You are on page 1of 1

NO.

AR 11/19
TECHNICAL BID EVALUATION OF PUMP STATION CHECKS VALVES REV. 0
SHEET :1/1
TECHNICAL BID EVALUATION

BIDDER-CTV- BIDDER-2 BIDDER-3-

DESIGNATION REQUIREMENTS Compliant Not Mentioned Not Compliant Supplier offer Observations Compliant Not Mentioned Not Compliant Supplier offer Observations Compliant Not Not Supplier offer Observations
Mentioned Complia
nt

PROCESS PERFORMANCE DATA


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

16

GENERAL OPERATING/LIQUID DATA

17
18
19
20
21
22
23
24
25
26
27
Basic spec
28 Valve type Swing Check Valve × Swing Check Valve
29 Valve Size Range DN 600 × DN 600
30 Bore Full Bore X
31 Quantity
32 Design Code AWWA C508-09 X
Valve Construction
33 Pressure Rating PN16, DIN2533 X PN 16
Body/Bonnet/Cover

Body & Bonnet Cast Iron ASTM A126/Ductile Iron ASTM A536
34 X GGG40-50
MOC FBE Internal Lined AWWA C116 / A21.16-09

Cast Iron ASTM A126 / Ductile Iron ASTM A536


35 Body Seat
FBE Internal Lined AWWA C116 / A21.16-09 ×
36 Seal/Packing Téflon ×
37 Lining Material Fusion Bonded Epoxy AWWA C116 / A21.16-09 ×
38 End Connections Flanged FF AWWA C207 / DIN2533 ×
39 Stem Non-Rising NA
40 Stem Seal Stainless Steel SS316 ×
Internals/Trim

Disc/Ball/Wedge/Ot
41 Bronze (Less than 16% Zinc) ASTM B61 / ASTM B62 X
her
42 Seat Natural Rubber / EPDM X
43 Seat Seal Natural Rubber / EPDM ×
44 Gland Bush Cast Iron ASTM A126 / Ductile Iron ASTM A536 ×
45 Gland Packing Cast Iron ASTM A126 / Ductile Iron ASTM A536 ×
46 Op. Mechanism Manual NA
47 Fastners Stainless Steel SS316 X SS304
Service
48 Valve Fluid Sanitary Waste Water X Potable Water
49 Valve Design Temp 70°C X
50 Valve Design Pr. 7 barg X
51 Jacket Fluid NA
52 Jacket Design Temp NA
53 Jacket Design Pr. NA
Insp. & Test.
54 Hydrotest MSS-SP61 / BS 6755 (part I) X BODY: 24 Bars SEAT: 16 Bars
55 Visual Inspection MSS SP-55 X
56 Marking MSS SP-25 X
Documents
57 Product Catalogue Vendor to Provide X
58 GA Drawing Vendor to Provide X
59 QA Plan Vendor to Provide X
60 Material Test Certs Vendor to Provide X
Electrical DATA
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
Inspection and tests
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
Supply limits
104
105
106
107
108
Documentation
109
110
111
112
113
114
115

NOTES & RECOMMANDATIONS:

You might also like