You are on page 1of 4

FAKULTI PENGURUSAN TEKNOLOGI DAN PERNIAGAAN

Borang Akuan Pelajar Terhadap Hasil Akademik


Semester II 2019 2020

Saya dengan sesungguhnya dan sebenarnya mengesahkan dan berakujanji bahawa jawapan
yang diberikan adalah hasil usaha saya sendiri dan tidak dihasilkan daripada perbuatan
meniru atau menipu atau memplagiat sumber lain.
Saya faham dan sedar bahawa pelanggaran kepada akujanji ini adalah terjumlah kepada
pelanggaran Peraturan Peperiksaan Akhir UTHM dan Kaedah Universiti Tun Hussein Onn
Malaysia (Tatatertib Pelajar-Pelajar) 2009 dan akan memberi implikasi terhadap pengajian
dan keputusan akademik saya jika didapati bersalah.

Kod kursus : Nama kursus : Nama pensyarah :


Construction Technology II Ts.Dr Yamani Bin Yahya
BPD 150603

Jenis penilaian : Ujian 1 / Ujian 2 / Peperiksaan Akhir

(sila potong mana yang tidak berkenaan)

Nama pelajar : Tan Zhi Cong

Nombor matrik pelajar : Ap190257

Tarikh : 7-Jun-20

Tandatangan : Cong
a)
1)Semi Circular Arches. It can be build as the main entrances for hotel. Besides, it also can
made hotel room’s door and this arches can be the design. The main entrances’s idea come
from like photo 1 and the pattern of hotel’s room come from photo 2.

Photo 1 Photo 2

2)Gothic Arches. Like the the vaulted ceiling utilised the technology of the pointed arch to
spread force and weight from upper floors. This provided the impression of height, grandeur
and elegance of hotel. The distribution of force within the vaulted ceiling enabled vaults can
be interior design and built in the hotel. The design idea is come from the Malbork Castle, in
Poland.

Picture taken from Malbork Castle, Poland


3) Flat arches. It can be built in any building and it can be made by any materials like
combination of a steel and concrete. Besides, it also the basic arches for any buildings and it
can afford more load than others.
b)
1)Double scaffolding. It is secure because there had two rows of scaffolding are use and the
putlogs supported safely. It make sure the safety of workers. The double scaffolding suitable
to use for the hotel because it had 30 floors. It can afford the loads such as materials and the
workers safety. It does not require any holes to the support structure, and it has less repair
work and clean up when the construction done.
2) Cantilever scaffolding/truss out scaffolding. This kind of scaffolding usually use to hotel
outside painting. The span length can be longer and it just need to support by one side of each
cantilever.
3) Steel tube frame scaffolding. It is easy to install and it is safety for workers and can be use
in another construction building. It can be build up with very high like this hotel. It can be
build up with other scaffoldings. It can support heavy loads like workers and the materials.

C)
I choose the spiral staircase. First, we need to consider the design and factors like the height
of the vertical rise of the staircase, the angle rotation of the staircase, the diameter od the
staircase.
This is the spiral staircase that I done with autocad.

You might also like