SECTION 09310

CERAMIC TILE

PART 1 - GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Particular

Conditions and Division 1 Specification Sections, apply to this Section.

1.02 SUMMARY

A. This Section includes ceramic tiles for floors and walls of the wet areas, at main
entrance fountain area at places as scheduled in drawings.

1.03 SUBMITTALS

A. Manufacturer's Data: Submit to the Engineer, manufacturers' specifications and


installation instructions for materials specified. Include certifications and other
data to show compliance with the Contract Documents.

B. Samples: Submit to the Engineer samples of each type, class and colour of tile,
not less than 300mm square on plywood backing, and grouted as required.
Sample submittal and Engineer's approval thereof shall be for colour, pattern,
texture and joint width only. Compliance with all other requirements is the
exclusive responsibility of the Contractor.

C. Shop Drawings: Submit detailed shop drawings showing layout (scale 1:20) of all
field tiles and trim shapes, jointing pattern, etc. Provide 1:2 details of expansion
joints, control joints, special tiles, frame and service abutments, etc.

1.04 QUALITY ASSURANCE

A. Obtain each material required for any type and colour of tile work from a single
source, so as to minimise variations in appearance and quality.

B. Field-Constructed Mock-Up: Before installing tile, erect mock-ups for each form
of construction and finish required to verify selections made under sample
submittals and to demonstrate aesthetic effects as well as qualities of materials
and execution. Build mock-ups using materials indicated for final unit of Work.