(See Clause 2.1)
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-1
National Highways Authority of India Request for Proposal – Bid Documents
Annexure-I
(Schedule – B)
The Project Highway shall follow the alignment shown in the plan and profile specified in Annex III of
Schedule-A, unless otherwise specified by the Authority.Notwithstanding anything to the contrary
contained in this Agreement or IRC:SP:87-2013, the proposed profile of the project highway as indicated
in the Annexure-III of Schedule-A shall be treated as an approximate assessment. Based on site/design
requirements specified in Schedule-D, the contractor shall design the alignment plans and profiles of the
project highway within the available ROW.
1.2.1 Six-lane divided carriageway shall be undertaken. The paved carriageway shall be provided as
indicated below and referred to in paragraph 2.8 of this Schedule–B and Annex –I of Schedule–D.
1.2.3 Except as otherwise provided in this Agreement, the width shall be adjusted to fit into appropriate
plans and cross sections developed in accordance with TCS enclosed.
1.2.4 Except as otherwise provided in this Agreement, but subject to provisions of Annex –I of this
Schedule–B, the width of the paved carriageway shall conform to Section 1.2.1 of Schedule B.
1.2.5 The entire cross-sectional elements shall be accommodated in the available/proposed ROW. If
required, suitable retaining structures shall be provided to accommodate the highway cross
section within the available/ proposed ROW and the same shall not constitute a Change of Scope,
save and except any variations in the length arising out of a Change of Scope expressly
undertaken in accordance with the provisions of Article 13.
2.1 General
Geometric design and general features of the Project Highway shall be in accordance with
Section 2 of the IRC: SP: 87-2013.
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-2
National Highways Authority of India Request for Proposal – Bid Documents
In the following stretches, where improvement of the existing road geometrics to the prescribed
standards is not possible, the existing road geometrics shall be improved to the extent possible
within the given right of way and proper road signs and safety measures shall be provided:
b) The Earthen Shoulder shall be provided with 200mm thick layer of well graded coarse granular
material for protection against Rain/Wind erosion.
Note:
1. Above length of the service/slip/connecting roads is indicative and minimum specified, The
actual length of the service/slip/connecting roads shall be determined by the Contractor in
accordance with the IRC:SP:87-2013 requirements with approval from the Authority’s Engineer.
Any increase in the length specified in this Clause of Schedule-B shall not constitute a Change of
Scope, save and except any variations in the length arising out of a Change of Scope expressly
undertaken in accordance with the provisions of Article 13.
2. The realignment of existing track to the SVUP outside the PROW and connecting roads between
consecutive underpasses wherever required as per plan & profile uploaded with bid document
and specified in Annex III of schedule A is to be constructed by the contractor as per site
requirement in consultation with Authority Engineer and the same would not constitute any
change of scope.
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-3
National Highways Authority of India Request for Proposal – Bid Documents
3. Length of service roads given in above table excludes length across the project Highway for
proper connectivity of cross roads on either side of project highway as given in the alignment
plan enclosed at Annex-III, Schedule-A which shall be deemed to be included in the scope of
work.
2.7.1 Grade separated structures shall be provided as per paragraph 2.13 of the IRC:SP:87-
2013. Proposed levels at structure locations as shown in plan & profile specified in
Annex III of schedule A are only for guidance and any changes in levels shall not
constitute any change of scope. The requisite particulars are given below:
SVUP
Span
S. Design Chainage Type of Total width
Arrangement Remarks
No. (In Km) structure (m)
(m)
1 02+025 RCC Box 1x7m x 4.5m 2 X 14.50
2 03+200 RCC Box 1x7m x 4.5m 2 X 14.50
3 04+750 RCC Box 1x7m x 4.5m 2 X 14.50
-Refer drawing
4 05+650 RCC Box 1x7m x 4.5m 2 X 14.50 of GAD
5 08+050 RCC Box 2 X 14.50 -The Diversion
1x7m x 4.5m
Road/Track shall
6 09+100 RCC Box 1x7m x 4.5m 2 X 14.50
be provided as
7 10+500 RCC Box 1x7m x 4.5m 2 X 14.50 marked in plan.
8 13+900 RCC Box 2 X 14.50 The Level shall
1x7m x 4.5m
not be more than
9 20+750 RCC Box 1x7m x 4.5m 2 X 14.50
500mm below
10 21+550 RCC Box 1x7m x 4.5m 2 X 14.50 the Existing
2 X 14.50 Ground level
11 22+850 RCC Box 1x7m x 4.5m
12 27+750 RCC Box 1x7m x 4.5m 2 X 14.50
13 28+250 RCC Box 1x7m x 4.5m 2 X 14.50
Note: All SVUP’s shall have clearance of 7.0 meter horizontal and 4.5 meter vertical.
LVUP
VUP
INTERCHANGE
S. Description / Description /
Length (m) Remarks
No. Location Location
NIL
Note:
1. The existing cross road shall be reconstructed for suitable length as given in Appendix B-3
2. The length of loops and ramps are minimum as shown in drawing and likely to get changed as
per site requirement; Any change as per site requirement may not constitute change of scope,
save and except any variations in the length arising out of a Change of Scope expressly
undertaken in accordance with the provisions of Article 13.
