2) Name and Capacity of Equipment No. of Unit No. of Unit Rate/Days Total Cost
(Operated) Days (Pesos)
Bakhoe 1 10 16,100.00 161,000.00
Minor Tool
Total Equipment Cost 161,000.00
No. of Total Cost
3) Designation of Personnel Unit Rate
No. of Men Days (Pesos)
Foreman 1 10 600.00 6,000.00
Skilled 4 10 450.00 18,000.00
Laborer 8 10 350.00 28,000.00
Total Labor Cost 52,000.00
Total Cost
4) Description of Materials Quantity Unit Unit Price
(Pesos)
Material Cost 5,977.62 Cu.m 150.00 896,643.00
SIGNATURE
Minor Tool
Total Equipment Cost 42,400.00
Total Cost
3) Designation of Personnel Unit Rate
No. of Men No. of Days (Pesos)
Foreman 1 4 600.00 2,400.00
Skilled 4 4 450.00 7,200.00
Laborer 8 4 350.00 11,200.00
Total Labor Cost 20,800.00
Total Cost
4) Description of Materials Quantity Unit Unit Price
(Pesos)
Material Cost 20.68 Cu.m 12,000.00 248,160.00
SIGNATURE
Total Cost
2) No. of Unit No. Of Day Unit Rate/
Name and Capacity of Equipment (Operated) Days
(Pesos)
Bar Bender 1 8 1,300.00 10,400.00
Bar Cutter 1 8 1,500.00 12,000.00
SIGNATURE
Total Cost
2) Name and Capacity of No. of Unit No. of Days Unit Rate/Days
Equipment (Operated) (Pesos)
SIGNATURE
SIGNATURE
SIGNATURE
Total Cost
2) Name and Capacity of No. of Unit No. of Days Unit Rate/Days
Equipment (Operated) (Pesos)
SIGNATURE
2) Name and Capacity of Equipment No. of Unit No. of Unit Rate/Days Total Cost
(Operated) Days (Pesos)
One bagger mixer 2 30 3,000.00 90,000.00
Water truck 1 30 7,600.00 228,000.00
Minor Tool
Total Equipment Cost 318,000.00
No. of Total Cost
3) Designation of Personnel Unit Rate
No. of Men Days (Pesos)
Foreman 1 30 600.00 18,000.00
Skilled 4 30 450.00 54,000.00
Laborer 12 30 350.00 126,000.00
Total Labor Cost 198,000.00
Total Cost
4) Description of Materials Quantity Unit Unit Price
(Pesos)
Material Cost 726.34 Cu.m 8,000.00 5,810,720.00
SIGNATURE
Total Cost
2) No. of Unit No. Of Day Unit Rate/
Name and Capacity of Equipment (Operated) Days
(Pesos)
Bar Bender 1 18 1,300.00 23,400.00
Bar Cutter 1 18 1,500.00 27,000.00
SIGNATURE
Total Cost
Name and Capacity of No. of No. of
2) Unit Rate/Days
Equipment (Operated) Unit Days
(Pesos)
Bakhoe 1 6 16,100.00 96,600.00
SIGNATURE
Total Cost
Name and Capacity of No. of No. of
2) Unit Rate/Days
Equipment (Operated) Unit Days
(Pesos)
Bakhoe 1 6 16,100.00 96,600.00
SIGNATURE
Total Cost
2) Name and Capacity of No. of Unit No. of Days Unit Rate/Days
Equipment (Operated) (Pesos)
One Bagger Mixer 2 6 3,000.00 36,000.00
SIGNATURE
Minor Tool
Total Equipment Cost 42,400.00
Total Cost
3) Designation of Personnel Unit Rate
No. of Men No. of Days (Pesos)
Foreman 1 4 600.00 2,400.00
Skilled 4 4 450.00 7,200.00
Laborer 8 4 350.00 11,200.00
Total Labor Cost 20,800.00
Total Cost
4) Description of Materials Quantity Unit Unit Price
(Pesos)
Material Cost 47.38 Cu.m 12,000.00 568,560.00
SIGNATURE
Total Cost
2) No. of Unit No. Of Day Unit Rate/
Name and Capacity of Equipment (Operated) Days
(Pesos)
Bar Bender 1 14 1,300.00 18,200.00
Bar Cutter 1 14 1,500.00 21,000.00
SIGNATURE
Total Cost
2) Name and Capacity of No. of Unit No. of Days Unit Rate/Days
Equipment (Operated) (Pesos)
One Bagger Mixer 1 1 3,000.00 3,000.00
SIGNATURE
SIGNATURE
SIGNATURE
Total Cost
2) Name and Capacity of No. of Unit No. of Days Unit Rate/Days
Equipment (Operated) (Pesos)
SIGNATURE
Total Cost
2) Name and Capacity of No. of Unit No. of Days Unit Rate/Days
Equipment (Operated) (Pesos)
SIGNATURE
Total Cost
2) Name and Capacity of No. of Unit No. of Days Unit Rate/Days
Equipment (Operated) (Pesos)
SIGNATURE
Total Cost
Name and Capacity of Unit
2) No. of Unit No. of Days
Equipment (Operated) Rate/Days
(Pesos)
SIGNATURE
Total Cost
Name and Capacity of Unit
2) No. of Unit No. of Days
Equipment (Operated) Rate/Days
(Pesos)
