPTION OF MACHINERY / EQUIPMENT UNIT for
No:
2013-14
1 2 3 4
1 Agitator car / Transit mixer 2 cum ( excluding tyres ) Each 21,50,000
18
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
S. Rate
Sl
DESCRIPTION OF MACHINERY / EQUIPMENT UNIT for
No:
2013-14
1 2 3 4
20 Concrete paver 100 Sqm / hr Each 23,61,000
21 Concete placer pump / hour Hour 120.80
22 Convey mucker ( excluding tyres ) Each 38,55,000
tyres and tubes 6 sets 86,000
23 Core drilling machine Each 11,00,000
24 Diesel generating set 30 KVA Each 4,95,000
25 Diesel generating set 50 KVA Each 6,40,000
26 Diesel Loco 45 hp Each 21,20,000
27 Dewatering pump 5 hp diesel Each 40,000
28 Dewatering pump 5 hp electric Each 24,500
29 Dewatering pump 10 hp diesel Each 60,000
30 Dewatering pump 10 hp electric Each 55,000
31 Dewatering pump 20 hp diesel Each 1,90,000
32 Dewatering pump 20 hp electric Each 1,00,000
33 Drifter Each 10,58,000
34 Drilling jumbo ( excluding tyres ) Each 13,02,000
tyres and tubes 6 sets 86,000
35 Dumper 4.5 cum ( excluding tyres ) Each 14,50,000
tyres and tubes 6 sets 86,000
36 Geophysical Ele.resistivity meter Each 4,75,000
37 Grouting pump Each 1,02,000
38 Guniting / sand blasting equipment Each 2,80,000
39 Ice plant with accessories 30 t / day Each 22,80,000
40 Jack hammer Each 65,000
41 Needle vibrator 40 mm petrol Each 20,000
42 Needle vibrator 40 mm electric Each 21,000
43 Needle vibrator 60 mm petrol Each 21,500
44 Needle vibrator 60 mm electric Each 25,500
45 Planing machine 4 m stroke Each 7,80,000
19
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
S. Rate
Sl
DESCRIPTION OF MACHINERY / EQUIPMENT UNIT for
No:
2013-14
1 2 3 4
46 Plate shearing machine up to 12 mm Each 4,25,000
47 Pneumatic placer 0.5 cum Each 5,80,000
48 Pneumatic tamper Each 85,000
49 Pug cutting machine Each 16,000
50 Pusher leg Each 52,000
51 Road roller diesel 10 t Each 8,50,000
52 Shovel 0.50 cum 75 hp Each 37,50,000
53 Shovel 0.85 cum 110 hp Each 63,80,000
54 Stationery derrick crane 5 t Each 6,53,000
55 Tipper 5 cum ( excluding tyres ) Each 16,25,000
tyres and tubes 6 sets 86,000
56 Tipping tub 1.5 cum Each 2,40,000
57 Tower crane 5 tonne Each 74,75,000
S. Rate
Sl
DESCRIPTION OF MACHINERY / EQUIPMENT UNIT for
No:
2013-14
1 2 3 4
tyres and tubes 6 sets 1,85,220
70 Heavy Duty Airless Spray Painting Equipment Each 4,87,770
21
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
1 The rate provided for ' SUNDRIES' (Lump sum provision for unquantified inputs in the
data rates) shall be updated on the basis of general percentage increase / decrease in the market
rates or on the basis of R.B.I ' All Commodity' index.
2 The rate for structural steel fabrication shall include cost of all materials (except
structural steel), machinery, labour and one coat of primer painting.
3 Demand charges and electric power charges shall be as per prevailing APCPDCL tariff.
4 Rate of interest on capital cost shall be as approved by Govt or other competent authority.
S Rate
Sl
DESCRIPTION OF MATERIAL UNIT for
No.
2013-14
1 2 3 4
1 Air hose 25 mm dia Rm 167
S Rate
Sl
DESCRIPTION OF MATERIAL UNIT for
No.
2013-14
1 2 3 4
9 Lubricants Ltr 275
10 Petrol Ltr 69
11 Rivets Kg 99
18 Steel wedges LS 16
19 Elbows / Nipple / Plugs etc., LS 17
20 Soldering materials LS 17
21 Steam circulation arrangement LS 17
22 Fuel charges ( gas for heating ) LS 17
23 Vulcanizing materials LS 17
24 Other accessories / controls / junctions LS deleted
25 Miscellaneous fittings / switches etc LS deleted
26 Anchors / supports for cables / lights LS deleted
27 Civil works for foundations / pedestals / duct etc LS deleted
28 Gas cutting set ( 2 No’s 15 m hose and nozzle unit ) Each 14,203
29 Grease Kg 254
Welding holder set ( cable / holder / gloves / mask
30 Each 7331
etc )
31 Use rate of ropes LS 150
23
Part I-Basic Input data for Irrigation items – Common SoR 2013-14
S Rate
Sl No. DESCRIPTION OF MATERIAL UNIT for
2013-14
1 Worm reducers Each 2,24,400
24
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
1 Average of the prevailing market rates, ignoring freak rates, is the criteria for
Fixing market rates for materials.
2 The rates for materials is inclusive of all taxes, duties and other local levies.
3 The rates for materials are exclusive of Seigniorage charges wherever applicable.
4 The rates for materials, except those for which lead charges are admissible as per the
Statement of lead charges is for all leads.
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
Quarried stone 150 - 200 mm size for Hand Broken
M-002 Cum 140
(Excluding Seigniorage charges)
Boulder with minimum size of 300 mm for Pitching
M-003 Cum 156
(Excluding Seigniorage charges)
Coarse sand for filling (Excluding Seigniorage Rate as per item
M-004 charges) Cum no.27(b) of material
of I&CAD
Coarse sand for mortar(Excluding Seigniorage Rate as per item
M-005 charges) Cum no.27(a) of material
of I&CAD
Rate as per item
Fine Sand (Excluding Seigniorage charges)
M-006 Cum no.28 of material of
I&CAD
Rate as per item
M-007 Murum (Excluding Seigniorage charges) Cum no.56 of Material
rates of I&CAD.
M-008 Gravel/Quarry spall(Excluding Seinorage Charges) Cum 98
M-009 Granular Material or hard murum for GSB works Cum Deleted
Granular Material or hard murum for GSB
M-010 Cum 89
works(Excluding Seigniorage charges)
M-011 Fly ash conforming to IS: 3812 ( Part II & I) Cum 70
For item No.M-012 to M-055 the note shall be as
follows
1) The rates mentioned are exclusive of Seigniorage
charges but inclusive of blasting charges of
Rs.70/cum and 25% machine crushing charges.
However, if the metal is obtained by hand broken,
machine crushing charges shall be deducted.
2) If the material is obtained by hand broken from
surface boulders/canal spoil, the blasting and crushing
charges shall be deducted.
3)The material shall be HB Stone of Granite,
Dolamite, Dolerite and Trap.(Quartzite and Basalt
with aggregate impact of less than 20)
25
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
Filter media/Filter Material as per Table 300-3
M-012 (MoRT&H Specification) (excluding Seiniorage Cum 335
Charges)
Close graded Granular sub-base Material 53 mm to
M-013 Cum 648
9.5 mm (excluding Seinorage Charges)
Close graded Granular sub-base Material 37.5 mm to
M-014 Cum 665
9.5 mm (excluding Seinorage Charges)
Close graded Granular sub-base Material 26.5 mm to
M-015 Cum 690
9.5 mm (excluding Seinorage Charges)
Close graded Granular sub-base Material 9.5 mm to
M-016 Cum 575
4.75 mm (excluding Seinorage Charges)
Close graded Granular sub-base Material 9.5 mm to
M-017 Cum 565
2.36 mm (excluding Seinorage Charges)
Close graded Granular sub-base Material 4.75mm to
M-018 Cum 495
2.36 mm (excluding Seinorage Charges)
Close graded Granular sub-base Material 4.75mm to
M-019 cum 475
75 micron mm((excluding Seinorage Charges)
Close graded Granular sub-base Material 2.36 mm
M-020 Cum 475
(excluding Seinorage Charges)
Stone crusher dust finer than 3mm with not more than
M-021 10% passing 0.075 sieve. (excluding Seinorage Cum 340
Charges)
Coarse graded Granular sub-base Material 2.36 mm
M-022 Cum 425
& below (excluding Seinorage Charges)
Coarse graded Granular sub-base Material 4.75mm to
M-023 cum 460
75 micron mm (excluding Seinorage Charges)
Coarse graded Granular sub-base Material 4.75 mm
M-024 Cum 460
to 2.36 mm (excluding Seinorage Charges)
Coarse graded Granular sub-base Material 9.5 mm to
M-025 Cum 545
4.75 mm (excluding Seinorage Charges)
Coarse graded Granular sub-base Material 26.5 mm
M-026 Cum 601
to 4.75 mm (excluding Seinorage Charges)
Coarse graded Granular sub-base Material 26.5 mm
M-027 Cum 602
to 9.5 mm (excluding Seinorage Charges)
Coarse graded Granular sub-base Material 37.5 mm
M-028 Cum 665
to 9.5 mm (excluding Seinorage Charges)
Coarse graded Granular sub-base Material 53 mm to
M-029 Cum 825
26 .5mm (excluding Seinorage Charges)
Aggregates below 5.6 mm(excluding Seiniorage
M-030 Cum 530
Charges)
Aggregates 22.4 mm to 2.36 mm (excluding
M-031 Cum 870
Seiniorage Charges)
Aggregates 22.4 mm to 5.6 mm (excluding
M-032 Cum 990
Seiniorage Charges)
Aggregates 45 mm to 2.8 mm (excluding Seiniorage
M-033 Cum 635
Charges)
26
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
Rate as per item
Aggregates 45 mm to 22.4 mm (excluding
M-034 Cum no.9 of Material
Seiniorage Charges)
rates of I&CAD.
Aggregates 53 mm to 2.8 mm (excluding Seiniorage
M-035 Cum 870
Charges)
Aggregates 53 mm to 22.4 mm (excluding
M-036 Cum 830
Seiniorage Charges)
Aggregates 63 mm to 2.8 mm (excluding Seiniorage
M-037 Cum 680
Charges)
Aggregates 63 mm to 45 mm (excluding Seiniorage
M-038 Cum 630
Charges)
Rate as per item
Aggregates 90 mm to 45 mm (excluding Seiniorage
M-039 Cum no.10 of Material
Charges)
rates of I&CAD.
Rate as per item
Aggregates 10 mm to 5 mm (excluding Seiniorage
M-040 Cum no.7 of Material
Charges)
rates of I&CAD.
Aggregates 11.2 mm to 0.09 mm (excluding
M-041 Cum 670
Seiniorage Charges)
Aggregates 13.2 mm to 0.09 mm(excluding
M-042 Cum 760
Seiniorage Charges)
Aggregates 13.2 mm to 5.6 mm (excluding
M-043 Cum 875
Seiniorage Charges)
Aggregates 13.2 mm to 10 mm(excluding
M-044 Cum 980
Seiniorage Charges)
Rate as per item
Aggregates 20 mm to 10 mm (excluding Seiniorage
M-045 Cum no.8 of Material
Charges)
rates of I&CAD.
Aggregates 25 mm to 10 mm (excluding Seiniorage
M-046 Cum 1075
Charges)
Aggregates 19 mm to 6 mm (excluding Seiniorage
M-047 Cum 990
Charges)
Aggregates 37.5 mm to 19 mm(excluding
M-048 Cum 1050
Seiniorage Charges)
Aggregates 37.5 mm to 25 mm(excluding
M-049 Cum 1090
Seiniorage Charges)
Aggregates 6 mm nominal size(excluding
M-050 Cum 700
Seiniorage Charges)
Aggregates 10 mm nominal size(excluding
M-051 Cum 890
Seiniorage Charges)
Aggregates 13.2/12.5 mm nominal size(excluding
M-052 Cum 1045
Seiniorage Charges)
Aggregates 20 mm nominal size(excluding
M-053 Cum 1300
Seiniorage Charges)
Aggregates 25 mm nominal size(excluding
M-054 Cum 1250
Seiniorage Charges)
27
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
Aggregates 40 mm nominal size(excluding
M-055 Cum 805
Seiniorage Charges)
M-056 AC pipe 100 mm dia Metre Rate as per PH item
M-057 Acrylic polymer bonding coat Litre 460
M-058 Aluminum Paint Litre 320
M-059 Aluminum alloy plate 2mm Thick Sqm 370
M-060 Aluminum alloy/Galvanized steel Tone 68,865
Aluminum sheeting fixed with encapsulated lens type
reflective sheeting including 2% towards lettering,
M-061 Sqm 940
cost of angle iron, cost of drilling holes, nuts, bolts
etc. and signs as applicable
Aluminum studs 100 x 100 mm fitted with lens As per local market
M-062 No’s
reflectors rate
M-063 Barbed wire Kg 80
M-064 Bearing (Cost of parts) No’s 570
Bearing (Cast steel rocker bearing assembly of 250
M-065 No’s 785
tonne )
Bearing (Elastomeric bearing assembly consisting of
7 internal layers of elastomer bonded to 6 nos.
M-066 Cm3
internal reinforcing steel laminates by the process of
vulcanization,)
M-067 Bearing (Forged steel roller bearing of 250 tonne) No’s
Bearing (Pot type bearing assembly consisting of a
metal piston supported by a disc, PTFE pads
As per Market
providing sliding surfaces against stainless steel
M-068 No’s Competitive rates.
mating together with cast steel assemblies/fabricated
structural steel assemblies duly painted with all
components
Bearing (PTFE sliding plate bearing assembly of 80
M-069 No’s
tonnes )
M-070 Bearing (Supply of sliding plate bearing of 80 tonne) No’s
M-071 Bentonite Kg 7.5
Rate as per item
M-072 Binding wire Kg no.3 of Material
rates of I&CAD.
M-073 Bitumen ( Cationic Emulsion ) Tone As per rates fixed
by R&B Dept based
M-074 Bitumen (60-70 grade)(Excluding taxes) Tone on refinery rates
M-075 Bitumen (80-100 grade ) (Excluding taxes) Tone
28
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
M-076 Bitumen (Cutback ) Tone
M-077 Bitumen (emulsion)(Excluding taxes) Tone
M-078 Bitumen (modified graded) Tone
As per Building
M-079 Brick Each
SSR
M-080 C.I. shoes for the pile Kg 54
Rate as per item
M-081 Cement Tone no.5 of Material
rates of I&CAD.
Rate as per item
M-082 Cold twisted bars (HYSD/TMT Bars) Tone no.62 of Material
rates of I&CAD
M-083 Collar for joints 300 mm dia No’s 160
M-084 Compressible Fibre Board(20mm thick) Sqm 525
M-085 Connectors/ Staples Each 80
M-086 Copper Plate(12m long x 250mmwide) Kg 520
M-087 Corrosion resistant Structural steel Tone 57,500
Corrugated sheet, 3 mm thick, "Tie" beam section
M-088 Kg 200
railing
M-089 Credit for excavated rock found suitable for use Cum 188
M-090 Curing compound Liter 131
As per local
Delineators from ISI certified firm as per the standard
M-091 Each competitive
drawing given in IRC - 79
quotations
Earth Cost or compensation for earth taken from
M-092 Cum 40
private land(Excluding Seigniorage Charges)
Elastomeric slab seal expansion joint assembly
As per local
manufactured by using chloroprene, elastomer for
M-093 Metre competitive
elastomeric slab unit conforming to clause 915.1 of
quotations
IRC: 83 (part II),
Electric Detonators @ 1 detonator for 1/2 gelatin stick
M-094 100 no’s 1205
of 125 gms each
Epoxy compound with accessories for preparing
M-095 Kg 350
epoxy mortar
M-096 Epoxy mortar Kg 115
M-097 Epoxy primer Kg 595
M-098 Epoxy resin-hardner mix for prime coat Kg 615
M-099 Flag of red color cloth 600 x 600 mm Each 25
29
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
M-100 Flowering Plants Each 40
M-101 Galvanized MS flat clamp No’s 195
Galvanized steel wire crates of mesh size 100 mm x
M-102 100 mm woven with 4mm dia. GI wire in rolls of Sqm 175
required size.
Galvanized structural steel plate 200 mm wide, 6 mm
M-103 Kg 905
thick, 24 m long
M-104 Gelatin 80% Kg 73
As per local
M-105 Geo grids Sqm competitive
quotations
M-106 (a)Geo membrane 500 micron thick Sqm 80
(b) Geo membrane 750 micron thick Sqm 120
(c) Geo membrane 1000 micron thick Sqm 165
As per local
M-107 Geo nets Sqm competitive
quotations
M-108 (a)Geo textile 160 gsm Sqm 110
(b) Geo textile 200 gsm Sqm 125
(c) Geo textile 250 gsm Sqm 150
As per local
M-109 Geo textile filter fabric Sqm competitive
quotations
M-110 GI bolt 10 mm Dia No’s 22
Rate covered in hire
charges of
M-111 Grouting pump with agitator Hour
machinery of
Irrigation items
Grass (Doob)
M-112 Kg 6
Grass (Fine)
M-113 Kg 8
M-114 HDPE pipes 75mm dia Metre Rate as per PH
M-115 HDPE pipes 90mm dia Metre items
M-116 Hedge plants Each
M-117 Helical pipes 600mm diameter Metre Rate as per local
competitive
M-118 Hot applied thermoplastic compound Litre quotations
M-119 HTS strand Tone
30
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
M-120 Joint Sealant Compound Kg
Jute netting, open weave, 2.5 cm square opening for
M-121 Sqm 90
seeding and Mulching
M-122 LDO for steam curing Litre 65
M-123 M.S. Clamps Kg Deleted
Rate as per local
M-124 M.S. Clamps Kg competitive
quotations
Rate as per local
M-125 M.S. shoes @ 35 Kg per pile of 15 m Kg competitive
quotations
Mild Steel bars
M-126 Tone 45,500
Modular strip/box seal expansion joint including
anchorage catering to a horizontal movement beyond
70 mm and up to 140mm assembly comprising of
Rate as per local
edge beams, central beam,2 modules chloroprene seal,
M-127 Metre competitive
anchorage elements, support and control system, all
quotations
steel sections protected against corrosion and installed
by the manufacturer or his authorized representative
Nipples 12mm
M-129 No’s 19
Nuts and bolts
M-130 Kg 94
Paint
M-131 Litre 243
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
quotations
R.C.C Pipes 200 mm dia, 2.5 m long for drainage Rate as per PH item
M-137 Metre
Plastic sheath, 1.25 mm thick for dowel bars
M-138 Sqm
RCC Pipe NP 4 heavy duty non pressure pipe 1200 Rate as per PH
M-150 Metre
mm dia items
RCC Pipe NP 4 heavy duty non pressure pipe 300
M-151 mm dia Metre
32
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
Reinforcement strips 60 mm wide 5 mm thick as per
M-156 Metre
clause 3102. (Stainless steel strips)
Reinforcement strips 60 mm wide 5 mm thick as per
M-157 Metre
clause 3102. (Aluminum strips)
M-158 Rivets Each 6
M-159 Sand bags (Cost of sand and Empty cement bag) No’s 16
Rate as per local
M-160 Sapling 2 m high 25 mm dia Each competitive
quotations
M-161 Scrap tyres of size 900 x 20 No’s 80
M-162 Seeds(Grass) Kg 18
Cost of Selected earth (Excluding Seignorage
M-163 Cum 40
Charges)
Separation Membrane of impermeable plastic Rate as per local
M-164 Sqm
sheeting 125 micron thick competitive
M-165 Sheathing duct Metre quotations
M-166 Shrubs Each 15
Rate as per local
Sludge / Farm yard manure @ 0.18 cum per 100 sqm
M-167 Cum competitive
at site of work for turfing
quotations
M-168 Sodium vapour lamp Each As per building SSR
Square Rubble Coursed Stone(Including Loading
M-169 Cum 2150
Charges but excluding Seigniorage charges)
Steel circular hollow pole of standard specification for
M-170 street lighting to mount light at 5 m height above deck Each Rate to be obtained
level from Electricity/
Steel circular hollow pole of standard specification for Municipal
M-171 street lighting to mount light at 9 m height above road Each Departments
level
Steel drum 300 mm dia 1.2 m high/empty bitumen
M-172 No’s As per local
drum
competitive market
Steel helmet and cushion block on top of pile head
M-173 Kg rate
during driving.
