T H E E X T R AO R D I N A RY I N F R AST R U C T U R E

P R O J E C T S O F T H E 2017 B E I N S P I R E D AWA R D S
Bentley’s mission is to provide innovative applications and services
for the enterprises and professionals who design, build, and operate
the world’s infrastructure – advancing both the global economy and the
environment for improved quality of life.

The 2017 Infrastructure Yearbook is a Bentley Systems publication that showcases the extraordinary work of Bentley
users who have participated in the 2017 Be Inspired Awards program. For information about how to enter your
innovative project for consideration in the next Be Inspired Awards program or for additional information about this
program, visit www.bentley.com/beinspired.

Online Versions
The digital version of the 2017 Infrastructure Yearbook and from previous years are available for viewing or
download at www.bentley.com/yearininfrastructure.

Browse Bentley’s user project profiles at www.bentley.com/projects, where many of the projects nominated
in Bentley’s annual Be Inspired Awards program are featured. Through these portfolios of exemplary project
achievements, Bentley shares innovative best practices of the architects, engineers, constructors, geospatial
professionals, and owner-operators who advance the world’s infrastructure.

ISBN Number: 978-1-934493-50-2


Published by
Bentley Systems, Incorporated
685 Stockton Drive | Exton, PA 19341
www.bentley.com
BIM ADVANCEMENTS & GOING DIGITAL

Bentley’s 2017 Infrastructure Yearbook recognizes and records the project and using that data to drive operational workflows, ensure reliable
outstanding accomplishments of Bentley users who design, construct, and production performance, facilitate predictive maintenance, and improve
operate the world’s infrastructure. It highlights the more than 400 remarkable asset reliability.
projects nominated in the annual Be Inspired Awards program. Each project
demonstrates the vision and talent of the infrastructure professionals who The projects featured in this yearbook illustrate the outstanding BIM
have applied innovative strategies to achieve significant BIM advancements Advancements for Going Digital of infrastructure professionals around the
for improved project delivery and asset performance. globe. Among them are a project by Mott MacDonald and the Costain, VINCI
Construction Grands Projets, Bachy Soletanche Joint Venture to update the
Underlying these strategies are Bentley’s “Project Playbooks” of software east section of the Thames Tideway Tunnel in London; a Guinness World
for advancing infrastructure. Leveraging Bentley’s apps, applications, and Record-setting structure built by JCM2 in Simi Valley, California to support
services, project teams from around the world have developed advanced a skydiver in a 25,000-foot freefall jump; a new airport in Sanya, China that
digital design, analytical, construction, reality, and asset performance is being constructed on an artificial island reclaimed from Hongtang Bay;
modeling workflows that enable better project delivery through greater and a project using drone technology and reality modeling to standardize
information mobility and improved asset performance through greater depth the inspection of Italy’s 11,800 radio base stations.
of information modeling.
In Malaysia, the MRT Corporation used Bentley applications on the first
These digital workflows can enable new business opportunities, such as metro project in Asia to adopt a BIM Level 2 strategy for the development
conceptioneering, the process of quickly creating multiple iterations of of the Sungai Buloh-Serdang-Putrajaya rapid transit line. To develop the
a conceptual infrastructure design model with engineering content at Sewer Master Plan 2041 for five municipalities in Rio de Janeiro’s Region
the beginning of a project, to constructioneering, the process of bringing of the Lakes, AEGEA utilized Bentley software to compare scenarios for
engineering data directly to the field to drive construction workflows improving operation efficiency.
and equipment, during construction and into operations. It can also
mean inspectioneering, which is the process of bringing as-operated With the 2017 Infrastructure Yearbook, Bentley celebrates the year’s most
2017 INFRASTRUCTURE YEARBOOK

and continuously surveyed, engineering reality meshes into digital inspiring infrastructure projects by users of its software. It also recognizes
engineering environments, enabling engineers to inspect and evaluate the commitment of the infrastructure professionals and organizations
infrastructure assets from any location. And, operationeering, the process responsible for their design, construction, and operation to advancing the
of bringing engineering data into the production and operations phases of a global economy and the environment, improving quality of life for all.

3
TABLE OF CONTENTS
6 264 274 287 302
About The Year in 2017 Index Index Index
Infrastructure Be Inspired Alphabetical Project Location Alphabetical
2017 Conference Awards Jurors by Organization by Country by Category

SPECIAL RECOGNITION AWARD WINNERS BIM Advancements in Manufacturing 87


• Asset Information Management Advancement 14 BIM Advancements in Mining and Offshore Engineering 105
• Comprehensive BIM Advancement 15 BIM Advancements in Municipal Operations 127
• Conceptioneering Advancement 16 BIM Advancements in Power Generation 135
• Constructioneering Advancement 17 BIM Advancements in Project Delivery 147
• Inspectioneering Advancement 18 BIM Advancements in Rail and Transit 155
• Operationeering Advancement 19 BIM Advancements in Reality Modeling 167

BIM Advancements in Roads 193


BE INSPIRED AWARD WINNERS BIM Advancements in Road and Rail Asset Performance 215
BIM Advancements in Bridges 21 BIM Advancements in Utilities and Industrial Asset Performance 219
BIM Advancements in Buildings and Campuses 29 BIM Advancements in Utilities Transmission and Distribution 225
BIM Advancements in Construction 63 BIM Advancements in Water and Wastewater Plants 235
BIM Advancements in Environmental Engineering 79 BIM Advancements in Water Networks 239

4
About the
2017 BE INSPIRED AWARDS

2017 Be Inspired Award Winners

The annual Be Inspired Awards program brings together infrastructure professionals


from around the globe. Its goal is twofold: to advance innovation and best practices in
design, engineering, construction, operations, and project delivery, and to celebrate the
extraordinary work of the organizations that help advance the world’s infrastructure.

The Be Inspired Awards has recognized more than 3,000 of the world’s most outstanding
infrastructure projects since its inception in 2004. The projects nominated for the
Be Inspired Awards are submitted by Bentley’s global community of users.

This year, 10 independent panels of jurors, comprising distinguished industry experts,


selected the 51 finalists and the Be Inspired Special Recognition Awards recipients from
more than 400 nominations submitted by organizations in more than 50 countries.

Representatives for the projects chosen as Be Inspired finalists presented their projects
before the jurors, other industry executives, and members of the media at Bentley’s
Year in Infrastructure 2017 Conference in Singapore. The winners were announced
on October 12, 2017 during the highly anticipated Be Inspired Awards ceremony.
Winners of the Be Inspired Special Recognition Awards also received their awards
during the ceremony.

This year’s nominated projects are presented in the 2017 Infrastructure Yearbook.
Searchable digital versions of Be Inspired Awards publications are available online at
www.bentley.com/yearininfrastructure, and the Be Inspired winners and finalists
are featured in User Project Profiles, available at www.bentley.com/projects. In
2017 INFRASTRUCTURE YEARBOOK

addition, the recorded presentations of the winning and finalist projects can be viewed at
www.bentley.com/projects2017.

5
October 10 – 12, 2017 I Marina Bay Sands Expo and Convention Center I Singapore

This gathering of leading executives in the world of infrastructure design, construction, and operations
is globally recognized as the leading forum for addressing the current priorities and opportunities
impacting the infrastructure industry. Attendees hear from industry thought leaders, engage in forums and
discussions, and learn about technologies and best practices that will shape the future of infrastructure
delivery and operations. This year, attendees gained valuable insights from keynotes presented by more
than 70 speakers from leading organizations around the world.

6
BENTLEY KEYNOTE SPEAKERS

CEO Greg Bentley – Going Digital


Greg Bentley’s keynote at The Year in Infrastructure 2017 Conference Additional highlights of the keynote include:
provided a corporate update and highlighted some of the projects from the
• the introduction of Bentley’s iModel 2.0 cloud platform and its iModelHub
2017 Be Inspired Awards program.
cloud service
The projects that Bentley featured demonstrate the BIM advancements made
• discussion around advancing BIM through a connected data environment
possible through embracing technologies and processes for going digital –
and digital components for the rail and transit lifecycle, from planning
making data, which has traditionally been locked in application-specific files
through performance, with Bentley’s new OpenRail application
or paper documents, available to be used and analyzed throughout the design
and construction stages of a project into operations and maintenance for • introduction of Microsoft Azure-based ProjectWise “365 Services” and
improved TOTEX (the combined CAPEX and OPEX) over the infrastructure CONNECTservices, which offer new learning, mobility, and collaboration
asset lifecycle. benefits to Bentley application subscribers

EVP and Chief Technology Officer Keith Bentley – Chief Product Officer Bhupinder Singh –
Future Technology Vision: iModel 2.0 and Product Keynote: Digital Workflows for
iModelHub Cloud Service the Digital City
In his technology keynote, Keith Bentley presented in depth the company’s Bhupinder Singh and several senior company executives discussed the
vision to advance data-centric, digital workflows enabled by iModel 2.0 cloud availability of the complete portfolio of CONNECT Edition applications by the
platform and iModelHub cloud service. end of 2017. The CONNECT Edition’s comprehensive modeling environment

Keith described the iModelHub technology as a cloud-based, relational supports aligned digital workflows across applications for all project

database that stores the history of changes made to project or asset data sets delivery disciplines, meeting the challenges of the most demanding

contained within an iModel, and makes that data accessible on numerous infrastructure projects.

devices. Users can effectively analyze and manage change, and gain insights, Bhupinder noted that the population in urban areas is projected to grow
use, and repurpose data for current and future infrastructure projects. exponentially over the next decade, and that cities will be challenged
with building and operating the infrastructure to support those expanding
populations. He explained that the answer to managing those challenges
2017 INFRASTRUCTURE YEARBOOK

is to build digital cities using a connected data environment, from planning


through the performance of infrastructure assets. Featured as examples
of this concept were four interdisciplinary presentations on the design,
construction, and operation of road, rail, water and wastewater, and airport
infrastructure using Bentley applications.

7
GUEST KEYNOTE SPEAKERS

1 Helmuth Ludwig,
Global Head of Information Technology, Siemens
Helmuth Ludwig discussed how Siemens’ “Ingenuity for Life” continues to help customers turn
infrastructure challenges into opportunities, driving increases in productivity, efficiency, flexibility,
resilience, and quality of life.

2 Corey Sanders,
Head of Azure Cloud Compute, Microsoft
Corey Sanders discussed cloud-enabled digital transformation, and how the ongoing ability to
build successful technology solutions and practices that drive digital transformation and business
2 value is crucial to success.

3 Going Digital:
An Interactive Panel Discussion with Alliance Partner Executives
Executives from Bureau Veritas, Microsoft, Siemens, and Topcon participated in a panel discussion
on the future of infrastructure. The discussion explored their shared vision with Bentley, their
current initiatives, and how going digital will transform the way we design, build, and operate the
world’s infrastructure.

Alliance Partner Pavilion and Presentations –


Bureau Veritas, Microsoft, Siemens, and Topcon
3
Offered for the first time at this year’s conference, Bentley’s strategic partners Bureau Veritas,
Microsoft, Siemens, and Topcon showcased ways in which, together with Bentley, they are
advancing infrastructure and leading the way for going digital. Presentations and technology
demonstrations focused on digital co-ventures with Bentley, including leveraging reality modeling
to converge engineering and inspection, connecting workflows for constructioneering, developing
cloud services strategies, supporting open access to the Industrial Internet of Things, and more.

8
INDUSTRY FORUMS

The Building and Campuses Forum brought together executives to discuss BIM processes
and standards and the cultural changes needed to enable digital transformation. The forum
also introduced how digital connections optimize asset performance to enable smart buildings
and cities.

The Digital Cities Forum examined how reality modeling helps users understand existing
conditions, clearly communicate these conditions, and better manage risks during design,
construction, and operation workflows within their environmental context. The forum also focused
on BIM advancements in environmental engineering and municipal operations as urban systems
develop new and innovative ways to contribute toward digital cities. Presentations by Bentley
users and industry experts covered 3D modeling, geospatial, land development, BIM processes,
asset performance, mapping, and more.

The Industrial Forum explored industry innovations and best practices, including establishing
expectations using concise contract terms, educating the supply chain to facilitate stakeholder
alignment, achieving design optimization and efficiency, and measuring third-party performance.
The forum focused on how planning, executing, and measuring outcomes can deliver tangible,
sustainable performance improvements and drive advancements for both project delivery and
ongoing operations.

The Rail and Transit Forum looked at trends and drivers affecting adoption of BIM methodologies
across the asset lifecycle, Bentley’s relationship with strategic partners and their positive impact
on project outcomes, plus new and emerging technologies that place Bentley at the center of
global rail and transit design, delivery, commissioning, handover, and operations.

The Roads and Bridges Forum examined how technology enables the design, delivery, and
operation of “smart” roads and bridges, emphasizing how this trend will “disrupt the industry.”
The forum focused on BIM/BrIM from design to construction, construction automation, the
autonomous vehicle movement and HD maps, road safety, smart roads, and continuous survey
and maintenance.

The Utilities and Water Forum explored topics around the use of digital engineering models,
reality modeling, infrastructure management, operational analytics, and asset health to realize
better performance, reliability, and compliance.

9
EXECUTIVE SUMMITS
The CIO Summit
The CIO Summit explored topics of interest to CIOs in the engineering and construction industry for the world’s infrastructure.
Topics included the impacts of digitalization on organizations, importance of digital strategy in driving business value, use of data
and analytics to drive business transformation, challenges facing CIOs, and industry best practices.

The Infrastructure Asset Performance Summit


Executives in asset information, asset management, operations, maintenance, and engineering shared leadership and asset
management strategies to improve the performance, reliability safety, and integrity of complex infrastructure and production assets.
Topics discussed included digital transformation and the Industrial Internet of Things, asset management improvement, reliability
strategies, data governance across the asset lifecycle, and leadership strategies for operational excellence.

The Project Delivery Summit


The Project Delivery Summit brought together infrastructure professionals to discuss emerging new demands for project
delivery, and embracing high-tech engineering, data exchange, and automation to accelerate the development of infrastructure.
Experts discussed strategies for delivering sustainable infrastructure in a rapidly changing market, and through global cultural
changes, modernizing traditional practices to enable more digitized, data-driven project delivery.