SIGNATURE
SIGNATURE
SIGNATURE
1. Part No. - Enter the "Part No." for each section of the BOQ where unit prices are entered.
2. Part Decription - Enter "Part Description" corresponding the "Part No."
3. Total Amount - Enter "Total Amount" in Peso for all pages having the same "Part
Description"
Name JIEZL LORRAINE S. ROBLE In the capacity of: Authorized Managing Officer
Signed: __________________________________________________Date: June 29, 2023
Duly authorized to sign the BID for and on behalf of JD-RG Construction and Supplies Corp.
Contract ID KITCHARAO CIS- CALAMITY REPAIR CIS-15-2023-ASDI-IMO
Contract Name Repair of Canalization, Canal Structures, Protection Works & Dam Desilting
Location Kitcharao, Agusan del Norte
BILL OF QUANTITIES
Unit Price Amount
No. Part Description Unit Quantity
( Pesos) ( Pesos )
DAM DESILTATION
CASH FLOW
PARTICULAR 1st QUARTER 2nd QUARTER 3rd QUARTER 4th QUARTER
Project Duration 52 104 157 210
Accomplishment (%) 25.000% 25.00% 25.00% 25.00%
Cash Flow (Pesos) 4,202,532.00 4,202,532.00 4,202,532.00 4,202,532.00
Comulative Accomplishment (%) 25.00% 50.00% 75.00% 100.00%
Comulative Cash Flow (PESOS) 4,202,532.003 8,405,064.005 12,607,596.008 16,810,128.01
Submitted By:
Temporary Works, Demolition of Common Gravel Furnishing, bending & Inst. Of 2400 PSI Concrete Side Borrow w/ Demobilization Move out
Move in RSB
0/0 Mobilization Old Concrete Excavation Blanket 200/200 Compaction Works 210/210
5/5 9/9 10/10 35/35 105/105 205/205 210/210
70 C.D 95 C.D 5 C.D 5 C.D
5 C.D 4 C.D 1 C.D 35 C.D
2 C.D
2 3000 PSI Concrete 20.68 Cu.m 18,970.68 392,313.62 2.33% 1.17% 1.17%
6 Structural Backfill w/ Comp. 450.00 Cu.m 330.96 148,932.00 0.89% 0.22% 0.22% 0.22% 0.22%
0.8
7 PVC Pipe 2" Ø 8.00 pcs. 4,107.60 32,860.80 0.20% 0.10% 0.10%
8 PVC Pipe 2" Ø 726.34 Cu.m 10,975.12 7,971,668.66 47.42% 6.77% 6.77% 6.77% 6.77% 6.77% 6.77% 6.77%
10 Common Excavation 3,016.06 Cu.m 48.88 147,425.01 0.88% 0.22% 0.22% 0.22% 0.22%
11 Backfill w/ comp. 3,698.19 Cu.m 39.86 147,409.85 0.88% 0.29% 0.29% 0.29%
0.6
12 Gravel Blanket 320.35 Cu.m 2,100.03 672,744.61 4.00% 1.33% 1.33% 1.33%
13 3000 PSI Concrete 47.38 Cu.m 16,800.71 796,017.64 4.74% 1.19% 1.19% 1.19% 1.19%
15 Gravel Blanket 7.63 Cu.m 2,864.31 21,854.68 0.13% 0.04% 0.04% 0.04%
0.4
16 Structure Excavation 310.04 Cu.m 307.24 95,256.69 0.57% 0.19% 0.19% 0.19%
17 Structural Backfill w/ Comp. 59.90 Cu.m 868.75 52,038.12 0.31% 0.10% 0.10% 0.10%
0.3
19 30"ø RCP 98.00 l.m. 5,216.14 511,181.72 3.04% 1.01% 1.01% 1.01%
0.2
20 36"ø RCP 8.00 l.m. 7,119.00 56,952.00 0.34% 0.34%
0.1
22 Anchor Bolt 32.00 pcs 1,063.13 34,020.16 0.20% 0.20%
23 3000 PSI Concrete 1.00 l.s 161,884.80 161,884.80 0.96% 0.48% 0.48%
0
24 Health and Safety 1.00 l.s 111,510.00 111,510.00 0.66% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
16,810,128.01 100.00%
Jun.-23 July-23 Aug.-23 Sep.-23 Oct.-23 Nov.-23 Dec.-23
PROJECT ACCOMPLISHMENT TARGET PERIODIC weekly 0.50% 2.10% 2.32% 2.36% 2.36% 1.00% 0.78% 0.47% 0.28% 5.25% 6.16% 6.28% 6.44% 8.34% 8.34% 6.83% 6.83% 7.54% 7.50% 7.73% 1.72% 2.51% 2.61% 2.32% 0.50% 0.06% 0.22% 0.65%
