17-May 11-May
24-May 18-May
31-May 25-May
08-Mar 02-Mar
15-Mar 09-Mar
22-Mar 16-Mar
29-Mar 23-Mar
05-Apr 30-Mar
09-Aug 03-Aug
16-Aug 10-Aug
23-Aug 17-Aug
30-Aug 24-Aug
06-Sep 31-Aug
08-Dec 02-Dec
15-Dec 09-Dec
22-Dec 16-Dec
29-Dec 23-Dec
05-Jan 30-Dec
09-Feb 03-Feb
16-Feb 10-Feb
23-Feb 17-Feb
01-Mar 24-Feb
12-Apr 06-Apr
19-Apr 13-Apr
26-Apr 20-Apr
03-May 27-Apr
13-Sep 07-Sep
20-Sep 14-Sep
27-Sep 21-Sep
04-Oct 28-Sep
11-Oct 05-Oct
18-Oct 12-Oct
25-Oct 19-Oct
01-Nov 26-Oct
07-Jun 01-Jun
14-Jun 08-Jun
21-Jun 15-Jun
28-Jun 22-Jun
29-Jun
12-Jan 06-Jan
19-Jan 13-Jan
26-Jan 20-Jan
02-Feb 27-Jan
06-Jul
13-Jul
20-Jul
02-Aug 27-Jul
CM3000126_D_LOCO_Lockdown_R3_08_05_2020
05-Jul
12-Jul
19-Jul
26-Jul
Date
Milestones
1 Fact Order Received 06-03-2020
2 Fact 1st Design Review with BEC 14-03-2020
3 Fact Design ready for Design Review -2 22-03-2020
4 Assumption-1 Agreement on timeline of GT by BEC/PRL 12-05-2020
Advance Payment of 10% Before
Assumption-2
to GT after Agreement 18-05-2020
5 Assumption-3 DAP2 by BEC-PRL (21 Days) 08-06-2020
Reciept of balance 20% adavance payment to
Before
Assumption-4 GT against DAP-2 and before comencement
14-06-2020
of actual manufacturing
Plan_R0 DM DAP DR RM F F M M A A T P/D I
1 Bolster Bracket Fixture Plan_R1 DAP2 DAP2 DAP2 DR RM RM F F M M M A A TG TG P/D I
Status DM DM >> >> >> >> >> >> >> >> >> >> >> >> DAP1 >> >> >> >> >> >> >> >> >>
Plan_R0 DM DAP DR RM F F M M A A T P/D I
Fixture for Assembly
2 Plan_R1 DAP2 DAP2 DAP2 DR RM RM F F M M M A A TG TG TG P/D I
of Interlock Bracket
Status DM DM >> >> >> >> >> >> >> >> >> >> >> >> DAP1 >> >> >> >> >> >> >> >> >>
Transom 1,2 & 3
Plan_R0
Side Plate Assembly
8 Plan_R1 DAP2 DAP2 DAP2 DR DR RM RM F F M M M M A A TG TG TG P/D I
LH &RH
Status DM DM DM >> >> >> >> >> >> >> >> >> >> DAP1 >> >> >> >> >> >> >> >> >>
Plan_R0 DM DM DAP DR RM F F M M M A A T T P/D I
9 Side Frame LH Plan_R1 DAP2 DAP2 DAP2 DR DR DR RM RM F F M M M M A A TG TG TG TG TG P/D I
Status DM DM DM DM >> >> >> >> >> >> >> >> >> DAP1 >> >> >> >> >> >> >> >> >>
Plan_R0 DM DAP DR RM F F M M M A A T T P/D I
10 Side Frame RH Plan_R1 DAP2 DAP2 DAP2 DR DR DR DR RM RM F F M M M M A A TG TG TG TG TG P/D I
Status DM DM DM DM >> >> >> >> >> >> >> >> >> DAP1 >> >> >> >> >> >> >> >> >>
Plan_R0 DM DAP DR RM F F M M A A T P/D I
11 Templates set for all stages in Side Frame Plan_R1 DAP2 DAP2 DAP2 DR DR DR DR DR RM RM F F M M M A A TG TG P/D I
Status DM DM DM DM >> >> >> >> >> >> >> >> >> DAP1 >> >> >> >> >> >> >> >> >>
Plan_R0 DM DM DM DAP DR RM F F M M A A T P/D I I
12 Fixture for Main Assembly Welding Plan_R1 DAP2 DAP2 DAP2 DR DR RM F F M M M M A A TG TG TG P/D I I
Status DM DM DM DM >> >> >> >> >> >> >> >> >> >> DAP1 >> >> >> >> >> >> >> >> >>
Main Frame
DM Design Modeling DAP1 Design Review with BEC DAP2 Design Review with BEC-PRL DR MFG Drawing Making F Fabrication M Machining A Assembly TG Trial at Godrej P/D Packing & Despatch I Installation