R6
910
8300 3500
2850
4120
2210
1420
1400
1400 2725
590
5490 1000
6750 2100 4920
520
R5
15200
2 HS 885 HD
Transport dimensions and weights
Basic machine and boom (No. 1515.xx)
Basic machine
with HD undercarriage, 2 x 300 kN winches with change gear box,
3270 without counterweight, boom foot and A–frame
3-web grousers 1000 mm
550 Width 4000 mm
1890 Weight 72000 kg
8500 4000
1520 A-frame
Width 600 mm
6980 Weight* 2420 kg
1640
Boom section (No. 1515.25) 3 m
Width 1660 mm
3170
Weight* 770 kg
1640
Boom section (No. 1515.25) 6 m
6170
Width 1660 mm
Weight* 1240 kg
1640
Boom section (No. 1515.25) 12 m
12170 Width 1660 mm
Weight* 2130 kg
1630
Boom head section (No. 1515.25) 6.4 m
6600 Width 1660 mm
A B Weight* 1310 kg
1210
1820
Boom head 1) A B
Width 850 mm 850 mm
2700 2820
Weight* 1800 kg 1840 kg
*) Including pendant ropes 1) Steel sheaves
HS 885 HD 3
Transport dimensions and weights
Fixed jib (No. 0806.xx)
Counterweight
Basic counterweight 1x
Basic counterweight
Width 820 mm
2200 Weight 19600 kg
Add. counterweight
585
Additional counterweight 1x
Width 670 mm
3200 3200 Weight 4500 kg
Add. counterweight II
Additional counterweight II 2x
Add. counterweight III Width 340 mm
2150 Weight 2600 kg
1210
Additional counterweight III 1x
835 835 1070 Width 405 mm
Weight 2000 kg
Hooks
30 t single hook
1050 400 Width 400 mm
Weight* 400 kg
4 HS 885 HD
Technical description
Boom winch
Line pull max. 2x 70 kN
Rope diameter 20 mm
Boom up 84 sec. from 15° to 82°
Control
The control system – developed and manufactured by Liebherr – is
designed to withstand extreme temperature changes and the rough
Swing heavy duty tasks common in the construction industry. Complete
machine operating data are shown on a high resolution display. The
Consists of rollerbearing with external teeth for lower tooth flank crane is equipped with proportional control for all movements, which
pressure, fixed axial piston hydraulic motor, spring loaded and can be carried out simultaneously.
hydraulically released multi–disc holding brake, planetary gearbox and Dragline operation: A special ”Interlock” control system is an option
pinion. Swing speed from 0 – 3.5 rpm continuously variable, selector available. It is designed for power lifting of the dragline bucket without
for 3 speed ranges to increase swing precision. using the drag winch brake.
Standard: On request, Liebherr also offers special custom designed control
Second swing drive systems for free-fall winches.
Operation: Left joy stick for boom winch and swing, right two directional
levers for winch I and II. Crawler control is actuated with the two central
foot pedals. Additionally, hand levers can be attached to the pedals.
Options:
s¬ 3PECIAL¬DEMOLITION¬CONTROL¬SYSTEM¬
Noise emission s¬ -$%¬-ACHINE¬DATA¬RECORDING
s¬ 0$%¬0ROCESS¬DATA¬RECORDING
Noise emissions correspond with 2000/14/EC directive on noise s¬ '3-¬MODEM
emission by equipment used outdoors.
HS 885 HD 5
Equipment (main boom No. 1515.xx and 32.5 t counterweight)
Casing oscillator and slurry wall grab
6 HS 885 HD
Equipment (main boom No. 1515.xx and 32.5 t counterweight)
Dynamic soil compaction
HS 885 HD 7
Load chart for duty cycle operation (main boom No. 1515.xx)
32. t counterweight
Capacities in metric tons for boom lengths (12 m – 36 m ) – with 300 kN winches
Boom length (m)
Radius 12 15 18 21 24 27 30 33 36 Radius
(m) t t t t t t t t t (m)
5 46.2 5
6 46.2 46.2 46.2 45.3 42.9 38.7 34.7 31.1 28.1 6
7 46.2 45.6 44.5 42.6 40.2 38.1 34.7 31.1 28.1 7
8 41.3 40.4 39.5 38.8 37.3 34.9 32.7 30.9 28.1 8
9 36.4 35.5 34.8 34.2 33.5 32.7 30.2 28.5 27.0 9
10 32.3 31.7 31.1 30.3 29.9 29.1 28.4 26.6 25.0 10
12 26.3 25.8 25.3 24.7 24.3 23.7 22.9 22.3 21.8 12
14 21.6 21.2 20.7 20.4 19.8 19.1 18.7 18.1 14
16 18.2 17.7 17.5 17.0 16.3 16.0 15.4 16
18 15.7 15.3 15.1 14.7 14.2 13.7 13.4 18
20 13.3 13.1 12.8 12.4 11.9 11.6 20
22 11.6 11.2 10.8 10.4 10.1 22
24 9.9 9.5 9.2 8.9 24
26 8.5 8.4 8.1 7.8 26
28 7.3 7.1 6.9 28
30 6.2 6.0 30
32 5.2 5.1 32
34 4.3 34
TLT 10538261 M99999 Vorab1
Maximum capacity in duty cycle operation with standard ropes 1) Lifting a load exceeding the line pull of one winch is only allowed
if it can be ensured that each individual winch is not overloaded.
Line pull kN 200 250 300 When working with a mechanical 2-rope grab the total load
to be lifted is limited by the line pull of one winch.
Rope diameter mm 30 34 36 Rigging and ropes are part of the load.