CUMMULATIVE weekly 0.50% 2.60% 4.92% 7.28% 9.64% 10.64% 11.41% 11.88% 12.17% 17.42% 23.57% 29.85% 36.29% 44.63% 52.97% 59.80% 66.64% 74.18% 81.68% 89.40% 91.13% 93.64% 96.25% 98.57% 99.08% 99.14% 99.36% 100.00%
TARGET BUDGET COST Monthly 1,223,777.32 773,770.19 3,020,107.60 5,035,137.64 4,975,965.99 1,541,320.64 240,048.63
FINANCIAL ACCOMPLISHMENT
COMMULATIVE BUDGET COST Monthly 1,223,777.32 1,997,547.51 5,017,655.11 10,052,792.75 15,028,758.74 16,570,079.38 16,810,128.01
MANPOWER UTILIZATION SCHEDULE
WEEK
PERSONNEL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Project Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Material Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Const. Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Safety Officer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Skilled workers 6 6 6 6 6 6 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
Surveyor with Equipment 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Driver 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Laborers 10 10 10 10 10 10 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Watchman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EQUIPMENT UTILIZATION SCHEDULE
WEEK
EQUIPMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
One Bagger Mixer 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1
Water Truck 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Bar Cutter 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Backhoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
Vibro Hammer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
Cargo Truck 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Road Grader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Dump Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 1 1 1
Prepared by:
Temporary Works, Demolition of Common Gravel Furnishing, bending & Inst. Of 2400 PSI Concrete Side Borrow w/ Demobilization Move out
Move in RSB
0/0
Mobilization Old Concrete Excavation Blanket 200/200 Compaction Works 210/210
5/5 9/9 10/10 35/35 105/105 205/205 210/210
70 C.D 95 C.D 5 C.D 5 C.D
5 C.D 4 C.D 1 C.D 35 C.D
2 C.D
2 3000 PSI Concrete 20.68 Cu.m 18,970.68 392,313.62 2.33% 1.17% 1.17%
6 Structural Backfill w/ Comp. 450.00 Cu.m 330.96 148,932.00 0.89% 0.22% 0.22% 0.22% 0.22%
0.8
7 PVC Pipe 2" Ø 8.00 pcs. 4,107.60 32,860.80 0.20% 0.10% 0.10%
8 PVC Pipe 2" Ø 726.34 Cu.m 10,975.12 7,971,668.66 47.42% 6.77% 6.77% 6.77% 6.77% 6.77% 6.77% 6.77%
10 Common Excavation 3,016.06 Cu.m 48.88 147,425.01 0.88% 0.22% 0.22% 0.22% 0.22%
11 Backfill w/ comp. 3,698.19 Cu.m 39.86 147,409.85 0.88% 0.29% 0.29% 0.29%
0.6
12 Gravel Blanket 320.35 Cu.m 2,100.03 672,744.61 4.00% 1.33% 1.33% 1.33%
13 3000 PSI Concrete 47.38 Cu.m 16,800.71 796,017.64 4.74% 1.19% 1.19% 1.19% 1.19%
15 Gravel Blanket 7.63 Cu.m 2,864.31 21,854.68 0.13% 0.04% 0.04% 0.04%
0.4
16 Structure Excavation 310.04 Cu.m 307.24 95,256.69 0.57% 0.19% 0.19% 0.19%
17 Structural Backfill w/ Comp. 59.90 Cu.m 868.75 52,038.12 0.31% 0.10% 0.10% 0.10%
0.3
19 30"ø RCP 98.00 l.m. 5,216.14 511,181.72 3.04% 1.01% 1.01% 1.01%
0.2
20 36"ø RCP 8.00 l.m. 7,119.00 56,952.00 0.34% 0.34%
0.1
22 Anchor Bolt 32.00 pcs 1,063.13 34,020.16 0.20% 0.20%
23 3000 PSI Concrete 1.00 l.s 161,884.80 161,884.80 0.96% 0.48% 0.48%
