You are on page 1of 6

Method Statement for Concrete Repair

Works | Structural Works


Contents [hide]
 1 Method Statement for Concrete Repair Works | Structural Works
o 1.1 PURPOSE:
o 1.2 SCOPE OF WORK:
o 1.3 WORK FLOW CHART:
o 1.4 MAPPING:
o 1.5 SURFACE PREPARATION:
o 1.6 DEFECT CATEGORY IDENTIFICATION AND TREATMENT
METHOD:
o 1.7 TREATMENT APPLICATION:
o 1.8 EQUIPMENT TO BE USED:
o 1.9 SAFETY CONTROL:
 1.9.1 Personal Protective Equipment:
 1.9.2 Barricades,signs and Materials to be used:
o 1.10 SIKA PRODUCTS:

PURPOSE:
The Main purpose of this Method Statement is to outline the repair procedure of
structural
concrete works for all building works in compliance with all the required
specifications,
standards, and proper construction procedures.

SCOPE OF WORK:
This document covers the work for the repair of structural concrete as follows:
 Repair of structural concrete surface due to honeycomb, tie rod holes
and other
imperfections of concrete surface. (Sikatop 121).
 Repair of structural concrete due to concrete surface cracking.( Sikadur
752/Sikadur
731)
 Repair of structural concrete due to water leak.(Sika Top Seal 107).

WORK FLOW CHART:

Work Flow Chart | Method Statement


for Concrete Repair Works

MAPPING:
A sketch of the surface defect shall be prepared indicating the location as
reflected in the
drawing. All surface defects shall be given ID number for easy reference.

SURFACE PREPARATION:
Surface preparation shall be done in accordance with the materials
manufacturer’s
recommendation as indicated in this method of statement, technical data sheet
as per
mentioned product.

DEFECT CATEGORY IDENTIFICATION AND


TREATMENT METHOD:
After surface preparation of affected area, types of defects and classification of
treatment shall be established as follows:
TREATMENT APPLICATION:
Mixing,application and curing shall be done in accordance with the
manufacturer’s
recommendation as indicated in this method of statement.

EQUIPMENT TO BE USED:

SAFETY CONTROL:
Prior to commencement of the works, we will ensure that technical
specifications of each
product was carefully carried out to avoid any problem at site.

Personal Protective Equipment:


 All required PPE such as helmet and safety shoes shall be provided and
maintained for all workers doing the repair works.
 For the porpose of protecting workers eye injury and flying particles,
eye protector such as safety glass,face shield and goggles shall be
provided engaged in the related work.
 Mask and rubber gloves are required to workers involved in mixing and
application as per MSDS requirements.

Barricades,signs and Materials to be used:

 Safety and warning signboards in dual language shall be installed.


 Barricades shall be erected to isolate the working area with suitable
and sufficient access.
 Materials required for this work shall be properly stored and identified
at areas designated for this purpose.
 All Scaffolding to be used, if any shall be inspected prior to use.

SIKA PRODUCTS:
 Sika Monotop 615HB
 Sika Monotop R
 Sikadur 731
 Sikadur 752
 Sika seal 107

Note: You can download the above product technical data sheets on sika official
website.