M-174 Steel pipe 25 mm external dia as per IS:1239 Metre 280
M-175 Steel pipe 50 mm external dia as per IS:1239 Metre 545
M-176 Steel wire rope 20 mm Kg 180
M-177 Steel wire rope 40 mm Kg 205
Rate as per local
M-178 Strip seal expansion join Metre competitive
quotations
33
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
Rate as per item
M-179 Structural Steel(HYSD/TMT bars) Tone no.62 of Material
rates of I&CAD
Super plasticizer admixture IS marked as per 9103-
M-180 Kg 65
1999
Rate as per local
Synthetic Geo grids as per clause 3102.8 and competitive
M-181 Sqm
approved design and specifications. quotations
Un slaked lime
M-188 Tonne 2540
Water
M-189 KiloLitre 100
Water based cement paint
M-190 Litre As per building SSR
Welded steel wire fabric
M-191 Kg 150
Wire mesh 50mm x 50mm size of 3mm wire
M-192 Kg 245
Wooden ballies 2" Dia for bracing
M-193 Each As per Building
SSR
M-194 Wooden ballies 8" Dia and 9 m long Each
M-195 Wooden packing Cum 1265
Wooden staff for fastening of flag 25 mm dia, one m
M-196 Each 75
long
34
Part I - Materials not covered under Irrigation basic data– Common SoR 2013-14
S. Rate
Sl. No. Description Unit for
2013-14
1 2 3 4
Thinner
5 Ltr 140
35
Conveyance Charges of Material – Common SoR 2013-14
Conveyance
Charges of Material
36
Conveyance Charges of Material – Common SoR 2013-14
1. For total lead up to 150 m (including initial lead) lead charges by head load only shall be adopted
irrespective of mode of conveyance.
2. For total lead exceeding 150 m conveyance by mechanical means only shall be adopted
irrespective of mode of conveyance.
3. The rates for loading at quarry including idle hire charges of trucks and hire charges
per for each kilometer and up to 5 km are cumulative and inclusive of total charges for
Preceding lead.
4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stones are for
loose volume and not for compacted or in-situ volume.
5. The rates for lift charges, lead charges, hire charges are cumulative and inclusive of rates for
preceding lift, lead and hire charges.
6. Lift charges are not payable where conveyance of materials is by mechanical means to final
placing point.
7. Loading and unloading charges are not payable for conveyance by head load.
8. Loading charges are not payable for conveyance by mechanical means for disposal of
excavated materials beyond initial lead of 50 m wherever specified.
9. Loading and unloading charges are not payable for conveyance by mechanical means for
disposal of excavated materials beyond initial lead of 1 km wherever specified.
10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble, size
stone and cut stone are inclusive of stacking.
11. Hire charges are per 1KM for tippers and trucks for transport of materials from work site to
dump yard and other places are cumulative& includes previous km up to 5 kms
12. For detailed calculations, refer to the Lead & Lift charges (Common to all Departments)
chapter of Irrigation & CAD works (Part-1), A.P. Revised Standard data. The lead & lift
charges are inclusive of 14% Contractors profit and Overhead charges.
37
Conveyance Charges of Material – Common SoR 2013-14
1 2 3 4 5
Total lead up to 50 m
1 (covered by item rate) initial lead initial lead initial lead
2 Total lead up to 100 m 45.60 26.60 58.00
3 Total lead up to 150 m 91.20 53.20 116.10
Notes: 1. No loading or unloading charges are admissible for conveyance by head load.
2. For total lead exceeding 150 m conveyance charges by mechanical means only shall be
adopted irrespective of mode of conveyance.
3.The lead & lift charges are inclusive of 14% Contractor Profit and Over Head
charges
B.( LEAD) CONVEYANCE CHARGES FOR MACHINERY PER KILOMETER FOR
TRANSPORTING MATERIALS BY TIPPERS AND TRUCKS EXCLUDING LOADING,
UNLOADING AND IDLE HIRE CHARGES OF MACHINERY
FOR THE YEAR: 2013-14
( No loading and unloading charges allowed for machinery loading and unloading )
(Lead) (Lead)
charges for (Lead) charges
(Lead)
(Lead) charges trucks and charges for trucks
charges for
for trucks and (Lead) charges for tippers per for trucks per 1000
trucks and
tippers for trucks and tippers cu.meter and nos. of
tippers for
Sl Rubble/Size for Cement/ Steel/ for PCC tippers bricks
Distance Earth / Sand
No. stones/ Cut RCC poles/ AC & slabs/ per
/Gravel /
Stones/ Coarse GI sheets/ Packed Shahabad cu.meter
Murrum/
aggregate per materials/tonne slabs/ CC & water/
Lime/ Surki/
cu.meter Laterite 1000
per cu.meter
blocks/ litres
Wood/ cum
1 2 3 4 5 6 7 8
1 Lead up to 1 km 30.00 28.90 18.00 42.40 17.80 48.10
2 Lead up to 2 km 42.00 40.40 25.30 59.40 24.90 67.30
3 Lead up to 3 km 56.00 56.00 35.00 82.40 33.20 89.80
4 Lead up to 4 km 68.00 68.00 42.50 100.00 40.30 109.00
5 Lead up to 5 km 80.00 80.00 50.00 117.70 47.40 128.30
for Every km
beyond 5 km up to
6 30 km 12.00 12.00 7.50 17.60 7.10 19.20
for Every km beyond
7 30 km 10.00 10.00 6.30 14.70 5.90 16.00
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head charges
38
Conveyance Charges of Material – Common SoR 2013-14
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head charges
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head charges.
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head charges
39
Conveyance Charges of Material – Common SoR 2013-14
Earth / Sand
/Gravel PCC slab/
Murrum/ Lime/ Cement / Shahbad
Total lift Surki/ Reinforce- slab / CC
Sl
( Total lift includes Size stone / Cut ment steel block/ BS
No.
initial lift ) stone Str steel slab / Laterite
Rubble / Coarse Rs / tonne / Wood
aggregate Rs / cum
Rs / cum
1 2 3 4 5
Total lift up to 3 m
1 (covered by item rate) Initial lift Initial lift Initial lift
For Every 1.00 Lift
beyond initial lift of 3
2 meters 5.30 3.80 7.10
Note: The lead & lift charges are inclusive of 14% Contractor Profit and Over Head charges
40
Machinery Hire Charges – Common SoR 2013-14
HIRE CHARGES
41
Machinery Hire Charges – Common SoR 2013-14
44
ROADS & BRIDGE WORKS
INDEX
PART-II
ROAD & BRIDGE WORKS
1
PREAMBLE
a) (i)25% extra over the rates on labour component of works is allowed in all
Municipal Corporation Limits of Andhra Pradesh except Greater
Hyderabad, Greater Visakhapatnam and Vijayawada municipal
corporation (Upto a belt of 12 kms from Municipal corporation limits)
and other corporations as notified by the Government from time to time.
(ii)40% extra over the rates on labour component of works for Greater
Hyderabad , Greater Visakhapatnam and Vijayawada Municipal
Corporation limits (Upto a belt of 12 kms from Municipal corporation
limits)
b) Allow 20% extra over basic rates on labour component of works in all
District Headquarters and the remaining Municipal limits ( up to a belt of
12 Kms. from Municipal limits ).
c) For works at Tirumala Hills in Chittoor District, 40% extra over the basic
rates of labour component is allowed.
d) For works at Horsely hills in Chittoor District, 30% extra over the basic
rates of labour component is allowed.
e) For works located inside Tirumala Temple, 20% extra over the basic rate
of labour component specified for Tirumala Hills is allowed.
f) For Works located inside T.T.D Temples of Sri Padmavathi Ammavari
Temple, Tiruchanoor, Sri Govindaraja Swamy Temple at Tirupathi, Sri
Kapleswara Swamy Temple, Kapilatheerthm, Tirupathi and Sri Kalyana
Venkateswara Swamy Temple, Srinivasa Mangapuram , 20% extra over
the basic rates of labour component for Tirupathi Municipal Corporation
is allowed.
2
B) JAIL COMPOUNDS:
20% extra is allowed over labour rates for the work in the Jail compounds.
Only equivalent number of Man Mazdoor shall be provided in the Jail
premises and no women Mazdoor are allowed inside.
C) INDUSTRIAL AREA:
a. 20% over basic rates on labour component works allowed for works
situated within 10 Kms belt of Industrial area of, Jeedimetla,
Lingampally, Ibrahimpatnam, Tandur in Ranga Reddy District,
Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla,
Gurajala, Challapalli in Guntur District Garividi in Vijayanagaram
District, Kothur in Mahabubnagar District, Patancheru,
Ramachandrapur in Medak District, Bibinagar in Nalgonda District,
Ramagundam and Godavarikhani in Karimnagar District, Renigunta in
Chittoor District and Yerraguntla & Mangampet in Kadapa District,
Manchiryal, Mandamarri, Bellampalli in Adilabad District, Sarpaka,
Kothagudem, Paloncha, Manguguru, Singareni Collieries in Khammam
District, Kamalapur, Bhoopalpally of Warangal District, Wadepally of
Nalgonda District, Nagapally(Centenary Colony, Begumpet “X”
roads) Takkalapally of Karimnagar District, Hindupur, Tadipatri,
Anantapur, Guntakal, Rayalcheruvu, Yadiki of Anantapur District and
Adoni, Dhone, Cement Nagar, Nandyal, Kurnool, Yemmiganur &
Bethamcherla of Kurnool District ,Anakapally of Vishakhapatnam
District.
a) 25% extra allowed for the works located with in the interior Agency /
Tribal limits, i.e. for the works located with in & upto16 KMs from any all
weather route inside Agency / Tribal.
3
b) 40% extra allowed for the works located with in the interior Agency /
Tribal limits, i.e. for the works located beyond 16 KMs from any all
weather route inside Agency / Tribal.
E) GHAT ROADS:
For Ghat Roads steeper than 1 in 20, the length of the road may be taken
as 1.5 times the existing length of the road for the purpose of leads only
for conveyance of materials based on the certificate for the Ghat Road
given by the Superintending Engineer concerned.
If more than one area allowance ( such as those ) for (1) Municipalities (2) Agency
/ Tribal areas (3) Industrial areas are applicable for a particular situation, only
4
2.0 WATER LEADS:
A. TRIAL TRENCHES:
B. TRIAL PITS:
5
IV) Silt removal in restricted areas such … 120% extra
U. T’s., Culverts and Syphons.
Note: 1) The extra percentage is allowed over rate for corresponding soil. It
includes the charges for all lifts and initial lead but does not include
dewatering charges if any in respect of all the items under ( A) and (B)
above.
4.0 Proportion of First class and 2nd class workmen under Skilled
Labour:
30% of the skilled labour provided in the data may be taken as 1st Class
and the remaining 70% as 2nd Class.
III) The rate of labour component as per the standard data book
is to be adopted for revetment work only. However for
apron work Rs. 3.00 per cum. should be deducted.
6
IV) For the labour for the “Rock Toe” shall be taken as 2/3rd
of the labour charges of revetment as Chief Engineer,
Circular No. P3/ OT2/ T3/ 65167/78, Dt: 19.03.1980.
7
LABOUR RATES
8
SoRate
S.S. Unit for
Sl. Item (per 2013-
No. No. Description ) 14 Remarks
1 2 3 4 5 6
(A) SKILLED WORKMEN
First Class
1 a Mason and stone Cutter Day 350 As per I& CAD
(S.No.39)
16 7 Tipper and Heavy Vehicle Driver above 12 Day 400 As per I& CAD
(S.No.15)
T
17 Tanker and Medium Vehicle Driver (7.5 T Day 350
to 12 T)
18 Tanker and Light Vehicle Driver up to 7.5 Day 280
T
19 Wagon Drill Operator upto 7.5 T Day 350
9
21 Road Roller Driver ( 7.5 T to 12 T) Day 350 As per I& CAD
(S.No.27)
38 16 Work inspector with I.T.I qualification Day 400 As per I& CAD
(S.No.9) Other
category
39 17 Work Inspector with LCE, LME, L.E.E Day 500 As per I& CAD
(S.No.4) Other
Qualification category
40 18 Work Inspector with B.E (Civil, Mechanical Day 670 As per I& CAD
(S.No.7) Other
and Electrical qualification) category
10
43 21a(i) Typist / Job Typist Day 390 As per I& CAD
(S.No.13)
Other category
SECOND CLASS
44 1 Mason Day 320 As per I& CAD
(S.No.35)
45 b Brick Layer and Stone Cutter Day 320 As per I& CAD
(S.No.35)
11
66 16 Cleaner/Helper Day 320
67 17 Stone Packer Day 320
68 18 Jawali Day 320
69 19 Ex-Service man / Goorkha watchman Day 320
70 20 Ratton worker Day 320
71 21 Mate Day 320
72 1 Head mazdoor(Mukaddar) Day 320 As per I& CAD
(S.No.10) semi
skilled
12
2) 25% extra over the corresponding labour
rates in respect of the work to be done during
night time subject to issue of certificate
accordingly by the concerned estimate
sanctioning authority for providing in the data and
by concerned Executive Engineer in charge of the
work for payment. The night time allowance is
applicable only to the works done under Greater
Hyderabad Municipal Corporation, Greater
Visakhapatnam municipal corporation and
Vijayawada municipal corporation limits only.
13
MATERIAL & WORK ITEM RATES
14
RATES OF MATERIALS & WORK ITEMS
RATES Remarks
OF SoRate
MATERI S.S.
Unit for
ALS & Item Description
WORK (per) 2013-
No.
ITEMS 14
Sl.No.
1 2 3 4 5
(A) STONE AND ROAD
MATERIALS
ROUGH STONE QUARRIED
INCLUDING WEDGING,
BREAKING, BURNING,
SPLITING
1 22.a For R.R Masonary Work (other 1 cum 160
than Granite, Dolomite and
Trap)
2 b.I For SS Revetment work 225 1 cum 140 As per I& CAD (S.no.3
of Miscellaneous
mm items Material other
than covered under
irrigation
3 b.ii For SS Revetment work 300 1 cum 156 As per I& CAD (M003
of Material) other
mm than covered under
irrigation
4 b.iii For SS Revetment work450 mm 1 cum 136
5 C Jeddy Stone above 450 mm to 1 cum 188
600 mm
6 d I. Laterite for revetment 225 mm 1 cum 118
7 d II. Laterite for revetment 300 mm 1 cum 138
8 d.iii Granite for SS revetment 225 1 cum 154
mm
9 d.iv Granite for SS revetment 300 1 cum 156
mm
Note:- Only when other granite
is not available
10 E Laterite for masonry 1 cum 136
11 F Cyclopean stones above 0.2 cum 1 cum 254
12 G For R.R.Masonry works ( 1 cum 245 As per I& CAD (M148
of Material) other
granite, dolamite and trap than covered under
variety) irrigation
15
13 NOTE:- For items 22(a) to 22© 1 cum 76
and 22(g) add extra Rs
/cum, wherever quarrying is
done by blasting
COURSED RUBBLE STONE
QUARRYING WEDGING,
BREAKING, BURNING AND
SPLITTING FOR SS FIRST
SORT WORKS
14 23.a Granite, Dolamite and trap 1 cum 262
15 B For other varieties 1 cum 188
16 27 Granite stone slabs for culverts, 1 cum 1728
lintels and copings (3 faces
dressed coarsed rubble
masonry)
17 NOTE: - For items 23(a), 23(b) 1 cum 74
and 27 add extra Rs. Per Cum,
wherever quarrying is done by
blasting
18 28 Bond stones ( 600 x 200 x 200 each 30
mm )
19 B Chainage stones and Centre line each 37
stones (750x150x150xmm)
20 31 Demarcation Stones ( 900 x 150 each 70
x 150 mm)
21 32.a Guard Stones ( 1200 x 200 x each 102
200 mm )
22 B Guide Stones ( 800 x 150 x150 each 70
mm )
23 C Carving letters and figures in each 8
stone up to 100 mm size
24 D Carving letters and figures in each 9
stone above 100 mm size
HARD BROKEN STONE OF
GRANITE, TRAP AND
DOLERITE FREE FROM DUST
OBTAINED BY QUARRYING,
WEDGING, BREAKING,
BURNING AND SPLITTING.
25 33.a - do - 6mm size (SS 5) 1 cum 504 As per I& CAD (M050
of Material) other
than covered under
irrigation
26 b - do - 10mm size (SS 5) 1 cum 656 As per I& CAD (M051
of Material) other
than covered under
irrigation
16
27 c - do - 12mm size (SS 5) 1 cum 780 As per I& CAD (M052
of Material) other
than covered under
irrigation
28 d - do - 20mm size (SS 5) 1 cum 984 As per I& CAD (M053
of Material) other
than covered under
irrigation
29 e - do - 25mm size (SS 5) 1 cum 944 As per I& CAD (M054
of Material) other
than covered under
irrigation
30 f - do - 40mm size (SS 5) 1 cum 588 As per I& CAD (M055
of Material) other
than covered under
irrigation
31 g - do - 50mm size (SS 5) 1 cum 456
32 h - do - 60mm size (SS 5) 1 cum 419
33 I - do - 65mm size (SS 5) 1 cum 379
34 j - do - 75mm size (SS 5) 1 cum 304
35 k - do - 75 to 100mm size (SS 1 cum 248
5)
36 NOTE:- (1) Add extra Rs. /- 70
per cum for items 33 (a) to 33
(k) if the metal is obtained by
blasting
37 (2) Add 25% extra per cum if 25%
the metal is obtained by
machine crushing excluding cost
of blasting.
38 (3) Deduct Rs. /- per cum if 9.9
the metal or rubble is obtained
from surface stone and
boulders.
39 (4) Add Rs. /- per cum for 17
selection of stones and boulders
from excavated spoil dumps for
items 33 a to 33 k, when this
addition of Rs. /- per Cum is
allowed, deduction of Rs. /- per
Cum mentioned under Note (3) 9.9
above should invariably be
made.
SOFT BROKEN STONE
SCREENED AND FREE FROM
DUST
40 33.l - do - 40 mm size ( SS 5 ) 1 Cum 123
41 33.m - do - 50 mm size ( SS 5 ) 1 Cum 111
42 33.n - do - 60 mm size ( SS 5 ) 1 Cum 87
17
43 33.o - do - 65 mm size ( SS 5 ) 1 Cum 78
44 33.p - do - 75 mm size ( SS 5 ) 1 Cum 73
18
addition of Rs. /- per cum 9.90
allowed deduction of Rs. /- per
cum mentioned under note (3)
above should invariably be made
HARD BROKEN STONE OTHER
THAN GRANITE SUCH AS
QUARTZ, QUARTZ-NAPA AND
BASALT SCREENED AND FREE
FROM DUST
60 33.q - do - 10 mm size (SS 5) 1 Cum 386.00
61 -do- 9.5 mm to 11.2 mm size ( 1 Cum 386.00
IRC and MORTH )
62 r - do - 12 mm size (SS 5) 1 Cum 362.00
63 -do- 12mm to 14 mm size ( IRC 1 Cum 362.00
and MORTH )
64 S - do - 20 mm size (SS 5) 1 Cum 293.00
65 -do- 19 mm to 22 mm size ( IRC 1 Cum 293.00
and MORTH )
66 T - do - 25 mm size (SS 5) 1 Cum 287.00
67 U - do - 40 mm size (SS 5) 1 Cum 170.00
68 -do- 40 mm to 45 mm size ( IRC 1 Cum 170.00
and MORTH )
69 V - do - 50 mm size (SS 5) 1 Cum 150.00
70 -do- 50 mm to 55 mm size ( IRC 1 Cum 150.00
and MORTH )
71 33.w - do - 65 mm size (SS 5) 1 Cum 142.00
72 -do- 60 mm to 65 mm size ( 1 Cum 142.00
IRC and MORTH )
73 X - do - 75 mm size (SS 5) 1 Cum 117.00
74 - do - 75 mm size ( IRC 1 Cum 117.00
&MORTH)
75 Y - do - 75 to 100 mm size 1 Cum 92.00
(SS 5)
76 - do - 75 to 100 mm ( IRC& 1 Cum 92.00
MORTH)
OTHER ITEMS
77 33.z1 Laterite 40 to 75 mm ( ring) 1 Cum 101.00
78 z2 kankar, hard broken kankar 40 1 Cum 75.00
to 75 mm ( ring )
79 z3 Soling stone of 150 mm size of 1 Cum 95.00
granite, trap and Dolamite
varieties.