0
24 Health and Safety 1.00 l.s 111,510.00 111,510.00 0.66% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
16,810,128.01 100.00%
Jun.-23 July-23 Aug.-23 Sep.-23 Oct.-23 Nov.-23 Dec.-23
PROJECT ACCOMPLISHMENT TARGET PERIODIC weekly 0.50% 2.10% 2.32% 2.36% 2.36% 1.00% 0.78% 0.47% 0.28% 5.25% 6.16% 6.28% 6.44% 8.34% 8.34% 6.83% 6.83% 7.54% 7.50% 7.73% 1.72% 2.51% 2.61% 2.32% 0.50% 0.06% 0.22% 0.65%
CUMMULATIVE weekly 0.50% 2.60% 4.92% 7.28% 9.64% 10.64% 11.41% 11.88% 12.17% 17.42% 23.57% 29.85% 36.29% 44.63% 52.97% 59.80% 66.64% 74.18% 81.68% 89.40% 91.13% 93.64% 96.25% 98.57% 99.08% 99.14% 99.36% 100.00%
TARGET BUDGET COST Monthly 1,223,777.32 773,770.19 3,020,107.60 5,035,137.64 4,975,965.99 1,541,320.64 240,048.63
FINANCIAL ACCOMPLISHMENT
COMMULATIVE BUDGET COST Monthly 1,223,777.32 1,997,547.51 5,017,655.11 10,052,792.75 15,028,758.74 16,570,079.38 16,810,128.01
MANPOWER UTILIZATION SCHEDULE
WEEK
PERSONNEL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Project Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Material Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Const. Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Safety Officer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Skilled workers 6 6 6 6 6 6 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
Surveyor with Equipment 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0
Driver 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Laborers 10 10 10 10 10 10 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
Watchman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EQUIPMENT UTILIZATION SCHEDULE
WEEK
EQUIPMENT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
One Bagger Mixer 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1
Water Truck 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Bar Cutter 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Backhoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
Vibro Hammer 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0
Cargo Truck 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1
Road Grader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Dump Truck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 1 1 1
Prepared by: Checked by: Reviewed by: Recommending Approval: Approved by:
SUBMITTED BY:
5 0 - Cu.m - - 0.000
6 0 - Cu.m - - 0.000
0.8
CANALIZATION
11 0 - Cu.m - - 0.000
0.6
12 24"ø RCP 12.00 l.m. 6,321.00 75,852.00 0.000
13 0 - 0 - - 0.000
14 0 - 0 - - 0.000
0.5
17 0 - pcs - - 0.000
0.3
18 0 - pcs - - 0.000
19 0 - 0 - - 0.000
0.2
20 0 - pcs - - 0.000
0.1
21 3000 PSI Concrete 1.00 l.s 161,884.80 161,884.80 0.000
Prepared by:
0
Mame/ Signature of Bidder's Authorized Representative
JD-RG CONSTRUCTION AND SUPLLIES CORP.
Contract ID. AMONTAY CIS- CALAMITY REPAIR CIS-06-2023-ADSI-IMO
Contract Name REPAIR OF DAM PROTECTION WORKS
Location Kitcharao, Agusan del Norte
SUBMITTED BY:
UTILIZATION SCHEDULE
WEEK
30
2
1
1
0
0
1
0
1
JD-RG Construction Corp.
ID No. 0
Name of Project : 0
Location: Agusan del Norte
: Unit Price of Construction Materials, Labor Rates and Equipment Rentals
Summary Unit
Earthworks:
Filling Material cu.m.
