Professional Documents
Culture Documents
COMMERCIAL QUAY
Berth 209/210
Vessel operating at this berth are conditioned to the arrival of RoRo and full-container vessels
where shall receive instructions from dock co. to unberth.
Berthing Priority is granted by berthing turn as per arrival date/time.
02 vessels programmed at 9.000 mtons versus 01 vessel programmed to 6.000 mtons.
Actually, due to draft restrictions all vessels programmed to shed 209/210 must berth firstly
on shed 211 for dischargin to reach draft 8,00 (FWD)
Berth 211
Preference for discharge vessels being programmed at 9.000 mtons or 6.000 mtons minimum
discharge rate per day.
Berthing Priority is granted by berthing turn as per arrival date/time.
02 vessels programmed at 9.000 mtons versus 01 vessel programmed to 6.000 mtons.
Port Admistration is also using optionals berths along the wharf for discharging os fertilizers,
to be confirmed during dock meeting.
SHED 209/210
SHED 211
FOSPAR TERMINAL
PORT OF ANTONINA - TERMINAL PONTA DO FELIX - PORT INFORMATION