19
80 NOTE:- (1) Add extra for items 1 Cum 70.00 As proposed by I&
CAD
to 33(z3) Rs /- Per cum,
wherever quarrying is done by
blasting. (2) Wherever
controlled blasting is resorted to
the Chief Engineer concerned
shall approve the observed data
in support of SS item No. 22 a
to 22 c , 22g, 23
81 z4 Soling stone of 150 mm size 1 Cum 66.00
other than granite variety
82 z5 Soling Stone laterite, Kankar 1 Cum 41.00
150mm, surface stone
83 z6 Field picked metal unbroken 1 Cum 55.00
20 mm size
84 z7 - do - 25 mm size 1 Cum 42.00
85 z8 - do - 40 mm size 1 Cum 48.00
92 B HBG Stone Chips 2.36mm and 1 Cum 330.00 As per I& CAD
(S.No.67 of Material)
below
93 36.a Sand for mortar, plastering, 1 Cum 505.00 As per I& CAD
(S.No.28 of Material)
ceiling coat including washing
screening etc.,
94 b. Sand for concrete 1 Cum 385.00 As per I& CAD
(S.No.27.a of
Material
95 c Sand for filling and blindage 1 Cum 285.00 As per I& CAD
(S.No.27 b of
Material)
20
96 37 Clay for puddle and masonry 1 Cum 35.00
Items 38 (a) to 39 (h) As per
local prevailing rates based on
competitive quotations.
(C) LIME AND CEMENT
97 40 to
41(c As per
) Local
prevailing
rates
based on
competiti
ve rates
98 42 Cement excluding cost of empty 1 MT monthly
cement bags rates will
be
communic
ated by
Govt
NOTE: (1) The rates are inclusive of sales tax. 2) As per the
rates applicable to the District. 3) Least of the (1) and (2 )
above may be allowed 4) The price of cement will be
reviewed and fixed on monthly basis and rates will be
communicated separately.
99 C Grinding lime mortar or Surkhi 1 Cum 94.00
mortar
100 D Shell lime slaked and screened 1 Cum 940.00
101 E White cement 1 Kg. 30.00
102 (D) MORTARS
103 43 to Items 43 to 45
45
(E) METAL AND IRON WORKS
104 Mild steel rods 6mm dia. 1 MT The
monthly
105 Mild steel flats 1 MT rates will
106 Mild Steel, Structural Steel, I.e., 1 MT be
Angles, Channels and I sections. communi
cated by
107 High Yield Strength Deformed 1 MT Govt.
Bars/TMT bars
108 Mild steel plates 1 MT
21
III RATES OF WORKS
(A) CLEARING SITE
109 1.a Clearing heavy Jungle 1 Sqm 2.90
110 B Clearing light Jungle 1 Sqm 2.60
111 C Clearing Scrub Jungle 1 Sqm 2.60
112 D Clearing Juliflora (Prosafis) 1 Sqm 3.70
jungle including up-rooting and
removing of Juliflora stumps.
113 2.a.I Cutting and removing Palmyrah Each 19.00
trees including stacking of girth
30 to 100 cm.
114 Ii - do - 100 to 200 cm. Each 44.00
115 2.b.I Uprooting and removing Each 46.00
Palmyrah stumps including
stacking of girth 30 to 100 cm.
116 Ii - do - 100 to 200 cm. Each 48.00
117 2.c.I Cutting and removing date trees Each 24.00
including stacking of girth 30 to
100 cm
118 Ii - do - 100 to 200 cm Each 35.00
119 d.I Uprooting and removing stumps Each 24.00
of date trees including stacking
of girth 30 to 100 cm.
120 Ii - do - 100 to 200 cm Each 30.00
121 eI Cutting and removing other kind Each 30.00
of trees including stacking of
girth 30 to 100 cm
122 Ii - do - 100 to 200 cm Each 46.00
123 iii - do - above 200 cm Each 75.00
124 f.I Uprooting and removing stumps Each 24.00
of other kind of trees including
stacking of girth 30 to 100 cm.
125 Ii - do - 100 to 200 cm Each 33.00
126 iii - do - above 200 cm Each 41.00
127 3.a Uprooting and clearing prickly 1 Sqm 2.30
pear jungle
128 B - do - under 2.5 meters height 1 Sqm 3.00
including burning and burrying
as directed.
129 C - do - over 2.5 meters height 1 Sqm 3.50
including burning and burrying
with an initital lead of
conveyance
22
130 4.a Removing of natchu, goobi, 1 Sqm 1.90
thooti etc., from drains,
channels including clearance if
not more than 1 metre depth of
water with an initial lead of 10
metresand lift of 2 metres.
131 b.I Clearing alchi, tilla 1 Sq.m 3.80
132 b.ii Removal of Jammu 1 Sq.m 3.30
133 c.I Removal of imponea, cornea 1 Sq.m 3.60
134 c.ii Removal of water hyacinth upto 1 Sqm 3.70
30 cm thick.
135 c.iii - do - more than 30 cm thick 1 Sq.m 5.00
136 D Removal of natchu, goobi, thooti 1 Sqm 1.40
etc., for every extra lead or lift
over the initial lead or lift.
(B) DISMANTLING
5 DISMANTLING, CLEARING
AWAY MATERIALS USEFUL
FOR REUSE.
137 n.(i) Dry rough stone revetment for 1 cum 62.50
aprons and stacking within 40
metres
7 Drilling holes in hard granite
or sheet rock
a) Manually ( Hand)
138 I) 20 mm dia meter 1 RM 124.00
139 ii) 25 mm dia meter 1 RM 131.00
140 iii) 36 mm dia meter 1 RM 151.00
141 b) Pneumatic Compressor
142 I) 20 mm dia meter 1 RM 140.00
143 ii) 25 mm dia meter 1 RM 152.00
144 iii) 36 mm dia meter 1 RM 165.00
8 Grouting the holes with neat
cement slurry excluding cost
of steel
145 I) 20 mm dia meter 1 RM 88.00
146 ii) 25 mm dia meter 1 RM 111.00
147 iii) 36 mm dia meter 1 RM 138.00
White Washing and Painting
works
23
148 AI White washing and colour each 8.60
banding for guard and guide
stones including cost of
materials
149 BI Screening sand and gravel 1 cum 9.30
150 B2 Screening chips and metal 1 cum 16.00
151 C1 Removing and refixing each 11.50
Hectometre or Demarcation
stones
(S ) ROAD WORK ITEMS
PICKING OLD METALLED
SURFACE TO DEPTH OF 40 TO
100 mm SPREADING OLD METAL
AND NEW METAL SECTIONING
INCLUDING EDGEBUNDS AND
SUBGRADE ROLLING,
SPREADING METAL INCLUDING
BLINDAGE OFGRAVEL
WATERING WITH AN INITIAL
LEAD OF 2 HECTOMETERS AND
HAND ROLLER ( 1.5 TO 2
TONNES) ROLLING ETC.,
INCLUDING BARRICADING,
DIVERSION OF TRAFFIC AND
WETTING THE NEW
CONSOLIDATION FOR A
FORTNIGHT COMPLETE
( For a compact thickness )
1 (I ) HARD METAL
152 A 40 mm thickness 10 sqm 70.00
153 B 50 mm thickness 10 sqm 74.00
154 C 75 mm thickness 10 sqm 80.30
155 D 100 mm thickness 10 sqm 87.00
156 1 (ii ) (For compact thickness of
soft metal)
157 A 50 mm thickness 10 sqm 53.80
158 B 75 mm thickness 10 sqm 63.90
159 C 100 mm thickness 10 sqm 70.10
5 Picking old metalled surface
to a depth of 40 to 100 mm
and spreading metal
including watering with an
initial lead of 2 Hectometers
and rolling with power
rollers watering and
spreading gravel for blindage
24
and power roller rolling
including hire charges of
power roller( 8 to 10 T )
barricading and diversion of
traffic and wetting the new
consolidation for a fortnight
(for compacted thickness of )
HARD METAL
160 5 (a) 40 mm thick ness 10 sqm 185.00
161 (b) 50 mm thick ness 10 sqm 210.00
162 (c ) 75 mm thick ness 10 sqm 231.30
163 (d ) 100 mm thick ness 10 sqm 248.80
164 (e) 150 mm thick excluding hire 10 sqm 445.40
charges
165 Gelatin(For MORTH data, for Per Kg 73.00 As per I& CAD (M104
of Material) other
works of state & national high than covered under
ways only) irrigation
166 Electric Detonators(For MORTH each 13.00 As per I& CAD (M094
of Material) other
data, for works of state & than covered under
national high ways only) irrigation
167 Hot applied thermoplastic Per Litre Rate as As per I& CAD (M118
of Material) other
compound(For MORTH data, for per local
than covered under
works of state & national high competit irrigation
ways only) ive
quotatio
ns
168 Reflectionising glass beads of 2 Per Kg 80.30
mm thick(For MORTH data, for
works of state & national high
ways only)
169 Road marking paint confirming Per Kg 196.60
to IS 164(For MORTH data, for
works of state & national high
ways only)
170 n Labour charges for laying filters 1 cum 55.30
with coarse aggregate.
171 o Labour charges for laying filter 1 cum 30.70
with sand.
New Items.
172 Fly Ash 1 cum
173 Binding wire 1 Kg. 70.00 As per I& CAD (M072
of Material) other
than covered under
irrigation
25
HIRE CHARGES OF
PLANT AND MACHINERY
FOR ROAD & BRIDGE WORKS
26
HIRE CHARGES OF PLANT& MACHNIERY FOR
ROAD & BRIDGE WORKS FOR THE YEAR 2013-14
SoRate
for
2013-14
Description Remarks
Sl.
No. Machine Activity Unit ( Rupees)
1 2 3 4 5
1 Dozer( D 80 ) Spreading Per 2511.70 As per I& CAD
(S.No.8)
Hour
Cutting
Cleaning
2 Dozer( D 50 ) Spreading Per 1570.00
Cutting Hour
Cleaning
3 Mortor Grader Clearing Per 3216.00
Spreading Hour
GSB
WMM
4 Hydraulic Soil Ordinary Per 2754.50 As per I& CAD
(S.No.53)
Excavator Soil Marshy Hour
Soil unsuitable
5 Front end loader Soil loading Per 1646.00
Hour
Aggregate Per
loading Hour
6 Tipper- 5.5 Cum Transportation of Per 877.30 As per I& CAD
(S.No.55)
soil, GSB,WMM, Hour
Hot mix etc
27
12 Tractor with Scarifying Per 422.00
rotavator/Grader Hour
13 Tractor with ripper Scarifying Per 422.00
attachment Hour
14 Air Compressor 5 General purpose Per 499.40 As per I& CAD
(S.No.2)
cmm (electric) Hour
15 Wet mix plant 60 Wet mix Per 1646.00
TPH Hour
16 Mechanical broom Surface cleaning Per 357.00
Hydraulic Hour
17 Bitumen Pressure Applying bitumen Per 1498.00
Distributor tack coat Hour
/Premix
20 Hot mix Plant – DBM/BM/SDC Per 24171.00
100 TPH capacity Hour
/Premix
21 Hot mix Plant – 60 DBM/BM/SDC Per 21668.00
TPH capacity Hour
/Premix
22 Hot mix Plant – 40 DBM/BM/SDC Per 19120.00
to 60 TPH capacity Hour
/Premix
23 Paver Finisher DBM/BM/SDC Per 11441.00
Hydrostatic with Hour
sensor control 100
TPH
/Premix
24 Paver finisher Paving of WMM, Per 2249.00
Mechanical 100 paving of DLC Hour
28
29 Bitumen boiler oil Bitumen Per 209.00
fired Spraying Hour
30 GSB Plant 50 Cum Producing GSB Per 1143.00
Hour
31 Mastic Cooker Mastic wearing Per 65.00
coat Hour
32 Batching and Concrete mixing Per 1231.90
Mixing Plant (a) Hour
50 Cum capacity
(b) 15 Cum Concrete mixing Per 1037.20 As per I& CAD
(S.No.10)
capacity Hour
29
41 Integrated stone Crushing of Per 8712.00
crusher spalls 100 TPH Hour
45 Truck 5.5 cum per Material Per 843.90 As per I& CAD
(S.No.59)
10 tones transport Hour
30
PUBLIC HEALTH ITEMS
PUBLIC HEALTH ITEMS
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
1 RATES OF LABOUR (SKILLED WORKMEN)
1. Caulkar Per Day
2. Plumber 1st Class Per Day
3. Plumber 2nd Class Per Day
4. Sewer Cleaner Per Day
As per
5. Well Sinker Per Day
Labour rates
6. Pipe line Fitter 1st Class Per Day
of SoR
7. Pipe line Fitter 2nd Class Per Day
8. Pump Operator Per Day
9. Bore Mechanic Per Day
10. Light Vehicle Driver Per Day
Note:The rate at relevant item in common SoR is applicable for
occasional employment.
2 RATES FOR EARTH WORK :
a. Earth work excavation in all types soils for pipe lines, for drainage and To follow
water supply, where the depth is more than 1.5 times the width. the relvent
items of
b. Earth work excavation in all types soils for pipe lines, for drainage and
Irrigation
water supply, where the depth is less than 1.5 times the width.
work items
c. Earth work excavation in all types soils for open trenches, for valve as per
pits, inspection chambers, etc. AP.Standard
3. a. Excavation of pipe line trenches for drainage and water supply in rock
requiring blasting with initial lead and lift including cost of blasting
materials where the depth is more than 1.5 times the width, in places
where there is no habitation.
b. Excavation of pipe line trenches for drainage and water supply in rock
requiring blasting with initial lead and lift including cost of blasting
materials where the depth is less than 1.5 times the width, in places
where there is no habitation.
c. Cutting rock for pipe line trenches by hammers, nuckles and chisels
including stacking where the depth is 1.5 times or more than the width.
d. Cutting rock for pipe line trenches by hammers, nuckles and chisels
including stacking where the depth is less than 1.5 times the width.
e. Cutting rock for works other than pipe lines trenches by hammers,
nuckles and chisels including stacking.
f. For contolled blasting at restricted places
NOTE :- Rock should be measured in solids. In case it is not possible,
stacks should be made in which case 40% for voids to be deducted
from the stack measurements.
1
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
4 Loading or unloading materials such as C.I. Pipes, PVC Pipes, AC
Pressure Pipes, DI Pipes, SW Pipes, PVC Pipes, A.C/Specials less than
300 mm dia upto 4 m in length including stacking.
2
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
1200mm dia Per Metre 1084.00
9. a. Jointing CI /DI pipes & fittings with s/s ends including cost of pig lead,
Spun yarn and sundries such as cost of fuel for melting lead, filling
with water with lead up to 500m and testing to required pressure
complete. (Reference to specifications. BIS No.3114/94/12288:1997)
Diameter of Pipe/Fittings in mm :
80mm to 800mm To follow as per
AP.Standard data
900mm dia Each Joint 12593.00
1000mm dia Each Joint 14068.00
1100mm dia Each Joint 15543.00
1200mm dia Each Joint 17018.00
9. b. Jointing C.I., D.I. pipes and fittings with rubber gasket (push-on-joint),
excluding the cost of the gasket but including all sundries filling with
water, with a water lead up to 500m and testing to required pressure, To follow as
etc. complete (Reference to specifications IS 3114/1994/12888/1997) per
AP.Standard
Diameter of Pipe/Fittings in mm : data
80mm to 1000mm dia Each Joint
10 Jointing CI pipes, fittings and valves with flanged ends including cost
of jointing materials such as bolts, rubber insertion, white lead
including filling with water, with lead up to 500 meters and testing to To follow as
per
required pressure complete. (Reference to specifications. BIS
AP.Standard
No.3114/1994.) data
Diameter of pipe/Fittings/ valve in mm :
80mm to 750mm dia Each Joint
800mm dia Each Joint 5280.00
900mm dia Each Joint 6210.00
1000mm dia Each Joint 7151.00
1100mm dia Each Joint 8116.00
1200mm dia Each Joint 9115.00
11a Lowering the RCC plain ended pipes carefully into the trench laying
them true to alignment and gradient, jointing RCC pipes with cement
joints including curing, the cost of jointing materials i.e., Cement
Mortar (1:1.5), hemp yarn etc., and testing including filling with
water with a water lead upto 500 metres excluding cost of rubber rings
as per BIS No.783/85.
per every 25 mm dia. Per Metre 16.00
11b Lowering the RCC S/S pipes carefully into the ready made trenches
laying them true to alignment and gradient, jointing with rubber rings To follow as
and testing including filling with water with a water lead upto 500 per
meters including cost of rubber rings as per BIS No. 783/1985 AP.Standard
per every 25 mm dia. Per Metre data
80mm to 600mm
3
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
700mm dia 265.00
800mm dia 318.00
900mm dia 382.00
1000mm dia 457.00
12 Lowering and Jointing G.I. pipes and specials / fittings including
excavation of trench of 0.5m width and 0.50 m depth in all soils
except rock requiring blasting and refilling trenches after laying and To follow as
jointing pipes and also including cost of jointing materials but per
excluding the cost of pipes. Reference to specifications. BIS No.783/85 AP.Standard
data
a G.I. Pipes :Dia in mm
15mm to 150mm Per Metre
b Laying, jointing of PVC/HDPE pipes as per BIS No.7634 part-III/75
for PVC and BIS No.7634 part-II/75 for HDPE pipes including trench
excavtion and refiling.
Dia in mm
50mm dia Per Metre 25.00
40mm dia Per Metre 25.00
32mm dia Per Metre 25.00
25mm dia Per Metre 23.00
20mm dia Per Metre 22.00
Note:(i) The above rates are applicable for the works in District only.
(ii) If the depth of excavation is more than 0.5 m separate rates to be
worked out.
13 Lowering and laying in ready made trench true to alignment and To follow as
gradient, jointing, and testing of Stone ware pipes including cost of per AP.
jointing material such as cement mortar (1:1) proportion and hemp Standard
yarn but excluding cost and conveyance of pipe. (Reference to data
specifications BIS No. 6530/72)
Dia of Pipes in mm .
100mm to 450mm Per Metre
14 Lowering, laying, jointing and testing to hydralic test pressure To follow as
including cost of water with minimum water lead of 500m for UPVC per AP.
pressure pipes in ready made trenches true to alignment and gradient Standard
including all sundries but excluding cost & conveyance of pipes from data
source of supply and jointing materials as per BIS No. 7634 - Part III -
1975
Dia of Pipes in mm .
63mm to 315mm Per Metre
15 Laying and jointing of HDPE pipes by butt fusion welding as per
IS:7634 – part-II/1975 as amended from time to time to the alignment
and gradient and testing the pipeline to the required pressure.