The extraordinary work of our users—the engineers, architects, constructors, and operators of the world’s
infrastructure—is exemplified by the projects included in our 2017 Infrastructure Yearbook. With more than
400 projects submitted this year for consideration for our Be Inspired Awards program, the most ever in the
program’s history, the juries’ selection of 17 category winners and our designation of six special recognition
award winners were certainly difficult tasks. I congratulate the organizations responsible for the delivery


or operations of these exceptional projects, and I applaud all of the nominees for their contributions in
advancing the world’s infrastructure.

– Greg Bentley, Bentley Systems CEO

10
The Be Inspired Awards program recognizes outstanding achievement in
infrastructure. At The Year in Infrastructure 2017 Conference, the awards
finalists presented the challenges and innovations of their inspiring projects
before the jurors, infrastructure thought leaders, and 130 members of the
press covering the event.

The following night, during the Be Inspired Awards ceremony and gala,
awards winners were recognized for their extraordinary contributions to
advancing infrastructure and improving quality of life around the globe.

This invitation-only event brought 130 members of leading international


industry, business, and financial media outlets together for a briefing
that included a press conference, press-specific industry sessions, and
exclusive access to conference press releases, product news alerts, and
advancement insights – that focus on the innovative technology, best
practices, and project strategies for advancing infrastructure design,
delivery, and performance.

To access the Digital Press Kit,


visit www.bentley.com/yii/press

• Bentley Announces iModel 2.0 Cloud Platform and Its iModel Hub
Cloud Service

• New OpenRail is First to Advance BIM for the Full Rail and
Transit Lifecycle

• Bentley Announces Agreement to Acquire ACTION Modulers’ Water


Modeling Software Business

• Helmuth Ludwig, Siemens’ Global Head of Information Technology,


Highlights Joint Development Projects with Bentley Systems

• Bentley Announces Microsoft Azure-based Cloud Services Extending


2017 INFRASTRUCTURE YEARBOOK

ProjectWise CONNECT Edition for Comprehensive Project Delivery

• Bentley Systems and Topcon Collaborate for Constructioneering


Academy Initiative

• Bentley’s New CONNECTservices Bring Comprehensive Learning,


Mobility, and Collaboration Benefits to Bentley Application Subscribers

11

Oregon DOT needed a faster, more efficient way to capture, aggregate,
and analyze asset data, ensure accuracy, run reports, and make data readily
available to downstream systems and processes. AssetWise provided a


foundational system—a single source of truth that other asset management
systems could connect to and access the very latest data.

– Lorena Lambert, Project Coordinator, Oregon Department of Transportation

12
RECOGNITION AWARDS
Candidates for Bentley’s Be Inspired Special Recognition Awards were selected by the jurors from the top
finalist projects, as well as other exemplary nominations. They represent both excellence and innovation
in a way that is emblematic of Bentley’s mission of advancing infrastructure. These project achievements
transcend the narrower focus of any individual category in the standing Be Inspired Awards. The Special
Recognition jury then evaluates these submissions and acknowledges projects that most advance their
respective fields of infrastructure.

Asset Information Comprehensive Conceptioneering


Management Advancement BIM Advancement Advancement
This award recognizes a project This award recognizes a project This award recognizes a
that develops a solution to that effectively utilizes a BIM project that best represents
best manage and integrate strategy to improve project conceptioneering – a process
asset information for improved delivery, enhance collaboration, of creating multiple iterations
asset performance. and better manage design of a conceptual design model
information across the to enable streamlined
project lifecycle. evaluation and comparison
of design alternatives.

Constructioneering Inspectioneering Operationeering


Advancement Advancement Advancement
This award acknowledges This award recognizes a This award is given to a project
excellence in constructioneering – project that best represents that demonstrates excellence
the process of bringing engineering inspectioneering – the process in operationeering – the process
data directly to the field to inform of bringing as-operated, of bringing engineering data into
construction workflows and use and continuously-surveyed, the production and operations
of construction equipment, and engineering-ready reality phases of a project and using
also the capability to bring as- meshes into digital engineering that data to drive operational
constructed reality context into environments, enabling workflows, ensure reliable
digital engineering environments. engineers to inspect and production performance,
evaluate infrastructure assets facilitate predictive maintenance,
from any location. and improve asset reliability.

13
Special RECOGNITION AWARDS
ASSET INFORMATION MANAGEMENT ADVANCEMENT

Oregon Department of Transportation


TransInfo – A Connected Data Environment for Transportation I Salem, Oregon, United States

With road network and feature information residing in a myriad of local repositories that led to data and process duplication, the Oregon Department of
Transportation (ODOT) sought to implement a new comprehensive linear asset management solution for more efficient data capture, analysis, and information
mobility. Known as TransInfo, the new system provided a connected data approach, integrating all network assets and asset information systems, and
enabling ODOT to meet reporting requirements.

AssetWise served as the foundation for TransInfo, providing a single source of truth for ODOT to manage all roadway asset information. The automated system
streamlined data entry and reporting, enhanced data accuracy, and reduced risk of error. Bentley’s highly configurable, interoperable solution reduced time to
enter construction planning information by 15 percent and labor costs related to data collection, entry, and maintenance by 10 percent. ODOT realized a 66
percent increase in efficiency with the new system. Project Playbook: AssetWise

14
COMPREHENSIVE BIM ADVANCEMENT

Guangdong Hydropower Planning & Design Institute


Guangdong Pearl River Delta Water Resources Allocation Project I Guangdong, China

The Pearl River Delta Water Resources Allocation project is a CNY 34.7 billion urban water conservation and supply initiative in the Guangdong province
of China. It includes 114.9 kilometers of water lines and shield tunnels running through four cities. Guangdong Research Institute of Water Resource and
Hydropower is responsible for planning and designing the project, which is expected to resolve water shortage issues and improve water supply.
2017 INFRASTRUCTURE YEARBOOK

The project team used Bentley applications to generate and refine 3D reality models of the planned locations and to produce animations that provided
stakeholders with an intuitive understanding of the project. The team used Bentley software for clash detection, which reduced design time by
1,500 hours and saved nearly CNY 250,000 in design costs. Streamlined workflows enabled the team to deliver the project 23 days ahead of schedule.
Project Playbook: AECOsim Building Designer, Bentley Raceway and Cable Management, ContextCapture, Descartes, LumenRT, Bentley Map, MicroStation,
Navigator, OpenRoads, OpenRoads ConceptStation, OpenRoads Designer, OpenRoads Navigator, ProjectWise, Bentley Substation

15
Special RECOGNITION AWARDS
CONCEPTIONEERING ADVANCEMENT

HNTB Corporation
I-94 Modernization Project I Detroit, Michigan, United States

The I-94 Ford Freeway modernization project involves the complete reconstruction of 6.7 miles of urban, depressed freeway in Detroit, Michigan. Initial plans
were underway to advance the project toward construction.

However, high residential and commercial growth and land-use changes along the corridor required modifications to more effectively meet the demands of the
community. The design also had to accommodate a growing reliance on bicycle transit. When completed, the renovated local roadway network is expected
to improve area facilities and services, economics, and vehicular, bicycle, and pedestrian mobility. Project Playbook: Descartes, gINT, LEAP, LumenRT,
MicroStation, Navigator, OpenRoads ConceptStation, OpenRoads Designer, OpenRoads Navigator, ProjectWise

16
CONSTRUCTIONEERING ADVANCEMENT

China Construction Sixth Engineering Division Corp., Ltd., Tianjin University of Technology,
and Tianjin Tianhe-Cloud Building Engineering Technology Co., Ltd.
Sanya New Airport Reclamation Project I Sanya, Hainan, China

A new airport in Sanya, Hainan, China is being constructed on an artificial island created by reclaiming land from Hongtang Bay. The USD 5 billion project
covers 28 square kilometers and includes an airport operation zone, international trade zone, and support services zone. Developed by an HNA Group Co.,
Ltd. subsidiary, the massive project awarded multiple construction contracts, with several going to China Construction Sixth Engineering Division Corp., Ltd.
2017 INFRASTRUCTURE YEARBOOK

This team’s responsibilities included dynamic simulation of the large-scale infrastructure project. With point cloud data acquired by unmanned aerial vehicles,
the team used ContextCapture to create a real-time, high-resolution reality model to monitor construction progress. For other work, ProjectWise enabled
collaborative management of 3D information models. SACS and MOSES helped address the unique maritime conditions associated with the island project’s
structures. Project Playbook: AssetWise, AXSYS, Descartes, LumenRT, ContextCapture, MicroStation, MOSES, OpenBridge, OpenRoads, ProjectWise, SACS

17
Special RECOGNITION AWARDS
INSPECTIONEERING ADVANCEMENT

SEIKEY Enterprise Drone Solutions


Cell Tower Inspections 4G and 5G I Caronno Pertusella, Varese, Italy

SEIKEY technological partner of Telecom Italia initiated a data capture and reality modeling project to standardize the inspection of Italy’s 11,800 radio base
stations (RBS) and accelerate information exchange among stakeholders for improved plant maintenance and asset management. The 3D real-time modeling
approach optimized maintenance and inspection activities, enhancing signal strength of RBS facilities for more effective phone coverage from the operators.

The project team used drones for high-precision aerial capturing of the stations to perform the inspections in just six hours compared to five days per
facility. ContextCapture enabled a detailed photogrammetric reconstruction from more than 400 terabytes of data for each plant. They used MicroStation and
Bentley Map to link data and geospatial information to the model. The reality modeling solution allows for safer, more precise preventative intervention and
maintenance, improving operational efficiency and reducing costs. Project Playbook: Bentley Map, ContextCapture, Descartes, MicroStation, ProjectWise

18
OPERATIONEERING ADVANCEMENT

Outotec
Design for Reliability Project in Counter Current Decantation (CCD) I Helsinki, Finland

As a global leader in minerals and metals processing technology, Outotec develops processes and equipment that help customers achieve higher production
rates. The company’s new Counter Current Decantation (CCD) circuits separate the solid and liquor components of a slurry feed in hydrometallurgical
applications by using a liquor for washing. This project improved production by incorporating predictive maintenance in the design phase of a CCD plant.
2017 INFRASTRUCTURE YEARBOOK

Facilitated by AssetWise, Outotec created a baseline for CCD-circuit plants with optimized maintenance. The baseline included critical analysis for
processes and equipment, asset hierarchies, and failure modes and effects analysis. Based on similar projects, Outotec estimated that predictive
maintenance considered during the design phase of CCD plants in the mining industry can produce a net production yield increase of 3 to 5 percent.
Project Playbook: AssetWise, MicroStation

19

Bentley’s ProjectWise has made it possible to quickly coordinate the


stakeholders, providing telephone network operators with immediate
access to up-to-date information and a huge amount of data.

– Cristiano De Leonardis, CEO and Founder,


SEIKEY Enterprise Drone Solutions

20
BRIDGES
This award category acknowledges projects that demonstrate excellence in planning, designing,
building, modeling, analyzing, and maintaining bridges.

21
BIM Advancements in BRIDGES
W I N N E R

Long Jian Road & Bridge Co., Ltd.


Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge Project I Heihe City, Heilongjiang, China

The Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge connects Heihe City, China to Blagoveshchensk City, Russia. The length of the entire
route is 19.9 kilometers, with the cable-stayed bridge portion spanning 1,284 meters in length. Located in the alpine region, the project is subject to extreme
temperature variations and strict environmental protection. To meet these challenges and accommodate a short construction schedule, the project team
implemented a collaborative BIM approach for delivery of the infrastructure project.

The project team used Bentley’s BIM technology, reality modeling applications, and ProjectWise for collaborative design, modeling, construction management,
and information sharing for optimal project coordination through construction. Accurate modeling with ProStructures reduced construction errors and
rework, saving five working days and 30 tons of materials. Design and collaboration using OpenRoads and ProjectWise improved modeling efficiency by 35
percent. Project Playbook: AECOsim Building Designer, ContextCapture, Descartes, LumenRT, Navigator, MicroStation, OpenBridge Modeler, OpenRoads,
ProjectWise, ProSteel, ProStructures, RM Bridge
22
F I N A L I S T F I N A L I S T

Arcadis-WSP/PB Joint Venture AECOM


Citylink Tulla Widening Pearl Harbor Memorial Bridge
Melbourne, Victoria, Australia New Haven, Connecticut, United States

Carrying approximately 210,000 vehicles per day, Australia’s Citylink To replace the old, functionally obsolete bridge over the Quinnipiac
Tullamarine Corridor is one of Melbourne’s busiest freeways. To meet River in New Haven, Connecticut, the Connecticut DOT initiated the
traffic demands, the roadway had to be widened, and the English Street redevelopment of the interchange Interstate 95, Interstate 91, and CT
Bridge needed to be replaced. Arcadis-WSP/PB Joint Venture performed Route 34, which included the new Pearl Harbor Memorial Bridge. AECOM
design services, including those for the bridge replacement. The new provided design services for the 1,013-foot main span, extradosed cable-
bridge and freeway are expected to reduce congestion, increase capacity stayed bridge unit. The project team provided two design alternatives
by 30 percent, and accommodate future growth. with the concrete box girder superstructure option, which ultimately
proved to be more aesthetically pleasant and cost-effective.
The project team used ProjectWise to share and manage all data among
multiple disciplines on a global scale. Engineers used MicroStation and AECOM used RM Bridge for structural modeling and design, including
OpenRoads to develop models allowing surveyors to optimize geometry construction sequence, post-tensioning, stay-cable force adjustments,
layout and the construction team to accurately complete work on site. and time dependent analysis. The team used the software to perform
2017 INFRASTRUCTURE YEARBOOK

The 3D design technology facilitated clash detection, which helped and plot multiple concrete service stress checks and strength capacity
the team to avoid rework. The collaborative BIM approach accelerated checks in accordance with the AASHTO Standard Specifications for
the design process, resulting in successful completion of the bridge Highway Bridges. Bentley technologies also enabled detailed evaluations
one week ahead of schedule. This time savings reduced site and against numerous constraints to determine the optimal cable angles and
traffic management costs and limited the impacts of road closures. tower heights to satisfy Federal Aviation Administration requirements.
Project Playbook: MicroStation, OpenRoads Designer, ProjectWise Project Playbook: MicroStation, RM Bridge
23
BIM Advancements in BRIDGES

Guizhou Transportation Planning Survey


& Design Academe Co., Ltd. JVTek Company
The Hongshui River Bridge on Huiluo Express, Guizhou Province Vam Cong Cable-Stayed Bridge
Luodian, Guizhou, China Can Tho, Vietnam

At 956 meters in length, the Hongshui River Bridge connects Guizhou At 2.97 kilometers, the Vam Cong Bridge is the second cable-stayed
province and Guangxi Zhuang Autonomous Region, China. A cable- bridge spanning the Hau River with a central span length of 450 meters,
stayed bridge scheme was adopted to address varying structural styles the second largest in Vietnam. The bridge will connect the Lap Vo district
that required differentiated construction processes on each shore. This of Dong Thap province with the Thot Not district of Can Tho City, providing
plan eliminated the environmental damage that an excavation to anchor a catalyst for development in the Mekong Delta region. With an H-shaped
a large-scale suspension bridge typically would have caused. Guizhou tower for scenic purposes, the structure is expected to become a regional
Transportation Planning Survey & Design Academe was independently landmark. A joint venture of engineering consultancies designed the
responsible for all phases of the project, from preliminary and detailed bridge and JVTek performed static and dynamic analysis during the
design through construction and operation. technical design and construction stages.

