The Estimation of Hydroelectric Power Station

Functioning Efficiency at the Poor Power Quality


Savina Natalia Viktorovna Suhomesov Michail Andreevich
Amur State University “RusHydro” join-stock company regional branch –
Blagoveschensk, Russia “Zeya Hydroelectric power station”
Zeya, Russia
power@amursu.ru LuckyCMA@yandex.ru

Abstract—The method of estimating the effectiveness of frequency of line voltage and to provide stability of power
hydroelectric power stations functioning according to power system work under the given conditions.
quality indexes was elaborated. Formulae for estimating the life
time of electric equipment isolation at the poor power quality Nowadays to analyze the efficiency of hydroelectric
were got, and formulae for estimating indexes of safety of electric power station functioning a great number of technical and
power stations at the poor power quality were elaborated. Areas economic indicators, which are not interconnected with each
characterizing the effectiveness of hydroelectric power station other, are used. Strictly speaking, it’s impossible to separate
functioning at power distortions were defined. these notions as the technical condition of equipment and, as
the result; the technical indexes define the economic ones.
Keywords-power quality, hydroelectric power station,
Nevertheless a great number of indexes characterizing the
effectiveness of functioning
efficiency of hydroelectric power station functioning is not
convenient for analyzing its state and working out measures
I. INTRODUCTION for providing its competitiveness. Besides, in some cases it’s
The decrease of power quality is one of the significant necessary to get one complex criterion, which will combine
tendencies of world power engineering in the last decades both technical and economic aspects of functioning. Such
(power quality). It is caused by an active introduction of criterion will enable to estimate the influence of a separate
specific rectifying load with nonlinear volt-ampere factor, in our case sinusoid curve distortion and the symmetry
characteristics and the introduction of such modern of current and voltage on the efficiency of hydroelectric power
technologies as a frequency-controlled drive. Considering that station functioning.
the effectiveness of the power station work is one of the most
important criteria of its functioning, it becomes necessary to A criterion is an indication, measure on the basis of which
analyze the influence which is produced by the power quality the assessment, the comparison of alternatives and the
distortions. classification of objects and phenomena are carried out. In our
case a criterion is an indication of comparison of the
II. ABBRIVIATIONS USED effectiveness of hydroelectric power station functioning in the
presence of a certain perturbing factor and without it.
In the article under the term “power quality distortion” we
mean sinusoid curve voltage distortion and symmetry of three- As for power stations, such a comprehensive criterion of
phase voltage system distortions. efficiency in the qualitative form can be the variable value
which reflects the share of electric power delivery from the
III. CRETERION OF EFFICIENCY power station divided into electric power delivery which is
required for the regime conditions under consideration [1]:
Efficiency is a measure of quality of the object
functioning proper or the utility of its use for the
accomplishing of intended functionality. In other words, M f [ E ( t )]
efficiency is a degree of power station suitability to generate  Ɏ( t ) ,  
electric power of the required quality and amount, to maintain M n [ E ( t )]

978-1-4244-5172-2/09/$26.00 ©2009 IEEE


M f [E ( t )] is the mathematical expectation of the actual from electric power station is the measured, therefore it
doesn’t require any calculations.
electric power delivery from electric power station at the
certain period of time (t); The method of calculation of the mathematical expectation
of under recorded and rerecorded electric power connected
M n [E ( t )] - is the mathematical expectation of electric with the resultant error of the system of electric power record,
power which should be delivered according to the regime caused by the power quality distortion M [ 'ɗca ( t )] is
conditions from hydroelectric power station at the certain described in detail in the works [2, 3]. The main idea used in
period of time t. the process of its elaboration consists in the use of current,
voltage and resistance models:
The quantity of the actual delivered electric power can be
calculated with the help of commercial record of electric power
data, which can be found at any hydroelectric power station
provided that the resultant error of this system of record is  I I (1) 1  k In2  k 22I  k 02I ,  
equal to zero. As a matter of fact, the resultant error is never
equal to zero, besides under the influence of some external
factors it can exceed the admissible error. Therefore the amount
of the actual electric power delivery from hydroelectric power  U 2
U (1) 1  kUn  k 22U  k 02U ,  
station will be estimated according to the data of the automatic
system of control and record of electric power taking and the
resultant error.
 z2 r 2 n  x 2 ˜ n 2 ,  
M [ E ( t )] r M ['Eca ( t )]
 F (t) ,   where:
M [ E ( t )] r M ['Eca ( t )]  M ['En (t )]
k 2 I , k 0 I , k 2U , k 0U ,
x are the dissymmetry currents and
or: voltage coefficients by reverse sequence and null
string, relative units;
M [ 'En ( t )] k In , kUn are the coefficients of harmonic component
 F (t) 1  ,   x
M [ E ( t )] r M ['Eca ( t )]  M [ 'En ( t )] of current and voltage, relative units

where: x n – harmonic number;