4
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
75mm dia OD Per Metre 35.00
90mm dia OD Per Metre 40.00
110mm dia OD Per Metre 45.00
125mm dia OD Per Metre 55.00
140mm dia OD Per Metre 58.00
160mm dia OD Per Metre 63.00
180mm dia OD Per Metre 69.00
200mm dia OD Per Metre 75.00
225mm dia OD Per Metre 83.00
250mm dia OD Per Metre 88.00
280mm dia OD Per Metre 97.00
315mm dia OD Per Metre 166.00
355mm dia OD Per Metre 185.00
400mm dia OD Per Metre 206.00
450mm dia OD Per Metre 229.00
16 Lowering, keeping in position and fixing C.I. sluice valves (with cap / To follow as
with hand wheel & Reflex valves) excluding cost of bolts, nuts, rubber per AP.
insertion, sluice valve and tail pieces Standard
Dia of Valve in mm. data
80mm to 450mm Each
17 Labour charges for fixing Air valves including boring the mains and
threading the bore fixing nipple etc., complete. To follow as
per
Dia of Air valve in mm.
AP.Standard
25mm dia Each
data
40mm dia Each
50mm dia Each 136.00
65mm dia Each 145.00
80mm dia Each 158.00
100mm dia Each 186.00
125mm dia Each 290.00
150mm dia Each 318.00
18 Labour charges for fixing Kinetic Air Valves with isolating Sluice
valves, Double Air valves/ Air Cushion valve excluding cost of jointing
materials such as bolts, nuts and rubber insertions etc., complete.
5
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
19 Uprooting C.I./ DI Pipes by melting the lead, loosening the joints, To follow as
scraping the pipes, hoisting and keeping within a lead of 10 m but per AP.
excluding earth work excavation and refilling. Standard
80mm to 600mm Per Metre data
20 Uprooting of RCC pipes including breaking the collars, loosening the To follow as
joint, seperating the pipes, hoisting and keeping within a lead of 10 m Per Metre per AP.
but excluding earthwork excavation and refilling. Standard
100mm to 300mm data
21 Removing old G.I.pipes and specials / fittings and cleaning, scraping
To follow as
the pipes, hoisting and keeping with in 50m lead but excluding earth
per
work excavation of trenches and refilling.
AP.Standard
Dia of Pipes in mm
data
15mm to 50mm Per Metre
22 Cutting C.I./ DI Pipes without water in mains.Dia of pipes in mm.
Dia of Pipes in mm To follow as
80mm to 600mm Each cut per
AP.Standard
data
680mm dia Each cut 384.00
700mm dia Each cut 395.00
750mm dia Each cut 424.00
800mm dia Each cut 452.00
900mm dia Each cut 508.00
1000mm dia Each cut 564.00
1100mm dia Each cut 622.00
1200mm dia Each cut 678.00
23 Cutting A.C. Pipes without water in mains.Dia of pipes in mm. Each cut
Dia of Pipes in mm
80mm dia Each cut 25.00
100mm dia Each cut 25.00
125mm dia Each cut 25.00
150mm dia Each cut 25.00
200mm dia Each cut 26.00
250mm dia Each cut 43.00
300mm dia Each cut 43.00
350mm dia Each cut 53.00
400mm dia Each cut 58.00
450mm dia Each cut 73.00
500mm dia Each cut 81.00
600mm dia Each cut 89.00
24 Drilling and tapping CI/ DI / GI Main and fixing brass screw down To follow as
ferrule and plug. per AP.
10 mm to 20mm Each Tapping Standard
25 mm to 40mm Each Tapping data
25 Cutting road surface including stacking of excavated materials for
pipe line trench work.
6
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
a) Cutting open B.T. road surface (as well as asphalt concrete upto 75 518.00
10 Sqm
mm thick) including water bound macadam
b) Cutting open C.C. road surface 1 Cum 1440.00
c) Cutting open water bound macadam road including soiling 1 Cum 177.00
26 Bailing out water.(For PH item)
a) Bailing out water from the pipe line trenches with oil engine driven HP/Hour 44.00
pumpsets, including hire charges, fuel charges and wages for Driver
and Helper.
b) Bailing out water from the pipe line trenches with Electric Driven HP/Hour 32.00
pumpset including hire charges, current charges and wages for Driver
and Helper.
NOTE:- The rate is payable on the total H.P. hours ignoring fractions
less than 0.5 HP hour and rounding off 0.5 HP hour or more to the
next higher integer.
27 Shoring and strutting of trenches for water and sewer main.
To follow as
a) Single Staging from (0 to 2.5 Mts.) 1 Sqm of per AP.
Shoring area Standard
b) Double staging from (2.5 m to 4.5 Mts.) 1 Sqm of data
Shoring area
28 Barricading, hoarding, lighting and watching etc., for water supply To follow as
and sewerage works for trenches. 1 RMT per AP.
Standard data
29 Excavation of trenches for infiltration galleries, syphon lines and
connecting mains in all soils under water including all leads, lifts,
shoring, strutting, bailing out water and removal of shoring and
strutting materials, after completion of pipe line work.
a) 0 to 1 m deep under water. 10 Cum 9645.00
b) 1 to 2 m deep under water. 10 Cum 13815.00
c) 2 to 5 m deep under water. 10 Cum 20737.00
d) Beyond 5 m deep under water for every additional 1 m depth over 3962.00
item 'c' 10 Cum
7
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
a) for R C C Elevated Service Reservoir of staging up to 15 metre below
L W L.
1) Slabs for thickness (150 mm to 300 mm) 2577.00
2) Slabs for thickness above (300 mm) One Sqm of 5152.00
3) Side walls curved surfaces. Centering 1947.00
4) Side wall straight surfaces. area 1733.00
5) Dome. 2110.00
6) Roof Slab. 1299.00
7) Column braces and beams 869.00
8) Circular braces, ring beams & circular column. 953.00
Note:- For RCC ELSR of staging above 15 m, the % increse in these
rates shall be as follows.
15-18 m ---- 9%
18-21m --- 15%
21-24 m --- 21%
24 m -27m --27%
above27m ---- 30%
b) For Ground level works :-
1) Slabs 1 Sqm To follow as
per
2) Beams & Lintels 1 Cum
AP.Standard
3) Sun shades 1 Sqm data
4) RCC vertical walls of plane surface 1 Sqm of As per
centering Building
area SoR
8
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
35 Labour charges for fixing of flushing cistern including fixing of flush
pipes, lead pipe, jointing etc., complete Each
Relevent
36 Labour charges for fixing wash hand basin including fixing of inlet Building SoR
and waste pipe connections etc., complete Each items
37 Fixing urinal with inlet and waste pipe connections etc., complete. Each
38 Refilling the trench for pipe line with excavated earth including
10 Cum
watering and tamping etc., complete
39( Extra allowance for isolated scattered works viz., valve pits / 50% extra
a) chambers, public fountains, meter pits and manholes, delivery cistern Each over the cost
etc., complete. of chamber.
( b) Repairs to the existing mains, interconnections, replacement of 150% extra
valves/specials etc., including the cutting ,jointing, bailing out of water, over the cost
drying, earth work execavation etc., complete. of work
40 Removal of wet silt and sludge from sullage drains with aid of baskets
10 Cum 1450.00
and vessels.
41 Well sinking in sandy and other loose soils under water either by
manual labour, divers, or dredgers, weighting the top of staining to
assist sinking etc., including dewatering and other incidental charges
such as hire charges for mechanical equipment etc
Upto 2 m below GL/m Per metre
From 2 to 4 m below GL/m Per metre To adopt as
From 4 to 6 m below GL/m Per metre per
AP.Standard
From 6 to 8 m below GL/m Per metre
data
From 8 to 10 m below GL/m Per metre
Note:-Below 10 m for every metre depth or part thereof add Rs.250/-
per m. For higher dia, observed data is to be prepared and got
approved.
42 Sinking in Hard strata other than rock but in soils like limestone,
Observed
gravel, clay under water including, pumping dewatering, hire charges
Data
for mechanical equipment etc., complete.
43 Rates for OHSRs/ELSRs including fixtures with a staging of 15 m,
without Seismic analysis.
a 500 Kilo litres Per litre 15.63
b 1000 Kilo litres Per litre 12.92
c 1500 Kilo litres Per litre 11.65
d 2000 Kilo litres Per litre 10.90
e 2500 Kilo litres Per litre 10.22
1) For intermediate ranges proportional rates may be adopted. All
VRCC shall be in M30 grade design mix.
2) The above rates are applicable for ELSRs / OHSRs with Raft
foundtion footings and rate of Rs.4,100/- per tonne for cement and
Rs.43,000/- per tonne for steel.
9
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
3) For every metre of staging less than 15 m, the rate shall be
reduced by Rs.0.05 paise per litre per every metre of difference in
staging
4) For every metre of staging above 15 m , the rate shall be increased
by Rs.0.10 paise per litre per every metre of additional in staging
9) The above rates are applicable for wind pressure upto 350 kg / sqm.
For every 100 kg/sqm decrease in wind pressure, the rate is to be
decreased by 5%
10) For tribal/Agency / Rural area, the above rates shall be increased
by 10%
11) If the ELSR is to be designed for seismic forces a) The above rates
are applied upto Zone-II earth quake. b) for Zone-III earth quake the
above rates are to be increased by 33 1/3% .
12) Fixtures include.
a) A balcony of 1.0 m width at floor slab level/middle ring beam level/
top ring beam level with S.S pipe hand railing upto 1.0mts height.
c) D.I swan neck ventilators shall be provided in top dome and slab for
mosquito proof.
d) RCC Finial - 1 No.
e) RCC precast ladders 0.60 m wide - 2 Nos.
10
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
f) RCC dog legged stair case with 1.0mts staircase flight width and
1.20mts landing width with S.S railing of 1.mts height - 1 No.
q)Vertical connections: All the inlet, out let, over flow and scour pipes
and fittings shall be of D.I. The minimum size of scour pipe is 200mm
dia. All the valves shall be of DI of PN 20 and valve chambers shall
be constructed with VRCC M20 grade with 150mm thick side walls,,
150mm thick top slab , 150mm thick base slab over base course of
100mm thick (1:4:8)prop . The rates of inlet, outlet, scour and over
flow pipes , D.I valves of PN20 and Valve chambers are included in
the litre rate of ELSRs
11
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
r)Compound wall: Construction of compound wall including
M.S.Gate is included in the litre rate of ELSRs.
Length of compound wall shall be minimum of 150mts. The
compound wall shall be constructed including earth work excavation
for the minimum width of 0.60mts and depth of 0.60mts for wall
portion and for column footings of 0.75x0.75 mts x 1.50mts size.
VRCC footings 0.75*0.75*0.30mts in VRCC M20 grade shall be
constructed over a C.C (1:4:8)prop bed of 150mm thick. The columns
shall be of 230*230 mm size with VRCC M20 grade at 3.60m c/c
spacing having depth of 0.75mts below ground level and height of
2.40mts, plinth beam of size 230X230 mm shall be constructed in
VRCC M20 grade at basement level. 450*450mm size columns in M20
grade shall be constructed for gate.
The size of CRS masonry in C.M(1:6)prop below ground level shall be
of 0.45X0.45mts and size of basement above G.L is 0.45X0.30mts and
size of brick work above plinth beam is 230mm with 2nd class bricks in
CM(1:6)Prop upto 1.80mts . Plastering shall be done with 16mm thick
in two coats i.e., base coat 12mm thick in CM(1:6)prop and 4mm thick
2nd coat CM(1:4) prop on both sides of brick work and CRS masonry
upto and including 150mm below ground level. Plain CC M20 grade
75mm thick coping shall be provided over top of compound wall to
prevent entry of rain water .
12
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
s)watchmen quarter shall be constructed for a minimum plinth area of
40 sqm with the following specification. Construction of RCC framed
structure with RCC grade not less than M20 design mix at the places
specified by the department at the time of execution with verandah,
hall, bed room, kitchen and bath &W/C with floor area of 40.00sqmts
excluding balconies and staircases.
MS hollow door frame with cold rolled processed steel sheet 1.25mm
thick bright CRCA conforming to IS 4351/76, Flush door shutters
with solid bond wood bond board doors shall be provided. N.C.L.
Windows centre fixed both sides openable shutter window 1.35 X
1.35mts outer frame section 48 x50mm shutter frame section with a
size of 48 X20 mm mullion section of size 48 X 50mm fixed beading
section of 12 X 12 mm shall be provided. Flooring with polished
Kadapa stone shall be provided. Walls should be provided with
snowcem paint in two coats over primary coat. Electrical and water
supply arrangement shall be provided as directed by dept officer.
Syntex tank with necessary out let and inlet connection, pipes shall
provided. septic tank for 5 users shall be provided.
13
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
4) For every metre of staging above 10 m , the rate shall be increase
by Rs.0.10 paise per litre per every metre of additional in staging
9) The above rates are applicable for wind pressures upto 350 kg / sq
m .For decrease in wind presure the rate has to be decreased by 5%
per every 100kg/sqm. If the ELSR / OHSR is to be designed for seismic
forces also, cost shall be arrived by working out detailed quantities
based on the designs.
10) For Tribal/Agency/ Rural area, the above rates shall be increased
by 10%
11) If the ELSR is to be designed for seismic forces also, cost shall be
arrived by working out detailed quanitites based on the design &
difference to be paid extra.
12) If the ELSR is to be designed for seismic forces a) The above rates
are applied upto Zone-II earth quake. b) for Zone-III earth quake the
above rates are to be increased by 33.33 % .
13) Fixtures include :
a) RCC or Aluminium ladder inside 0.60 m wide.
b) spiral staircase on the outside shall be provided upto 200KL. Above
200KL capacity dog legged staircase shall be provided with staircase
flight width of 1.0mts and landing width of 1.20mts with S.S railing
upto 1.0 height.
c) Lightening arrestor, including conductor and earthing etc.
d) RCC ventilators with copper or stainless steel fly proof mesh.
14
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
e) D.I Manholes frame and cover 0.60x0.60 m as per IS specifications
(light duty) - 2 Nos.
f) Water level indicator of good quality with ebonite/ copper float
approved pattern - 1 No.
g) The ladder shall be with M.S ladder and Verticals with HDPE of
10kg/Sqcm shall be provided for single column OHSRs only.
j)The railing provided to the gallery and stair case shall be with
stainless steel of grade 304 for a height of 1.20mts.
k). The dog legged staircase shall be enclosed with brick/CRS wall on
three sides and front side with M.S collapsible gate upto 1st brace
level from ground level to prevent unauthorized entry.
l). D.I swan neck ventilators shall be provided in top dome and slab.
m). The above rates are exclusive of all inlet, out let conenction and
valves. All valves near inlet, out let and for scour of ELSRs shall be
D.I valves.
45 Construction of Rapid Gravity Filtration Plant including civil,
mechanical and electrical fully automation including trial running etc.,
complete.
1) 2.0 Mld Per litre 3.09
2) 5.0 Mld Per litre 2.82
3) 10.0 Mld Per litre 2.55
4) 20.0 Mld Per litre 2.29
5) 30.00 mld and above Per litre 2.01
NOTE :-
a) For intermediate ranges proportional rates may be adopted
15
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
e) For Rural areas an extra allowance of 10% shall be given on basic
rate
The components of the filtration plant are as follows:
A) Civil Works
(All works of VRCC Shall be in M30 design mix)
1). Stilling Chamber and Areation cascade
2). Ventury flume channel with measuring device
3) Flash Mixer chamber
4) .Clariflucculator / tube settler & flocculation tanks
5). Filter house, chemical house, Alum store, laboratory office room
chlorination plant room, toilet etc. (All items shall be under RCC roof
only ). Separate Isolated chemical house & chlorinator room has to be
provided.
6). Wash water tank of suitable capacity
16). The minimum size of entrance hall shall be 12'x13' , Lab size shall
be of 10'x15', Office room size shall be of 10'x15'.
17). The water from the treatment plant shall be tested for quantity
and quality simultaneously.
16
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
19). S.S railing of grade 304 shall be provided for staircase.
21).All cables shall be with copper, Cable drains shall be covered with
chequed plate.
22).HDPE/MDPE pipes shall be provided for water drainage .
23).Alum storage capacity shall be for minimum period of 90 days.
17
Sl. Description Unit SoR for
No. 2013-2014
1 2 3 4
3) Erecting mechanical and electrical equpment, trial run for 90 days
23.50 hours per day ttesting the treated water for efficient stardards
and maintenance of records and imparting training to staff.
18
1. SoRATES FOR R.C.C. PLAIN ENDED PIPES
Sl.
Description
No.
1 2
MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. PLAIN ENDED
1 PIPES CONFORMING TO B.I.S. 458/2003 , EX-FACTORY, EXCLUDING
TRANSPORTATION, TAXES & DUTIES
Size Unit SoR For 2013-14
NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Metre 129
100 mm dia Metre 149
150 mm dia Metre 176
200 mm dia Metre 209
225 mm dia Metre 227
250 mm dia Metre 243
300 mm dia Metre 348 791 812
350 mm dia Metre 433 977 996
400 mm dia Metre 499 1079 1103
450 mm dia Metre 611 1235 1247
500 mm dia Metre 671 1343 1544
600 mm dia Metre 993 2019 2397
700 mm dia Metre 1272 2512 3216
800 mm dia Metre 1566 3318 4203
900 mm dia Metre 1972 4171 5236
1000 mm dia Metre 2397 5178 7157
1100 mm dia Metre 2843 6112 8299
1200 mm dia Metre 3387 7201 9705
1400 mm dia Metre 4614 9306 13433
1600 mm dia Metre 5348 12086 16177
1800 mm dia Metre 7010 16031 21704
Note : All the prices are ex-works. Excise duty, CST/VAT extra as applicable at the
time of supply.
The above rates of RCC Plain ended pipes are based on the following raw materials cost.
Cement. Rs.4,100/- per MT (including all taxes and freight).
Steel (M.S. Rods) - Rs.42,500/- per MT. (including all taxes and freight).
The revised cost of RCC pipes due to increase / decrease in the cost of raw materials shall
be as per the following formula.
Revised Cost =Cost as per the above table +R1+R2
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of M.S.
Roads = (S2-S1)/1000 X Ws.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of Cement
= (C2-C1)/1000 X Wc.
S1 = Rs. 42,500/- , S2 = Cost of M S Rods (Rs. Per MT including all taxes and freight) at the
time of preparation of estimate.
C1 = Rs. 4,100/- C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time
of preparation of estimate.
Ws=Weight of MS Rods required (Kg.) per metre of pipe as per IS:458/2003.
Wc= Weight of Cement required (Kg.) per metre of pipe.
19
2. SoRATES FOR R.C.C. COLLARS
Sl.No. Description
1 2
MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. COLLARS
CONFORMING TO B.I.S. 458/2003 (RATE PER EACH COLLAR)
1
SUITABLE FOR R.C.C. PLAIN ENDED PIPES INCLUDING
TRANSPORTATION BUT EXCLUDING TAXES & DUTIES
Size Unit SoR For 2013-14
NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Each 39
100 mm dia Each 40
150 mm dia Each 42
200 mm dia Each 56
225 mm dia Each 60
250 mm dia Each 66
300 mm dia Each 87 124 124
350 mm dia Each 107 153 153
400 mm dia Each 118 175 175
450 mm dia Each 185 233 233
500 mm dia Each 211 277 277
600 mm dia Each 285 364 364
700 mm dia Each 371 491 491
800 mm dia Each 524 623 623
900 mm dia Each 626 726 726
1000 mm dia Each 731 908 908
1100 mm dia Each 896 1150 1150
1200 mm dia Each 1089 1440 1440
1400 mm dia Each 1404 1824 1824
1600 mm dia Each 1792 2339 2339
1800 mm dia Each 1861 3015 3015
Note: Excise duty, CST/VAT extra as applicable at the time of supply.
The above rates of RCC Collars suitable to plain ended pipes are based on the following raw
materials cost.
Cement. Rs.4,100/- per MT (including all taxes and freight).
Steel (M.S. Rods) - Rs.42,500/- per MT. (including all taxes and freight).
The revised cost of RCC collars due to increase / decrease in the cost of raw materials shall be
as per the following formula.
Revised Cost =Cost as per the above table +R1+R2
R1= Variation (increase / decrease) in cost (Rs. per each )due to change in the cost of M.S.