Soil Poisoning(Termite Control) liters
Concrete Works:
Reinforcing Steel Bars kgs.
GA 16 Tie Wire kgs.
Fine Aggregates cu.m.
Portland Cement bags
3/4" Gravel cu.m.
1/4" x 4' x 8" Ord Plywood pcs.
1" x 2" x 8' Stick bdls.
Cocolumber(Falsework) bd.ft.
Common Wire Nails(Assorted) kgs.
Metal Structures
12 mm dia x 300 mm Long Anchor Bolts kg
50mm x 50mm x 6m Angular bar kg
25mm square bar flat bar kg
Turn Buckles pcs.
12mmØ @ 9m sagrods kg
Welding Electrodes pc.
32 mm dia G.I Pipe (for railings ) pc.
Red lead Paint pc.
75 x 75 x6 mm x 6 m Angle bars kg
65mm x 65mm x 6mm x 6 m Angle bar kg
150mm x 65mm x 3mm 20mm x 6mm C- Purlins pc
25mm x 25mm x 3mm x 6mm Angular Cleats pc
25mm x 25mm x 6mm angular bar kg
12mm thk. Base Plate kg
6 mm thk Gusset Pate pc
Masonry Works
0 pc
0 pc
30-Dec pc
Hardener bags
CARPENTRY & JOINERY WORKS
2" x 2" x 12 Lumber bdft
1" x 3" x 10 Apitong bdft
1" x 1" x 16 bdft
6mm thk 4" x 4" lawanit board pcs
1/4" thk 4 x 8 ordinary Plywood pcs
12mm x 38mm x 0.8mm thk metal furring pcs
19mm x 50mm x 0.5mm thk metal furring pcs
Fiber cement Ceiling Board(4.5 mm thk) pcs
12mm ₵ x 6 m ( hanger ) pcs
insect screen 1/36" diameter lin.m.
50m x 5 mm thk. Flat bar pcs
2" teck screw / rivets for the furring pcs
ELECTRICAL WORKS
36 watts, 230 volts Flourescent lighting set
18 watts compact flourescent lamp pcs
single pole wall switch pcs
wall fan, 65 watts 230 V 60 Hz set
8mm2 THWN Single, Copper, strand m
3.5 mm TW roll
electrical tape pcs
grounding clamp pcs
grounding rod pcs
PVC clip pack
Convenience ( WP ) outlet grounded type pcs
Service entrance cap pcs
Electrical conduit dia 19 mm dia pcs
PVC elbow 90⁰bend 3/4" die pcs
Junction box 4" x 4" with cover pcs
Panel board wt 4 breaker set
100 A 2P circuit breaker set
20A 2P circuit breakers set
vibrating bell 8" set
fire alarm bell vibrating type set
fire alarm manual single action set
fire alarm control panel, one zone set
utility box 2" x 4" pcs
PLUMBING WORK
Water closet set
Lavatory set
Floor drain 4" x 4" plastic pcs
100 mm dia PVC Shed 40 @ 3m pcs
75 mm PVC dia 40 @ 3m pcs
100mm x 100 mm wye set
50 mm dia PVC sched pcs
50 mm dia P-trap pcs
75 mm x 50 mm WYE pcs
75mm dia PVC elbow pcs
75mm dia PVC tee pcs
50 mm dia PVC elbow pcs
12mm PVC blue @ 6m pcs
12mm PVC elbow pcs
1/2" diameter faucet ( heavy duty ) pcs
12 mm diameter PVC tee pcs
12 mm diameter PVC coupling pcs
PVC solvent qrt
tape lon pcs
3mm thick facial mirror on aluminum frame set
CORRUGATED METAL ROOFING
Long span roofing, corrugated pre-painted sq.m
1220 x 0.4 mm thk
0.6 mm thk Pre-form flashing Pre-painted lm
0.6mm thk pre-formed gutter ( Pre-painted ) lm
0.6mm thk pre-formed Ridge roll ( pre-painted lm
Vulca seal qrt
J bolt for roofing pcs
4.5 mm thk fiber cement fascia Board pcs
25 mm x 25mm x 6 mm angular bar kgs
Rivets box
CERAMIC TILES
200mm x 200 mm vitrified unglazed tile pcs
200mm x 200 mm vitrified glazed tile cu m
Hardener pcs
Tile trim pcs
PAINTING WORKS
Concrete neutralizer gal
Flat wall latex paint gal
Paint prime solvent gal
Gloss latex paint gal
Tinting Color Latex paint ltr
Chocolate brown gal
Flat wall Enamel paint gal
Tinting Color Enamel paint ltr
roller brush with pud pcs
Paint brush 2" pcs
Paint brush 3/4" pcs
Sand Paper pcs
Wood putty ( Calsomine ) kls
Easy tite body filler ( Hardener ) gal
Gloss enamel paint gal
Paint thinner gal
OCCUPATIONAL SAFETY AND HEALTH PROGRAM
Hard hat man-day
First aid ket/ barrier/ safety net man-day
Safety Shoes man-day
Rain coats man-day
Gloves man-day
EQUIPMENT RATES Daily Rate
Dumptruck 10400
Bagger Mixer 2400
Concrete Vibrator 2000
Concrete Saw 1200
Bar Cutter 1600
Backhoe 9600
LABOR RATES Daily Rate
Const. Foreman 550.00
Skilled Worker 450.00
Laborer 300.00
Signature:
0
Authorized Managing Officer
Name of Bidder:
JD-RG Construction Corp.
