You are on page 1of 3

K. THETCHINAMOORTHI - B.E.

Civil, PMP
Senior Construction Manager- Civil
Metro & Railways Projects

Mobile/WhatsApp: +91-7358205683
thetchinamoorthi@gmail.com

PURPOSE STATEMENT

To be a successful professional with an expert knowledge in the field of Civil


Engineering. With 15 years of Experience, A personable, approachable, and flexible Civil
Construction manager who is ready to take on the most complex projects anywhere in the
world, no matter how large or small.

WORKING EXPERIENCE- 14 Years

1. Larsen & Toubro Ltd. – Chennai Metro Rail Project- 0.5 years

From : 22.06.2022 To: Present

Designation : Senior Construction Manager

Project Site. : Construction of Approx.1.2 kms of underground station Cut And


Cover Section.

2. Larsen & Toubro Ltd. – Mauritius Metro Rail Express Project- 4.5 years

From : 01.12.2017 To: 07.06.2022

Designation : Construction Manager

Project Site. : Construction of all structures of 6 km length out of 26 km length


of Metro Project.

I had managed (Stakeholders, Resource, Construction) for execution of all the below
activities within project Schedule.
• Cast-in-situ bore pile 1 m Dia. & 24 m depth, Pile cap1.5 m depth &
Pier 1.5 m dia. & Pier Cap & Portal Beams.
• Construction of Diaphragms Between I Girders & Deck slabs above I
Girders & Upstand wall above Deck slab.
• All Structures for 4 stations.
• Construction of Retaining walls up to 8 m Height & Flood drain of 4
m width & 6 m Height and Ramp Structures.
• Milestone of Project: We have completed the project within Project
Schedule & before client requirement.

3. Larsen & Toubro Ltd.– Doha, Qatar Metro Project- 3.5 years

From : 16.06.2014 To: 30.11.2017

Designation : Assistant Construction Manager

Project Site. : Construction of Underground Metro station Ras Bu Abound


Station, Length of station 1 km. Overall station site divided as Station, Stabling yard
& cooling plant.
I have executed all the below activities.
• Site mobilization, Cast-in-situ bore pile 1 m Dia. & 30 m depth, Deep
excavation 23 m depth, shotcrete & anchoring.
• Dewatering well 25.5 m depth & Grouting
• Construction of All level’s concrete slabs.
• Major concrete costing single casting 5000 cum with 6 boom placers.
• Technical Support Engineer for station.

4. Afcons Infrastructure Limited- Chennai Metro Rail Project -3 years

From : 29.08.2011 To : 14.06.2014

Designation : Execution Engineer

Project Site. : Construction of Underground Metro station-Thirumanagalam.


I have executed all the below activities.
• Excavation and construction of Guide wall.
• Excavation for Diaphragm walls & Plunge column by Using
"Hydraulic grab" & Piling Rigs.
• Construction of All level’s concrete slabs.
• Construction of Diaphragm walls & Plunge columns.
• Road diversion works

4. CEC International Corporation India Pvt. Ltd.- Bangalore Metro-0.5 years

From : 14.03.2011 To : 27.08.2011

Designation : Assistant Engineer (Civil)

Project Site. : Construction of underground Ramp Structures- Shanthi Nagar


I have executed all the below activities.
• Soldier Pile 800 mm Dia.
• Secant Pile 800 mm Dia. with 150 mm Overlap.
• Contiguous Pile 800 mm Dia.

5. GPNR Constructions Madhuranthagam Railway Over Bridge-0.6 years

From : 02.08.2010 To : 12.03.2011

Designation: Site In charge

Project Site. : Construction of ROB Bridge- Southern Railway.


I have executed all the below activities.
• Cast-in-situ bore pile 1m Dia., Pile caps & Piers, Portal Beams.
• Composite Girders span of 36 m.

6. L&T ECC MNM - VPT Gauge Conversion Project.-2 years

From : 16.06.2008 To : 31.07.2010

Designation : Civil Supervisor

Project Site. : Construction of 2 Major Bridge across rivers & 45 Minor Bridges –
Aruppukottai to Manamadurai Gauge Conversion Project ,Southern Railway.
I have executed all the below activities.
• Cast-in-situ bore pile 1m Dia, Pile cap, Pier, Pier Cap & Abutments
• Cast-in situ Minor Bridges including 2*6 m span Twin box,40 m
length & Precast Minor Bridges including precast, Erection, Return
walls
SKILLED EXPERIENCE
1. Underground station construction (Bottom Up & Top-Down Method)
2. Diaphragm wall & Barrette in Plunged column in underground metro railway station
3. Roof slab, concourse slab & base slab and related activity in underground metro railway station
4. Sheet piling, Solider Piling, Secant Piling & Contiguous Piling in underground metro railway
stations
5. Cast-in-Situ piling in Railway Major Bridges
6. Pile Cap, Pier & Abutment in Southern Railway Major Bridges
7. Composite Girder works in Southern Railway Road Over Bridge
8. Pre-Stressed Girder in Major Bridges in Southern Railway Gauge Conversion Project
9. Cast-in-Situ & Precast Minor Bridges in Southern Railway Gauge Conversion Project

SKILLS SET
Technical:
1. Programming Languages : Auto CAD, MS Project, BIM, Aconex
2. Operating systems : Windows, Mac
ACADEMIC CREDENTIALS

BE (CIVIL) Thanthai Periyar Govt. Inst. of Tech., Vellore. 2008 75.00 %

HSC S.R.M.V.Boys H.S. School , Chengalpattu. 2003 87.18 %

SSLC V.S.Boys Higher Secondary school, Thiruvarur. 2001 82.80 %

PERSONAL PROFILE

Father's Name : Mr. M. Kannaiyan.


Date Of Birth. : 29-06-1986.
Languages Known : Tamil, English, Hindi
Contact Address : N0: 4 / 177, Bharathi Chellamal Street, Singa Perumal koil ,
Chengalpattu, Kancheepuram Dist., Tamil Nadu -603204
Additional : GCC/Abroad Experience, PMP, Chartered Engineer

DECLARATION

I hereby declare that the above written particulars are true to the best of my knowledge
and belief.
Place : Chennai Yours Truly

Date : 18 Oct 2022 K.Thetchinamoorthi

You might also like