Roads = (S2-S1)/1000 X Ws. R2= Variation (increase / decrease ) in cost (Rs. per each )due to
change in the cost of Cement = (C2-C1)/1000 X Wc.
S1 = Rs. 42,500/- , S2 = Cost of M S Rods (Rs. Per MT including all taxes and freight) at the
time of preparation of estimate.
C1 = Rs. 4,100/-, C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time
of preparation of estimate
Ws=Weight of MS Rods required (Kg.) per each collar.
Wc= Weight of Cement required (Kg.) per each collar.
20
3. SoRATES FOR R.C.C. S/S PIPES (Non Pressure)
Sl.No. Description
1 2
MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. SOCKET AND
SPIGOT PIPES CONFORMING TO B.I.S. 458/2003 AT EX-FACTORY
1
(RATE PER METER OF EFFECTIVE LENGTH) EXCLUDING
TRANSPORTATION, TAXES & DUTIES.
Size Unit SoR For 2013-14
NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Metre 159
100 mm dia Metre 180
150 mm dia Metre 210
200 mm dia Metre 255
225 mm dia Metre 278
250 mm dia Metre 298
300 mm dia Metre 418 1005 1070
350 mm dia Metre 537 1283 1305
400 mm dia Metre 593 1422 1447
450 mm dia Metre 738 1570 1582
500 mm dia Metre 851 1796 1952
600 mm dia Metre 1197 2519 2594
700 mm dia Metre 1552 3217 3376
800 mm dia Metre 1992 4258 4411
900 mm dia Metre 2517 5354 5545
1000 mm dia Metre 3056 6054 6617
1100 mm dia Metre 3585 7148 7647
1200 mm dia Metre 4065 8436 8951
1400 mm dia Metre 5783 11173 12697
1600 mm dia Metre 7154 14513 15307
1800 mm dia Metre 8048 19245 20544
Note: All the prices are ex-works, Excise duty, CST/VAT extra as applicable at the time
of supply. The above rates of RCC S/S Non-Pressure pipes are based on the following
raw materials cost.
Cement. Rs.4, 100/- per MT (including all taxes and freight).
Steel (M.S. Rods) - Rs.42, 500/- per MT. (including all taxes and freight).
The revised cost of RCC pipes due to increase / decrease in the cost of raw materials shall
be as per the following formula.
Revised Cost =Cost as per the above table +R1+R2
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of
M.S. Roads =(S2-S1)/1000 X Ws.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of
Cement =(C2-C1)/1000 X Wc.
S1 = Rs. 42,500/- , S2 = Cost of M S Rods (Rs. Per MT including all taxes and freight) at
the time of preparation of estimate.
C1 = Rs. 4,100/- , C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the
time of preparation of estimate
Ws=Weight of MS Rods required (Kg.) per metre of pipe as per IS:458/2003.
Wc= Weight of Cement required (Kg.) per metre of pipe.
21
4. SoRATES FOR R.C.C. S/S PIPES (Pressure)
Sl.No. Description
1 2
MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. SOCKET
AND SPIGOT PIPES CONFORMING TO B.I.S. 458/2003 EX-
1
FACTORY (RATE PER METER OF EFFECTIVE LENGTH)
EXCLUDING TRANSPORTATION,TAXES & DUTIES.
Size Unit SoR For 2013-14
P1 - Class P2 - Class P3 - Class
80 mm dia Metre 208 234 266
100 mm dia Metre 234 280 324
150 mm dia Metre 323 418 516
200 mm dia Metre 375 539 712
225 mm dia Metre 422 613 794
250 mm dia Metre 463 656 836
300 mm dia Metre 625 946 1182
350 mm dia Metre 778 1313 1702
400 mm dia Metre 924 1737 2245
450 mm dia Metre 991 2059 2770
500 mm dia Metre 1314 2244 3155
600 mm dia Metre 1799 3343 4391
700 mm dia Metre 2395 4418 5589
800 mm dia Metre 3000 5272 6774
900 mm dia Metre 3623 6216
1000 mm dia Metre 4565 7151
1100 mm dia Metre 5477
1200 mm dia Metre 6428
Note: All the prices are ex-works, Excise duty, CST/VAT extra as applicable at the time of
supply.
The above rates of RCC S/S Pressure pipes are based on the following raw materials
cost.
Cement. Rs.4,100/- per MT (including all taxes and freight).
Steel (M.S. Rods) - Rs.42,500/- per MT. (including all taxes and freight).
The revised cost of RCC pipes due to increase / decrease in the cost of raw materials
shall be as per the following formula.
Revised Cost =Cost as per the above table +R1+R2
R1= Variation (increase / decrease) in cost (Rs. per metre) due to change in the cost of
M.S. Roads =(S2-S1)/1000 X Ws.
R2= Variation (increase / decrease) in cost (Rs. per metre) due to change in the cost of
Cement =(C2-C1)/1000 X Wc.
S1 = Rs. 42,500/-
S2 = Cost of M S Rods (Rs. Per MT including all taxes and freight) at the time of
preparation of estimate.
C1 = Rs. 4,100/-, C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at
the time of preparation of estimate
Ws=Weight of MS Rods required (Kg) per metre of pipe as per IS: 458 / 2003.
Wc= Weight of Cement required (Kg) per metre of pipe.
22
5. SoRATES FOR RUBBER RINGS TO SUIT R.C.C. S/S PIPES
Sl. No. Description
1 2
MANUFACTURE, SUPPLY AND DELIVERY OF RUBBER RINGS
TO SUIT R.C.C. SOCKET AND SPIGOT PIPES CONFORMING TO
1
B.I.S. 5382/ 1985 (RATE PER EACH RUBBER RING) INCLUDING
TRANSPORTATION BUT EXCLUDING TAXES & DUTIES.
Size Unit SoR For 2013-14
NP - 2 Class NP - 3 Class NP - 4 Class
80 mm dia Each 24
100 mm dia Each 29
150 mm dia Each 52
200 mm dia Each 61
225 mm dia Each 67
250 mm dia Each 75
300 mm dia Each 92 118 118
350 mm dia Each 106 141 141
400 mm dia Each 117 160 160
450 mm dia Each 133 182 182
500 mm dia Each 174 208 208
600 mm dia Each 228 303 303
700 mm dia Each 310 362 362
800 mm dia Each 394 439 439
900 mm dia Each 493 594 594
1000 mm dia Each 576 716 716
1100 mm dia Each 693 917 917
1200 mm dia Each 1109 1153 1153
1400 mm dia Each 1220 1268 1268
1600 mm dia Each 1519 1548 1548
1800 mm dia Each 1892 1977 1977
MANUFACTURE, SUPPLY AND DELIVERY OF RUBBER RINGS
TO SUIT R.C.C. SOCKET AND SPIGOT PIPES CONFORMING TO
2
B.I.S. 5382/ 1985 (RATE PER EACH RUBBER RING) INCLUDING
TRANSPORTATION BUT EXCLUDING TAXES & DUTIES.
Size P1 - Class P2 - Class P3 – Class
80 mm dia Each 24 24 24
100 mm dia Each 29 31 31
150 mm dia Each 52 52 52
200 mm dia Each 61 61 61
225 mm dia Each 67 68 70
250 mm dia Each 75 77 79
300 mm dia Each 92 97 101
350 mm dia Each 106 122 133
400 mm dia Each 117 160 164
23
Size P1 - Class P2 - Class P3 – Class
450 mm dia Each 133 184 188
500 mm dia Each 174 208 217
600 mm dia Each 228 257 262
700 mm dia Each 310 340 362
800 mm dia Each 394 435 435
900 mm dia Each 493 549
1000 mm dia Each 576 663
1100 mm dia Each 693
1200 mm dia Each 1109
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation
of estimate.
24
6. SoRATES FOR CONVEYANCE OF R.C.C. PLAIN ENDED PIPES
Rate upto
5 Kms Rate for Rate upto 5 Rate for
Lead every Kms Lead every
including additional including additional 1
Sl.No. Description
Loading, 1 KM lead Loading, KM lead or
unloading or part unloading and part
and thereof. stacking thereof.
stacking
1 2 3 4 5 6
CONVEYANCE OF R.C.C. PLAIN ENDED PIPES ON ALL
1 WEATHER ROADS INCLUDING LOADING, UNLOADING AND
STACKING (per Metre) SoR For 2013-14
NP - 2 Class NP - 3 Class & NP - 4 Class
80 mm dia 3.00 0.12
100 mm dia 4.00 0.12
150 mm dia 5.00 0.24
200 mm dia 7.00 0.24
225 mm dia 8.00 0.36
250 mm dia 9.00 0.36
300 mm dia 13.00 0.48 35.00 0.97
350 mm dia 18.00 1.09 38.00 1.09
400 mm dia 20.00 1.21 45.00 1.45
450 mm dia 26.00 1.45 49.00 1.69
500 mm dia 28.00 1.69 54.00 1.69
600 mm dia 41.00 2.66 81.00 3.75
700 mm dia 52.00 3.75 90.00 4.36
800 mm dia 61.00 3.75 108.00 4.36
900 mm dia 70.00 3.75 142.00 8.23
1000 mm dia 104.00 7.74 171.00 8.23
1100 mm dia 114.00 7.74 185.00 8.95
1200 mm dia 129.00 8.23 207.00 8.95
1400 mm dia 155.00 8.23 282.00 9.32
1600 mm dia 180.00 8.23 338.00 9.32
1800 mm dia 207.00 8.23 451.00 13.07
25
7. SoRATES FOR CONVEYANCE OF R.C.C. S/S PIPES
Rate upto 5 Rate upto 5
Rate for Rate for
Kms Lead Kms Lead
every every
Sl.N including including
Description additional 1 additional 1
o. Loading, Loading,
KM lead or KM lead or
unloading & unloading
part thereof. part thereof.
stacking and stacking
1 2 3 4 5 6
CONVEYANCE OF R.C.C. SOCKET AND SPIGOT PIPES ON ALL WEATHER
1 ROADS INCLUDING LOADING, UNLOADING AND STACKING (per Metre of
effective length) SoR For 2013-14
Size NP - 2 & P1 Class NP – 3 & NP - 4 Class
80 mm dia 4.00 0.11
100 mm dia 4.00 0.22
150 mm dia 6.00 0.22
200 mm dia 8.00 0.44
225 mm dia 9.00 0.44
250 mm dia 10.00 0.99
300 mm dia 16.00 1.10 42.00 1.32
350 mm dia 19.00 1.21 45.00 1.54
400 mm dia 19.00 1.43 56.00 2.86
450 mm dia 27.00 1.54 62.00 2.86
500 mm dia 30.00 1.65 68.00 3.08
600 mm dia 39.00 2.86 92.00 4.40
700 mm dia 48.00 3.08 124.00 8.69
800 mm dia 66.00 4.73 146.00 8.69
900 mm dia 99.00 8.47 169.00 8.69
1000 mm dia 113.00 8.47 178.00 8.69
1100 mm dia 127.00 8.69 191.00 8.69
1200 mm dia 142.00 8.69 214.00 8.91
1400 mm dia 176.00 8.69 286.00 8.91
1600 mm dia 209.00 8.91 338.00 9.57
1800 mm dia 259.00 8.91 451.00 13.09
P2 - Class P3 – Class
80 mm dia 4.00 0.11 4.00 0.11
100 mm dia 4.00 0.22 4.00 0.22
150 mm dia 6.00 0.22 6.00 0.22
200 mm dia 8.00 0.44 11.00 0.99
225 mm dia 11.00 0.99 13.00 1.10
250 mm dia 12.00 1.10 15.00 1.21
300 mm dia 23.00 1.32 26.00 1.43
350 mm dia 28.00 1.54 36.00 1.65
400 mm dia 34.00 1.65 48.00 2.86
450 mm dia 43.00 2.75 60.00 2.86
500 mm dia 48.00 2.86 73.00 4.29
600 mm dia 64.00 2.86 105.00 5.50
700 mm dia 95.00 5.83 154.00 8.69
800 mm dia 126.00 8.25 196.00 8.69
900 mm dia 154.00 8.69
1000 mm dia 189.00 8.91
26
8. SoRATES FOR A.C. PIPES
Sl.No Description
MANUFACTURE AS PER BIS NO: 1592/2003AS AMENDED FROM TIME TO TIME
(MAZZA PROCESS) AND SUPPLY OF AC PRESSURE PIPES DULY MARKED WITH
BIS MARK, INCLUDING COST OF MATERIAL, INCIDENTAL HANDLING, LOADING
1 AND PACKING CHARGES BUT ARE EXCLUSIVE OF TRANSPORTATION,
UNLOADING, STACKING AT DEPARTMENTAL STORES, EXCISE DUTY, VAT
OCTROI AND OTHER GOVT. LEVIES.
Size Unit SoR For 2013-14
Class - 15 Class - 20 Class - 25
80 mm dia Rate/Metre 168 184 230
100 mm dia Rate/Metre 222 282 347
125 mm dia Rate/Metre 290 361 453
150 mm dia Rate/Metre 408 508 639
200 mm dia Rate/Metre 677 865 1098
250 mm dia Rate/Metre 857 1111 1391
300 mm dia Rate/Metre 1200 1562 1995
350 mm dia Rate/Metre 1465 1903 2398
400 mm dia Rate/Metre 1904 2487 3088
450 mm dia Rate/Metre 2256 2994 3749
500 mm dia Rate/Metre 2788 3662 4598
600 mm dia Rate/Metre 3963 5173 6593
700 mm dia Rate/Metre 5249 7120 9207
750 mm dia Rate/Metre 5982 8219 10535
800 mm dia Rate/Metre 6844 9312 11951
850 mm dia Rate/Metre 7677 10476 13458
900 mm dia Rate/Metre 8559 11704 15053
1000 mm dia Rate/Metre 10566 14368 18512
2 Lowering, laying and Jointing of AC Pressure pipes with AC Couplings or CID Joints complete
with Rubber Rings in readymade trenches true to alignment and gradient including filling with
water lead upto 500 mts and testing to required pressure including all sundries but excluding
cost of jointing materials and conveyance from source of supply as per BIS No. 6530/72
80 mm dia Rate/Metre 32.00 32.00 32.00
100 mm dia Rate/Metre 47.00 47.00 47.00
125 mm dia Rate/Metre 52.00 52.00 52.00
150 mm dia Rate/Metre 62.00 62.00 62.00
200 mm dia Rate/Metre 81.00 81.00 81.00
250 mm dia Rate/Metre 97.00 97.00 97.00
300 mm dia Rate/Metre 120.00 120.00 120.00
350 mm dia Rate/Metre 204.00 204.00 204.00
400 mm dia Rate/Metre 305.00 305.00 305.00
450 mm dia Rate/Metre 372.00 372.00 372.00
500 mm dia Rate/Metre 473.00 473.00 473.00
600 mm dia Rate/Metre 508.00 508.00 508.00
700 mm dia Rate/Metre 567.00 567.00 567.00
750 mm dia Rate/Metre 631.00 631.00 631.00
800 mm dia Rate/Metre 664.00 664.00 664.00
850 mm dia Rate/Metre 708.00 708.00 708.00
27
900 mm dia Rate/Metre 773.00 773.00 773.00
1000 mm dia Rate/Metre 795.00 795.00 795.00
1. The above rates of AC Pipes are based on the Cement cost of RS 4,100/- per MT
(Including all taxes and freight).
2. The above rates of AC pipes are based on the Fiber cost of Rs 68,198/- per M.T basic
price (Ex- India Port) (Excluding duties, taxes and transportation etc.)
For any Increase/ Decrease in the rate of cement, the price of AC pipe per Rmt shall be
increased/decreased as under.
W x 0.85 x IC Where W = Weight of pipe in Kg’s/Rmt
IC = Increase/Decrease in cost of cement/Kg
For any increase/decrease in the rate of fiber, the price of AC pipe per Rmt shall be
increased/Decreased as under :
W x 0.15 X IF Where : W=: Weight of pipe in Kg’s/Rmt
IF = Increase /Decrease in cost of fiber/Kg
Note: 1) The Fiber rates are to be obtained from A.C. Pipe manufacturer of “Mazza” process.
2) The cement rate shall be communicated by the sub-committee of Board of Chief
engineers.
3)The duties and taxes as applicable shall be added as per rules at the time of preparation of
estimate
Transportation of AC pressure pipes at site of work anywhere in Andhra 10% on the basic
Pradesh on motor able roads for full truck loads including transit cost of
2 insurance, unloading, and stacking at site of work etc. Complete (AC corresponding
Couplings and Rubber rings are to be supplied free of transportation AC Pressure
charges). pipes.
28
9. SoRATES FOR A.C. COUPLINGS
Sl.
Description
No.
1 2
MANUFACTURE AS PER MANUFACTURERS SPECIFICATION (MAZZA
PROCESS) AND SUPPLY OF A.C. COUPLINGS EXCLUDING COST OF RUBBER
RINGS TO SUIT AC PRESSURE PIPES INCLUDING COST OF MATERIAL,
1
INCIDENTAL HANDLING, PACKING,TRANSPORTATION AND UNLOADING AT
SITE TRANSIT RISK BUT EXCLUDING EXCISE DUTY, VAT AND OTHER GOVT.
LEVIES.
Size Unit SoR For 2013-14
Class - 15 Class - 20 Class – 25
80 mm dia Rate/Each 82 87 101
100 mm dia Rate/Each 106 113 137
125 mm dia Rate/Each 133 146 176
150 mm dia Rate/Each 154 193 239
200 mm dia Rate/Each 284 310 395
250 mm dia Rate/Each 332 418 533
300 mm dia Rate/Each 433 561 722
350 mm dia Rate/Each 562 726 927
400 mm dia Rate/Each 865 1131 1449
450 mm dia Rate/Each 1037 1367 1756
500 mm dia Rate/Each 1236 1653 2112
600 mm dia Rate/Each 1513 1897 2427
700 mm dia Rate/Each 2002 2695 3505
750 mm dia Rate/Each 2259 3088 3985
800 mm dia Rate/Each 2562 3474 4496
850 mm dia Rate/Each 2854 3886 5039
900 mm dia Rate/Each 3158 4320 5609
1000 mm dia Rate/Each 3855 5253 6846
1. The above rates of AC Coupling are based on the Cement cost of RS 4,100/- per MT (Including
all taxes and freight).
2. The above rates of AC Coupling are based on the Fiber cost of Rs 68,198/- per M.T basic price
(Ex- Indian Port) (Excluding duties, taxes and transportation etc.)
For any Increase/ Decrease in the rate of cement, the price of AC Coupling per Each shall be
increased/decreased as under.
W x 0.85 x IC Where W = Weight of Coupling in Kgs/Each
IC = Increase/Decrease in cost of cement/kg
For any increase/decrease in the rate of fiber, the price of AC Coupling per Each shall be
increased/Decreased as under :
W x 0.15 X IF Where : W=: Weight of Coupling in Kgs/Each
IF = Increase /Decrease in cost of fiber/kg
The Fiber rates are to be obtained from A.C. Pipe manufacturer of “Mazza” process.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of
estimate.
10. SoRATES FOR RUBBER RINGS TO SUIT A.C. COUPLINGS
Sl.
Description
No.
1 2
SCHEDULE OF RATE FOR SUPLY OF RUBBER RINGS MANUFACTURED AS
PER BIS: 5382/1988 WITH BIS MARK EMBOSSED PER EACH SET SUITABLE
1 FOR A.C. COUPLINGS INCLUDING COST OF MATERIAL, INCIDENTAL,
HANDLING, PACKING, TRANSPORTATION AND UNLOADING AT SITE
TRANSIT RISK ETC., BUT EXCLUDING VAT.
