Total Quantity Of Building Project Estimation From Start


To Finish

 24.0K views ·  One comment 4.6K Shares  996       

This is the project of boy Modal school  ( Real Quantity Estimation of building ) so
after reading this article you will be able to know Estimation for full building project.

P.C.C in foundation footing

3’0″x 3’0″ x 0.5 x 9 Nos   =          40.5 cft

 Material required 

 Cement                       =          7 bags

sand                            =          27 cft

Aggregate                 =          35 cft


 Follow 
We use cookies to ensure that we give you the best experience possible on our website. If you continue to 
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 1/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

R.C.C for column up to 5 feet height

9″x 9″x 5’0″x 9 nos     =          25.31 cft

Material required

cement                  =          5 bags

sand                      =          17 cft

Aggregate           =          22 cft

R.C.C for Column Footing

3’0″ x 3’0″x 0.75 x 9 nos

Material Required

cement            =          10 bags

sand                =          40 cft

3/4 Aggregate      =  51 cft

 Tie Beams all Round and Inside

22’3″ x 9″ x 9″ x 3 nos          =          37.54 cft

21’0″ x 3 Nos x 9″ x 9″         =          35.4375

Total                                       =          72.95 cft

Material Required 

Cement           =          14 nos


We useFollow
Sand               =         
cookiesto ensure that40 cft you the best experience possible on our website. If you continue to
we give 
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 2/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

3/4 Aggregate           =          52 cft

Volume of 2 walls and each wall thickness is 9 inch

22’3″ x 9″ x 9’0″ x 2                         =          310 .54  cft

21’0″ x 9″ x 9’0″ x 3             =          425.25 cft

 Material required 

Cement                       =          58 bags

Sand                           =          478 cft

Brick                           =          18,000 Nos

Inner wall plastering

23’0″ x 9’0″ x 2          =          414 cft

21’0″ x 9’0″ x 4          =          756 cft

Total                           =          1170 cft

 Material required 

Cement                       =          47 Nos

Sand                           =          760 cft

 External wall plastering

23’0″ x 9’0″ x 2          =          414 cft

21’0″ X 9’0″ x 2         =          378 cft


We useFollow
Total                          
cookiesto ensure that=          792
we give you theCft
best experience possible on our website. If you continue to 
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 3/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

 Material required 

Cement           =          32 Nos

sand                =          514 Cft

Quantity of R.C.C roof of 1:2:4

23’0″ x 21’0″ x 0.375             =          182 cft

 Material required 

 cement            =          39 nos

 sand                =          313 cft

3/4 Aggregate           =          410 cft

Estimation for additional works

 P.C.C in foundation

3’0″ x 3’0″x 0.5x  12  Nos              =          54 cft

Material required

 Cement                       =          5 Nos

Sand                           =          36 cft

1 1/2 Aggregate                   =          46 cft

R.C.C Column up to 5 feet Height

9″ x 9″ x 5’0″ x 12 Nos                     =          33.75 Cft


We useFollow
Material required
cookiesto ensure that we give you the best experience possible on our website. If you continue to 
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 4/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

Cement                       =          8 Nos

Sand                           =          22 Cft

3/4 Aggregate                      =          29 Cft

  R.C.C for column footing

3’0″ x 3’0″x0.75 x 12 Nos      =          81 cft

 Materials required

Cement           =          14 Nos

Sand               =          53 Cft

3/4 Aggregate          =          69 Cft

 Tie Beams all round and inside

8’0″ x 9″ x 9″ x 6                  =          27 cft

21’0″ x 9″ x 9″ x 2    =          23.625 Cft

20’9″ x 9″ x 9″ x 2    =          23.34375 cft

9’6″ x 9″ x 9″ x 2                  =          10.6875 Cft

Total                                       =          84.65625 Cft

Material Required 

Cement                       =          19 Nos

Sand                           =          56 Cft


3/4
We useFollow
Aggregate        that
cookiesto ensure      we
   give
    =          72experience
you the best Cft possible on our website. If you continue to 
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 5/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

Quantity for bricks all wall thickness is 9 inch

8’9″ x 9″ x 9’0″ x 4   =          236.25 Cft

21’0″ x 9″ x 9’0″ x 2 =          283.5 Cft

9’6″ x 9″ x 8’0″ x 2   =          114 . 0 Cft

20’9″ x 9″ x 8’0″x 2  =          249.00 Cft

Total                                       =          882.75 Cft

Materials required 

Cement                       =          36 Nos

Sand                           =          265 Cft

Brick                           =          11035 Nos

 Inside all thickness is = 9 inch 

 8’0″ X 9″0″ X 2                    =          144 Sft

4’7 1/2 ” x 3 x 8’0″     =          111 sft

 4’0″ x3 x 8’0″             =          96 sft

Total                                       =          351.00 Sft

Materials required 

Cement                       =          8 Nos

Sand                           =          54 Cft


We useFollow
Brick                          
cookiesto ensure that=          1790
we give you Nosexperience possible on our website. If you continue to
the best 
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 6/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