Minimum breaking load kN 846 1046 1186
2) Max. capacities in metric tons do not exceed 75% of tipping load.
Line pull - 1-rope duty cycle operation t 20 25 30 Crane standing on firm, horizontal ground.
Line pull - 2-rope duty cycle operation 1) t 30.3 37.9 46.2
Capacities in duty cycle operation are for reference only and are not programmed in the LMI system.
All loads and counterweight configurations are max. values and must not be exceeded.
Weight of additional equipment on boom (e.g. walkways, hose drums etc.) must be deducted to get the net capacity.
8 HS 885 HD
Dragline equipment (main boom No. 1515.xx)
32.5 t counterweight
E D
Max. capacities in metric tons do not exceed 75% of tipping load.
Capacities in duty cycle operation are for reference only and are not programmed in the LMI system.
The size of the bucket has to be determined according to local conditions.
Digging diagram
C = Radius / dumping radius
D = Max. digging radius = approx.
C + 1/3 to 1/2 J - K
E = Digging depth = approx.
40 - 50% of C
J = Height to centre rope pulley
boom head
K = Length of dragline bucket
(according to manufacturer‘s
specification)
HS 885 HD 9
Working range - main boom 82° – 15°
32.5 t counterweight
Auxiliary jib 30 t
2000
10 HS 885 HD
Load chart for lift crane operation (No. 1515.xx)
32.5 t counterweight
Capacities in metric tons for boom lengths (11 m – 74 m ) – with 300 kN winches
Boom length (m)
with standard boom head with L-boom head
Radius 11 14 17 20 23 26 29 32 35 41 47 50 56 59 62 68 74 Radius
m t t t t t t t t t t t t t t t t t m
3.8 120.0 3.8
4.0 120.0 120.0 4
5 108.4 107.2 104.4 5
6 80.0 80.2 80.3 78.5 76.9 75.2 6
7 63.1 63.2 63.3 63.2 62.6 61.3 60.1 58.8 7
8 51.8 52.0 52.0 51.9 52.0 51.6 50.6 49.6 48.7 46.7 8
9 43.8 43.9 44.0 43.9 43.9 43.8 43.6 42.8 42.0 40.3 38.7 9
10 37.7 37.9 38.0 37.9 37.9 37.8 37.7 37.4 36.8 35.3 33.9 33.1 10
12 29.0 29.5 29.5 29.5 29.5 29.3 29.2 29.0 29.0 28.0 26.9 26.3 25.0 16.5 14.4 10.5 12
14 23.7 23.9 23.8 23.9 23.7 23.6 23.4 23.3 23.0 22.1 21.6 20.5 14.4 13.0 9.5 4.7 14
16 20.0 19.9 20.0 19.8 19.7 19.5 19.4 19.1 18.5 18.0 17.1 12.9 11.4 8.3 3.9 16
18 16.8 16.9 16.9 16.8 16.7 16.5 16.4 16.0 15.7 15.3 14.4 11.6 10.2 7.4 3.2 18
20 14.5 14.6 14.4 14.3 14.1 14.0 13.6 13.3 13.1 12.3 10.4 9.2 6.5 1.8 20
22 12.6 12.5 12.4 12.2 12.1 11.7 11.4 11.2 10.5 9.7 8.2 5.6 1.1 22
24 11.0 10.9 10.8 10.6 10.6 10.2 9.8 9.6 9.1 8.5 7.2 4.6 24
26 9.6 9.5 9.3 9.3 8.9 8.5 8.3 7.9 7.3 6.5 3.7 26
28 8.4 8.2 8.1 7.8 7.4 7.2 6.8 6.2 5.7 2.8 28
30 7.4 7.3 7.2 6.8 6.5 6.3 5.8 5.3 4.9 30
32 6.4 6.4 6.0 5.6 5.4 5.0 4.5 4.1 32
34 5.6 5.3 4.9 4.7 4.3 3.8 3.3 34
36 4.6 4.3 4.1 3.6 3.2 2.6 36
38 4.0 3.7 3.5 3.1 2.6 1.5 38
40 3.5 3.2 3.0 2.5 2.1 40
42 2.7 2.5 2.1 1.7 42
44 2.3 2.1 1.7 1.3 44
46 1.9 1.7 1.3 56
48 1.3 48
TLT 983627514 M 48668
Above load chart is for reference only. For actual lift duty please refer to load chart in operator’s cab or manual.
L–boom configuration
Configuration for boom lengths (59 m - 74 m)
Length Amount of boom extensions
Boom foot 4.0 m 1 1 1 1 1 1
Boom section 3.0 m 1 1 1
Boom section 6.0 m 1 1
Boom section 12.0 m 4 4 4 4 5 5
L–boom head 7.0 m 1 1 1 1 1 1
Boom length (m) 59 62 65 68 71 74
HS 885 HD 11
Working range – fixed jib (No. 0806.xx) 15° and 30°
Main boom 80° – 30°
12 HS 885 HD
Load chart – fixed jib (No. 0806.xx)
Offset 15°
Capacities in metric tons with fixed jib (No. 0806.xx), 32.5 t counterweight. Above load chart is for reference only. For actual lift duty and
complete chart with all available configurations please refer to load chart in operator’s cab or manual.
HS 885 HD 13
Load chart – fixed jib (No. 0806.xx)
Offset 30°
Capacities in metric tons with fixed jib (No. 0806.xx), 32.5 t counterweight. Above load chart is for reference only. For actual lift duty and
complete chart with all available configurations please refer to load chart in operator’s cab or manual.
14 HS 885 HD
Notes
HS 885 HD 15
HS 885 HD—10099246—03/2010 Subject to change without notice.