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-5
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-6
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-7
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-8
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-9
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-10
National Highways Authority of India Request for Proposal – Bid Documents
Note:
(i) Type of Junction to be improved as per IRC:SP:87-2013 and MOST type design for intersection
on National Highways, 1992.
(ii) Any other junction not mentioned above but observed during the construction of the project
shall be improved as per IRC:SP:87-2013 requirements. The same shall not constitute a Change
of Scope, save and except any variations arising out of a Change of Scope expressly undertaken
in accordance with the provisions of Article 13.
(iii) The contractor shall take up ‘Detailed Engineering study’ to ascertain further details of all
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-11
National Highways Authority of India Request for Proposal – Bid Documents
intersections and treatment of the intersections shall be designed in accordance with the latest
guidelines mentioned out in section-3 of IRC:SP:87-2013. The same shall not constitute a
Change of Scope, save and except any variations arising out of a Change of Scope expressly
undertaken in accordance with the provisions of Article 13.
(iv) Junction improvement under grade separators/ interchanges shall be carried out as per
IRC:SP:87-2013and typical layout drawing attached at Appendix B-2 to B-3with proper
entry/exit to cross roads and slip/service roads and pavement composition as indicated in clause
5.3 of this Schedule B.
(v) Construction of new road embankment/cuttings shall conform to the Specifications and
Standards given in section 4 of the IRC: SP: 87-2013 and the specified cross sectional details.
Notwithstanding anything to the contrary contained in this Agreement or IRC:SP:87-2013, the
proposed profile of the project highway as indicated in the Annex-III of Schedule A shall be
treated as an approximate assessment. Based on site/design requirement specified in Schedule-D,
the Contractor shall design the alignment plans and profiles of the project highway within the
available Right of Way.
5 Pavement design
5.1 Pavement design shall be carried out in accordance with Section-5 of the IRC:SP:87-2013.
Design is considering 170 MSA at 10% CBR.
(a) Flexible pavement shall be constructed for the entire length of Project Corridor excluding
Toll Plaza. Flexible pavement shall be designed for a minimum design period of 20 years
and minimum sub grade CBR of 10% at 170 MSA.
(b) For interconnecting roads to Interchanges /VUPs/ LVUPs/ SVUPs, flexible pavement shall
be provided for minimum 100 MSA traffic and subgrade CBR of 8 %. The width of the
carriageway shall be equal to the clear span of the Interchange /VUP/ LVUP/ SVUP for the
minimum length of the pavement equal to the width of PROW.
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-12
National Highways Authority of India Request for Proposal – Bid Documents
Main carriageway
Main Carriageway should be designed as per IRC : 37-2012 (CBR= 10%) and 170MSA.
Design Chainage
S. No. Remarks
From To
Nil
Drainage system including surface and subsurface drains for the Project Highway shall be
provided as per section 6 of theIRC:SP:87-2013.Unlined Drains (except at ROB location) shall
be provided in the entire project length which gets terminated at all cross drainage locations.
7 Design of structures
7.1 General
7.1.1 All bridges, culverts and structures shall be designed and constructed in accordance with section-
6 of the IRC:SP:87-2013 and shall conform to the cross-sectional features and other details
specified therein. Superstructure to be designed for edge movement of the vehicle considering
stitching of new superstructure in future due to widening for additional lane. Special vehicle
loading is to be considered in Design of structures.
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-13
National Highways Authority of India Request for Proposal – Bid Documents
ROB - Nil
7.1.4 The following structures shall be designed to carry utility services specified in table below:
7.1.5 Cross-section of all structures including new culverts and bridges at deck level for the Project
Highway shall conform to the typical cross-sections given in section 6 of the IRC:SP:87-2013
and TCS in Para 2.8.
7.2 Culverts
7.2.1 Overall width of all culverts shall be equal to the roadway width of the approaches - 33 meter
7.2.4 New culverts (given in table below) shall be constructed for width equal to the roadway width of
the Project Highway & as per typical cross-section given in the TCS specified in Para 2.11 and
alignment plan. The details are given as under:
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-14
National Highways Authority of India Request for Proposal – Bid Documents
• In addition to above, additional 2 nos. box culverts of size 3m x 3m shall be provided as per site
requirements for facilitating access of farmers to field channels on either side of the carriageway.
The location of such culverts shall be decided in consultation with Authority Engineer.
• Culverts of 1.2 x 1.2 meter shall be provided to facilitate irrigation of fields as per site condition
and requirements.
• Drains for field channel as per site condition and modification to the irrigation requirement shall
be part of scope.
Note:
1. The overall width of the above culverts shall be equal to Roadway width including median &
service road, in case there is any service road. Any additional Barrel length required as per site
conditions shall not constitute a Change of Scope.