The span asymmetry and diversity of construction processes, among JVTek used RM Bridge to ensure static and dynamic safety conditions
other factors, complicated the process of ensuring structural integrity. in the design of the bridge structure. This analysis led JVTek to propose
Using RM Bridge enabled the project team to calculate and analyze using a supplemental wind cable during construction to secure dynamic
the asymmetrical spans at difficult points along the bridge to balance stability of the bridge and to recommend using RM Bridge to calculate
structural stress and guarantee safety. The software’s efficient aerodynamic coefficients. Completing this analysis saved time and the
modeling and analysis capabilities reduced design time by 240 hours. cost of wind tunnel tests on the estimated USD 271.5 million project.
Project Playbook: RM Bridge Using Bentley’s bridge design and analysis software optimized structural
integrity on a tight deadline. Project Playbook: RM Bridge
24
MCC Capital Engineering & Research
Incorporation Limited Nagesh Consultants
Bridge Construction Project over Hondlon River in Baotou City Coleroon River Bridge
Beijing, China Srirangam, Tamil Nadu, India

The bridge construction over Hondlon River in Baotou City, Beijing, China, Designed as an architectural landmark to replace the existing steel
consists of a main urban trunk road and a 375-meter long bridge with bridge, which has long outlived its utility, the new Coleroon River Bridge
a total of 13 spans. MCC Capital Engineering & Research Incorporation features 24 bowstring arches and is the longest and widest bowstring
Limited (MCC) is the general contractor on this municipal EPC project, arch girder bridge in South India. The bridge spans approximately 1,000
responsible for managing multiple engineering disciplines throughout meters across the Coleroon River with four lanes and 1.5-meter pedestrian
the design and construction phases of the bridge, road, and water supply footpaths on each side. Nagesh Consultants conducted a feasibility study
and drainage system. Preserving the environmental integrity around the and cost analysis, and provided structural designs and detailed drawings
construction site was a top priority. for the superstructure, substructure, and pile foundations.

MCC implemented a 3D BIM approach for the first time on a municipal The project team used STAAD.Pro from conceptual to final design stages
EPC project using Bentley’s technology to improve design quality, avoid to optimize structural engineering, which resulted in the adoption of a
collisions among disciplines, and improve construction management. partially pre-stressed bowstring girder with reinforced concrete deck
2017 INFRASTRUCTURE YEARBOOK

The team used Bentley applications to achieve the design of the slab structural system. Using STAAD.Pro saved materials and reduced
prefabricated, prestressed concrete, continuous box beam bridge design time by almost 15 days. The software allowed the team to
structure and roadway; for drainage and pipeline design; and to share complete the project 90 days ahead of schedule and saved USD 2.5
design results. Using Bentley technology shortened the design cycle by million on the originally estimated USD 15 million bridge structure.
two months. Project Playbook: AECOsim Building Designer, LumenRT, Project Playbook: STAAD.Pro, MicroStation, ProjectWise
Navigator, OpenBridge Modeler, OpenRoads, ProjectWise
25
BIM Advancements in BRIDGES

R&B Design Circle Saanvi Infrastructure Pvt. Ltd.


Construction of ROB on Dungri Link Road Mumbai Delhi Feasibility Study and Detailed Project Report for Proposed
Route of Western Railway in Valsad District High Level Bridge Near Kumrabad
Dungri, Gujarat, India Dumka, Jharkhand, India

To reduce traffic congestion at certain railway crossings on various state To improve road infrastructure near Dumka Airport in Jharkhand, India,
highways, the government of Gujarat Road and Building Department the government’s Road Construction Department proposed a high-level
has proposed the construction of a road over bridge (ROB) on the Dungri bridge over the Mayurakshi River near Kumrabad. The new bridge will
Link Road of Western Railway’s Mumbai-Delhi in the Valsad District. shorten the distance to reach the Murabahal-Makrampur-Sitpahari
R&B Circle Design, the department’s design organization, conducted a Public Works Department Road by 40 kilometers. Saanvi Infrastructure
feasibility study and performed detailed design services. Once the ROB is conducted a feasibility study and prepared a detailed project report.
complete, the government will close the railway crossings.
The Saanvi team used STAAD.Pro for analytical modeling of the
The project team performed field surveys and investigations for the 2.34-kilometer superstructure, which improved design accuracy and
proposed ROB and approaches. Using Bentley’s LEAP Bridge and STAAD.Pro, reduced analysis time by 50 percent, enabling the team to deliver the
engineers designed and analyzed several alternatives with different project on time. Once constructed, the bridge will save one hour in travel
structural types and foundations, prepared bills of quantities and cost time and boost the local economy. Project Playbook: STAAD.Pro
estimates in accordance with the rate schedule, and delivered detailed
designs of all structural components. Bentley’s interoperable applications
provided a single platform to exchange drawings, which accelerated the
design of the complex structure and delivered it to the construction team
on time. Project Playbook: LEAP Bridge, STAAD.Pro

26
Structcon Designs Pvt. Ltd. Strukad Consultant
Approaches around Mumbai Airport Construction of Railway ROB on Karjan Bypass Road
Mumbai, Maharashtra, India Karjan, Gujarat, India

The GVK-controlled Mumbai International Airport commissioned Structcon To provide residential and public transportation vehicles in Karjan, Gujarat,
Designs to conduct a feasibility study and deliver structural designs for India, easy access over the broad gauge track line at Karjan Bypass Road,
new approaches around the Mumbai Airport. The project team was faced the executive engineer roads and bridges division in Vadodara proposed a
with determining a comprehensive and creative design solution that could road over bridge (ROB) solution. A land acquisition dispute, which delayed
be effectively presented to the client. the project by three years, resulted in Strukad Consultant redesigning the
project to fit in a more confined space. Strukad Consultant was responsible
Structcon used MicoStation and STAAD.Pro for structural design and for the design and analysis of the pile foundation, curved superstructure,
analytical modeling. Using LumenRT enabled Structcon to deliver an and girder box.
interactive, visual simulation of the proposed roadway infrastructure.
Bentley’s integrated reality modeling software optimized stakeholder Using STAAD.Pro to analyze the vehicle moving load around a 90-degree
communication on this INR 300 million feasibility and design project. curvature and test the structure’s stability, the design team quickly made
Project Playbook: LumenRT, MicroStation, STAAD.Pro design changes that eliminated issues that would cause vehicles to easily
2017 INFRASTRUCTURE YEARBOOK

overturn. STAAD.Pro facilitated optioneering of the complex design,


reducing the amount of land acquired for the INR 15.6 million project.
Project Playbook: STAAD.Pro, MicroStation, ProjectWise

27
BIM Advancements in BRIDGES


Bentley’s comprehensive technology solution not only
brought objective economic benefits for this project,
but also provided efficient, convenient, and visible


technical support for engineering management to
cope with complicated project environments.

– Xuyuan Liang, Director, Technology R&D Center,


Long Jian Road & Bridge Co., Ltd.

Traffic Planning and Design, Inc.


Yellow Springs Bridge Over Pennsylvania Turnpike
Charleston Township, Chester County,
Pennsylvania, United States

To replace the single-span Yellow Springs Bridge over the Pennsylvania


Turnpike, the Turnpike Commission selected Traffic Planning and Design,
Inc. (TPD) to design a two-span, curved steel I-beam bridge with an
approximate total centerline length of 211 feet that allows for a third lane
in each direction to meet growing traffic demands.

This USD 7.1 million project involved correcting the alignment of Yellow
Springs Road to eliminate a substandard horizontal curve south of the
structure. Using Bentley’s OpenRoads, TPD developed a digital terrain
model for the proposed horizontal and vertical alignments for the road
and the bridge structure. The model enabled the efficient development
and refinement of cross sections and roadway contours, providing design
alternatives to accelerate optioneering. OpenRoads technology saved
countless hours calculating proposed roadway elevations, allowing TPD
to meet the aggressive project deadline. Project Playbook: OpenRoads,
MicroStation, ProjectWise

28
BUILDINGS AND
CAMPUSES
Projects in this award category demonstrate excellence in planning, designing, building, operating,
and maintaining a building or campus and its supporting infrastructure, including commercial buildings,
educational and government campuses, airports, and other public or private facilities.

29
BIM Advancements in BUILDINGS AND CAMPUSES
W I N N E R

Morphosis
The Bloomberg Center I New York, New York, United States

Cornell Tech contracted Morphosis Architects to design and deliver the Bloomberg Center, the first building to be constructed at its new technology and
entrepreneurship campus on Roosevelt Island, New York. The Bloomberg Center is a four-story, 160,000-square-foot building that will be Cornell Tech’s
academic headquarters. Setting a new standard for sustainability in New York, the academic building is designed to achieve net-zero energy and a Platinum
LEED rating. One of its sustainable facets is a broad energy canopy containing a solar panel array that shades the building and surrounding landscape below.

Bentley technology allowed the project team to explore intricate architecture and coordinate complex building systems through a unified design methodology.
This comprehensive BIM strategy bettered communication, improved data sharing among consultants and contractors, built trust among stakeholders,
and kept construction on schedule. The process also led to cost savings as open dialogue eliminated miscommunication in preconstruction, helping the
team resolve building system clashes before installation and minimize field conflicts. Project Playbook: AECOsim Building Designer, MicroStation,
Navigator, ProjectWise
30
F I N A L I S T F I N A L I S T

WSP Shalom Baranes Associates


One Blackfriars, London Cannon House Office Building Renewal
London, United Kingdom Washington, D.C., United States

Developed by St. George, One Blackfriars, London, is a GBP 200 million, Shalom Baranes Associates was contracted by the Architect of the Capitol
mixed-use complex accented by an iconic 170-meter residential tower to design an in-depth renovation of the century-old Cannon House Office
overlooking the River Thames. The scheme features an adjacent low- Building. The USD 752.7 million project will be phased over 10 years to
rise hotel and three-story basement with pool, spa, cinema, and other align with Congress’ election cycle schedule. Project renovations include
amenities. WSP worked with SimpsonHaugh and Partners to develop utility systems upgrades, optimization of office functionality, stabilization
a structural framing solution for layout of 274 apartments in the of the exterior envelope, conservation and preservation of historic interior,
50-story tower. and implementation of sustainability measures.

The unique building geometry called for each floor plan to be a different A lifecycle BIM approach enabled by Bentley applications allowed the
size and shape. WSP imported floor plate layouts from the architect’s 3D team to insert building systems within a restrictive historic interior. The
model to RAM Concept for modeling and design of the post-tensioned project team used Navigator for clash detection, identifying possible
concrete floors. RAM’s meshing algorithm predicted concrete behavior conflicts at every stage, and mitigating issues to minimize demolition.
2017 INFRASTRUCTURE YEARBOOK

throughout optioneering. Within a short period of time, WSP achieved an Utilizing AECOsim Building Designer for 3D visualization also reduced
efficient, cost-effective structural solution incorporating longer, thinner time on drafting plans, improved coordination between 2D and 3D
slabs, and fewer columns. Project Playbook: MicroStation, RAM files, ensured compliance with requirements, and lessened the
potential of construction rework, resulting in cost avoidance on labor
and materials. Project Playbook: AECOsim Building Designer,
MicroStation, Navigator, ProjectWise
31
BIM Advancements in BUILDINGS AND CAMPUSES

AECOM Al Shaffar Steel Engineering (ASSENT)


Perth Stadium Station Mohammed Bin Rashid Library
Perth, Western Australia, Australia Dubai, United Arab Emirates

The Public Transport Authority of Western Australia formed the Prism Al Shaffar Steel Engineering (ASSENT) constructed the Mohammed Bin
Alliance with Laing O’Rourke and AECOM to design and construct the Rashid Library, the largest cultural center in the Middle East and North
AUD 110 million Perth Stadium Station, a new six-platform train station Africa (MENA) region, for the government of the United Arab Emirates.
at Burswood Peninsula (Stadium Station) with additional stowage at Opened in February 2016, the AED 60 million complex spans 1 million
Victoria Park Station. The station features two concourses, three island square meters and encompasses a library of over 4.5 million books, as
platforms with six faces for passenger loading, track and civil works, and well as spacious venues, interaction areas, and a 500-seat theater. The
associated facilities. project aimed to be safe, high quality, and economical in design.