Inner wall plastering

8’0″ X 9’0″ X 8                      =          576

20’9″ X 8’0″ X 2                    =          332

9’6″ X 8’0″ X 2                      =          152

4′ 71/2″ X 8’0″ X 6                =          222

Total                                       =          1282

Materials required

Cement           =          23 Nos

Sand               =          167 Cft

 External wall plastering

 8’0″ x 11’0″ x 4                      =          352

21’0″ x11’0″ x 2                     =          462

20’9″ x 9’0″ x 2                      =          373.5

9’6″ x 9’0″ x 2                        =          171.00

 Total                                       =          1358.50 sft

 Materials requried

Cement                       =          21 Nos

Sand                           =          177 Cft

We useFollow
 R.C.C Rooftoslab
cookies ensure that we give you the best experience possible on our website. If you continue to 
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 7/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

8’0″ x 21’0″ x 0.375 x 2         =          126.00 Cft

20’9″ x 9’6″ x 0.375               =          73.92 Cft

Total                                       =          199.92  Cft

Materials required

cement                        =          34 nos

Sand                           =          130 cft

3/4 Aggregate                     =          169 cft

 P.C.C in Flooring

8’9″ x 21’0″ x 2          =          367.5

20’9″ x 9’6″    =          197.125

Total               =          564.625 Cft

Materials required 

 Cement                       =          46  Nos

Sand                           =          368 Cft

11/2 Aggregate                    =          480 Cft

Total material requirements

 Cement                       =          212 nos x 185                         =          39220

Sand                           =          2189 cft x 12                           =          26268


We useFollow
cookiesto ensure that we give you the best experience possible on our website. If you continue to 
Brick                          use
=          18000
this website, x 2.40 
we assume that  you
     agree
       with
    it.
    =          43200 OK

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 8/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

11/2 Aggregate         =          135 cft x 20                               =         2700

3/4 Jally                      =          462 cft x 28                             =          12936

Steel required for beam, column, and slab

8 mm                           =          210 kg x 30                             =          6300

10 mm                         =          112 kg x 30                             =          3360

6 mm                           =          180 kg x 30                             =          5400

Cement                       =          214 nos x 185 rs                     =          39,590 Rs

Sand                           =          1328 Cft x 12 Rs                    =          15936 Rs

Brick                           =          12,825 x 2.4 Rs                       =          30780 Rs

3/4 Aggregate          =          340 Cft x 29 Rs                      =          9860 Rs

1 1/2 Aggregate                   =          526 Cft x 20 Rs                      =          10520 Rs

Total Cost of steel required

 10 mm                         =          224 Kg x 30 Rs                      =          6720 Rs

8 mm                           =          450 Kg x 30 Rs                      =          13500 Rs

6 mm                           =          400 Kg x 30 Rs                      =          12000 Rs

Mason                         =          L.S                                          =          57600 Rs

Helper’s                      =          L.S                                          =          35800 Rs

Door’s & windows     =          L.S                                          =          40000 Rs


We useFollow
Centering Labor    
cookiesto ensure =          L.S                                         
that we give you the best experience possible on our =         
website.35000 Rs to
If you continue 
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 9/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

Water Tank               =          L.S                                          =          12000 Rs

Plumbing Work         =          L.S                                          =          20000 Rs

White washing           =          L.S                                          =          30000 Rs

Total Building Project Cost  =      508690 Rs/=

This is the real building project for boy modal school and the above is the total
Estimation of project.

Share this

1 Comment Sort by Oldest

Add a comment...

Waqqayyo Abdi Kootti


Best learning
Like · Reply · 27w

Facebook Comments Plugin

1 COMMENT

Ahan malek says:


March 28, 2019 at 4:24 am

Thank you Civil Er.Dis.


You are providing so helpful information.
Keep it on

Reply

We useFollow
cookiesto ensure that we give you the best experience possible on our website. If you continue to 
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 10/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Comment

Name *

Email *

Post Comment

Enter your search topic Search

SOCIAL LINKS

        
8.4M 1.1M 66K 100K 16K 17K 4K

FEATURED POSTS

Top 40 Most Beautiful Houses 2019


 815.5K

Handmade Bed With Storage For Civil Engineers New Technology


 519.1K


We useFollow
cookiesto ensure that we give you the best experience possible on our website. If you continue to 
OK
use this website, we assume that you agree with it.
Why Bamboo Is More Stronger Than Steel Reinforcement?
https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 11/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

 491.4K

Unique 50 Modern And Classic Wooden Main Door Design Ideas


 488.7K

Unique Backyard Ideas to Steal For Your House


 380.5K

RECENT POSTS

Two Storey House Plan With 3 Bedrooms And 2-Car Garage


122 views

Modern Minimalist House Design Projects


61 views

Purposes Of House Valuation Or Property Valuation


328 views

Stunning House Plans 16.8×11 With 4 Bedrooms


556 views

Top Modern House Design Ideas For 2021


9.4K views

CATEGORIES

Architectural Engineering (330)

Civil Engineering (597)

Electrical Engineering (33)


House Follow
We useDesign With
cookies Plan that we give you the best experience possible on our website. If you continue to
to ensure (34)
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 12/13
07/05/2020 Total Quantity Of Building Project Estimation From Start To Finish - Engineering Discoveries

Math (32)

Mechanical Engineering (16)

Programming Engineering (3)

Safety (6)

Structural Engineering (31)

Technology (8)

Water Resource Engineering (7)

Engineering Discoveries
 8.4M  1.1M  66K  100K  16K  17K  4K  

Developed by Discoveries Company, About Us

We use cookies to ensure that we give you the best experience possible on our website. If you continue to
OK
use this website, we assume that you agree with it.

https://engineeringdiscoveries.com/2019/03/22/total-quantity-of-building-project-estimation-from-start-to-finish/ 13/13

You might also like