2. Location of the above culverts are indicative and span arrangement is minimum specified. Exact
location of these culverts shall be decided in consultation with Authority Engineer. The actual
ventway/span arrangements of culverts shall be determined on the basis of detailed investigations
by the Contractor in accordance with the Specifications and Standards. Any variations in
ventway/span arrangements specified in this Schedule-B shall not constitute a Change of Scope,
save and except any variations in the length arising out of a Change of Scope expressly
undertaken in accordance with the provisions of Article 13.
7.2.5 Repairs/replacements of railing/parapets, flooring and protection works of the existing culverts
shall be undertaken as follows:
NIL
7.2.6 Floor protection works shall be as specified in the relevant IRC Codes and Specifications.
7.2.7 In case of culverts proposed for widening/repair as per details in Clause 7.2.3 above, the same
shall be re-constructed if the design shows that these are unsafe for design loads. No change of
scope shall be considered in such cases.
7.2.8 Utility ducts in form of NP-4 Hume Pipe dia600mm shall be provided across the Project
Highway @ 500 mtr. c/c and along with inspection chamber where directed for crossing of
utilities anywhere as per IRC:SP:87-2013 (Clause 2.16) requirements. Location for such utility
crossing shall be finalized in consultation with Authority Engineer which may not be exact at
every 500m.
7.3 Bridges
New bridges at the following locations on the Project Highway shall be constructed. GADs for the
new bridges are attached in the drawings folder.
Major Bridges:
Minor Bridges:
• The ROB shall be provided along with vehicular clearance for road on either side. Footpath shall
be provided all along the structure.
• An effective drainage system for bridge decks shall be provided as specified in paragraph 9.80 of
the IRC: SP: 87-2013
7.4.1 Design, construction and detailing of ROB/RUB shall be as specified in section 6 of the
IRC:SP:87-2013
7.4.2 Road over bridges (road over rail) shall be provided at the following locations, as per GAD
drawings attached:
NIL
7.4.3 Road under bridges (road under railway line) shall be provided at the following level crossings, as
per GAD drawings attached: Nil
1 ROB 0 -
2 Major Bridge 0 -
3 Minor Bridge 0 -
4 SVUP 13 -
5 Flyover 0 -
6 VUP 1 -
7 VOP Nil -
8 LVUP 8 -
9 Interchange 1 -
10 Culverts 34+2(Additional) -
11 Culverts 1.2 x 1.2 As required As per requirement
12 Utility Duct 600 mm dia. -
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-17
National Highways Authority of India Request for Proposal – Bid Documents
8.1 Traffic control devices and road safety works shall be provided in accordance with Section 10 of
the IRC:SP:87-2013.
9. Roadside furniture
9.1 Roadside furniture like km/Hectometer Stones, Railings, Traffic Impact Attenuators, Delineators
shall be provided in accordance with the provisions of Section 9 of IRC:SP:87-2013 and Traffic
Signage plan as indicated in Annexure-III of Schedule-A.
Precast Boundary wall shall be provided along the entire length on either side (including transverse
requirements at structures) in accordance with Schedule D.
9.2 Traffic Signs (excluding overhead signs at Toll Plaza). Traffic sign boards as per details given
below shall be provided in the project highway as per the road signage plan indicated in
Annexure-III of Schedule-A and deemed to be part of this Schedule-B
Note: The numbers and location of Traffic Signages shown in Traffic Signage plan as indicated in
Annexure-III of Schedule-A are tentative and minimum specified. The actual numbers and
location of Traffic Signages shall be determined by the Contractor in accordance with the
IRC:SP:87-2013 requirements with approval from the Authority’s Engineer. Any increase in the
number specified in this Clause of Schedule-B shall not constitute a Change of Scope, save and
except any variations in the length arising out of a Change of Scope expressly undertaken in
accordance with the provisions of Article 13.
Nil
Retaining walls and protection works shall be provided at locations as indicated below and as
provided in TCS schedule in cl. 2.8 of schedule-B.
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-19
National Highways Authority of India Request for Proposal – Bid Documents
RE Wall
Design
RE Wall Length
S. No. Chainage Remarks
(m)
(Km) Start End
As per Interchange Layout
1 26+400 showing RE/ Retaining Wall in 2250 Dumbbell Interchange with
Appendix MDR-
Note: Above Length and height of Retaining wall/ Reinforced Earth wall is tentative and minimum
specified. The actual length of Retaining wall/ Reinforced Earth wall shall be determined by the
Contractor in accordance with the IRC:SP:87-2013 requirements with approval from the
Authority’s Engineer. Any increase in the length and height specified in this Clause of Schedule-
B shall not constitute a Change of Scope, save and except any variations in the length arising out
of a Change of Scope expressly undertaken in accordance with the provisions of Article 13.
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-20
National Highways Authority of India Request for Proposal – Bid Documents
Nil
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-21
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-22
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-23
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-24
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-25
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-26
National Highways Authority of India Request for Proposal – Bid Documents
Construction of 6-lane access controlled Greenfield highway from km(1+900) to Km(30+000)(AJ/RD-PKG-1) Page B-27