Working from different locations, team members needed to share The ASSENT team designed all structural steel elements on the
data and models. ProjectWise provided a cloud-based common data Mohammed Bin Rashid Library with STAAD.Pro. The application’s intuitive
environment (CDE) and single point of truth for all disciplines. The CDE graphical user interface and user-friendly platform allowed modeling to
enabled integrated project delivery by allowing models to pass through be conducted effortlessly by the project team. As a result, ASSENT saved
each stage without rework. “Digital commuting” allowed the best people 15 percent of total structural design resource hours, and modeling was
to join the team without relocating, saving AUD 1,000 per person for the accomplished ahead of schedule. Project Playbook: STAAD.Pro, RAM
70-week program. Project Playbook: ProjectWise

32
Architect Group 5 (AG5) Avijit Ghosh
Multi-functional Sports Enclosure Abhijit Tea Company
Elsinore and Hillerød, Sjælland, Denmark Darjeeling, West Bengal, India

Region Hovedstaden (Region H), the Capital Region of Denmark, Structural engineer Avijit Ghosh developed an economical seismic design
commissioned Architect Group 5 (AG5) to design a unique multi- for an INR 143 million residential complex to be built in a high-seismic
function sports facility for its psychiatric centers in North Zealand. The zone of Darjeeling, West Bengal, India. The six-story building offers 11
DKK 4.7 million facility aims to increase patients’ physical activity and million square feet of floor space in four towers. A third party vetted the
decrease their reliance on medication. The architectural vision was to structural system to ensure it could withstand high seismic forces and
improve patient quality of life. After one year of use, the project was provide suitable ductility for the area’s weak soil.
deemed successful.
Avijit Ghosh used STAAD products to produce structural drawings and
AG5’s BIM strategy made AECOsim Building Designer the platform for estimate a bill of quantities to aid in determining if the project was viable.
model creation, data sharing, and construction documentation. The 3D Bentley’s STAAD applications supported quick 3D modeling, calculated
model was available to all contractors, helping gain stakeholder buy-in seismic loads, and delivered credible dynamic analysis results. The
and secure local regulatory approvals. Sharing the Industry Foundation optimal design was approved, and the complex is under construction.
2017 INFRASTRUCTURE YEARBOOK

Classes (IFC) data model with steel fabricators accelerated final steel The interoperable STAAD software shortened issue response time and
detailing. The highly accurate BIM deliverables contributed to short on- reduced overall project delivery time. Project Playbook: STAAD.Pro,
site construction time. Project Playbook: AECOsim Building Designer STAAD Foundation Advanced, STAAD Advanced Concrete Design

33
BIM Advancements in BUILDINGS AND CAMPUSES

Baldridge & Associates Structural


Backbone Structural Consultants, Jaipur Engineering, Inc. (BASE)
Hissar Commercial Complex The Ritz-Carlton Residences Waikiki Beach, Phase 1
Jaipur, Rajasthan, India Honolulu, Hawaii, United States

The INR 500 million Hissar Commercial Complex is a prestigious Real estate developer Pacrep LLC contracted Baldridge & Associates
project located in the rapidly developing city of Jaipur in North India. Structural Engineering (BASE) for structural design Phase 1 of its USD 275
The project site is in a densely populated neighborhood, where the million Ritz-Carlton Residences in Waikiki Beach, Hawaii. The 37-story
foundation and superstructure were severely constrained. The developer condo-hotel houses 459 units, three restaurants, and multiple pools.
assigned responsibility for structural design to Backbone Structural BASE developed the underlying 8-story concrete podium and used thin,
Consultants, Jaipur. post-tensioned slabs to maximize the number of floors within the 350-foot
building height restriction.
The project team used STAAD.Pro to analyze multiple possibilities for
the building’s structural system. The 3D visualizations and iModels Traditional models for analyzing concrete floors cannot account for
communicated proposed changes to the architect, which resulted in equilibrium requirements or the distribution of forces across the
a quick response time. This iterative approach yielded the optimal design. RAM Concept overcame these problems, allowing BASE
design and reduced the project cost by about 15 percent through the to accurately confirm performance characteristics. RAM Concept
conservative use of materials and right-sizing of structural elements. optimized the structural design, reducing concrete use by 30 percent
Project Playbook: STAAD.Pro and development time by 40 to 50 percent. The new Ritz-Carlton has
helped revitalize Waikiki’s Kuhio Road and meet tourism demands.
Project Playbook: RAM Concept

34
CCCC Water Transportation Planning
Design Institute Co., Ltd.
Beijing Institute of Architectural Design Ningbo – Container Terminal Project in Meishan Port Area
Swimming Pool of Hangzhou Olympic Sports Center of Zhoushan Port
Hangzhou, Zhejiang, China Ningbo, Zhejiang, China

Hangzhou Olympic and International Expo Center Construction and Ningbo Zhoushan Port contracted CCCC Water Transportation Planning
Investment Co., Ltd. contracted Beijing Institute of Architectural Design Design Institute to design and construct a container terminal at Ningbo-
to undertake the comprehensive design of the Hangzhou Olympic Sports Zhoushan Port, located along the coast of southeast Meishan Island. The
Center in Hangzhou, Zhejiang, China. The estimated CNY 4.5 billion nearly CNY 5.5 billion project encompasses five container berths, six
project, projected to be completed in May 2021, will serve as the main approach bridges, and a highway bridge, as well as two corresponding
stadium for the 2022 Hangzhou Asian Games. An upper and lower part projects involving two 200,000-ton berths and three 150,000-ton berths;
compose the nearly 400,000-square-meter complex, which comprises yearly throughput capacity will be 4.3 million TEU.
parking lots, a stadium, swimming pools, and commercial facilities.
CCCC Water Transportation Planning Design Institute Co., Ltd. created
Because the shape of the structure is complicated to design and create a 3D collaborative design model utilizing the advanced capabilities of
traditionally, parametric methods were applied and multiple teams STAAD.Pro, AECOsim Building Designer, ProjectWise, and ProConcrete,
collaborated using a BIM platform. Bentley software helped shorten the which reduced design time. MicroStation’s implementation during
2017 INFRASTRUCTURE YEARBOOK

modeling stage by 50 percent, and abbreviated the concrete and steel construction, to ensure model consistency and maintain quality
structures design cycle. The integrated BIM workflow saved 50 days of control, shortened building time and lowered project delivery costs.
design modification, 10 days of check and review, and is projected to Project Playbook: AECOsim Building Designer, MicroStation, Navigator,
save 100 days of site error processing. Project Playbook: AECOsim OpenRoads Designer, ProConcrete, ProjectWise, STAAD.Pro
Building Designer, LumenRT, MicroStation, Navigator, ProjectWise,
ProStructures, STAAD.Pro
35
BIM Advancements in BUILDINGS AND CAMPUSES

CNI Ingenieros Consultores SAS/La Rotta Arquitectos Copenhagen Airport A/S


Edificio Gerardo Arango – Facultad de Artes Building Information Modeling in Existing Buildings
Bogota, Colombia Copenhagen, Kastrup, Denmark

CNI Ingenieros Consultores SAS/La Rotta Arquitectos conducted the The Copenhagen Airport A/S undertook a DKK 1 million initiative to
building design of the Gabriel Arango Building – Faculty of Arts of the create building information models of existing buildings for operation,
Javeriana University in Bogota, Colombia. The USD 35 million building maintenance, and refurbishment purposes. The team produced
contains a six-level tower and three basements. The last basement has information-rich 3D models of the facilities based on a combination of
a four-level platform area containing flow areas of the tower, as well as 2D drawings, surveys, and field inspections. The initiative also called
access. The structural system had a central rigid core and porticos at the for the creation of BIM standards, including specification of a Level of
periphery, which met seismic resistance requirements in Colombia. Solid Development (LOD) for new building projects.
slabs were used inside to maximize space.
The first project to test the BIM-based approach was the Central
STAAD.Pro was the predominant application used to analyze structural Security Check Extension. Prior to handing models over to the consultant,
alternatives for the building, including examining steel structures, the airport resolved issues around coordination, collisions, missing
mixed sections, and reinforced concrete. Because of STAAD.Pro’s objects, and detailing. Bentley’s interoperable products facilitated
thorough evaluation and interoperability, the project team ultimately collaboration, ProjectWise helped locate information, and MicroStation
decided to use a mixed structure, instead of conventional reinforced expedited project execution. Overall, the BIM initiative achieved
concrete, and definitive architectural features on the façade. 4.46 percent cost savings on the entire budget for new construction.
Project Playbook: STAAD.Pro Project Playbook: ContextCapture, Descartes, Pointools, Bentley Map,
MicroStation, ProjectWise

36
Design (R&B) Circle
Design (R&B) Circle Construction of Girls Hostel at Government
Construction of District Court Building Polytechnic, Ahmedabad
Himatnagar, Gujarat, India Ahmedabad, Gujarat, India

The government of Gujarat demolished an old judicial court building and The INR 4.85 crore Girls Hostel at Government Polytechnic, Ahmedabad,
replaced it with high-tech facilities in the municipality of Himatnagar is a state-of-the-art facility designed to empower young women to fully
to expedite processing of local cases. Design (R&B) Circle, a premier participate in student life at this acclaimed technical college. The hostel is
design group within the Gujarat Public Works Department, designed and accessible from local transportation and features a library, entertainment
executed construction of the new building. The INR 20.58 crore district rooms, and other amenities. The Gujarat Public Works Department’s
courthouse provided more court rooms, prison facilities, and other space. premier design group, Design (R&B) Circle, performed structural design
and project execution.
Design (R&B) Circle used Bentley’s STAAD products for design and
analysis. The software facilitated collaboration among multiple Located on a site constrained by existing campus buildings, the
disciplines, providing the project team with quick and accurate results. hostel posed a significant design challenge for the project team.
Using Bentley solutions gave Design (R&B) Circle confidence that the new Bentley technology provided fast and accurate analysis that helped
campus would provide an improved environment for fast-tracking judicial to resolve issues and deliver the optimal solution. The final design,
2017 INFRASTRUCTURE YEARBOOK

cases at the local level. Project Playbook: STAAD.Pro which also addressed seismic resistance, ensured safe and welcoming
accommodations for women. Project Playbook: STAAD.Pro

37
BIM Advancements in BUILDINGS AND CAMPUSES

Design (R&B) Circle Etpro Sumit Designs Co., Ltd.


Government Colony, Multi-story Two Tower Hua Hin Condominium
Ahmedabad, Gujarat, India Hua Hin, Prachuap Khiri Khan, Thailand

Design (R&B) Circle, a premier design group within the Gujarat Public Etpro Sumit Designs Co., Ltd. consulted on analysis and design of the
Works Department, carried out structural design and construction of INR THB 220 million Hua Hin Condominium development project in Hua Hin,
27.58 crore residential quarters for officers stationed at the Vastrapur Prachuap Khiri Khan, Thailand. The 12,650-square-meter complex was
Government Colony in Ahmedabad, Gujarat, India. The two-tower facility located in a seismic zone, so earthquake loading was a significant factor.
comprised a ground floor plus 13 stories. Located in the city center, the The tight project schedule made it imperative that the team of contractors
quarters will provide employees with easy access to transportation, work together to meet milestones.
schools, and other amenities.
STAAD.Pro and STAAD Foundation Advanced enabled the team to quickly
The project team used STAAD.Pro to design and model the building, create a model, apply loads, and analyze and design the superstructure
leveraging the software’s analytical capabilities to optimize the and substructure. Navigator facilitated collaboration among contractors,
structural system and reduce concrete and steel quantities. Savings allowing timely delivery of an earthquake-resistant design and cost-saving
included nearly 20 percent less concrete, nearly 30 percent less material selections. Bentley software shortened design time by more than
steel, and a reduction in resource hours. The software enabled 10 percent and reduced costs by 10 percent. Bentley Channel Partner REI
Design (R&B) Circle to deliver the project ahead of schedule. Software Co., Ltd. provided training and technical support throughout.
Project Playbook: STAAD.Pro Project Playbook: STAAD.Pro, STAAD Foundation Advanced, Navigator

38
Etpro Sumit Designs Co., Ltd. Fantawild Design Institute (Shenzhen) Co., Ltd.
Kasetsart University - Si Racha Campus Oriental Heritage
Si Racha, Chonburi, Thailand Ningbo, Zhejiang, China

This THB 565 million project added four buildings to the Kasetsart Fantawild Culture Group retained the Fantawild Design Institute (Shenzen)
University campus in Si Racha, Chonburi, Thailand. The reinforced to formulate a comprehensive design of Ningbo Fantawild Oriental
concrete structures totaled nearly 38,000 square meters of space for Heritage, a theme park that incorporates Chinese history and culture in
business management, engineering, marine engineering and observatory, Ningbo, China. The CNY 3 billion project is 741,500 square meters and
and a guest hotel and swimming pool. Etpro Sumit Designs Co., Ltd. comprises over 50 buildings and 15 outdoor recreational projects.
produced 2D drawings for construction using an integrated BIM approach.
The integration of numerous specialty disciplines on the project required
The project team constructed a 3D building information model to perform intense collaboration. ProjectWise standardized file names, directory
clash detection, analysis, design, and detailing. Together, STAAD.Pro and structure, and design templates. The application also adopted the
STAAD Foundation Advanced analyzed loads and calculated earthquake electronic approval process and allowed for cooperative operation for the
reinforcements. With other contractors using a BIM methodology, single building project among all disciplines. Using ProjectWise reduced
Etpro Sumit Designs could use Bentley applications to produce a fully design time by approximately 30 percent and lowered design costs by
2017 INFRASTRUCTURE YEARBOOK

coordinated construction model, saving 15 percent of design time and costs. 25 percent. Bentley’s content management and collaboration software
REI Software Co., Ltd. provided training and technical support throughout. also eradicated communication and coordination issues throughout the
Project Playbook: STAAD.Pro, STAAD Foundation Advanced, Navigator, construction phase, diminishing costs and augmenting work efficiency.
RAM Structural System, Structural Modeler, Sectionwizard Project Playbook: ProjectWise

39
BIM Advancements in BUILDINGS AND CAMPUSES

Fontemaggi Srl John McAslan + Partners


AMB for interpack The Burrell Collection
Düsseldorf, North Rhine-Westphalia, Germany Glasgow, Scotland, United Kingdom

Italian designer Fontemaggi organizes events and implements custom Glasgow Life curated the 9,000-object Burrell Collection amassed by Sir
exhibition stands. For interpack, a triennial trade fair held in Düsseldorf for William Burrell and gifted to the City of Glasgow, Scotland. The building
the processing and packaging sector, Fontemaggi designed, constructed, housing the collection opened in 1983 and, in 2013, was designated to
and assembled onsite a 172-square-meter, two-story exhibition stand be of special architectural or historic interest. John McAslan + Partners
that showcased the products of a large packaging company. The EUR (JMP) joined the project team retained for a GBP 66 million repair,
131,000 project was produced and assembled within a short time and restoration, and upgrade of the building and displays.
required close coordination with several contractors.
With no prior experience using AECOsim Building Designer, JMP
MicroStation allowed Fontemaggi to perform all aspects of the design adopted a BIM approach based on Bentley software and coordinated
in the minimum amount of time, and export files in the formats required internal and external designs across software platforms. JMP met BIM
for numerical control machinery and other applications. Integration with Level 2 requirements and issued data that was 100 percent accurate
Fontemaggi’s management information system saved time processing and coordinated. AECOsim Building Designer enabled the BIM process
quotes and quantities. The custom-designed stand achieved the goal of while saving more than GBP 20,000 in software licensing costs. Evolve
generating sales contacts for the exhibitor by displaying the company’s Consultancy provided BIM training and support throughout the project.
value to a wide audience. Project Playbook: MicroStation Project Playbook: AECOsim Building Designer, MicroStation

40
John Portman & Associates John Portman & Associates
615 South College Hotel Indigo at 230 Peachtree Street
Charlotte, North Carolina, United States Atlanta, Georgia, United States

Developer Portman Holdings partnered with China Orient Summit Capital Located in downtown Atlanta, Georgia the Hotel Indigo is an adaptive
to build this 375,000-square-foot office tower in Charlotte, North Carolina. reuse of Peachtree Center’s first high-rise office tower. The renovation
At a cost of USD 65 million, 615 South College was constructed on top converted the 27-story building into office space on floors 10-27 and a
of a Westin hotel’s existing parking deck. Architects John Portman & hotel on floors two to nine. The hotel offers 203 guest rooms, two suites,
Associates (JPA) took the project from site evaluation through construction and a restaurant, all of which is connected to AmericasMart Atlanta by a
administration with a team hand-picked for expertise in 3D modeling and new skylight corridor. John Portman & Associates provided architectural
4D scheduling. design and structural engineering for the USD 50 million project.