Size Unit SoR For 2013-14
Class - 15 Class - 20 Class - 25
80 mm dia Each Set 62.00 62.00 62.00
100 mm dia Each Set 75.00 75.00 75.00
125 mm dia Each Set 98.00 98.00 98.00
150 mm dia Each Set 124.00 124.00 124.00
200 mm dia Each Set 129.00 129.00 129.00
250 mm dia Each Set 149.00 149.00 149.00
300 mm dia Each Set 149.00 149.00 149.00
350 mm dia Each Set 169.00 169.00 169.00
400 mm dia Each Set 207.00 207.00 207.00
450 mm dia Each Set 243.00 243.00 243.00
500 mm dia Each Set 281.00 281.00 281.00
600 mm dia Each Set 318.00 318.00 318.00
700 mm dia Each Set 661.00 661.00 661.00
750 mm dia Each Set 686.00 686.00 686.00
800 mm dia Each Set 737.00 737.00 737.00
850 mm dia Each Set 822.00 822.00 822.00
900 mm dia Each Set 864.00 864.00 864.00
1000 mm dia Each Set 957.00 957.00 957.00
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of
estimate
Public Health Items
11. SoRATES FOR PRE-STRESSED (NON-CYLINDER) CONCRETE PIPES FOR THE YEAR 2013-14
Sl.No. Description
1 2
MANUFACTURE, SUPPLY, DELIVERY OF PRE-STRESSED (NON-CYLINDER) CONCRETE PIPES CONFORMING TO
1 IS 784/2001 Ex-factory excluding transportation, taxes & duties.
Size Unit SoR For 2013-14.
Rs. Rs. Rs. Rs. Rs. Rs.
6 Kg/cm2 8 Kg/cm2 10 Kg/cm2 12 Kg/cm2 14 Kg/cm2 16 Kg/cm2
350 MM DIA Metre 2511 2520 2532 2546 2600 2692
400 MM DIA Metre 2693 2714 2747 2784 2837 2882
450 MM DIA Metre 2840 2854 2889 2948 3027 3094
500 MM DIA Metre 3073 3088 3114 3186 3255 3355
600 MM DIA Metre 3529 3556 3595 3713 3837 3960
700 MM DIA Metre 4349 4369 4442 4551 4719 4857
800 MM DIA Metre 5132 5187 5326 5459 5685 5893
900 MM DIA Metre 5951 5999 6141 6407 6666 7134
1000 MM DIA Metre 6990 7053 7261 7561 7930 8360
1100 MM DIA Metre 7937 8056 8291 8759 9155 9602
1200 MM DIA Metre 8786 8942 9424 9873 10517 11326
1300 MM DIA Metre 9959 10539 11131 11733 12764 13957
1400 MM DIA Metre 11399 12070 12771 13892 14908 15733
1500 MM DIA Metre 13305 14097 14889 16176 17258 18194
1600 MM DIA Metre 14982 15885 16790 19068 19556 20617
1700 MM DIA Metre 15769 16428 17322 19538 21697 22722
1800 MM DIA Metre 16982 18111 19151 21109 23441 24583
1900 MM DIA Metre 18153 19196 20957 22206 24208 27029
2000 MM DIA Metre 19953 21252 22418 24702 28218 30347
Cost of laying jointing, testing to Hydrostatic field test pressure including cost of rubber rings, cost of transportation of water
2
and emptying pipe line after completion of field testing etc.
350 MM DIA Metre 176 176 176 176 176 176
31
Public Health Items
400 MM DIA Metre 190 190 190 190 190 190
450 MM DIA Metre 220 220 220 220 220 220
500 MM DIA Metre 234 234 234 234 234 234
600 MM DIA Metre 287 287 287 287 287 287
700 MM DIA Metre 337 337 337 337 337 337
800 MM DIA Metre 382 382 382 382 382 382
900 MM DIA Metre 418 418 418 418 418 418
1000 MM IA Metre 483 483 483 483 483 483
1100 MM IA Metre 542 542 542 542 542 542
1200 MMDIA Metre 601 601 601 601 601 601
1300 MM DIA Metre 681 681 681 681 681 681
1400 MM DIA Metre 770 770 770 770 770 770
1500 MM DIA Metre 835 835 835 835 835 835
1600 MM DIA Metre 936 936 936 936 936 936
1700 MM DIA Metre 1019 1019 1019 1019 1019 1019
1800 MM DIA Metre 1078 1078 1078 1078 1078 1078
1900 MM DIA Metre 1139 1139 1139 1139 1139 1139
2000 MM DIA Metre 1198 1198 1198 1198 1198 1198
CONVEYANCE OF PRE-STRESSED (NON-CYLINDER) CONCRETE PIPIES AND ACCESSORIES including loading at
3 Factory, un-loading at site and stacking for the following sizes.(Minimum distance of 100 KM to be considered if the distance
is less by 100 KM from factory to site)
350 MM DIA PerKM/M 1.21 1.21 1.21 1.21 1.21 1.21
400 MM DIA PerKM/M 1.21 1.21 1.21 1.21 1.21 1.21
450 MM DIA PerKM/M 1.43 1.43 1.43 1.43 1.43 1.43
500 MM DIA PerKM/M 1.54 1.54 1.54 1.54 1.54 1.54
600 MM DIA PerKM/M 1.76 1.76 1.76 1.76 1.76 1.76
700 MM DIA PerKM/M 2.86 2.86 2.86 2.86 2.86 2.86
800 MM DIA PerKM/M 2.86 2.86 2.86 2.86 2.86 2.86
900 MM DIA PerKM/M 2.86 2.86 2.86 2.86 2.86 2.86
32
Public Health Items
33
Public Health Items
1400 MM DIA Per Pair 49073 49073 49073 49073 49073 49073
1500 MM DIA Per Pair 57579 57579 57579 57579 57579 57579
1600 MM DIA Per Pair 64122 64122 64122 64122 64122 64122
1700 MM DIA Per Pair 71950 71950 71950 71950 71950 71950
1800 MM DIA Per Pair 82229 82229 82229 82229 82229 82229
1900 MM DIA Per Pair 95076 95076 95076 95076 95076 95076
2000 MM DIA Per Pair 114349 114349 114349 114349 114349 114349
Cost of MS Flanges including cost of Bolts, Nuts, Rubber Packing etc., complete and flange thickness confirming to IS:7322-
5 1985 and flange dimensions confirming to IS:1538-1993 excluding cost of MS Specials including cost and conveyance to site,
VAT etc., complete.
Diameter and thickness Unit Rate Diameter and thickness Unit Rate
80 mm DIA x 15 mm thick Each Flange 713 0 mm DIA x 20 mm thick Each Flange 7206
100 mm DIA x 15 mm thick Each Flange 972 600 mm DIA x 20 mm thick Each Flange 9071
125 mm DIA x 15 mm thick Each Flange 1167 700 mm DIA x 25 mm thick Each Flange 12830
150 mm DIA x 15 mm thick Each Flange 1555 750 mm DIA x 25 mm thick Each Flange 14126
200 mm DIA x 15 mm thick Each Flange 1944 800 mm DIA x 25 mm thick Each Flange 15810
250 mm DIA x 15 mm thick Each Flange 2527 900 mm DIA x 25 mm thick Each Flange 18143
300 mm DIA x 15 mm thick Each Flange 2863 1000 mm DIA x 25 mm thick Each Flange 21382
350 mm DIA x 18 mm thick Each Flange 4173 1050 mm DIA x 25 mm thick Each Flange 22653
400 mm DIA x 18 mm thick Each Flange 5209 1100 mm DIA x 25 mm thick Each Flange 24492
450 mm DIA x 18 mm thick Each Flange 6052 1200 mm DIA x 32 mm thick Each Flange 32527
Note: a) The above rate of PSC pipes are based on the HT wire cost of Rs.58,000/-MT (Basic+ CED+ST & freight).
and cement price of Rs.4,100/- per MT (including all taxes and freight)
The rates may be revised depending upon the increase/decrease in the cost of HT wire and cement. as per the following method. The cost of HT wire
may be obtained from reputed firms like SAIL/TATA/ SS Ltd. etc.,
Revised Cost =Cost as per the above table +R1+R2.
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of HT Wire =(H2-H1)/1000 X Wh.
34
Public Health Items
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of Cement =(C2-C1)/1000 X Wc.
H1 = Rs. 58,000/- H2 = Cost of HT Wire (Rs. Per MT including all taxes and freight) at the time of preparation of estimate.
C1 = Rs. 4,100/- C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time of preparation of estimate
Wh=Weight of HT Wire required (Kg.) per metre of pipe. Wc= Weight of Cement required (Kg.) per metre of pipe.
The rates for MS flanges are considering landed price of MS Plates of Rs.43,000/- per MT. Price variation to be released on actual weight of flange.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of estimate
35
Public Health Items
12. SoRATES FOR PRE-STRESSED (CYLINDER) CONCRETE PIPES FOR THE YEAR 2013-14
Sl
Description
No.
1 2
PRE-STRESSED (CYLINDER TYPE ) CONCRETE PIPES CONFORMING TO IS 784/2001 @ Ex-factory Cost of pipes, excluding
1 transportation, laying, jointing, testing, Bends, Tees, Specials, taxes & duties Etc.
Size Unit SoR For 2013-14
8 10 12 14 16 18 20
4 Kg/cm2 6 Kg/cm2
Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2
400 MM DIA Meter 4784 4784 4784 4784 4808 4859 4944 5026 5089
450 MM DIA Meter 5199 5199 5199 5223 5284 5359 5467 5541 5628
500 MM DIA Meter 5684 5684 5697 5776 5845 5940 6028 6161 6259
600 MM DIA Meter 6750 6799 6888 7008 7117 7228 7398 7555 7714
700 MM DIA Meter 7799 7921 8068 8225 8373 8518 8699 8931 9103
800 MM DIA Meter 9151 9322 9527 9733 9920 10112 10345 10592 10876
900 MM DIA Meter 10819 11038 11292 11549 11805 12036 12346 12653 12959
1000 MM DIA Meter 12547 12838 13145 13462 13776 14038 14401 14776 15161
1100 MM DIA Meter 13945 14293 14661 14992 15343 15662 16060 16481 17402
1200 MM DIA Meter 15806 16212 16623 17032 17452 17827 18293 19215 19874
1300 MM DIA Meter 17576 18045 18523 19001 19491 19923 21025 21613 22351
1400 MM DIA Meter 19274 19808 20365 20924 21481 22583 23266 23965 25516
1500 MM DIA Meter 21112 21707 22302 22888 24121 24797 25821 27342 29145
1600 MM DIA Meter 23819 24482 25158 26419 27186 27954 29866 30714 31539
1700 MM DIA Meter 25630 26397 27210 28655 29525 31151 32617 33535 34406
1800 MM DIA Meter 28071 28876 30450 31427 32380 34172 35735 36838 37941
1900 MM DIA Meter 32916 33834 35591 36633 38489 39971 41409 42634 43792
2000 MM DIA Meter 35078 36819 37999 39213 41332 42615 44597 46006 47255
Cost of laying jointing, testing to Hydrostatic field test pressure including cost of site welding and fixing of Polypropylene Diapher cloth,
2
cost of transportation of water and emptying pipe line after completion of field testing etc.
36
Public Health Items
400 MM DIA Meter 371 371 371 371 371 371 371 371 371
450 MM DIA Meter 436 436 436 436 436 436 436 436 436
500 MM DIA Meter 475 475 475 475 475 475 475 475 475
600 MM DIA Meter 556 556 556 556 556 556 556 556 556
700 MM DIA Meter 634 634 634 634 634 634 634 634 634
800 MM DIA Meter 727 727 727 727 727 727 727 727 727
900 MM DIA Meter 820 820 820 820 820 820 820 820 820
1000 MM DIA Meter 898 898 898 898 898 898 898 898 898
1100 MM DIA Meter 1018 1018 1018 1018 1018 1018 1018 1018 1018
1200 MM DIA Meter 1111 1111 1111 1111 1111 1111 1111 1111 1111
1300 MM DIA Meter 1189 1189 1189 1189 1189 1189 1189 1189 1189
1400 MM DIA Meter 1309 1309 1309 1309 1309 1309 1309 1309 1309
1500 MM DIA Meter 1453 1453 1453 1453 1453 1453 1453 1453 1453
1600 MM DIA Meter 1573 1573 1573 1573 1573 1573 1573 1573 1573
1700 MM DIA Meter 1771 1771 1771 1771 1771 1771 1771 1771 1771
1800 MM DIA Meter 1877 1877 1877 1877 1877 1877 1877 1877 1877
1900 MM DIA Meter 2048 2048 2048 2048 2048 2048 2048 2048 2048
2000 MM DIA Meter 2180 2180 2180 2180 2180 2180 2180 2180 2180
CONVEYANCE OF PRE-STRES-SED (CYLINDER TYPE) CONCRETE PIPIES AND ACCESSORIES including loading at Factory,
3 un-loading at site and stacking for the following sizes. (Minimum distance of 100 KM to be considered if the distance is less by 100 KM from
factory to site)
Per 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99
400 MM DIA
KM/M
Per 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99
450 MM DIA
KM/M
Per 1.43 1.43 1.43 1.43 1.43 1.43 1.43 1.43 1.43
500 MM DIA
KM/M
Per 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65 1.65
600 MM DIA KM/M
700 MM DIA Per 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64
KM/M
37
Public Health Items
800 MM DIA Per 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64
KM/M
900 MM DIA Per 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64 2.64
KM/M
1000 MM DIA Per 4.18 4.18 4.18 4.18 4.18 4.18 4.18 4.18 4.18
KM/M
1100 MM DIA Per 4.18 4.18 4.18 4.18 4.18 4.18 4.18 4.18 4.18
KM/M
1200 MM DIA Per 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14
KM/M
1300 MM DIA Per 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14
KM/M
1400 MM DIA Per 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14
KM/M
1500 MM DIA Per 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14
KM/M
1600 MM DIA Per 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14 8.14
KM/M
1700 MM DIA Per 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.90
KM/M
1800 MM DIA Per 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.90
KM/M
1900 MM DIA Per 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.90 9.90
KM/M
2000 MM DIA Per 10.45 10.45 10.45 10.45 10.45 10.45 10.45 10.45 10.45
KM/M
Note: The rates of PCCP pipes which were incorporated in the SSR are based on the following raw materials cost.
HT Wire: - Rs.58,000/- (including all taxes & freight)
HR Coil (Hot Rolled): - Rs.48,500/- (including all taxes & freight)
Cement Cost Rs. 4,100/-.per MT (including all duties, taxes & freight)
The rates may be revised depending upon the increase/ decrease in the cost of raw materials (landed price) as per the following method.
Revised Cost =Cost as per the above table +R1+R2+R3.
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of HT Wire =(H2-H1)/1000 X Wh.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of HR Coil =(R2-R1)/1000 X Wr.
R3= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of Cement =(C2-C1)/1000 X Wc .
H1 = Rs. 58,000/- H2 = Cost of HT Wire (Rs. Per MT including all taxes and freight) at the time of preparation of estimate.
38
Public Health Items
R1 = Rs. 48,500/- R2 = Cost of HR Coil (Rs. Per MT including all taxes and freight) at the time of preparation of estimate .
C1 = Rs. 4,100/- C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time of preparation of estimate
Wh=Weight of HT Wire required (Kg.) per metre of pipe. Wc= Weight of Cement required (Kg.) per metre of pipe.
Wr = Weight of HR Coil required (kg) per metre of pipe.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of estimate
39
Public Health Items
13. SoRATES FOR BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES FOR THE YEAR 2013-14
Sl.
Description
No
1 2
BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES CONFORMING TO IS 15155 - 2002, Ex-factory excluding transportation, taxes and
1
duties etc., for Bar wrapped steel cylindrical pipes.
Size Unit Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
4 -12 14 16 18 20 22 24 26 28 30
Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2 Kg/cm2
250 MM DIA Meter 2788 2788 2788 2788 2788 2788 2791 2832 2864 3013
300 MM DIA Meter 3139 3139 3139 3139 3139 3187 3276 3400 3470 3650
350 MM DIA Meter 3801 3801 3801 3824 3868 3916 4021 4168 4294 4485
400 MM DIA Meter 4172 4172 4198 4268 4323 4529 4712 4900 5066 5726
450 MM DIA Meter 4602 4619 4701 4767 5009 5220 5476 5688 5923 6422
500 MM DIA Meter 5144 5220 5311 5576 5850 6150 6457 6723 7173 7619
600 MM DIA Meter 6799 6914 7037 7455 7870 8213 8676 9083 9650 10139
700 MM DIA Meter 8202 8447 9034 9605 10186 10765 11513 12033 12621 13419
800 MM DIA Meter 9327 10129 10858 11571 12338 13285 14096 15197 15915 16902
900 MM DIA Meter 11569 12102 13040 13969 14869 15636 17207 18471 19361 20647
1000 MM DIA Meter 13077 14378 15464 16546 17659 19189 21057 22528 23837 25503
1100 MM DIA Meter 18832 19182 19438 21342 23474 24966 27739 29186 31177 33854
1200 MM DIA Meter 20828 21493 22346 24618 27057 29186 31771 33146 37069 40709
Cost of laying jointing, testing to Hydrostatic field test pressure including cost of site welding and fixing of Polypropylene Diaher cloth, cost of
2
transportation of water and emptying pipe line after completion of field testing.
250 MM DIA Meter 253 253 253 253 253 253 253 253 253 253
300 MM DIA Meter 297 297 297 297 297 297 297 297 297 297
350 MM DIA Meter 352 352 352 352 352 352 352 352 352 352
400 MM DIA Meter 394 394 394 394 394 394 394 394 394 394
450 MM DIA Meter 394 394 394 394 394 394 394 394 394 394
500 MM DIA Meter 493 493 493 493 493 493 493 493 493 493
600 MM DIA Meter 605 605 605 605 605 605 605 605 605 605
40
Public Health Items
700 MM DIA Meter 705 705 705 705 705 705 705 705 705 705
800 MM DIA Meter 803 803 803 803 803 803 803 803 803 803
900 MM DIA Meter 944 944 944 944 944 944 944 944 944 944
1000 MM DIA Meter 1043 1043 1043 1043 1043 1043 1043 1043 1043 1043
1100 MM DIA Meter 1225 1225 1225 1225 1225 1225 1225 1225 1225 1225
1200 MM DIA Meter 1372 1372 1372 1372 1372 1372 1372 1372 1372 1372
Conveyance of Bar Wrapped steel Cylindrical (BWSC) pipes and accessories including loading at Factory, un-loading at
3 site and stacking for the following sizes. (Minimum distance of 100 KM to be considered if the distance is less by 100 KM
from factory to site)
250 MM DIA Per KM/M 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55
300 MM DIA Per KM/M 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55
350 MM DIA Per KM/M 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77
400 MM DIA Per KM/M 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
450 MM DIA Per KM/M 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21
500 MM DIA Per KM/M 1.43 1.43 1.43 1.43 1.43 1.43 1.43 1.43 1.43 1.43
600 MM DIA Per KM/M 1.54 1.54 1.54 1.54 1.54 1.54 1.54 1.54 1.54 1.54
700 MM DIA Per KM/M 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76 1.76
800 MM DIA Per KM/M 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31
900 MM DIA Per KM/M 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31 2.31
1000 MM DIA Per KM/M 2.86 2.86 2.86 2.86 2.86 2.86 2.86 2.86 2.86 2.86
1100 MM DIA Per KM/M 6.93 6.93 6.93 6.93 6.93 6.93 6.93 6.93 6.93 6.93
1200 MM DIA Per KM/M 9.68 9.68 9.68 9.68 9.68 9.68 9.68 9.68 9.68 9.68
Note: The above rates of BWSC pipes are based on the following raw materials' cost.
HR Plates - Rs.48,500/- per MT (Basic +CED+ST & freight)
Wire rods - Rs.46,000/- per MT (Basic +CED+ST & freight)
Cement Cost Rs. 4,100/-.per MT (including all duties, taxes & freight)
The rates may be revised depending upon the increase/ decrease in the cost of raw materials (landed price) as per the following method.
Revised Cost =Cost as per the above table +R1+R2+R3.
R1= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of HR Plate =(H2-H1)/1000 X Wh.
R2= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of wire rods =(W2-W1)/1000 X Ww.
