You are on page 1of 1

ATTACHMENT B1

SCHEDULE OF PRICE
NO. 0021/DE-TE/IV/ASA/2013
PALEMBANG TRANSPORTATION SERVICES (BRIDGING)

Table Amendment No. 3


Duration UNIT RATE TOTAL
NO DESCIPTIONS OF WORK Qty
(months) (USD) (USD)

Pick-up, Double Cabin, Dual Air bag, 4 X 4, including


fire extinguisher, reversing alarm (alarm mundur),
1 2 2 15,250,000.00 61,000,000.00
headrest for all passenger, reflective stripping, Windows
Film max 40%, first aid kit tools, safety cone (2 Units).
Manual transmission, Ban Rimba, brand new
2 Multi Purpose Vehicles V 2.5 M/T (Diesel) 1 2 8,000,000.00 16,000,000.00
3 Driver Cost 5 2 2,480,000.00 24,800,000.00
Est Overtime for Driver (if any based on actual referred to
4 5 2 2,237,716.76 22,377,167.63
approved time sheet)
Total Estimated Contract Value 124,177,167.63

Note:
1 All equipments shall be conformed to Company's HSE procedure
The Total Estimated Contract Value shall be inclusive with all costs, expenses, and allowances for overhead, profit,
2
mobilization/demobilization, security, supply and provision of all required labor, supervision, equipment, tools,
frame works, consumables, PPE equipments (uniform, safety shoes, etc) and complete performance of the
Services by Contractor in full compliance with the requirements of the Contract and as described within the
respective pricing item.

3
The Basic Salary of Driver as stipulated at point no. 3 is Rp 1,630,000.00. It will be used for the overtime rate basis
4 Contractor shall be responsible with all applicable taxes except VAT 10%
5 The Total Estimated Contract Value is estimated only, Company will pay with the actual basis incurred during the
performance of the Services