M [E ( t )] is the mathematical expectation of electric x r, x – active and inductive impedance of the secondary
x circuit.
power estimated by the system of commercial record at
the period of time t, delivered from electric power during the mathematical formulation of the main elements of
station; the measuring system (current and voltage transformer).

M ['Eca ( t )] is the mathematical expectation of To calculate the mathematical expectation of the


x underdelivered electric power caused by electric power quality
under recorded and rerecorded electric power distortions, firstly we should estimate the safety of the separate
conditioned by the resultant error of the system of elements of electric power station at the poor power quality.
electric power record, caused by the distortion of
power quality; It should be mentioned that the variety of reasons for
electrotechnical equipment faults is reflected in the division of
x
M ['En ( t )] is the mathematical expectation of the faults into random failures and gradual failures, mathematical
under delivered electric power connected with the models of which are different. As a matter of fact any element
decrease of safety in the period of time t. of electric power station is influenced by a great number of
factors (sudden and conditionally constant), which can lead
either to the random failure or gradual wear. Therefore to
IV. THE SEQUENCE OF EFFICIENCY CRETERION
analyze the safety of hydroelectric power stations power
CALCULATION
equipment it’s advisable to use the combination of two laws:
To calculate the criterion of effectiveness we should find demonstrative and normal [4]:
the amount of all component parts of the formula (2).
The amount of the mathematical expectation of electric (t-T)2
power estimated by the system of commercial record in the O˜t t -T 1 
2V 2T
 a(t ) e [O (1  Ɏ( ))]  e ,  
period of time t and the amount of electric power delivered VT 2S V T
(t -T) 2

e 2V 2 T Having found the failure rate of the separate elements of
 O (t ) O  ,   electric power station we perform the following operations:
t -T
V T 2S Ɏ( )
VT x The scheme of hydroelectric power station substitution
from the point of view of safety is drawn.
where Ɏ is Laplace’s function and ıɌ is mean-square x The power that should be delivered into the system
time of no-failure operation. according to the regime conditions is calculated, then
Energy quality distortions can lead to the decrease of by the search of eventual failures of the separate station
isolation life time. The main reason it can be thermal aging. elements potential deficits in this regime are calculated.
It’s definitely known that we can find out the increase of x The risk of potential deficit emergence is calculated in
temperature which can lead the twofold life time decrease of accordance with redundance.
any type of isolation (for example, for the isolation with
organic base it’s 8°ɋ – eight degree rule). With the help of the x Then the duration of potential deficits is calculated:
formulae (4, 5, 6) additional electric power loss for the
separate elements of electric equipment caused by energy  t ( Pd ) p( Pd ) ˜ Ɍ y   
quality distortions were estimated. Then we estimated the
amount of the additional heating of isolation, it enabled us to
detect the interconnection between power quality distortion where Ɍy = 8760 h, and the mathematical expectation of the
and the decrease of isolation life time. quantity of the underdelivered electric power:
Having introduced the decrease of life time connected with
poor electric quality of a separate element into the formula (5), n
we can calculate an element’s failure rates taking into
consideration the influence of power quality:
 M ['En ( t )] ¦ P ˜t( P ) 
1
d d  

The complex criterion of hydroelectric power station


(t-T-'T)2 operating efficiency characterizes the whole set of factors

2V 2T which influence the underdelivery of electric power in
1 e
 Oqe (t )  ,   comparison with its the required quantity and quality according
T  'T V 2S Ɏ( t - T - 'T ) to the existing regime. The structure of influence of the
T
VT separate technical indexes of electric power station work on the
complex criterion of its operating efficiency is given in
where ǻɌ is the decrease of isolation life time caused by figure 1.
power quality distortion (the method of calculation is
described [5]).