JPA used the unique site characteristics to develop a cost-efficient design The 50-year-old building’s history of modifications created discrepancies
featuring flexible floor plans with 18 large-area cantilevered floor plates, between original documentation and as-built conditions. These
and façade setbacks with roll-away walls opening to outdoor terraces. differences presented challenges for integrating mechanical, electrical,
AECOsim Building Designer allowed JPA to quickly define the geometry and plumbing systems and connecting a new glass staircase. The
2017 INFRASTRUCTURE YEARBOOK

and translate the design vision into a collaborative working 3D model. building information model created in AECOsim Building Designer
The BIM technology improved productivity and reduced project team size. improved collaboration and ensured a fully coordinated design. Design
Project Playbook: AECOsim Building Designer iterations in GenerativeComponents produced optimal solutions while
staying on schedule. Project Playbook: AECOsim Building Designer,
GenerativeComponents

41
BIM Advancements in BUILDINGS AND CAMPUSES

Karnataka Public Works Department


John Portman & Associates Building Division
Union Tower West CMM Court Premises
Denver, Colorado, United States Bangalore, Karnataka, India

The USD 100 million Union Tower West in the Lower Downtown district The Karnataka Public Works Department (KPWD) built an INR 280 million
of Denver, Colorado is a hotel and office building jointly owned by court building for the Chief Metropolitan Magistrate in Bangalore Urban
Portman Holdings, Hensel Phelps Development, and Canyon Partners. The District to facilitate the processing of cases. The KPWD Building Division
complex provides 180 hotel rooms and 100,000 square feet of office published the Tender for Construction and was responsible for executing
space. The owners commissioned John Portman & Associates (JPA) the project, including performing the structural design.
to fully realize the project, from site evaluation through design and
construction administration. One of the project requirements was to use a composite structural system
of RCC and structural steel that would lower construction costs and ensure
The unique building geometry posed design challenges that JPA project viability. The KPWD Building Division used STAAD.Pro to analyze
met using AECOsim Building Designer. The 3D modeling process and design the entire structure. Optimizing the design with STAAD.Pro
allowed JPA to test multiple designs before finding an architectural reduced concrete use by 15 percent and steel use by 20 percent.
solution that maximized efficiency while minimizing material use. Project Playbook: STAAD.Pro
JPA’s efforts resulted in a mixed-use structure that uses green design
to provide a holistic and welcoming environment for 24-hour usage.
Project Playbook: AECOsim Building Designer

42
Kutumbale Consultants & Engineers Pvt. Ltd.
KLCC Projeks Sdn. Bhd. Seismic Strengthening of Preheater Building
Mövenpick Spa & Resort at Purbanchal Cement
Kuala Terengganu, Terengganu, Malaysia Guwahati, Assam, India

Mövenpick Spa & Resort is a five-star luxury resort on a 25-acre beachfront When Surya Cement expanded capacity from 400 to 550 tons per
site in Kuala Terengganu, Malaysia. Located in the gateway city to the day at its plant in Guwahati, Assam, India, the raw mill, cooler, and
state of Terengganu’s many attractions, the resort is an international preheater buildings had to be strengthened to withstand the load. At the
destination and economic boon for the region. Eclipse Portfolio Sdn. Bhd. same time, the buildings needed upgrading to comply with the current
developed the MYR 128.5 million property and retained KLCC Projeks seismic zone designation. Kutumbale Consultants & Engineers Private
Sdn. Bhd. to construct and commission eight blocks of 2-, 3-, and 5-story Ltd. (KCEPL) designed and detailed the strengthening scheme for the
buildings, nine pavilions, spa, and related facilities. preheater building.

KLCC Projeks’ BIM approach allowed collaborative information sharing KCEPL used STAAD.Pro to model the as-built structure, then design the
among all disciplines. Design coordination, clash detection, and issue building retrofit for added capacity and seismic resistance. STAAD.Pro
resolution minimized defective work and mitigated risk associated with a improved the design team’s productivity, resulting in fewer resource
large-scale project. It also minimized delays and kept the project moving hours and a shortened schedule. These efficiencies reduced the project
2017 INFRASTRUCTURE YEARBOOK

forward. Bentley technology drove the 3D modeling and integrated delivery cost for this INR 10 million project and produced a reliable
building design, analysis, and construction. Project Playbook: AECOsim and economical strengthening system for the preheater building.
Building Designer, LumenRT, MicroStation, Navigator Project Playbook: STAAD.Pro

43
BIM Advancements in BUILDINGS AND CAMPUSES

La Bottega del Legno Snc Malmi Airport Development Group


Old Wood Interiors Helsinki-Malmi Airport Development Project
St. Moritz / Silvaplana, Graubünden, Switzerland Helsinki, Uusimaa, Finland

La Bottega del Legno (The Wood Workshop) coordinated a micro project The Malmi Airport Development Group used the City of Helsinki, Finland’s
to install old wood furnishings at a private residence in the posh St. award-winning reality model as the basis for a virtual reality video
Moritz / Silvaplana region of Graubünden, Switzerland. The EUR 70,000 introducing the Helsinki-Malmi Airport Development Project. The 3D
project involved multiple contractors, including interior design, electrical, digital model featured the planned renovation of historic airport facilities
plumbing, bricklayers, tilers, painters, and woodwork. Using 3D design and proposed new construction, including a dwelling area for 10,000
software in a 2D environment kept costs down and avoided rebuilds. residents. The multi-media visualization targeted decision makers as well
as the community at large.
The Wood Workshop used MicroStation to create wall coating and
furnishing components off-site, saving time and money. The easy Bentley’s 3D modeling technology provided the platform for creating
integration of design elements with other platforms, including conversion the 3D model and importing city model data. The developer created a
of inbound and outbound files, made the design process highly efficient virtual game screen console and used video capture software to import
and greatly reduced errors. In the end, design optimization with and edit the video. The immersive presentation of the proposal made it a
MicroStation saved approximately EUR 1,400 in manufacturing costs and persuasive device for promoting the project at meetings with governmental
materials. Project Playbook: MicroStation and municipal officials. Bentley’s exacting 3D modeling software
made it possible. Project Playbook: AECOsim Building Designer,
MicroStation, GenerativeComponents

44
National Center for Research
on Earthquake Engineering
Nagesh Consultants Using ContextCapture for 3D Model Analysis of Structural
Meditation Hall Collapse in Earthquake
Tirupati, Andhra Pradesh, India Taipei, Taiwan

The Brahmarishi Ashram’s new Meditation Hall in Tirupati, Andhra In the aftermath of a 2016 earthquake in Meinong District, Kaohsiung
Pradesh, India provides an inspiring, shell-shaped gathering place City, Taiwan, the National Center for Research on Earthquake Engineering
with double curvature and layered elevation, soaring to 35 meters (NCREE) investigated why five structures collapsed, where the weak
at its center. The Ashram asked for a simple structural system that points were, and what design changes could be made to prevent future
required an uncomplicated construction methodology. Nagesh Consultants collapses. The TWD 3 million project required just five investigators
delivered the design, detailing, and construction drawings for the INR 250 for three days of on-site work and four days of modeling to evaluate
million project. the collapses.

The project team used STAAD.Pro to model the structural geometry and NCREE conducted unmanned aerial vehicle scans and terrestrial laser
optimize the design for structural steel, which saved nearly INR 5 million. scans of the collapsed structures, capturing complete data while ensuring
Preliminary designs were presented to stakeholders using visualizations investigators’ safety. The team then used point-cloud data to create 3D
generated from the 3D model. Demonstrating how the curved structure geometric models with ContextCapture. These models were compared to
2017 INFRASTRUCTURE YEARBOOK

would be executed gained buy-in and fast-tracked the project. Using the simulated structural collapse analyses conducted with finite element
Bentley applications, the team completed the detailed design in models, providing a complete picture of the conditions for collapse.
just 50 resource days rather than the budgeted 180 resource days. Project Playbook: ContextCapture
Project Playbook: STAAD.Pro

45
BIM Advancements in BUILDINGS AND CAMPUSES

National Taipei University of Technology Plotini Allestimenti


Ancient Folk Culture Village City after the City
Kinmen, Fukin, Taiwan Milan, Italy

A team of master’s degree students at the National Taipei University of Held at the former site of EXPO 2015 in Milan, Italy, the XXI Milan
Technology created an interactive virtual reality (VR) scene depicting the International Triennial of Design hosted the “City after the City” exhibition
traditional architecture of an ancient Chinese folk village. The 3D model for a four-month celebration of new frontiers in design. Plotini Allestimenti,
featured 18 Fujian-style houses that could be explored using the VR agent a provider of temporary architecture for shows, stands, and furnishings,
as a tour guide. The TWD 100,000 project presented a cost-efficient way was charged with building the EUR 400,000 temporary installation in a
to preserve cultural artifacts. 2,500-square-meter exhibition space.

The students used ContextCapture to construct the 3D model from The set-up involved self-supporting curved walls made of solid wood
photos taken via an unmanned aerial vehicle. The easy-to-use and plasterboard, rising up to 14 meters high. Exhibitors projected videos
Bentley application helped complete the project in just four days— and images of their designs on these walls. MicroStation allowed Plotini
one day for photography and three days for modeling. The ability to Allestimenti to produce the precise construction drawings used by the
integrate the village model into a BIM database presented future production department to make pre-fabricated items and assemble the
opportunity to manage the historic site for tourism and other purposes. structures in-house. These drawings reduced on-site assembly time from
Project Playbook: Descartes, ContextCapture 12 days to less than 10 days. Project Playbook: MicroStation

46
PLS snc di Paolo & Loretta Segato PPS Tech LLP
Camera 2 Alstom Bharat Forge Power Ltd.
Moscow, Russia Mundra Special Economic Zone, Gujarat, India

Furniture manufacturer PLS snc di Paolo & Loretta Segato created Alstom Bharat Forge Power Ltd. retained PPS Tech LLP to provide
custom-made furniture for a 90-square-meter apartment in central structural design for a 588,700-square-foot facility to manufacture
Moscow, Russia, specifically designing the pieces for one 10-square- turbine generators, heat exchangers, and auxiliary equipment in Mundra
meter bedroom. The company created a layout for the furniture ahead of Special Economic Zone (SEZ), Gujarat, India. Located in Seismic Zone 5,
time and adapted furniture to the wall constructions, which were wood the 288-meter-long building cleared heights of 15 to 33.5 meters, with
paneling and cabinets. multi-level gantry cranes ranging in capacity from 20 to 500 metric tons.

PLS snc di Paolo & Loretta Segato transformed a 2D architectural design PPS Tech used STAAD.Pro to design the structural steel superstructure
into 3D plans with the use of MicroStation for the EUR 200,000 project. and RAM Concept to design the foundation system pile cap. Bentley’s
MicroStation’s interoperability allowed the team to import the 2D designs interoperable software prevented data loss, which saved time.
presented by the architect and convert them into 3D plans using the The team also used STAAD.Pro to perform a combined analysis
application’s practical and intuitive controls. The 3D creation enabled of crane load and position. Using Bentley technology saved PPS
2017 INFRASTRUCTURE YEARBOOK

the team to compare all facets of the project with the architect, and the Tech about 10,000 resource hours and reduced design costs by 35
software’s flexible platform permitted changes to be made in almost real percent, enabling on-time delivery of the INR 588.7 million project.
time. The team reduced project planning and implementation time to Project Playbook: RAM Concept, STAAD.Pro
1,600 hours by using MicroStation. Project Playbook: MicroStation

47
BIM Advancements in BUILDINGS AND CAMPUSES

Precision Precast Solutions Pvt. Ltd. PT. Wijaya Karya (Persero) Tbk.
The North Country Mall Rehabilitation of School Building Package 1
Mohali, Punjab, India Jakarta, Indonesia

Developed by Gumberg India, the Indian venture of U.S.-based J.J. PT. Wijaya Karya Industri & Konstruksi (WIKON), a subsidiary of PT.
Gumberg Co., the western-style North Country Mall offers 1.03 million Wijaya Karya (Persero) Tbk. (WIKA), won the IDR 369.4 billion design-
square feet of retail space in Mohali, Punjab, India. The INR 3.6 billion build contract to demolish and replace 24 school buildings in and around
regional destination was designed by architects for the human experience, Jakarta, Indonesia. The Republic of Indonesia Ministry of Education
TVS Design, with structural design and supervision by Precision Precast and Culture specified that the contract be completed within 11 months.
Solutions Pvt. Ltd. (PPS). To accelerate design, WIKON formed a BIM team that used Bentley
technology for the first time.
PPS used STAAD.Pro to design the mall, which is a hybrid reinforced
concrete and structural steel structure spanning 350 meters with just The BIM team implemented AECOsim Building Designer and ProStructures
two expansion joints and a 110-meter-long floor plate. Using Bentley to model and detail the first two school buildings. LumenRT produced
software reduced design and drafting time by 30 percent and saved animations for client presentations, and ContextCapture generated 3D
INR 1.5 million in design costs. The accelerated pace and accurate reality models for construction. The BIM team completed two building
results allowed the team to deliver the project 90 days ahead designs in five days, then executed the remaining 22 designs. WIKON’s
of schedule. Project Playbook: STAAD.Pro, STAAD Foundation effective application of Bentley software might convince WIKA to adopt
Advanced, RAM Concept BIM technology. Project Playbook: AECOsim Building Designer,
ProStructures, LumenRT, ContextCapture

