3 helper
3 helper
3 helper
3 helper
Name of Project
LOCATION
Name of Contractor
Unit
Columns 6
Length 0.4
width 0.3
Height 6
Volume 4.32
Masonry
Length 20
Width 5
Area 100
Length 2
Width 5
Area 10
Plastering Area = 10
Materials ₱ 1,580.00
Labor ₱ 632.00
Direct Cost ₱ 2,212.00
Mark up ₱ 663.60
VAT ₱ 345.07
Total Cost ₱ 3,220.67
Length 2
Width 5
Area 10
Note
Rebars depends on Plans/design