Operation Relaying
cost and automation

Invalidity of energy Power Equipment The safety of energy


and power record losses life time and power output

Power measuring Electrotechnical Control Relaying


complex equipment system and automation

Influencing factor

Figure 1. The influence of electrical power station technical indexes on the complex criterion of efficiency
The complex criterion is used to estimate the degree of the  D (1  F ( t )) ˜ W ˜ E   
separate factor influence on the operating efficiency of electric
power station on the whole and the necessity of its record. The where:
use of this efficiency criterion enables to single out the factors,
the influence of which is quite significant for station D – is a total amount of damage caused by influencing factors;
functioning. Besides the use of the criterion enables to
E – expenditures caused by underdelivery and underrecord
elaborate the system of measures for hydroelectric power
(rerecord) of power;
station protection from adverse effects. Moreover we have the
opportunity of estimating the qualitative amount of this W– average annual generation of electric power
criterion, which will make electric power station more megawatt/hour.
competitive, it will make possible to compare different
It should be mentioned that the expenditures caused by
hydroelectric power station between each other. Besides the
power underdelivery and underrecord (rerecord) include not
criterion of efficiency makes it possible to predict the
only the cost of underdelivered and underrecord (rerecord)
functional state of the station.
power but also:
To describe the essence of the suggested criterion let’s
x the expenditures on breakdown elimination caused by
consider the influence of power quality distortion on the
the influencing factor;
operating efficiency of hydroelectric power station.
x partial cost of the broken equipment (the equipment
Power quality distortions influence the functioning of
which can’t be repaired).
electric power measuring complex, electrotechnical
equipment, control system of hydroelectric power station, x the expenditures caused by the sudden power limiting.
relay protection and automatics. It leads to a great number of
This approach enables not only to assess the actual
negative consequences at electric power station: the invalidity
efficiency of the power station work, but to compare them and
of electric power record, additional current losses in
predict their functional state.
electrotechnical equipment of station, the decrease of isolation
life time, equipment failures, and, as the result, to the decrease Thus, the complex criterion of power station efficiency
of electric power delivery safety. functioning was elaborated, and its mathematical formulation
was carried out.
Additional losses of electric power at energy quality
distortion is a generally recognized fact [6, 7]. The invalidity
V. THE CRETERION OF EFFICIENCY USE
of electric energy and power records should be taken into
consideration as a metrology component of loss [8]. It’s quite The use of the suggested criterion enables to single out
important that the loss is released in the form of heat in factors producing a pronounced influence on power stations
electrotechnical equipment of the station and leads to the efficient functioning and to elaborate the complex of measures
component parts thermal growth. In the process the equipment to prevent some negative influence. Besides it enables to
engineering the loss and its negative effect is taken into predict the efficiency of power station functioning in the
consideration, nevertheless the presence of additional loss can future.
lead to thermal balance failure in electric machines and cause To estimate the actual significance of the suggested
rapid isolation thermal aging. Besides thermal aging, energy criterion the calculation on the base of Zeya hydropower
quality distortion leads to electric aging of isolation. What’s station was made. Three scenarios were chosen:
more reciprocal moments produced during energy quality
distortions on electric machines shaft cause vibration aging of The first one corresponds with minor power quality
isolation. distortions (the distortions don’t exceed 50% of State Standard
13109-97 maximum permissible rate);
The rapid isolation aging leads to the decrease of its life
time and, as the consequence, to the possible increase in The second corresponds with the situation when the
electrotechnical equipment breakdown and the decrease of distortions are equal to State Standard maximum permissible
electric power output safety. rate;
Power quality distortion also affects the control system of The third – the distortions exceed maximum permissible
hydropower station operating procedure, relaying and rate in 50%.
automation operating. Particularly significant influence is
Besides, we found power range, which should be released
produced by the poor power quality on brand new
into the circuit – from the power of station (1330 MW) to
microprocessor units, it can lead to protection misoperation
minimum acceptable rate (500 MW). For conditions
and to power deficit. As the result, it also leads to the decrease
mentioned above a series of the suggested criterion
of power output safety.
calculations were made, the results of which are presented in
For the sake of convenience let’s display the money the form of a chart (figure 2).
equivalent of the given index as damage:
decrease of the main equipment life time, power underrecord
and the increase of power underdelivery possibility during the
maximal station load. There can be no apparent manifestations
of power quality distortions noticed by the station personnel
but the decrease of economic efficiency is already evident. It’s
quite reasonable to take some measures for power quality
normalization. Besides the constant power quality distortion
monitoring should be carried out.
The third area can be called the area of failures. The
influence of power quality distortions on the hydroelectric
power station functioning efficiency is significant and it’s
essential to take measures for power quality index
Figure 2. Variable value of the criterion of hydroelectric power station work
improvement, at the same time variable value of power quality
efficiency at different load and power quality distortion level index should be controlled. But the existence of hydroelectric
power stations in the area is unlikely, because in this case
From the chart given above we can see that the increase of hydroelectric power station should have rated load all the time
power quality distortion rate leads to the decrease of and an extremely high level of power quality distortions.
hydroelectric power station functioning efficiency. Besides the
In the electric power competitive market it is necessary to
load increase leads to the increase of power quality distortions
increase economic efficiency of hydroelectric power stations
influence. The given chart (chart 2) characterizes the influence
work, to do it we should find out to what area they belong.
of power quality distortions on hydroelectric power station
According to this data the measures for loss decrease
functioning. To get the quantitative assessment of this
connected with power quality distortions should be taken.
influence another variant of relation (figure 3).
The recommendation for the stations of the second and the
third category is the elaboration of the system of constant
power quality distortion monitoring.