48
RendArk RendArk
Monnalisa Shop São Paulo - Brazil TUUM Store Assisi
São Paulo, São Paulo, Brazil Assisi, Perugia, Italy

RendArk was contracted by Monnalisa S.p.A. to design a new store for TUUM Jewels retained the architect RendArk to design its new retail store
Monnalisa, a well-known children’s retail brand, in São Paulo, Brazil. The in Assisi, Perugia, Italy, home of the Papal Basilica of Saint Francis of
EUR 200,000 store design project created an ornate, chic, and refined Assisi. The objectives were to “design with history,” evoking the history,
space for the Italian-based fashion company. artistry, and spirituality of the region as well as the tangible spirituality
of TUUM’s jewelry, which imprints the words of a prayer onto each piece.
By using a single platform through MicroStation, contact with Monnalisa
was maintained and RendArk achieved design goals expeditiously. RendArk has used Bentley products for about 25 years to provide a
The client received a 3D model and PDF, and oversaw progress and single design platform from concept to final execution. This project
management of the project with the software. MicroStation’s ability to was conceived and developed entirely with MicroStation. Starting with
enable interaction with stakeholders and other professionals involved early concepts delivered as 3D PDFs, MicroStation managed continuous
in the project eliminated mistakes and time loss. Design time was also updates and visualized each design iteration to help reach the client’s
reduced because all store furniture was designed and modeled with goal quickly and efficiently. Project Playbook: MicroStation
2017 INFRASTRUCTURE YEARBOOK

MicroStation. Project Profile: MicroStation

49
BIM Advancements in BUILDINGS AND CAMPUSES

Roark Consulting Engineers LLP Sanni, Ojo & Partners


Jai Prakash Narayan International Convention Center Church Auditorium
Lucknow, Uttar Pradesh, India Port-Harcourt, Rivers State, Nigeria

Lucknow Development Authority united a hotel, sports and convention Christ Embassy’s new five-story church auditorium in Port-Harcourt,
complex, and museum in one 90,000-square-meter convention center in Rivers State, Nigeria features a main hall with seating for 3,000 people
Lucknow, Uttar Pradesh, India. The INR 800 crore Jai Prakash Narayan and amenities including a book shop, conference rooms, offices, and roof-
International Convention Center features a rooftop public garden and top activity deck. The megachurch retained Sani, Ojo & Partners (SO&P)
two column-free, 150-by-48-meter bays for an Olympic-size pool, tennis to provide structural engineering services and facilitate town planning
courts, and conference halls. As structural consultant, Roark Consulting approvals for the NGN 2.8 billion project.
Engineers LLP met these requirements with elegant solutions.
The client intended to build in stages, starting with the roof and
The team applied STAAD.Pro to the analysis and design of a steel perimeter structure. SO&P prepared a 3D analytical model in STAAD.Pro
and RCC structural system that optimized more than 10,000 steel to ensure accurate load distribution to supporting beams, walls, and
and RCC members while retaining aesthetic appeal. The design used columns at different stages of erection. The 66-meter roof trusses were
a 4-by-4-meter grid of steel pipe arches to support the RCC roof, a critical component, and STAAD.Pro provided detailed analysis of the
which imposed heavy dead loads. This solution was 10 to 30 percent forces on truss members. The software saved about 160 resource hours
less costly, and the arches consumed 400 metric tons less steel. and, by optimizing structural elements, reduced construction costs.
Project Playbook: STAAD.Pro Project Playbook: STAAD.Pro

50
Sanni, Ojo & Partners Saunrachana Strucon Pvt. Ltd.
Multi-story Office Building Amul Cattle Feed Plant
Abeokuta, Ogun State, Nigeria Kapadvanj, Gujarat, India

Sanni, Ojo & Partners provided structural engineering for a NGN 1.8 Amul, a unit of Kaira District Co-Operative Milk Producer’s Union Ltd.,
billion, 11-story office building in Abeokuta, Ogun State, Nigeria. expanded its cattle feed production capacity by 2,000 tons per day with
The triangular shape of this reinforced concrete structure required a the addition of a 24-acre plant at Kapdivav Village in the city of Kapadvanj,
non-orthogonal floor beam arrangement and eccentrically positioned lift Gujarat, India. The INR 200 crore plant has 50,000 square meters of built-
shaft. A two-story trussed bracket positioned at the first-floor setback up storage with 16 silos. Saunrachana Strucon Pvt. Ltd. (SSPL) provided
provided a 5-meter cantilever to support the upper nine floors beyond building planning, design, detailing, and cost estimating.
the building footprint.
SSPL designed the ground floor plus a nine-story structure and raft
When the client added three stories to the original 8-story concept, foundation with STAAD.Pro, performing 3D modeling and analysis of
STAAD.Pro allowed the project team to quickly adapt the structural various load combinations for heavy equipment. STAAD.Pro reduced
model. Modeling the floor slabs, shear wall, and raft foundation allowed design time by nearly 20 percent, compared to manual efforts. With
for accurate load distribution to the supporting beams and limitation of production growing just 4 percent per year and demand growing 6 to 7
2017 INFRASTRUCTURE YEARBOOK

stresses on the lift core. STAAD.Pro saved about two months and NGN percent in India, the technologically advanced plant could revolutionize
3 million in design time required to fulfill the client’s requirements. cattle feed manufacturing. Project Playbook: STAAD.Pro
Project Playbook: STAAD.Pro

51
BIM Advancements in BUILDINGS AND CAMPUSES

Saunrachana Strucon Pvt. Ltd. Saunrachana Strucon Pvt. Ltd.


Cattle Feed Plant at Sumul Dairy SRFDCL House at Sabarmati Riverfront
Surat, Gujarat, India Ahmedabad, Gujarat, India

Surat District Milk Producer’s Union Ltd. (Sumul) invested INR 160 crores Sabarmati Riverfront Development Corporation Limited (SRFDCL) retained
in an ambitious new 87,700-square-meter cattle feed plant in the Bajipura Saunrachana Strucon Pvt. Ltd. to perform structural engineering and
commercial area of Surat, Gujarat, India. Capable of producing and storing analysis for a 16,712-square-meter office complex on the western side
1,000 tons per day of finished product, the plant will help meet rapidly of the Sabarmati River in Ahmedabad, Gujarat, India. The INR 50 crore
growing demand for cattle feed in India. Saunrachana Strucon Pvt. Ltd. building will house a museum, exhibition hall, and cafe on the ground
(SSPL) provided planning, design, detailing, and cost estimation for the floor, offices on six floors, and three floors of basement parking.
plant building.
Bentley solutions provided the 3D design technology the project team
SSPL used STAAD.Pro to generate a 3D model of a composite steel and needed to address such challenges as an irregular building shape and
RCC structure, then analyze the various equipment load requirements, the inclusion of four lifts. The applications reduced design time by 15
cutout locations on different levels, and floor material options. Compared percent, enabling Saunrachana Strucon to deliver the project on time.
to manual methods, the software made the analysis and design Upon completion, the office complex will become part of SRFDCL’s
quick and easy. As a result, SSPL reduced design time by 15 percent. 11.25-kilometer multidimensional development designed to transform
Project Playbook: STAAD.Pro the riverfront environment and provide socio-cultural amenities.
Project Playbook: STAAD.Pro

52
Scon Pvt. Ltd. Shree Prefab Steel Pvt. Ltd.
Structural Designs Basis Report of Ashiana Anantara Mother Dairy Plant Building
Jamshedpur, Jharkhand, India Gandhinagar, Gujarat, India

Real estate developer Ashiana Housing Ltd. worked with structural Mother Dairy Fruit & Vegetable Pvt. Ltd., a wholly owned subsidiary of
consultant Scon Private Limited to design the INR 10 million Ashiana National Dairy Development Board, retained Shree Prefab Steel Pvt.
Anantara residential complex in Jamshedpur, Jharkhand, India. Ltd. (Shree) to provide structural design, analysis, and erection of a
Located in a posh area of the city, the high-rise building offers all the pre-engineered steel building at its dairy plant in Gandhinagar, Gujarat,
expected amenities. India. The INR 6 crore plant building was four floors and spanned
25 meters.
The project team chose the STAAD family of products to take advantage
of the ability to exchange data, as well as to draw upon the included Shree created the optimal design for the building using STAAD.Pro,
data files on member sizes, dead weights, and floor loads. The software’s which helped to significantly reduce the steel consumption.
automatic calculations ensured accurate analysis and design of the Project Playbook: STAAD.Pro
complicated RCC structure. Intra-operability between STAAD.Pro and
STAAD Foundation Advanced reduced resource hours and project delivery
2017 INFRASTRUCTURE YEARBOOK

time. Project Playbook: STAAD.Pro, STAAD Foundation Advanced

53
BIM Advancements in BUILDINGS AND CAMPUSES

Shree Prefab Steel Pvt. Ltd. Shree Prefab Steel Pvt. Ltd.
Process House Building of Nandan Denim Limited Show Room Building
Ahmedabad, Gujarat, India Rajkot, Gujarat, India

Located in Ahmedabad, Gujarat, India, Nandan Denim’s 22-meter-high Shree Prefab Steel Pvt. Ltd. (Shree) was designated only two months to
process house was originally intended to be an RCC building. Shree design, fabricate, and erect the steel structure housing for a new INR 2.1
Prefab Steel Pvt. Ltd. (Shree) proposed the steel construction alternative, crore Honda showroom and workshop at the Aan Motors dealership in
with the addition of liner panels to protect against damage from leakage. Rajkot, Gujarat, India.
As the consultant responsible for structural design, analysis, and erection,
Shree devised an innovative solution for the INR 9.5 crore steel building. Shree used Bentley solutions, including STAAD.Pro, to complete the
project in 40 percent less time than a manual process would have
Shree used STAAD.Pro to design the complex structure, which spanned taken. The new buildings were ready in time for a scheduled visit by the
28 meters and had two floors plus a mezzanine. The design called for 25 president of Honda Motor Company and the chief minister of Gujarat.
millimeters of steel plate. Shree estimated that the steel process building Project Playbook: STAAD.Pro
took nearly 25 percent less time to design and erect than the RCC building
alternative. Project Playbook: STAAD.Pro

54
Silicon Engineering Consultants Pvt. Ltd.
BRTS – Chhattisgarh (Workshop, Control Building, Silicon Engineering Consultants Pvt. Ltd.
and Bus Shelters) Educational Hub at Diu
Raipur, Chhattisgarh, India Dui, Daman and Diu, India

As the EPC contractor for the Bus Rapid Transit System (BRTS) Control The Public Works Department, Diu, retained Silicon Engineering
Center at Raipur, Chhattisgarh, India, Silicon Engineering Consultants Consultants Pvt. Ltd. to provide the structural design for an INR 150 crore
Pvt. Ltd. provided structural design and detailing of various structures, Educational Hub in Diu, Daman and Diu, India. The 55,000-square-meter
including the workshop, control building, main entry gate, and bus facility is being constructed in three phases. Located on the eastern
shelters. The INR 100 crore project will provide the facilities for BRTS to end of Diu Island in the coastal union territory of Daman and Diu, the
maintain buses in-house. Hub was designed as a green building to minimize its impact on the
natural environment.
The client, Naya Raipur Development Authority, specified the use of RCC
and structural steel building materials. Silicon Engineering’s analysis in STAAD.Pro provided accurate analysis and design of the project to
STAAD.Pro confirmed that this composite structural system was optimal. ensure on-time completion. The software improved efficiency, reduced
The application was quick and easy to use for the design and detailing working hours for the design team, and lowered project delivery costs.
of complex structures, which reduced design time and project costs. The 3D renderings aided in stakeholder communications and buy-in for
2017 INFRASTRUCTURE YEARBOOK

Project Playbook: STAAD.Pro an educational hub that will benefit a global community. The building’s
energy-efficient features include wind towers and building cutouts.
Project Playbook: STAAD.Pro

55
BIM Advancements in BUILDINGS AND CAMPUSES

SimpsonHaugh SKA Consulting Engineers, Inc.


Library Walk Steven Tanger Center for the Performing Arts
Manchester, Lancashire, United Kingdom Greensboro, North Carolina, United States

Commissioned by Manchester City Council, the GBP 3.5 million Library Commissioned by the City of Greensboro, North Carolina, the Steven
Walk between Manchester Town Hall and the Central Library in Tanger Center for the Performing Arts is a state-of-the-art facility with
Manchester, England provides a covered walkway at ground level as a a 3,000-seat capacity, featuring tiered seating and balcony, orchestra
practical and appealing alternative to the convoluted basement-level pit, fore- and main stages, theatrical equipment, and support spaces.
route between buildings. Designed by SimpsonHaugh, the 175-square- The USD 63 million center was designed by a team of experts, including
meter pavilion uses frameless structural glass panels to support a 30-ton SKA Consulting Engineers, Inc. (SKA) as structural engineer, construction
stainless steel roof. administrator, and special inspector.