R3= Variation (increase / decrease ) in cost (Rs. per metre )due to change in the cost of Cement =(C2-C1)/1000 X Wc .
H1 = Rs. 48,500/- H2 = Cost of HR Plate (Rs. Per MT including all taxes and freight) at the time of preparation of estimate.
41
Public Health Items
W1 = Rs. 46,000/- W2 = Cost of Wire rods (Rs. Per MT including all taxes and freight) at the time of preparation of estimate .
C1 = Rs. 4,100/- C2 = Cost of Cement (Rs. Per MT including all taxes and freight) at the time of preparation of estimate
Wh=Weight of HR Plate required (Kg.) per metre of pipe. Wc= Weight of Cement required (Kg.) per metre of pipe.
Ww = Weight of wire rods required (kg) per metre of pipe.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of estimate.
42
Public Health Items
Thicknes
Sl.No. Description Unit Rate (Rs.)
s in mm
1 2 3 4 5
1 Manufacture, Supply and Delivery of
Spirally welded M.S Pipes Conforming to
IS 3589/2001 including in lining with
Cement motor(1:2)15mm thick using 4
numbers of 6mm dia M.S.Rings at each
end of the pipe and Out coating cement
motor(1:3)30mm thick by shorcreting or
Guniting duly providing wire mesh of
size 50x50x3mm including cost of all
materials,Labour charges, transportation
to anywhere in AP, but excluding taxes &
duties, etc.
500 MM DIA Meter 8.00 8126
43
Public Health Items
44
Public Health Items
47
Public Health Items
48
Public Health Items
15. S.S. RATES FOR H.D.P.E PIPES FOR THE YEAR 2013-14. (PE - 80 Grade)
4.0 kg/
Sl.No Description
sqcm
1 2 4
Manufacture, supply, & delivery of HDPE pipes conforming to IS
4984 - 1995 including transportation to any where in A.P, excluding
excise duty, sale tax and specials etc., complete. (Supply upto 90
mm dia in coil & above 90 mm dia straight length in 6 M.)
Rate per Meter
OD 20 mm -
OD 25 mm -
OD 32 mm -
OD 40 mm 37
OD 50 mm 56
OD 63 mm 77
OD 75 mm 105
OD 90 mm 151
OD 110 mm 224
OD 125 mm 290
OD 140 mm 358
OD 160 mm 468
OD 180 mm 590
OD 200 mm 724
OD 225 mm 942
OD 250 mm 1165
OD 280 mm 1453
OD 315 mm 1846
OD 355 mm 2242
OD 400 mm 2905
OD 450 mm 3692
OD 500 mm 4535
OD 560 mm 5608
OD 630 mm 7093
OD 710 mm 9013
OD 800 mm 11408
OD 900 mm 14455
OD 1000 mm 17800
Note: Excise duty, CST / VAT extra as applicable at the time of supply.
The IPCL resin cost adopted for the above rates are
For PE - 80 grade Rs.94,680/- per MT. (Excluding CED&ST)
The variation in cost of HDPE pipes due to increase / decrease in raw material cost shall be
allowed as per the following price variation formula.
price variation formula as follows:
P2 = P1 + (A2 - A1) /1000 x M x 0.95(for increase in raw material cost)
P2 = P1 - (A1 - A2) /1000 x M x 0.95(for decrease in raw material cost)
P2 = Revised pipe price in Rs. Per Meter excluding CED & ST
P1 = Existing pipe price in Rs. Per Meter excluding CED & ST
A2 = Revised price of raw material Rs. Per MT excluding CED & ST
A1 = Existing price of raw material Rs. Per MT excluding CED & ST
M = Weight of pipe in Kgs per Meter as per weight chart.
49
Public Health Items
16(I). SoRATES FOR H.D.P.E PIPES FOR THE YEAR 2013-14. (PE - 100 Grade)
6.0 kg/ 8.0 kg/ 10.0 kg/ 12.5 16.0
Sl.
Description sqcm sqcm sqcm kg/ kg/
No
sqcm sqcm
1 2 3 4 5 6 7
I Manufacture, supply, &
delivery of HDPE pipes
conforming to IS 4984 - 1995
including transportation to
any where in A.P, excluding
excise duty, sale tax and
specials etc., complete. (
Supply upto 90 mm dia in
coil & above 90 mm dia
straight length in 6 M.)
Rate per Meter
OD 25 mm 38
OD 32 mm 38 50 62
OD 40 mm 49 58 75 95
OD 50 mm 60 75 91 117 148
OD 63 mm 91 116 140 185 230
OD 75 mm 129 164 197 263 328
OD 90 mm 183 234 280 374 476
OD 110 mm 275 349 416 562 693
OD 125 mm 351 450 540 721 891
OD 140 mm 441 563 677 907 1124
OD 160 mm 576 733 881 1182 1459
OD 180 mm 725 928 1115 1492 1841
OD 200 mm 896 1146 1375 1847 2274
OD 225 mm 1158 1480 1781 2330 2873
OD 250 mm 1425 1829 2199 2878 3547
OD 280 mm 1786 2290 2751 3616 4456
OD 315 mm 2264 2900 3484 4559 5636
OD 355 mm 2841 3632 4370 5799 7170
OD 400 mm 3742 4779 5736 7508 9255
OD 450 mm 4647 5959 7166 9492 11646
OD 500 mm 5747 7347 8838 11724 14019
OD 560 mm 6663 8524 10189 13096
OD 630 mm 8399 10785 12907 15483
OD 710 mm 10685 13667 16394
OD 800 mm 13560 17352 20879
50
Public Health Items
Note:-
Excise duty, CST / VAT extra as applicable at the time of supply.
The IPCL resin cost adopted for the above rates are
For PE - 100 grade Rs.95,680/- per MT. (Excluding CED&ST)
The variation in cost of HDPE pipes due to increase / decrease in raw material cost shall be
allowed as per the following price variation formula.
price variation formula as follows:
P2 = P1 + (A2 - A1) /1000 x M x 0.95(for increase in raw material cost)
P2 = P1 - (A1 - A2) /1000 x M x 0.95(for decrease in raw material cost)
P2 = Revised pipe price in Rs. Per Meter excluding CED & ST
P1 = Existing pipe price in Rs. Per Meter excluding CED & ST
A2 = Revised price of raw material Rs. Per MT excluding CED & ST
A1 = Existing price of raw material Rs. Per MT excluding CED & ST
M = Weight of pipe in Kgs per Meter as per weight chart.
51
Public Health Items
16(II)HDPE PIPES –(PE –100 Grade) SEWER LINES FOR THE YEAR 2013-14
52
Public Health Items
OD 1000 mm 24594
Note:-
Excise duty, CST / VAT extra as applicable at the time of supply.
The IPCL resin cost adopted for the above rates are
For PE - 100 grade Rs.95,680/- per MT. (Excluding CED&ST)
The variation in cost of HDPE pipes due to increase / decrease in raw material cost shall be
allowed as per the following price variation formula.
price variation formula as follows:
P2 = P1 + (A2 - A1) /1000 x M x 0.95(for increase in raw material cost)
P2 = P1 - (A1 - A2) /1000 x M x 0.95(for decrease in raw material cost)
P2 = Revised pipe price in Rs. Per Meter excluding CED & ST
P1 = Existing pipe price in Rs. Per Meter excluding CED & ST
A2 = Revised price of raw material Rs. Per MT excluding CED & ST
A1 = Existing price of raw material Rs. Per MT excluding CED & ST
M = Weight of pipe in Kgs per Meter as per weight chart.
53
Public Health Items
54
Public Health Items
OD 400 mm 2896
OD 450 mm 3781
OD 500 mm 4329
(c) END CAPS Rate per Each
OD 50 mm 46
OD 63 mm 56
OD 75 mm 70
OD 90 mm 93
OD 110 mm 106
OD 125 mm 147
OD 140 mm 171
OD 160 mm 263
OD 180 mm 426
OD 200 mm 465
OD 225 mm 485
OD 250 mm 690
OD 280 mm 706
OD 315 mm 965
OD 355 mm 1490
OD 400 mm 2602
OD 450 mm 4185
OD 500 mm 7712
(d) REDUCERS Rate per Each
OD 50 mm x 63 mm 65
OD 63 mm x 75 mm 93
OD 75 mm x 90 mm 152
OD 90 mm x 110 mm 211
OD 110 mm x 125 mm 321
OD 125 mm x 140 mm 444
OD 140 mm x 160 mm 620
OD 160 mm x 180 mm 859
OD 180 mm x 200 mm 1110
OD 200 mm x 225 mm 1362
OD 225 mm x 250 mm 1857
OD 250 mm x 280 mm 2638
OD 280 mm x 315 mm 3730
OD 315 mm x 355 mm 4277
OD 355 mm x 400 mm 6036
55
Public Health Items
56
Public Health Items
OD 450 mm 24586
OD 500 mm 33332
II
Providing and fixing Electro fusion Ferrule Tapping Saddle confirming
to prEN 12201-3, Manufactured from virgin resin of PE-80/PE-100
having blue/black colour using food grade compounded raw material
with quality assurance certificate from quality agencies like
DVGMK/KIWA/SPGN/WRc etc. for usage in drinking water system
and having working pressure of 10 Bar. The cost shall include testing of
all materials, labour all taxes (Central, State and Municipal), inspection
charges, transportation upto site, transit insurance, loading, unloading,
stacking, providing and fixing etc. complete as specified and directed
57
Public Health Items
58
Public Health Items
20 13
25 19
32 30
40 28 47
50 44 72
63 48 69 105
75 70 95 151
90 63 96 137 213
110 95 139 198 319
125 124 181 253 417
140 151 226 327 516
160 201 298 422 678
180 252 381 544 867
200 320 463 662 1056
225 413 612 885 1408
250 497 714 1090 1718
280 638 935 1376 2175
315 804 1183 1729 2744
355 1666 2417
400 2100 3076
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of
estimate.
The resin cost adopted for the above rates is Rs.65,325/- per MT(Basic rate, excluding CED)
The variation in cost of PVC pipes due to increase / decrease in raw material cost shall be allowed
subject to the following price variation formula.
The price variation formula to be adopted is as follows:
P2 = P1 + (A2 - A1) /1000 x M x 0.95 (for increase in raw material cost)
P2 = P1 - (A1 - A2) /1000 x M x 0.95 (for decrease in raw material cost)
P2 = Revised pipe price in Rs. Per Metre, P1 = Existing pipe price in Rs. Per Metre
A2 = Revised price of raw material Rs. Per MT, A1 = Existing price of raw material Rs. Per MT
M = Weight of pipe in Kgs per Meter as per weight chart.
59
Public Health Items
19. SoRATES FOR NON- PRESSURE P.V.C.U PIPES FOR THE YEAR 2013-14
Code Description
No
1 2 4
Manufacture, supply, & delivery of Unplasticized Non- Proposed
Pressure Polyvinyl Chloride(PVC-U) pipes of dark (any Rates
shade of Brown) for use in underground drainage & 2013-14
sewerage system conforming to IS 15328/2003) with
solvent cement jointing as per specification inclusive of
transportation to the Sub-Divisional stores any where in
A.P, excluding Central Excise duty, Cess, & VAT etc.,
Rate per Meter Rs.
OD 160 mm 263
OD 200 mm 401
OD 250mm 621
OD 315 mm 980
Pipe Series (S20)
OD 125 mm 204
OD 160 mm 326
OD 200 mm 495
OD 250mm 772
OD 315 mm 1212
Pipe Series (S16.5)
OD 110 mm 180
OD 125 mm 242
OD 160 mm 378
OD 200 mm 589
OD 250mm 912
OD 315 mm 1440
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of
estimate.
The resin cost adopted for the above rates is Rs.65,325/- per MT (Basic rate, excluding CED)
The variation in cost of PVC pipes due to increase / decrease in raw material cost shall be allowed
subject to the following price variation formula.
The price variation formula to be adopted is as follows:
P2 = P1 + (A2 - A1) /1000 x M x 0.95 (for increase in raw material cost)
P2 = P1 - (A1 - A2) /1000 x M x 0.95 (for decrease in raw material cost)
P2 = Revised pipe price in Rs. Per Metre
P1 = Existing pipe price in Rs. Per Metre
A2 = Revised price of raw material Rs. Per MT
A1 = Existing price of raw material Rs. Per MT
M = Weight of pipe in Kgs per Meter as per weight chart.
60
Public Health Items
20. SoRATES FOR NON- PRESSURE P.V.C.U PIPES FOR THE YEAR 2013-14
Code Description
No
1 2 4
Manufacture, supply, & delivery of unplasticized Non- Proposed
Pressure Polyvinyl Chloride(PVC-U) pipes of dark (any Rates
shade of Brown) for use in underground drainage & 2013-14
sewerage systemr conforming to IS 15328/2003) with
Elastomeric Seal Ring Joints (Ringtite PVC Pipes)as per
specification inclusive of transportation to the Sub-
Divisional stores any where in A.P, excluding Central
Excise duty,Cess, & VAT etc.,
OD 160 mm 282
OD 200 mm 427
OD 250mm 664
OD 315 mm 1045
Pipe Series (S20)
OD 125 mm 220
OD 160 mm 346
OD 200 mm 526
OD 250mm 821
OD 315 mm 1288
Pipe Series (S16.5)
OD 110 mm 192
OD 125 mm 258
OD 160 mm 404
OD 200 mm 623
OD 250mm 968
OD 315 mm 1528
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of
estimate.
The resin cost adopted for the above rates is Rs.65,325/- per MT (Basic rate, excluding CED)
The variation in cost of PVC pipes due to increase / decrease in raw material cost shall be allowed
subject to the following price variation formula.
The price variation formula to be adopted is as follows:
P2 = P1 + (A2 - A1) /1000 x M x 0.95 (for increase in raw material cost)
P2 = P1 - (A1 - A2) /1000 x M x 0.95 (for decrease in raw material cost)
P2 = Revised pipe price in Rs. Per Metre
P1 = Existing pipe price in Rs. Per Metre
A2 = Revised price of raw material Rs. Per MT
A1 = Existing price of raw material Rs. Per MT
M = Weight of pipe in Kgs per Meter as per weight chart.
61
Public Health Items
Sl.
Description Unit S.S. Rates for 2013-14
No.
1 2 3 4 5 6
SOCKET AND SPIGOT CENTRIFUGALLY
CAST (SPUN) IRON PRESSURE PIPES FOR
WATER, GAS AND SEWAGE CONFORMING
I TO SPECIFICATION NO: I..S 1536/1989
(THIRD REVISION) WITH Amdt. No: 1 & 2 IN
STANDARD LENGTHS OF 3.66 M, 4 M, 4.5M, 5 LA Class A Class B Class
M, 5.5 M & 6 M AND DETAILS GIVEN (Rs) (Rs) (Rs)
BELOW, SUITABLE EITHER FOR LEAD
JOINTING OR RUBBER GASKET (PUSHON)
JOINTING AT PURCHASERS OPTION AT
EX-FACTORY EXCLUDING
TRANSPORTATION, TAXES & DUTIES.
Nominal dia (in MM)
80 Rmt 780 846 909
100 Rmt 950 1043 1115
125 Rmt 1198 1308 1408
150 Rmt 1452 1591 1715
200 Rmt 2120 2300 2490
250 Rmt 2856 3111 3366
300 Rmt 3684 4029 4364
350 Rmt 4710 5110 5542
400 Rmt 5734 6266 6763
450 Rmt 6938 7623 8222
500 Rmt 8203 8937 9668
600 Rmt 10850 11845 12829
700 Rmt 14276 15596 16851
750 Rmt 15989 17482 18964
800 Rmt 17898 19501 21096
900 Rmt 21810 27149 25784
1000 Rmt 26202 28621 30936
Conveyance of Centrifugally Cast (Spun)
Iron Pressure Pipes and accessories including
loading at Factory, un-loading at site and
Class
stacking for the following sizes. (The
Minimum distance/lead in Km for destination
below 100 Km to be taken as 100 Km)
SIZE IN MM UNIT LA A B
80 Per KM/RMT 0.22 0.22 0.22
100 Per KM/RMT 0.22 0.22 0.22
125 Per KM/RMT 0.33 0.33 0.33
150 Per KM/RMT 0.33 0.33 0.33
200 Per KM/RMT 0.55 0.55 0.55
62
Public Health Items
63
Public Health Items
22.S o RATES FOR DUCTILE IRON PRESSURE PIPES FOR THE YEAR2013-14
S.S. Rate
Sl.
Description Unit for
No.
2013-14
1 2 3 4 5
CENTRIFUGALLY CAST (SPUN) DUCTILE IRON PRESSURE PIPES FOR
WATER, GAS AND SEWAGE WITH SOCKET SPIGOT ENDS CONFORMING
TO I.S.: 8329/2000 IN STANDARD WORKING LENGTHS OF 4, 5 5.5 & 6 METER
1 FOR CLASSIFICATION K9 & K7 SUITABLE FOR PUSH-ON-JOINT (RUBBER
GASKET D JOINTING) WITH CEMENT MORTAR LINING INSIDE THE PIPES
WITH OUTSIDE ZINC COATING. RATES ARE EX-FACTORY, EXCLUDING
TRANSPORTATION, TAXES & DUTIES.
Nominal Dia in mm Rmt K7 K9
100 Rmt 868 1033
150 Rmt 1203 1528
200 Rmt 1676 2040
250 Rmt 2247 2677
300 Rmt 2886 3391
350 Rmt 3630 4227
400 Rmt 4405 5095
450 Rmt 5297 6096
500 Rmt 6312 7092
600 Rmt 8398 9354
700 Rmt 10864 12089
750 Rmt 12171 13567
800 Rmt 13453 14970
900 Rmt 16413 18257
1000 Rmt 19457 21645
1100 Rmt 23159
1200 Rmt 27073
CENTRIFUGALLY CAST (SPUN) DUCTILE IRON PRESSURE PIPES FOR
WATER, GAS AND SEWAGE WITH PLAIN ENDS CONFORMING TO
I.S.:8329/2000IN STANDARD WORKING LENGTHS OF 4, 5, 5.5 & 6 METER
2
FOR CLASSIFICATION K9 & K7 WITH CEMENT MORTAR LINING INSIDE
THE PIPES WITH OUTSIDE ZINC COATING. RATES ARE EX-FACTORY,
EXCLUDING TRANSPORTATION, TAXES & DUTIES.
Nominal Dia in mm K7 K9
100 Rmt 741 949
150 Rmt 1068 1393
200 Rmt 1514 1892
250 Rmt 1970 2512
300 Rmt 2592 3178
350 Rmt 3254 3949
400 Rmt 3937 4759
450 Rmt 4714 5624
500 Rmt 5610 6712
600 Rmt 7429 8664
700 Rmt 9832 10990
64
Public Health Items
65
Public Health Items
66
Public Health Items
67
Public Health Items
23. SoRATES FOR DUCTILE IRON FITTINGS FOR THE YEAR 2013-14
IV DI Flanged Socket
Upto 500 mm dia Kg 92.00
Above 500 mm dia Kg 103.00
V DI Flanged Spigot
Upto 500 mm dia Kg 92.00
Above 500 mm dia Kg 103.00
68
Public Health Items
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of
estimate.
69
Public Health Items
24. SoRATES FOR RUBBER GASKETS SUITABLE FORC.I/ D.I. S/S PIPES
S.S Rates
Sl.
Description Unit For
No.
2013-14
1 2 3 4
MANUFACTURE AS PER BIS 12820/89 WITH S.B.R. QUALITY
RUBBER CONFIRMING TO BIS: 5382/85, SUPPLY AND
DELIVERY OF RUBBER GASKETS SUITABLE FOR C.I/ D.I. S/S
PIPES ANYWHERE IN A.P. F.O.R. DESTINATION
DEPARTMENTAL STORES INCLUDING COST OF MATERIAL,
1
LOADING, INCIDENTAL HANDLING WITH COMPANYS
STANDARD PACKING, TRANSPORTATION, UNLOADING &
STACKING BUT EXCLUDING CENTRAL EXCISE DUTY,
SALES TAX, OCTROI AND OTHER GOVT. LEVIES ETC.,
COMPLETE.
