Harimohan Gupta Chief General Manager, DFCCIL. NOlda
Bridging faster and better
Many br id ge const ru ct ion industries cage at ground , procedure for lifting & Yamuna & Hindon rivers, covering th e prefer worki ng with we ll-established placing the 35 t rei n forceme nt cage of bridge s tru c tur es , approaches in ways of con-structioll, with activ ities to pier ca p in place (that cal led for embankments, gu ide blinds & protection be exec ut ed in series . For bridge spec ially des igned lifting gears , reaction works, in clud in g testing & projects, this involves the creation of arrangement & liftpJan)attopofthetwo commiss ioning. Th e design-bui ld lump large ground suppo rting system (OSS), pi ers. Any elTorwh il e lifting and plac ing sum pri cecontrac t (Spec ial wor k s large working platfomls with tempo- the cage of pier cap wou ld invite severe contract package - 15C) on the Rewari - rary stmchl res and li fting & fi xing of complications and time impact on the D adri section covered construction of 13 each rebar at the cast in situ site. The project schedule. pi er cap s, ten on a Yamuna Bridge and need to cOIll -plete the works efficien tly three 011 a Hi ndon Bridge. T he pier caps The ZMT 4 team in minimum time, keeping quality and measure 19 x 3.0 x 2.0 m, consuming safety at pa r, has ne-cessitated the Th e field PM C and d esign team s 110 CU . I11 . MAO concrete w ith 35 t adoption of an innovative modular investigated various cons traints and reinforcement over 124 sq. m. shu ttering. construction method. DFC has adopted suggested mitigations requi red for Conventional in situ method an u n usual seq ue n ce fo r pie r cap executi on and supported this method . construction that eliminated the GSS, II S- L&T Consortium with the help of its In most such co nstruct ion proj ec ts, reduced resource needs , removed technica l ex p er ti se successfull y usually th e trad iti ona l method followed critical safety challenges, improved the co mpleted the li ft ing and placing of the is for construction of pier caps on GSS in quality of rebar cage and saved about 30 rebar cage at pier top with two 75 t w hi c h hu ge s upportin g systems days in eac h pier cap construction. Thi s heavy-duty cranes working in tandem. ( te mp ora ry stru cture s) a re created method separates various activities into ground up fo r fixing bottom shutters an d This modular construction method of sub-activ ilie s th at were executed in for working platfonTIs. Each rebar is pier cap is an excellent exampl e of va lue paraliel, accelerating the comprehensive lifted from the ground and fixed in the engineering that can be lIsed as a case schedul e of constructi on. cast-in-situ location above the cast piers. study for the budding civil eng ineers. Thi s method requires all110st 45 days for DF CC IL's Noida unit showed an The contract was for design & this activity, lIses a lot of resources, faces ambitious interest in developing co n stru c tion of three s pec ia l stee l criti ca l sa fe ty chall enges & quality pioneering ways to accelerate ongoing bridges over exis ting rail lin es & concern s. All the operations in thi s constru ction. After the detai led planning with the design and build contractor (IIS- L&T Co ns0l1ium), the unit came up w ith an innovative method of executing the binding & fi xing of pier .,. cap works , right at the grou nd surface and not at the top of the pre-consh'ucted piers as conventional m ethods would require. The apprehensions we re for providing the bottom support to the pi er cap, need of specia ll y designed jigs & fi xtures for assemb ly of reinforcement -- November 20 J 9 I CONSTRUCTION FREIGHT CORRIDORS Aft er with a special hydr aulic syste m. pi er. it acts stress ing both B I bea ms with pi er for as a single en ti ty with the sa me to the tra nsfe rring a load of pie r cap Furt he r hori zont al bea ms found ation. sses we re e rec ted to a nd vert ical tru te r, as the base o f support the bott om shut The base the pi er cap is not unifoJ111. me nt shutt er plac ed over thi s arra nge fo r requ i red a wor k in g plat form shutt erin g, mad e with the supp ort of ProdUcf these beam s. .:. Co mp Jig fabr icat ion ly and .:. Air Br This process start s s imu ltan eous h the ind ep e nd e ntl y a lon g wit .:. Dis c E beam con stru ctio n of pi e rs and th e rt. A stru c tural base cage e recti on pa .:. Tre ad grou nd le ve l near the 1:1bri cated at the a base j ig & app li c abl e co d e pro v i s ion s, pi er loca tion acte d as CUIll .:. A ir Sl onl y, met hod are e xecu ted in se ries mo dify in g th e fi xture for asse mb ly o f reba r cage . s. ne ces s itat ing w hi ch has high dire ct & indirect cost rein force men t draw ings. Ass emb l y of reb ars on th e base .:. Da mr Inno vati ve mod ular assembly d stru ctur e Beam Asse mbl y and com - Brin g in g abou t spec iall y des igne the th e .:. Bra kl In an ou t o f th e box solu t ion, jigs & fi xtur es to ass emb l e pl eted reba r cage rcem e nt cag e wa s the grou nd . com p let e rein fo rein force m ent cage at Lift ing Arra nge me nt: a s pec ia ll y at resp ectiv e .:. Au tol asse mbl ed a l the grou nd of designed lifte r was pl ac ed at the top jigs & Rev iew des ign & prep ara ti o n pie r loca ti on in spec iall y des igned of asse mbl ed rebar cage, conn ec ted exec uted spec iall y designed lift er. .:. He at fixtures. A ll th e ac..;t iviti es were with the rein-I'o rcem cnt cage a t 28 cap in para llel mod e, e.g. cage of pier A s p ec ial ri g ging team to be loca ti ons thro ugh spec ia ll y des igne d .:. Sw it ' was read y as the respective piers were j bei ng cast. The rei nforcem ent cage wa s lifte d and of3 5 plac ed mobilised and trai ned.
