You are on page 1of 1

List of projects Completed

1. Latur Nilanga Project


Client: Maharashtra State Road Development Corporation
Project Cost: - Rs 350 Cr (USD 50 Million)
Project Length: - 64.3 km

i) Design of Slab Culverts : 16 Nos


ii) Design of Minor Bridges : 14 Nos
iii) Design of Major Bridges : 01 Nos

“Satyajit has worked as a team member with us on Reinforced concrete design of Bridges. He has
gained experience in getting the drawings proof-checked from the consultants. He has evolved as
good structural engineer with a sound knowledge of Geotechnical Engineering as well. We Wish him
best of luck in the future endeavours. “
- Rajeev Mahalle, PM Latur Nilanga Project

2. Kashedi Project
Client: CE- National Highway – Public Works Department.
Project Cost: - Rs 388 Cr (USD 54 Million)
Project Length: - 8.57 km
Project features - 1.8 km Long 3 lane - Twin Tunnel
- 6.0 km Highway road
- 5 Viaducts (Min 80 m Long)
- 7 Minor Bridges
- 10 Hume Pipe Culverts

“Satyajit has worked in the planning stage of the project. He has actively participated in the
surveying and finalizing alignment of road for the project. He has been involved in planning of many
viaducts and Minor Bridges.”
- Santosh Borate, PM Kashedi Project

You might also like