SimpsonHaugh developed design concepts with GenerativeComponents, To promote communication among disciplines, SKA linked the team’s BIM
then moved to AECOsim Building Designer to develop the 3D model. software, Revit, to RAM Structural System (RSS), which allowed SKA to
Easy data interoperability among the design team and third parties look at structural components without remodeling, and solve coordination
using other software saved time and improved accuracy. The ability to issues early in the project. Every aspect of the building structure was
easily convey the design to specialist manufacturers and fabrication designed with RAM, which saved about three months in design time
teams reduced the risk of misinterpreting drawings and details and and reduced structural design fees by an estimated USD 60,000.
ultimately helped deliver a successful and unique scheme, on time Project Playbook: RAM Structural System, RAM Concept, RAM Elements
and within budget. Project Playbook: AECOsim Building Designer,
MicroStation, GenerativeComponents

56
Skeleton Consultant Pvt. Ltd. Skeleton Consultant Pvt. Ltd.
ICSS Complex at SGPC, Gurdwara Rakab Ganj Sahib Sri Sathya Sai Sanjeevani Hospital
New Delhi, India Ballabhgarh, Haryana, India

The Shiromani Gurdwara Parbandhak Committee (SGPC) manages Sikh Sri Sathya Sai Charitable Trust commissioned the Sri Sathya Sai
places of worship (Gurdwaras) and educational institutions, such as Sanjeevani Hospital to provide free heart care to children. Located in
the International Centre for Sikh Studies (ICSS). The SGPC premises at Ballabhgarh, Haryana, India, the specialty hospital will serve patients
the historic Gurdwara Rakab Ganj Sahib near Parliament House in New from India and other developing countries. Skeleton Consultant Pvt. Ltd.
Dehli were renovated to create gathering space, an auditorium, and (SCPL) performed the structural engineering for the ground plus two-floor
other amenities. Skeleton Consultant Pvt. Ltd. (SCPL) provided structural structure, with a provision for one future floor.
engineering for the INR 14 crore project.
With a built-up area of 147,300 square feet, the heart-shaped building
SCPL used STAAD.Pro for analysis and design, paying attention to the has a concrete substructure and steel superstructure. SCPL implemented
architect’s innovative shell-type dome intended to create light space STAAD.Pro for the fast-track design, using the graphic interface to model
within the building’s core. The 3D modeling helped to visualize the the structure in less time. The analysis engine helped to understand the
complex shape, while analytical modeling simulated non-standard structural behavior of the complex heart shape and optimize the design in
2017 INFRASTRUCTURE YEARBOOK

sections, dismantled structural parts, and other difficult aspects. rapid iterations. Bentley technology helped SCPL achieve on-time delivery
STAAD.Pro provided rapid, accurate analysis required to optimize of the safe and vibration-free structure. Project Playbook: STAAD.Pro
the connection design and deliver the structural design on time.
Project Playbook: STAAD.Pro

57
BIM Advancements in BUILDINGS AND CAMPUSES

Skematic Consultants Smith Structures India Pvt. Ltd.


Library Building for NIT Agartala Industrial Complex at Ditasan
Agartala, Tripura, India Ahmedabad, Gujarat, India

The INR 30 million library building for the National Institute of Technology Ammann Apollo India built an INR 15.35 crore manufacturing facility
(NIT) Agartala required a structural system capable of withstanding high near Ditasan Village in Ahmedabad, Gujarat, India. The complex has 41
seismic forces and a foundation suitable for very soft soil. As the project’s transverse and longitudinal cranes, as well as a 28-meter open gantry
structural engineer, Skematic Consultants designed an RCC structure crane with 2-25 metric ton capacity. The clear span and crane beams
that met these requirements while fulfilling client expectations for an presented challenges to Smith Structures India Pvt. Ltd. (SSIPL), who was
essential building on this prestigious campus. responsible for building design, detailing, fabrication, and erection.

The project team achieved accuracy in analysis and design with The solution was to completely design the 1,800-metric-ton pre-
STAAD.Pro, STAAD Foundation Advanced, and STAAD Advanced engineered steel building in STAAD.Pro. As building plans changed,
Concrete Design. Bentley software intra-operability allowed data STAAD.Pro enabled SSIPL to make quick revisions and stay on schedule.
transfer from modeling and analysis to design, reducing resource hours When SSIPL submitted files for verification, the consultant also used the
and project delivery time. Using Bentley applications allowed Skematic software to provide rapid turnaround. STAAD.Pro reduced the burden on
Consultants to produce a high-quality design for the new library, which the project team by saving roughly 240 design hours. The optimized design
is used daily by thousands of NIT students on campus in the state capital also saved about 100 metric tons of steel. Project Playbook: STAAD.Pro
of Tripura, India. Project Playbook: STAAD.Pro, STAAD Foundation
Advanced, STAAD Advanced Concrete Design

58
Stemas Sunil Mutalik & Associates
02PLDF Filmatrice Doppia Vallonia
Motta di Livenza, Treviso, Italy Pune, Maharashtra, India

Stemas, of Motta di Livenza, Treviso, Italy created a custom computer Current residential development in Pune, India is focused on balancing
numerical control (CNC) machine designed to varnish both sides of cabinet the city’s traditional charm with contemporary architecture. Lohia Jain
doors and the molded heads of poles. The company, which specializes in Housing contracted with Sunil Mutalik & Associates to develop the
envisioning and producing wood manufacturing machines, sought to grow structural design for its INR 847 million Vallonia housing development.
daily production volume by creating a machine that presents poles to be The project is an apartment complex of two- and three-bedroom-hall-
varnished at the optimum angle, with minimal distance between them. By kitchen units set in a landscape of infinity pools, recreation areas, and
employing Bentley software, Stemas created a tailored CNC machine and Zen gardens.
achieved this goal.
Using STAAD.Pro and STAAD Foundation Advanced for structural analysis,
The design modeling project, valued at EUR 10,000, was facilitated Sunil Mutalik & Associates designed Vallonia’s apartment complex
through MicroStation. The CNC machine optimized production times, without altering the existing architectural layout or compromising its utility
lowered production costs, generated less waste, and reduced the cost of of space. Bentley software saved the company 750 resource hours and
2017 INFRASTRUCTURE YEARBOOK

the final product. The application’s adaptability maximized design speed reduced design costs by 25 percent. The use of Bentley products provides
because the utilization of a single platform guaranteed that information Vallonia residents with clean, environmentally friendly living opportunities.
was retained and rapidly disseminated. Project Playbook: MicroStation Project Playbook: STAAD.Pro, STAAD Foundation Advanced

59
BIM Advancements in BUILDINGS AND CAMPUSES

University of Chile
Toyo Construction Co., Ltd. Renovation of the Civic Boulevard in Tierra Amarilla,
BBAJ Tochigi New Factory Project Project of Renovation of Public Space and Services
Tochigi-shi, Tochigi-Prefecture, Japan Yellow Earth, Atacama, Chile

B. Braun Aesculap Japan hired Toyo Construction to design and construct University of Chile student architect Rafael Bombardiere designed the
a factory in Tochigi, Japan. The factory is a major manufacturing base for renovation of the civic walk of Tierra Amarilla, an impoverished city in
anesthetic needles from the B. Braun Group. The JPY 6.4 billion project northern Chile located in the desert valley of Copiapo River. Public space
involved construction of a 7,070-square-meter, two-story steel structure; and services have deteriorated over time due to a lack of infrastructure,
design elements centered on natural light and glass partitioning of office and quality of life has suffered due to pollution caused by mining and
space and production zones. Over 10 companies were involved in the agriculture. The design renewed existing public services of Civil Registry,
project, so the utilization of a BIM methodology was necessary to expedite Post Office of Chile, a service tourism office, and a municipal Mediatek.
decision making and focus on quality assurance during construction.
MicroStation generated data for digital manufacture, while LumenRT
MicroStation was crucial in replicating the detailed topography of the created real-time rendering. AECOsim Building Designer organized
area—it reproduced the terrain based on information from the Geospatial a joint workflow and produced the data to create physical models.
Information Authority of Japan in just minutes, when, previously, the The interoperability of Bentley software allowed the project team
modeling took months. Real-time data sharing augmented consensus to collaborate with external participants using other platforms. This
building, and collaboration among stakeholders with MicroStation capability eliminated the need to invest in new computers, therefore
eliminated redundancies and drawing oversights, which cut design saving money. Bentley applications also helped the team to complete
time significantly and lessened the construction phase by two months. deliverable documentation in half of the estimated time, cutting project
Project Playbook: MicroStation costs by 50 percent. Project Playbook: AECOsim Building Designer,
LumenRT, MicroStation
60
Vadalkar and Associates
Department of Energy Science and Engineering,
Centre for Environmental Science and Engineering
Mumbai, Maharashtra, India

The Indian Institute of Technology (IIT) Bombay commissioned a common


building for two academic divisions on the Mumbai campus—the
Department of Energy Science and Engineering (DESE) and the Centre
for Environmental Science and Engineering (CESE). As principal structural
consultant on the INR 660 million project, Vadalkar and Associates
had to deliver the RCC work for the ground plus 7-story building in just
14 months.

The design concept required large, column-free spaces with beam-


depth restrictions to accommodate services below the beam. Vadalkar
and Associates used STAAD.Pro to streamline analysis and optimize the
design while preserving architectural elegance. Construction time and
2017 INFRASTRUCTURE YEARBOOK

cost savings resulted from solutions such as using rebar couplers instead
of lapping columns. Vadalkar and Associates completed the RCC work
ahead of schedule in 12 months. Project Playbook: STAAD.Pro

61

For over two decades Bentley’s modeling platforms have been central
to Morphosis’ development and delivery of highly innovative,
award-winning architectural projects. The Bloomberg Center provided


the office with the opportunity to advance the use of technology
through an integrated approach to project delivery.

– Cory Brugger, Director of Design Technology, Morphosis Architects

62
CONSTRUCTION
This award category includes projects that demonstrate excellence during the construction phase of a project,
representing a clear return on investment, such as reduced design and/or project time, resource hours
saved, cost savings realized, improved business performance, or risks mitigated to avoid overruns, and which
exemplify how the use of technology has advanced work processes to the benefit of all stakeholders.

63
BIM Advancements in CONSTRUCTION
W I N N E R

Leighton Asia
Hong Kong Boundary Crossing Facilities, Hong Kong-Zhuhai-Macao Bridge I Hong Kong

The Highways Department, Government of Hong Kong Special Administrative Region, is participating in building a 50-kilometer bridge linking Hong Kong,
Zhuhai and Macao. Crossing a series of bridges and tunnels, vehicles will enter/leave Hong Kong through boundary crossing facilities on a 130-hectare
reclaimed island. The Leighton-Chun Wo Joint Venture is responsible for construction of the USD 1.08 billion 90,000-square-meter passenger clearance
building and associated works.

The team made Bentley’s BIM technology the common platform to facilitate communications, and to anticipate and rectify construction problems. Solving
more than 3,000 clashes before construction has largely reduced remedial work and hence saved time and cost. The survey team compared 3D design models
to point cloud models to avoid discrepancies on site, then continuously updated the design model to create accurate as-built models. Project Playbook:
AECOsim Building Designer, LumenRT, ContextCapture, Descartes, MicroStation, Navigator, OpenRoads, ProjectWise

64
F I N A L I S T F I N A L I S T

SPECIAL RECOGNITION AWARD WINNER

China Construction Sixth Engineering Division Corp., Ltd.,


Tianjin University of Technology, and Tianjin
Tianhe-Cloud Building Engineering Technology Co., Ltd. JMC2
Sanya New Airport Reclamation Project Heaven Sent
Sanya, Hainan, China Simi Valley, California, United States

A new airport in Sanya, Hainan, China is being constructed on an artificial Sponsored by Stride gum, daredevil skydiver Luke Aikins leapt from
island created by reclaiming land from Hongtang Bay. The USD 5 billion a plane at 25,000 feet without a parachute or wingsuit, reaching a
project covers 28 square kilometers and includes an airport operation terminal velocity of 120 miles per hour before landing safely in a
zone, international trade zone, and support services zone. Developed by 10,000-square-foot net outside Simi Valley, California. The USD 8 million
an HNA Group Co., Ltd. subsidiary, the massive project awarded multiple stunt, dubbed “Heaven Sent,” set a Guinness World Record. JMC2 Civil
construction contracts, with several going to China Construction Sixth Engineering + Surveying conceptualized the fall, designed the lifesaving
Engineering Division Corp., Ltd. “trap,” and oversaw construction.

This team’s responsibilities included dynamic simulation of the large- Using PowerCivil and MicroStation for 3D modeling, site layout,
scale infrastructure project. With point cloud data acquired by unmanned schematics, and detailed drawings, JMC2 managed the logistics
aerial vehicles, the team used ContextCapture to create a real-time, for the death-defying freefall and satisfied a multitude of demands
high-resolution reality model to monitor construction progress. For from concerned regulatory agencies. Optioneering various schemes
2017 INFRASTRUCTURE YEARBOOK

other work, ProjectWise enabled collaborative management of 3D produced plans for a trap comprised of nets, air pistons, cables, cranes,
information models. SACS and MOSES helped address the unique and guidance lights. Using Bentley applications helped JMC2 save
maritime conditions associated with the island project’s structures. the sponsor nearly USD 1 million in design and construction costs.
Project Playbook: AssetWise, AXSYS, Descartes, LumenRT, Project Playbook: MicroStation, PowerCivil
ContextCapture, MicroStation, MOSES, OpenBridge, OpenRoads,
ProjectWise, SACS
65
BIM Advancements in CONSTRUCTION

Beijing Housing Construction Co., Ltd.


Alberta Pipe Trades College First Section of Binhu Embellished Garden
Alberta Pipe Trades College Construction Academy Prefabricated Residential Project
Edmonton, Alberta, Canada Hefei, Anhui, China

Alberta Pipe Trades College is operated by the United Association (UA) of In the Binhu district of Hefei, Anhui province, the CNY 100 million Binhu
Plumbers and Pipefitters, Local 488, in Edmonton, Alberta, Canada. The Embellished Garden project is the largest industrial housing project in
college purchased a three-year subscription to the Bentley Construction China, covering 80,000 square meters and including residential high-
Academy and trained on-site trainers to deliver educational programs rises (up to 33 floors), commercial buildings, and kindergartens. In the
in Advanced Work Packaging (AWP) and WorkFace Planning (WFP). first section of the project, Beijing Housing Construction Co., Ltd., was
The programs help UA members advance their knowledge, skills, and responsible for detailed design and construction of the prefabricated
career opportunities. structures, 50 percent of which required assembly.

