PILE DRIVING LOG

BRIDGE ( Bagacay -Batinguel) CONTINUED: 03-17-2020


3.7 – 3.8 15
PILE NO. __8__ 3.8 – 3.9 19
3.9 – 4.0 24
DATE OF PILE DRIVE: _March 14,2020_ 4.0 - 4.1 22
4.1 - 4.2 25
PILE MARKINGS NO. OF BLOWS 4.2 – 4.3 25
3.4 - 3.5 20 4.3 - 4.4 26
3.5 - 3.6 21 4.4 – 4.5 28
3.6 – 3.7 21 4.5 – 4.6 28
3.7 – 3.8 20 4.6 – 4.7 30
3.8 – 3.9 23 4.7 – 4.8 31
3.9 – 4.0 24 4.8 – 4.9 30
4.0 - 4.1 30 4.9 – 5.0 32
4.1 - 4.2 34 5.0 – 5.1 35
4.2 – 4.3 45 5.1 – 5.2 40
4.3 - 4.4 49 5.2 – 5.3 40
--STOPPED DUE TO DAMAGE AT BOTTOM OF PILE---- 5.3 – 5.4 41
5.4 – 5.5 42
5.5 – 5.6 50
PILE DRIVING LOG 5.6 – 5.7 46
BRIDGE ( Bagacay -Batinguel)
5.7 – 5.8 50
5.8 – 5.9 55
PILE NO. __9__ 5.9 – 6.0 77
6.0 – 6.1 93
DATE OF PILE DRIVE: _March 14 AND 17, 2020_ 6.1 – 6.2 203
---------------------------REFUSAL ----------------------
PILE MARKINGS NO. OF BLOWS
2.0 – 2.1 9 PILE DRIVING LOG
2.1 – 2.2 8 BRIDGE ( Bagacay -Batinguel)
2.2 – 2.3 7
2.3 – 2.4 8 PILE NO. __10__
2.4 – 2.5 15
DATE OF PILE DRIVE: _March 16 AND 17, 2020_
2.5 – 2.6 12
2.6 – 2.7 10 PILE MARKINGS NO. OF BLOWS
2.7 – 2.8 14 1.0 – 1.1 5
2.8 – 2.9 11 1.1 – 1.2 3
2.9 – 3.0 12 1.2 – 1.3 6
3.0 – 3.1 12 1.3 – 1.4 5
3.1 – 3.2 12 1.4 – 1.5 5
3.2 – 3.3 12 1.5 – 1.6 7
3.3 – 3.4 14 1.6 – 1.7 6
3.4 – 3.5 16 1.7 – 1.8 8
3.5 - 3.6 18 1.8 – 1.9 7
3.6 – 3.7 21 1.9 – 2.0 10
--STOPPED DUE TO HAMMER DAMAGE

1
2.0 – 2.1 11 PILE DRIVING LOG
2.1 – 2.2 11 BRIDGE ( Bagacay -Batinguel)
2.2 – 2.3 10
2.3 – 2.4 9 PILE NO. __11__
2.4 – 2.5 11
2.5 – 2.6 10 DATE OF PILE DRIVE: _March 16 AND 17, 2020_
2.6 – 2.7 9
PILE MARKINGS NO. OF BLOWS
2.7 – 2.8 10
0 – 1.0 16
2.8 – 2.9 12
1.0 – 1.1 4
2.9 – 3.0 12
1.1 – 1.2 5
3.0 – 3.1 12
1.2 – 1.3 9
3.1 – 3.2 14
1.3 – 1.4 8
3.2 – 3.3 16
1.4 – 1.5 10
3.3 – 3.4 17
1.5 – 1.6 9
3.4 – 3.5 20
1.6 – 1.7 5
3.5 - 3.6 25
1.7 – 1.8 7
3.6 – 3.7 30
1.8 – 1.9 9
3.7 – 3.8 35
1.9 – 2.0 9
3.8 – 3.9 38
2.0 – 2.1 9
3.9 – 4.0 52
2.1 – 2.2 9
4.0 - 4.1 58
2.2 – 2.3 9
4.1 - 4.2 54
2.3 – 2.4 10
4.2 – 4.3 43
-------STOPPED DUE TO PILE HEAD DAMAGE------ 2.4 – 2.5 11
CONTINUED: 03 – 17 -2020 2.5 – 2.6 11
4.3 - 4.4 24 2.6 – 2.7 14
4.4 – 4.5 21 2.7 – 2.8 15
4.5 – 4.6 24 2.8 – 2.9 14
4.6 – 4.7 23 2.9 – 3.0 15
4.7 – 4.8 22 3.0 – 3.1 17
4.8 – 4.9 28 3.1 – 3.2 19
4.9 – 5.0 26 3.2 – 3.3 20
5.0 – 5.1 30 3.3 – 3.4 21
5.1 – 5.2 28 3.4 – 3.5 21
5.2 – 5.3 28 3.5 - 3.6 23
5.3 – 5.4 30 3.6 – 3.7 27
5.4 – 5.5 37 3.7 – 3.8 33
5.5 – 5.6 42 3.8 – 3.9 54
5.6 – 5.7 35 3.9 – 4.0 48
5.7 – 5.8 35 ---STOPPED DUE TO HEAD DAMAGE----
5.8 – 5.9 47 4.0 - 4.1 45
5.9 – 6.0 52 4.1 - 4.2 48
6.0 – 6.1 75 4.2 – 4.3 21
-----STOPPED DUE TO PILE HEAD DAMAGE------ 4.3 - 4.4 20
4.4 – 4.5 27
4.5 – 4.6 48
---STOPPED DUE TO HEAD DAMAGE----

2
4.6 – 4.7 26
PILE DRIVING LOG 4.7 – 4.8 27
4.8 – 4.9 27
BRIDGE ( Bagacay -Batinguel) 4.9 – 5.0 29
5.0 – 5.1 28
PILE NO. __12__
5.1 – 5.2 30
DATE OF PILE DRIVE: _March 17, 2020_ 5.2 – 5.3 27
5.3 – 5.4 30
PILE MARKINGS NO. OF BLOWS 5.4 – 5.5 36
0 – 1.0 15 5.5 – 5.6 32
1.0 – 1.1 4 5.6 – 5.7 33
1.1 – 1.2 4 5.7 – 5.8 39
1.2 – 1.3 4 5.8 – 5.9 37
1.3 – 1.4 4 5.9 – 6.0 52
1.4 – 1.5 5 6.0 – 6.1 86
1.5 – 1.6 6 6.1 – 6.2 105
1.6 – 1.7 6 6.2 – 6.3 205
1.7 – 1.8 7 -----REFUSAL------

1.8 – 1.9 5
1.9 – 2.0 8
2.0 – 2.1 8
2.1 – 2.2 8
2.2 – 2.3 7
2.3 – 2.4 8 Prepared by :
2.4 – 2.5 10 ALISA JANE T. TUBORO
2.5 – 2.6 9 FIELD ENGINEER
2.6 – 2.7 10
2.7 – 2.8 12
2.8 – 2.9 12
2.9 – 3.0 12 Recieved by:
NORMAN SUMAYA
3.0 – 3.1 16
MATERIALS ENGINEER
3.1 – 3.2 17
3.2 – 3.3 21
3.3 – 3.4 19
3.4 – 3.5 19
3.5 - 3.6 24
3.6 – 3.7 24
3.7 – 3.8 32
3.8 – 3.9 31
3.9 – 4.0 38
4.0 - 4.1 41
4.1 - 4.2 35
4.2 – 4.3 25
4.3 - 4.4 27
4.4 – 4.5 28
4.5 – 4.6 28