uction Corp.
Unit Price
500
800
45.25
100
700
266
800
353
220
20
75
75
75
75
285
75
2
2
51
75
230
175
250
48
150
1610
14
11
18
300
50.00
50.00
48.00
353.00
353.00
160.00
0.00
483.00
0.00
175.00
235.00
2.00
1450
340
240
1500
60
4350
50
180
1300
110
370
100
100
35
40
1800
1480
1150
850
1450
850
1200
75
5500
1000
180
450
375
245
185
350
175
35
75
150
650
75
450
75
75
246
50
1500
435.00
298.00
396.00
298.00
370.00
11.00
483.00
75.00
285.00
40.00
30.00
580.00
125.00
695.00
908.00
799.00
880.00
400.00
908.00
908.00
400.00
180.00
40.00
35.00
13.00
18.00
580.00
908.00
500.00
0.31
4.17
0.25
0.21
Rate/Hour
1300
300
250
150
200
1200
Rate/Hour
68.75
56.25
37.5
JD-RG CONSTRUCTION AND SUPLLIES CORP.
CONSTRUCTION SCHEDULE
START END
3 Furnishing, bending & Inst. Of RSB 748.95 cu.m. 177.52 132,953.60 0.000 90%
50%
12 3000 PSI Concrete 47.38 l.s 16,800.71 796,017.64 0.000
13 Furnishing, bending & Inst. Of RSB 2,275.48 cu.m. 157.39 358,137.80 0.000
Err:509
0%
29 Err:509 Err:509 unit Err:509 - 0.000
- -
PLANNED ACCOMPLISHMENT - - - - - - -
COMMULATIVE PLANNED ACCOMPLISHMENT - - - - - - -
PERCENT PLANNED ACCOMPLISHMENT 0 9.00 11.00 12.85 13.35 12.20 15.60 26.00
PERCENT COMMULATIVE PLANNED ACCOMPLISHMENT 0 9.00 20.00 32.85 46.20 58.40 74.00 100.00
Prepared by:
Chart Title
12
10
0
0 50 100 150 200 250 300
180
1 2 3 4
32.850 67.150
No. QUANTITY DPWH
Err:509 3000 PSI Concrete 20.68 54,362.96
0 0 - 74,765.37
0 0 - 15,462.72
0 0 - 16,633.33
0 0 - 1,198,279.82
0 0 - 1,715,640.70
0 0 - 1,069,588.48
0 0 - 255,404.09
0 0 - 219,475.57
0 0 - 80,676.20
0 0 - 23,920.53
0 0 - 99,830.34
0 0 - 223,591.02
0 0 - 88,103.64
0 0 - 123,605.74
0 0 - 176,930.58
0 0 - 5,903.99
0 0 - 139,119.38
0 0 - 63,647.83
0 0 - 141,246.00
0 0 - 319,955.98
6,106,144.27
DPWH
ADJUST UNIT JDRG Difference % Difference from DPWH
18,970.68 79,122.13 (24,759.17) -45.54%
- 92,261.70 (17,496.33) -23.40%
- 15,441.20 21.52 0.14%
- - - 0.00%
- 1,203,216.60 (4,936.78) -0.41%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
- - - 0.00%
0.00 - - 0.00%
- - 0.000000
6,106,144.27
Legacy -
5,910,747.64
6,106,144.26 0.01