80mm dia Each 57
100mm dia Each 89
125mm dia Each 106
150mm dia Each 130
200mm dia Each 158
250mm dia Each 176
300mm dia Each 268
350mm dia Each 340
400mm dia Each 371
450mm dia Each 399
500mm dia Each 554
600mm dia Each 656
700mm dia Each 872
750mm dia Each 968
800mm dia Each 1161
900mm dia Each 1401
1000mm dia Each 1533
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation of
estimate.
70
Public Health Items
Rate/ Kg
including
packing,
forwarding,
Sl. Quality or
Description transit risk and
No. sort
delivery any
where in A.P. for
the year 2013-14.
Rs.
1 2 3 4
I.S. No.
MANUFACTURE, SUPPLY AND DELIVERY OF CAST 7181/1986
IRON PIPES AND FITTINGS (Spls.) CONFORMING 5531/1988
TO I.S. No. 7181/1986, 5531/1988, 3950/1979 AND C.I.D. 3950/1979
JOINTS CONFIRMING TO IS No.8794/1988 AT SITE & 67.20
OF WORK ANYWHERE IN A.P. INCLUDING, 8794/1988
LOADING, UNLOADING, TRANSPORTATION TO
SITE OF WORK STACKING AT SITE TRANSIT RISK
AND PACKAGE, EXCLUDING TAXES AND DUTIES.
Foot Note: The rate of CI pipes, CI Specials and CID Joints etc., which are to be incorporated
in the SSR are based on the following raw materials cost.
Pig Iron: Rs.27,500/- per M.T.(excluding CED, Tax & Fright)
Coke : Rs.37,000/- per M.T. .(Excluding CED, Tax & Fright)
The rates may be revised depending upon the increase/decrease in the cost of raw materials as
per the following method. For every increase/decrease of Rs.1000/- in the cost of raw
materials or part there of proportionately.
In respect of Pig Iron: The increase/decrease in cost of CI Specials per Kg is 3.43%.
In respect of coke: The increase/decrease in cost of CI Specials per Kg is 0.67%.
The above price is at site of work , Excise duty, CST/VAT extra as applicable at the time of
supply.
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation
of estimate.
71
Public Health Items
26.SoRATES FOR WATER HAMMER CONTROL DEVICES FOR THE YEAR 2013-14
(Rate Each in Rs.)
TEST PRESSURE
Additional
charges
Sl.
Description 10 15 25 for
No. 20 Kgs/cm2
Kgs/cm2 Kgs/cm2 Kgs/cm2 Flanged
ended
valves
1 2 3 4 5 6 7
Manufacture, Supply and
delivery of zero velocity
valve/ PSLV with CI body
with flanged ends as per
1
AWWA, Ex-factory
excluding transportation,
Central Excise duty and
sale tax etc., complete.
DIA IN MM
Rate/Each Rs. Rs. Rs. Rs.
150 66929 78125 82741 91017
200 69921 80408 86440 95082
250 78890 90723 97528 107281
300 88781 102098 109758 120731
Manufacture, Supply and
delivery of zero velocity
valve/ PSLV with MS
Fabricated Body with Plain
2 ends. as per AWWA, Ex-
factory excluding
transportation, Central
Excise duty and sale tax etc.
Complete
DIA IN MM Rate/ Each Rs. Rs. Rs. Rs. Rs.
350 94560 108743 116899 128588 8193
400 104522 120199 129214 142141 9879
450 121567 139803 150288 165317 11806
500 140501 161574 173693 191063 12771
525/550 150914 171560 188951 207846 16505
600 168974 194319 208893 229783 23545
650 189147 208064 236496 255291 26626
700 220473 242640 275651 297698 31806
750 244206 268661 305288 329744 35709
800 297486 342111 367767 404541 40239
72
Public Health Items
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation
of estimate.
73
Public Health Items
27. SoRATES FOR CAST STEEL VALVES FOR THE YEAR 2013-14.
Sl.No. Description TEST PRESSURES
1 2 3 4 5 6
Manufacture, Supply and delivery of
Cast Carbon Steel rising / Non rising
spindle sluice valve design standard
as per IS:14846/2000 for Water
Supply Scheme with SS Spindle &
Class-150
SS Working parts the grade of Cast Class-300
Body
Steel for body Bonnet, Dome, Stool Body 1100
425PSI FOR Enclosed Spur
1 Cover, Wedge, Stuffing Box, Gland PSI Seat
Seat 300 Gear Arrangement.
Thrust Plate, shall be as per IS : 750 PSI
PSI
1030 / 1989. (The valve shall be used PN-30
PN-20
for High pressure schemes &
pumping stations) excluding
transportation, Central Excise duty
and sale tax etc., complete. ISI
Marked
Rate/Each Class 150 Class 300
DIA IN MM Rs. Rs. Rs.
40 5456 10912
50 8990 16367
65 11251 20459
80 13494 24551
100 17997 32734
125 23081 41967
150 27004 49101
200 43613 88656 53379 97532
250 61385 139540 71150 148418
300 77543 176261 87308 185138
350 103400 235015 116716 247121
400 210045 477374 223361 489480
450 235434 524587 248751 536693
500 276982 629504 290298 641610
600 316220 717635 329537 729741
700 611668 624984
750 657831 676474
800 761699 780342
900 900191 918834
1000 1154091 1172733
1100 1246418 1265061
74
Public Health Items
Rate/Each
DIA IN MM Rs.
500 419669
600 524587
700 629504
750 776389
75
Public Health Items
800 1154091
900 1384909
1000 1510809
1100 1783595
1200 1804578
Manufacture, Supply and delivery of
Cast Steel D/F Butter fly Valves
conforming to IS; 13095/1991
4 manually heavy duty Gear
operation,excluding transportation,
Central Excise duty and sale tax etc.,
complete.
DIA IN MM PN- PN-2.5
Rate/Each 1.0/1.6
300 80099 99850
350 107750 135401
400 129476 167879
450 156907 198602
500 178852 228228
600 208478 267729
700 326981 405983
750 405983 504735
800 445484 554111
900 504735 633113
1000 800993 998498
1100 998498 1294755
1200 1196003 1294755
1300 1601985 1788518
1400 1689765 1887270
1500 1788518 1986023
1600 2084775 2381033
1800 2578538 2776043
2000 3566063 3862320
Conveyance of valves and
accessories including loading at 10% on basic cost of
5
factory and unloading, stacking at valves
site of work.
Note : The duties and taxes as applicable shall be added as per rules at the time of preparation
of estimate.
76
Public Health Items
28. SoRATES FOR DI D/F VALVES FOR THE YEAR 2013-14.Rate/Each in Rs.
Sl. TEST PRESSURE
Description
No. PN 10 PN 16
1 2 3 4 5 6
Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in
Ductile Iron of grade SG 400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent
1 revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and
Gaskets and seals of EPDM food grade quality Epoxy powder coating (EP-P) inside and
outside colour blue. Drilled as per IS:1538.
DIA IN MM PN 10 PN 16 PN 25
25 (Screwed End) 8190 8190
32 (Screwed End) 16290 16290
40 (Screwed End) 17100 17100
50 29421 29421 37856
80 39250 39250 39250
100 45825 45825 52698
150 55787 55787 63756
200 61100 61100 71062
300 99000 99000 109000
Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft
sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/ SG
400/12 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully
2 rubber lined with EPDM food grade quality and seals of NBR and the valves should be of
vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-
2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and
outside pocket less body passage. Drilled as per IS:1538.
DIA IN MM PN 10 PN 16 PN 25
50 7043 7043 11904
80 9020 9020 14676
100 11898 11898 16640
150 18734 18734 27755
200 31131 31131 46814
250 43117 43117 69534
300 65165 65165 112786
350 197300 197300 330048
400 206937 206937 335704
450 With By-pass & Gear 356020 356020 669213
500 With By-pass & Gear 378070 378070 710659
600 With By-pass & Gear 486846 486846 915124
77
Public Health Items
Manufacture, Supply and delivery of DI D/F Butterfly Valves with GGG40/SG 400/12 or
Equivalent grade as per I.S.3896-part 2-1985 and subsequent revisions, Double eccentrically
Disc., with renewable soft seal on the disc and Body seat face of stainless steel / nickel weld
3
overlay, with powder or liquid Epoxy coating with minimum thickness of 250 microns applied
on both body and disc inside and outside. Face to face dimensions as per AWWA C 504 or BS
5155 or IS:13095. Drilled as per IS: 1538/ISO
DIA IN MM PN 10 PN 16 PN 25 PN 40
150 75082 75082 77505 102898
200 81776 84431 99204 125117
250 95280 98050 114844 175325
300 113690 117037 130541 184097
350 130079 141911 165283 200372
400 163837 185620 216115 306338
450 179864 199625 254237
500 181574 214326 340822 378551
600 237977 336000 395590 414792
700 469808 495722 745049
800 509329 530792 1087427
900 666102 666102
1000 834990 834990 1576839
1100 960239
1200 1118792 1118792 1761526
1400 2404501 2404501
1600 2867145 2867145
1800 3516719 3516719
2000 6007465 6007465
2200 8672955 8672955
Manufacture, Supply and delivery of DI D/F Swing Check Valves Slanted/Straight seated
with metallic, corrosion proof and wear resistant seat faces resilient seat, Body and Disc of
ductile cast iron GGG 40/SG Iron 420/12 or equivalent grade as per IS 3896(part2)-1985 and
4
subsequent revisions. All the inside and outside of the body is to be coated with double coating
of epoxy liquid. Drilled as per IS:1538. Specification and Dimensions as per I.S 5312 or
equivalent codes.
DIA IN MM PN 10 PN 16 PN 25 PN 40
100 29751 33056
150 49958 55509
200 75761 80268 117720 154085
250 83376 88426 142973 180660
300 104511 110727 174054 220520
350 123004 130385 197987 240723
78
Public Health Items
Manufacture, supply and delivery of DI (Ductile Iron) Wafer Butterfly valves conforming to IS
5 13095-1991. With hand lever below 150 mm, with Worm gear for 200 mm and above excluding
transportation, CED and taxes etc, completed
DIA IN MM PN 10 PN 16
40 5100 5100
50 5100 5100
65 5519 5519
80 6018 6595
100 8461 8771
125 10633 10633
150 14359 14670
200 19482 19482
250 25925 25925
300 36479 36479
350 44268 48022
Manufacture and supply of- Air Release – Vacuum Break – Surge Alleviation” Valve for
potable water. Construction material Cylindrical Body of Ductile Iron GGG-50/SG-500-7,
6 Three cylindrical Floats of High Density Poly Ethylene. Baffle Plate, Orifice venture and all
construction bolts of stainless steel, coating internally and externally. Electrostatically applied
epoxy (1) Flange connection as per IS 1538, (2) Female (BSP/NTP Threaded for sizes 25 mm
DIA IN MM PN 10 PN 16 PN 25
25 mm dia 13467 - -
50 mm dia - 43400 43400
80 mm dia - 68087 68087
100 mm dia - 75075 75075
150 mm dia - 153962 153962
200 mm dia - 231231 231231
Manufacturer and supply of Metal Seated Gate Valve Non- Rising Stem with by-pass & gear
operated, for water and sewage applications& dimensions confirming to IS 14846-2000.
Material construction Body, Bonnet, Wedge and Distance Piece of ductile iron GGG-
50/SG500/7 DIN1693 or equivalent. Body seat, Wedge seat and Stem nut of Aluminum Bronze
7
BS EN 1982 CC331G/equivalent, Stem of Stainless steel BS EN 100881.4057 or equivalent. 'O'
Seal Body/Cover is of EPDM food grade Quality. Fastners is of Steel Sheraplex coated to BS
3692 Gr 8.8 or equivalent. Body and Bonnet internally and externally blue two pack epoxy to
WIS 4-52-01 Class B. Leakage tested for seat 1.1 PN and body 1.5 x PN. Flange connection as
79
Public Health Items
per IS 1538
DIA IN MM PN 10 PN 16
DN700 1247445 1247445
DN800 1577213 1577213
DN 900 1782891 1782891
DN 1000 1997580 1997580
DN 1100 3093809 3093809
DN 1200 2721881 2721881
NOTE:-All the prices are ex-go down /ex-factory. Excise duty and CST /Local Tax Extra as
applicable at the time of supply. Packaging and Transportation extra at 5% on basic cost. The
duties and taxes as applicable may be added as per rules at the time of preparation of estimate.
The grade of DI & conformation to specifications shall be certified by a third party Quality
Control Agency approved by indenting authority at the cost of supplier.
80
Public Health Items
29. SoRATES FOR SFRC MAN-HOLE FRAME WITH COVERS FOR THE YEAR
2013-14
SoRates
Sl.No. Description Unit for
2013-14.
1 2 3 4
Note: The duties and taxes as applicable shall be added as per rules at the time of preparation
of estimate.
81
Public Health Items
30. SoRATES FOR CI and M.S. DISMANTLING JOINTS FOR THE YEAR 2013-14
Sl.No. Description Unit 2013-14.
1 2 3 4
Manufacture, Supply and delivery of CI Dismantling Joints
with both side flange end suitable for installation in between
1 Rs.
flange end pipes. These rates are excluding Excise duty, Taxes
and transportation charges etc., complete.
Nominal Dia. In MM
50 Each 3988
80 Each 4365
100 Each 5728
125 Each 7365
150 Each 8080
200 Each 11458
250 Each 13640
300 Each 21825
Manufacture, Supply and delivery of MS. Dismantling
Joints with both side flange end suitable for installation in
2 between flange end pipes. Thickness as per IS: 7322. These Each
rates are excluding Excise duty, Taxes and transportation
charges etc., complete
Nominal Dia. In MM
350 51762
400 59314
450 64351
500 77021
600 89624
700 99706
750 102229
800 122394
900 127690
1000 152953
1100 165580
1200 190840
1300 216097
1400 241847
1600 267156
1800 316368
2000 393705
Conveyance of joints and accessories including loading at 5% on basic
3
factory and unloading, stacking at site of work. cost
The duties and taxes as applicable shall be added as per rules at the time of preparation
Note:
of estimate.
82
Public Health Items
S.S. Rates
Sl.
Description Unit for
No.
2013-14.
1 2 3 4
83
Public Health Items
S.S Rates
Sl.
Description Unit For
No.
2013-14
1 2 3 4
Manufacture Supply of Rubber Rings made with EPDM
Rubber rings(seals according to EN681 AND ASTM425)
suitable for SWG pipes confirming to IS No.651/1992 any
1 where in A.P , FOR including cost of materials, loading,
unloading , handling with company standard packing ,
transportation, unloading and stacking but excluding central
excise duty and other taxes etc complete
84
Public Health Items
85
Annexure-Seigniorage Charges – Common SoR 2013-14
ANNEXURE
1
Annexure-Seigniorage Charges – Common SoR 2013-14
Copy of
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
Mines and Minerals - Amendments to Rule 10 of the Andhra Pradesh Minor Mineral
Concession Rules, 1966 - Orders - Issued.
-----------------------------------------------------------------------------------------------------------
INDUSTRIES AND COMMERCE (M.I) DEPARTMENT
G.O.Ms.No.198. Dated:13.08.2009
Read the following:
1. G.O.Ms.No.217, Industries & Commerce (M-I) Dept., dated 29-09-2004.
2. From the Director of Mines & Geology, File No.25395/MR/ 2007, Dated:29.9.2007.
3. G.O.Ms.No.104, Ind. & Com. (M.I) Department, dt.15.5.2009.
***
ORDER :
The following notification will be published in the Extra-Ordinary issue of the Andhra Pradesh
Gazette dated 13.8.2009.
NOTIFICATION
In exercise of the powers conferred by sub-section (1) of section 15 of the Mines and Minerals
(Development & Regulation) Act,1957 (Central Act 67 of 1957), the Governor of Andhra Pradesh
hereby makes the following amendments to the Andhra Pradesh Minor Mineral Concession Rules,
1966 issued in G.O.Ms.No.1172, Industries and Commerce(M-I) Department, dated 04-09-1967 and
subsequently amended from time to time.
AMENDMENTS
In the said rules, Under Rule 10 for Schedules I and II the following shall be substituted, namely :
“SCHEDULE -I
RATES OF SEIGNIORAGE FEE
Sl.No. Name of the Minor Mineral Unit Rate of Seigniorage Fee
(in Rupees)
1 2 3 4
1 Building Stone M3/MT Rs.50/33
(Rupees Fifty /Thirty Three)
2 Rough Stone/Boulders M3/MT Rs. 50/33
(Rupees Fifty /Thirty Three)
3 Road Metal & Ballast M3/MT Rs. 50/33
(Rupees Fifty /Thirty Three)
3(a) Dimensional Stone MT Rs.88/-
used for Kerbs & Cubes (Rupees Eighty Eight)
4 Limekankar / Limestone MT The rate of Royalty as applicable
to limestone (other than L.D.
2
Annexure-Seigniorage Charges – Common SoR 2013-14
3
Annexure-Seigniorage Charges – Common SoR 2013-14
Black Granite Rs. 3300/- Rs. 2625/- Rs. 2475/- Rs. 1100/-
Galaxy Variety (Rupees (Rupees Two (Rupees Two (Rupees One
Three thousand Six thousand Four thousand One
(a)
Thousand hundred and hundred and hundred only)
Three twenty five Seventy Five
hundred) only) only)
Black Granite other Rs. 2475/- Rs.2000/- Rs.1,925/- Rs.825/-
than Galaxy (Rupees Two (Rupees Two (Rupees One (Rupees Eight
Variety thousand thousand thousand Nine hundred and
(b)
Four hundred only) hundred and Twenty Five
and Seventy Twenty Five only)
Five only) only)
Colour Granite Rs. 2475/- Rs.2000/- Rs.1925/- Rs.825/-
Srikakulam Blue, (Rupees Two (Rupees Two (Rupees One (Rupees Eight
Indian aurora of thousand thousand thousand Nine hundred and
Nizamabad Dist., Four hundred only) hundred and Twenty Five
(c)
Leptinites of Coastal and Seventy Twenty Five only)
Dists., Black pearl of Five only) only)
Praksam and Guntur
Dists.
Colour Granite of RS.1,925/- Rs. 1625/- Rs.1650/- Rs.825/-
other varieties (Rupees One (Rupees One (Rupees One ( Rupees Eight
thousand thousand Six thousand Six hundred and
(d)
Nine hundred hundred and hundred Fifty Twenty Five
and Twenty Twenty five only) only)
Five only) only)
SCHEDULE –II
RATE OF DEAD RENT
(PER HECTARE PER ANNUM)
Sl. Name of the Minor Mineral Rate of Dead Rent per
No. hectare per Annum
01 Black Granite Rs.55,000/- (Rupees fifty five
thousand only)
02 Colour Granite Rs.44,000/- (Rupees
forty four thousand only)
03 Limestone other than classified as Major Minerals used Rs.27,500/- (Rupees
for Lime burning for building construction purposes, twenty seven thousand
Marble, Boulders, Building Stone Including Stone used and five hundred only)
for Road Metal, Ballast Concrete and other Construction
purposes, Shale, Slate and Phyllites, Mosaic Chips,
Fuller’s Earth/Bentonite & Dimensional Stones used for
cubes & kerbs,
04 Gravel, Morrum, Shingle, Limestone Slabs used for Rs.16,500/- (Rupees
Flooring purposes Limekankar, Chalcedeny pebbles used sixteen thousand and five
in the building purposes Limeshell for burning used for hundred only)
building purposes and Rehmatti.
4
Annexure-Seigniorage Charges – Common SoR 2013-14
NOTE:-1) The above rates are liable to be revised and amended from time to time by the State
Government by notification in the Andhra Pradesh Gazette.
2) In case of revision, the revised rates as fixed by Mines and Geology Department have to be
adopted.