VI. CONCLUSION
Summarizing everything mentioned above we can draw
the following conclusion:
1. We suggested the criterion of hydroelectric power station
effectiveness taking into account technical consequences
of the capital equipment work of hydroelectric power
Figure 3. The areas characterizing hydroelectric power station functioning
station in the presence of Ʉɗ distortions.
efficiency at power quality distortions
2. The suggested criterion enables to provide the qualitative
and quantitative assessment of the effectiveness of
In figure 3 the areas where the coefficient of functional
hydroelectric power station functioning.
efficiency varies on 0,01 relative unit (1%) are presented. To
calculate money equivalent of the given criterion of damage 3. The suggested instrumentality enables to define the limit
we should use the formula (12). It’s quite convenient that the of hydroelectric power station effective functioning in
result is presented in relative units that mean that it can be case of power quality distortions according to power
converted into any required unit. output. The limits exceed will lead to the increase of
operation cost and the decrease of profit and in case of
In chart 3 there are areas corresponding with different
the extremely high degree of distortions can even cause
hydroelectric power station functioning efficiency. The first
failures. This limit enables to elaborate the measures for
area can be called the area of hydroelectric power station
power quality providing and normalization at certain
effective functioning, here the influence of power quality
stations with real conditions.
distortions is minimal and doesn’t lead to significant economic
consequences. If a station works in this area there is no 4. The areas characterizing hydroelectric power station
necessity to take any measures for power quality functioning efficiency on the base of Zeya hydroelectric
normalization, but some kind of ɉɄɗ control should be taken power station were plotted according to the level of
from time to time to prevent the possibility of transference into power quality distortions and station load.
the second area.
5. The use of the suggested criterion of hydroelectric power
The second area is the area of economic damage for station functioning efficiency and the defining of the
hydroelectric power station. It is the area where the negative limits of effective functioning on its base will enable
consequences caused by power quality distortions appear: the hydroelectric power stations to decrease their
expenditures and increase profit at the poor power quality
which will lead to the increase of stations
competitiveness in the market.

REFERENCES
[1] Savina N.V., Suhomesov M.A., “The quantitative assessment of
functioning power stations effectiveness,” electric power from
generating and distribution to the effective use, Tomsk, TPU, 2008, pp.
154-156.
[2] Savina N.V., Suhomesov M.A., “The resultant error of the measuring
complex of electric power during its quality loss,” Moscow, Electric
power stations, 2008, ʋ 6, pp. 48-54.
[3] Savina N.V., Suhomesov M.A., “Modelling of instrument current and
voltage transformers at the poor electric power quality,” Moscow,
Electricity, 2008, ʋ 11, pp 6-11.
[4] Fokin J. A., “Safety and effectiveness of electric network systems,”
Moscow, Higher school, 1989, 224 p.
[5] Savina N.V., Suhomesov M.A., “The safety of work of power equipment
isolation at electric power distortion,” Energetics: control, quality and
effectiveness of energy resources use, Blagoveschensk, AmSU, 2008, pp
156-161.
[6] Zhezhenko I.V., “Higher harmonics in the systems of industrial
enterprises energy saving,” Moscow, Energoatomizdat, 1994, 272 p.
[7] “The standardization of electric power indexes and its optimization,”
Edited by Bogutsky A., Gamma A.Z., Zhezhenko I.V., Glivitse –
Irkutsk, 1988, 249 p.
[8] Zhelezko J.S., Artemjev A.V., Savchenko O.V., “Calculation, analysis
and standardization of electric power loss in power network: guidance
for practical calculations” Moscow, SC ENAS, 2004, 280 p.

You might also like