Pro pe r mon it orin g o f liftin g
th e lifti n g ge ars , and cou pl ed w e mbe d-d ed heav y -dut y (hor izon ith - .:. Wi p t over a 19 m lcng th pipe s. cran es rein force ment cage as per appr o ved tall y & verti cally fix ed) in to its position with two craw ler lift plan. .:. Pla t in ta nd e m li ft in g , acc ord ing to a Lifting Ope ration: per the appr o ved ly s pec ia ll y d es ig ned li fte r a nd with Pro pe r mon itori ng o f p lac in g & lift plan , th e cage was lift ed slow r an fix ed bott om .:. Gol various uniq ue li ft ing gea rs unde lowe rin g o f the rein forc emc nt cage a nd placed it over the st approved lift plan . The li ft ing oper ation into the dense dow els of cast pi ers. shutter. This process, one of the mo ent criti cal activ ities in thi s mod ular wa s con du c ted und er th e st ring ely cia l s o f a ll Thi s meth odol ogy save s ap prox imat cons truc tion , takes arou nd 3 hours . s up erv is i on of offi of piers, bott om .:. Tra ng. This one mon th as the cast ing depa rtme nts with proper pl anni cap wor ks, and Ba lanc e rein fo rcem ent: Onc e the s hutt erin g for pier modul ar meth od of pi er cap cons truc tion ortin g prep arin g of entire rein forc eme nt cage cage is plac ed ove r the bott o m Our e limin ates com pl ete ground supp ent ur ces , of pier cap at th e grou nd was don e shutte r, the bala nced rein -for cem sys te m (GS S) , redu ces reso ng of is com plet ed and m isce ll aneo us ica l safe ty chal l enge s, s imu lta neou sly, elim inat es lifti e limi na tes c rit s of bea ring and rebars. Thu s a 45 days cycl e for in sit\.l re bar requ irem ent mai ntai ns qu ality of reba r cage in each wor ks was com pres sed to abou t 15 days . pede stal, O HE mas t etc. are inse rted. finally save d the time of 30 days is Thi s bala nce re in forc eme n t pier cap cons truc ti on . Construction sequence main ly on side s. pier The challenges Bea m erec tio n : Dur ing the Shu tt er in g a nd co nc ret in g: sid e cons truction , spec ia l holes of 70 111111 re of Met icul ous plan ning a nd prep arat ion pier . shutterin g sta rted from the cent plet e sche me w ith the diam e ter wer e mad e in eac h th e pier cap afte r com peti -ti on of the of the com thos e tim isin g re s ourc es Mac alloy bars were inse rted in pie r cap rein forc e men t case . Volu me co nt ract o r op Two B 1- holes a wee k afte r pier cast ing. m. ava il able at grou nd leve l. of the concrete: 110 cu. d on both side s of the beam s were e recte k, A deta iled revi ew of the sche me by piers acro s s the alig nm ent of the brid ge Afte r the compl etion of f0n11 wor r PMC & its design team & in-d epth and attac hed to Mac a ll oy bars with a set star t pou ring of conc retin g afte r com pl ete all coordina ti on with the site team . of faste ners . Inse rted Mac allo y bars eng inee r and emp loye h end and were stres sed up to 75 t from eac chec ks. A deta iled stud y of the draw ings