Bentley Construction Academy attendees represent owners, EPCs, The project team used Bentley’s BIM advancements to meet the
contractors, and vendors from 37 regional organizations. Scenario-based requirements of industrial housing, from structural design through
classes use ConstructSim to solve constructability problems, devise 3D coordination and clash detection, to assembly and construction
better ways to plan and execute work, and learn best practices in AWP- simulation. ProjectWise shortened design time by nearly 30 percent and
WFP. Fourteen percent of graduates have accepted WFP positions, 22 reduced design costs by about 25 percent. The combination of Bentley
percent are now certified WorkFace Planners, 92 percent use AWP- series software and assembly technology curtailed the construction
WFP skills to improve project performance. Bentley Construction period by 30 percent. Project Playbook: AECOsim Building Designer,
Academy is also a revenue generator for Alberta Pipe Trades College. ContextCapture, MicroStation, Navigator, OpenRoads, OpenRoads
Project Playbook: ConstructSim Planner, ConstructSim Work Package Navigator, ProjectWise
Server, ContextCapture, Navigator
66
Bina Puri Sdn. Bhd. Cad Connect
Sabah State Administrative Centre Architectural Project
Kota Kinabalu, Sabah, Malaysia Milan, Italy

Located seaside in Kota Kinabalu, the Sabah State Administrative Centre Freelance visual designer Daniele Podda was contracted by Cad Connect
is a government complex comprising one 33-story office tower and two to design a pilot project that demonstrates the BIM features of AECOsim
9-story office buildings. The tower rises 187.45 meters above sea level, Building Designer. Intended for use in classroom training, the demo built-
making it the tallest building in the state. In addition to Sabah State out an expansive, EUR 10 million villa in Milan, Italy. The villa comprised
Government offices, the complex houses a restaurant, a banquet hall, two sections—one ground-floor level for daytime activities, and a second
and an auditorium. The MYR 388.7 million project was completed by two-level wing for sleeping quarters and a study.
Bina Puri Sdn. Bhd.
The structural composition consisted of a steel and iron skeleton with
Bina Puri implemented MicroStation and AECOsim Building Designer stone, reinforced concrete, or plasterboard coatings. The simulation
to visualize and coordinate the building’s elements. The project team’s detailed the windows and outdoor living space, as well as provided
BIM approach promoted multidiscipline collaboration and integrated context in the form of panoramic views and background settings. Podda
design and construction. Constructability reviews were performed used MicroStation to render visualizations for use in training manuals.
2017 INFRASTRUCTURE YEARBOOK

using BIM technology, which eliminated clashes and resolved drawing Bentley Channel Partner Cad Connect provided technical support for this
disputes. The BIM model prepared for 5D construction planning project. Project Playbook: AECOsim Building Designer
and aided the site surveyor in accurately mapping out the project.
Project Playbook: AECOsim Building Designer, MicroStation, Navigator

67
BIM Advancements in CONSTRUCTION

Dongguan Huajian Property Investment Co., Ltd.


Daelim Industrial Co., Ltd. Kaida Science & Technology Design Center (Phase 1)
CPMS+ No. 12 Office Building
Seoul, South Korea Dongguan, Guangdong, China

Daelim Industrial Co., Ltd. invested KRW 73 million in a Construction The CNY 20 million Kaida Science & Technology Design Center in
Progress Management System (CPMS) to introduce 3D design models into Dongguan, Guangdong, China will serve as a high-tech research and
the construction management process. The system uses the technology development center, design institute, business incubator, exhibition
for planning, conducting simulations, checking for interferences, venue, and other customized office space. In keeping with this forward-
managing workflows, and confirming construction tasks and productivity, thinking approach, the owner established 3D BIM management and
among other functions. The CPMS operates on a tablet device, providing solicited participation from the architectural design, construction, and
mobility and enhancing field supervision. prefabrication units.

The CPMS uses 3D models that integrate the engineering design Full integration of Bentley applications allowed the designers to change
data required for construction with the EPC information required for their thinking from a 2D to a 3D approach. Using 3D models for clash
construction management. Built on the ProjectWise platform, the CPMS is detection ensured delivery of accurate design solutions to construction
standardized for implementation on all projects based on real-time shared and reduced change requests. ProjectWise provided a central repository
information. Navigator accessed drawings, documents, and models, and for all project information and helped the owner, contractor, designer,
resolved issues. The system enabled quick decision making and accurate and fabricator more effectively work together. This collaboration laid the
scheduling, resulting in shorter, less costly construction programs. foundation for future asset management. Project Playbook: AECOsim
Project Playbook: MicroStation, Navigator, ProjectWise Building Designer, ProjectWise Construction Management, MicroStation,
ProjectWise, ProStructures

68
Hyundai Engineering Co., Ltd.
Enord LLC Construction of CPF Complex and Development of Kandym
Spanish River Group of Fields
Miami, Florida, United States Bukhara, Uzbekistan

Florida’s Miami-Dade County contracted aerial imaging specialist Enord Hyundai Engineering Co. Ltd. is continuously expanding the range of
LLC to perform a topographic survey, generate volumetric reports, and 3D applications used to improve work efficiency and innovation. This
calculate cut-and-fill amounts at various phases of construction for a project applied mobile 3D technology at the construction site for the
recent county project. Enord gathered the survey data for this USD 45,000 Kandym Gas Treatment Facility in Bukhara, Uzbekistan. The goal was to
contract using unmanned aerial imaging drones. make the 3D data that had previously only been available in the office,
available on site. It removed barriers posed by expensive equipment and
Enord imported the point cloud data into ContextCapture, then created a software licensing.
3D reality model of the construction site. The Bentley software allowed
Enord to process a massive amount of information and calculate cut- After a trial period, the engineering IT team introduced Navigator Mobile
and-fill volumes monthly. The timely information was used to compare to the plant work site. The application replaced traditionally cumbersome
actual versus proposed amounts. By enabling aerial surveying and data 2D drawings with electronic files and all linked content. Access to 3D
acquisition to be used with confidence and accuracy, Bentley software models improved understanding of the design and visualized work
2017 INFRASTRUCTURE YEARBOOK

allowed the surveyors to work safely out of traffic and hazardous locations. spaces. Navigator Mobile clarified instructions to workers, which
Project Playbook: Descartes, ContextCapture, OpenRoads Designer resolved communication problems and reduced errors and rework.
Project Playbook: MicroStation, Navigator Mobile

69
BIM Advancements in CONSTRUCTION

iSpatial Global Systems Namibia KDC Division 4


Elisenheim GIS Kanher Power Station
Windhoek, Khomas, Namibia Satara District, Maharashtra, India

Trustco Properties is building commercial properties and real estate The Kanher Power Station generates hydroelectric power at Kanher Dam on
developments throughout Namibia. The NAD 1.3 million Elisenheim the Wenna River in the Satara District of India. Owned by the government
Lifestyle Village Estate project near the capital city of Windhoek comprises of Maharashtra’s Water Resources Department, the 4,000-kilowatt
about 12,000 parcels on 300 hectares. Trustco created a comprehensive plant was leased to the Maharashtra State Power Generation Company
system to manage data from time of sale through build and transfer. The Limited (Mahagenco) for operation and maintenance. KDC Division 4 was
solution also served as a construction management tool. responsible for structural design of the INR 125 million plant.

iSpatial Global Systems Namibia (iGlobe) used Bentley applications Bentley software helped the project team acknowledge and facilitate
to develop an integrated GIS solution that captured data, gave all the numerous changes made during the design phase and perform the
parties complete visibility, and consolidated data without duplication. necessary recalculations in a short amount of time. Consequently,
ProjectWise managed the content, which linked to a geospatial database the design changes were submitted to the reviewing authority in a
in Bentley Map and was stored in Microsoft SQL Server. Geo Web timely manner. STAAD.Pro reduced design time by 7,500 resource
Publisher allowed for information sharing among multiple groups. iGlobe’s hours, saving INR 3 million in project costs. The time savings enabled
“capture once and share many times” approach saved time and money. KDC Division 4 to deliver the project 150 days ahead of schedule.
Project Playbook: Bentley Map, MicroStation, ProjectWise, Geo Web Project Playbook: STAAD.Pro
Publisher, ContextCapture

70
Larsen & Toubro Construction Lendlease
Mega Lift Irrigation Project - Cluster XII Kingsford Smith Drive Upgrade
Bhubaneswar, Odisha, India Brisbane, Queensland, Australia

The government of Odisha initiated an INR 6.5 billion project to supply The Brisbane City Council’s Kingsford Smith Drive upgrade reduces travel
water to areas where there was insufficient water for agriculture. The time by 30 percent in the corridor along the Brisbane River in Queensland,
state requested tenders for five clusters of lift irrigation projects over Australia. The AUD 650 million project widens the road from four to
81,160 hectares of irrigable land. Larsen & Toubro Construction (L&T six lanes, and includes improvement works and public transport facility
Construction) submitted a proposal within two months and a bid within upgrades. Lendlease is responsible for design and construction, which are
15 days to develop Cluster XII, supplying water to 21,300 hectares via 16 being carried out without interrupting traffic flow.
individual schemes.
Lendlease is contending with design clashes, scheduling issues, and
L&T Construction used WaterGEMS to analyze pipe routing options, logistic challenges related to infringements on live traffic. Using
compare different scenarios, design the schemes, and optimize pipeline ProjectWise as a common data environment and single source of
quantities. WaterGEMS Darwin Designer ensured that the most suitable information helps the design and construction teams collaborate on
diameter was used for the 25,870 tons of ductile iron pipeline and 6,246 solutions. By modeling in AECOsim Building Designer, and performing
2017 INFRASTRUCTURE YEARBOOK

tons of high-density polyethylene. Bentley applications reduced design constructability reviews and construction sequencing in Navigator, the
time by nearly 50 percent, which lowered the cost of bidding on the teams resolve complex construction staging issues virtually, before real-
project. Project Playbook: HAMMER, WaterGEMS world impacts occur. Project Playbook: AECOsim Building Designer,
MicroStation, Navigator, ProjectWise

71
BIM Advancements in CONSTRUCTION

Mallikarjun Associates Bangalore Metal Projekt Krakow


REVA Grand Staircase Power Plant Modernization
Bangalore, Karnataka, India Gdansk, Pomorskie Region, Poland

REVA University’s INR 30 million Grand Staircase was constructed in the Part of EDF Group, one of the world’s leading electric utilities, EDF Poland
center of an existing building block on the Bangalore campus. Mallikarjun S.A. contracted Metal Projekt Krakow to modify a large-scale coal-fired
Associates served as structural designer and construction contractor. power plant in Poland to improve the plant’s efficiency. The project
Extending from the first floor to the eighth floor, the staircase was involved design and engineering of the pulverized coal-fired boilers and
suspended above an auditorium to allow students to view performances steam drum.
and programs from the staircase platforms, thus effectively expanding
auditorium capacity. Metal Projekt used ProStructures to create the steel structure, as well
as the steel pipes, containers, and tanks, and the connections between
Mallikarjun Associates used STAAD.Pro for structural analysis and design, the steel components and the piping elements. The structural steel
shortening design time by at least one month and meeting the completion models helped the project team determine how to integrate the new
deadline ahead of exams. Construction was challenging, with work components with the existing plant components. The use of Power
scheduled around ongoing classes. The roof was erected first to place ProStructures improved multidiscipline collaboration, shortened detailed
girders for suspending the staircase. Staircase members were erected design time by 30 percent, and minimized clashes during construction.
manually using chain pulleys and a derrick. Optimal use of structural steel The use of 3D modeling also significantly reduced project costs.
reduced the overall project cost. Project Playbook: STAAD.Pro Project Playbook: ProSteel, ProStructures, Integrated Structural
Modeling, STAAD.Pro

72
Municipal Engineering Co., Ltd.,
of CREC Shanghai Group
Application of Bentley Technology to Yangjialing Bridge PT. Shinryo Indonesia
Project of Menghua Railway Aeon Mall - Jakarta Garden City
Sanmenxia, Henan, China Jakarta Utara, Jakarta, Indonesia

The CNY 153.2 million Yangjialing Bridge project is part of Menghua Aeon Mall Co., Ltd., developer of nearly 200 large-scale shopping centers
Railway’s 1,837-kilometer coal transport line from Mengxi to Central throughout Asia, opened Aeon Mall BSD City in 2015, becoming the first
China. In the mountainous terrain, the constrained construction site Japanese developer to operate a mall in Indonesia. Aeon Mall Jakarta
resulted in a difficult and changeable construction scheme. Municipal Garden City is now under construction in North Jakarta, with PT. Shinryo
Engineering Co., Ltd., a division of China Railway Engineering Corp. Indonesia responsible for mechanical design and construction of the
(CREC), was responsible for the bridge earthworks, pile foundation, high USD 46 million project. The mall will create a vibrant community around
pier, bridge, railway, and tunnel works. this shopping destination.

Implemented within the ProjectWise framework, Bentley’s BIM Shinryo used MicroStation in conjunction with Japanese modeling
technology was used to establish reality models of the construction site, software designed to run exclusively on the Bentley platform.
build a 3D structural model of the bridge, provide integrated construction MicroStation reduced design time by 10,000 resource hours, saving
management, and inform construction planning. The technology optimized approximately USD 150,000 in engineering design costs and producing
2017 INFRASTRUCTURE YEARBOOK

the construction scheme, saving CNY 2.3 million in material costs and CNY more accurate construction documents. The reduction in design time and
4 million in construction costs, and shortening the construction period precise documentation allowed the project to advance to the construction
by approximately three months. Project Playbook: ContextCapture, phase more quickly and run about two months ahead of schedule.
LumenRT, MicroStation, Navigator, ProjectWise, ProStructures Project Playbook: MicroStation, ProStructures, STAAD.Pro

73
BIM Advancements in CONSTRUCTION

PT. Taikisha Indonesia Engineering Simon India Ltd.


Yamaha Manufacturing Indonesia Caustic Soda Project - KLJQ
Bekasi, Jawa Barat, Indonesia Doha, Qatar

PT. Taikisha Indonesia Engineering provided mechanical design, Simon India Ltd. provided an end-to-end solution for the design and
construction, and painting services for the USD 20 million expansion construction of a 200 ton-per-day (TPD) caustic soda plant, owned and
of the Yamaha manufacturing facility in Bekasi City, West Java, operated by KLJ Organic in Doha, Qatar. The EPC contractor developed
Indonesia. The project team cut design time in half by using 3D modeling a design, incorporating process safety rules for operation in hazardous
technology, including MicroStation, MicroStation PowerDraft, and other situations, and planned for future expansion to 250 TPD. The design
software applications. produced 3D information models to aid in the plant construction
and operation.
MicroStation’s visualization capabilities produced high-quality imagery
that dramatically improved the workflow for renderings. The intelligent 3D The project team used Bentley’s AutoPLANT for 3D plant design,
models produced 2D drawings with more accurate, detailed information, Trimble’s Tekla software for multidiscipline collaboration, and Autodesk’s
eradicating the labor-intensive drawing production process. The improved Navisworks for project review. The interoperability among products
accuracy prevented work package delays and rework, eliminated resulted in the timely delivery of intelligent models for review by different
clashes in piping and structural systems, and enhanced procurement disciplines and stakeholders before delivery to the construction team.
and construction sequencing. Project Playbook: MicroStation, Using AutoPLANT required no special skills and saved 500 to 700 resource
MicroStation PowerDraft hours. Project Playbook: AutoPLANT

74
SK E&C SK E&C
Mobile 3D Model SK A Project
Jazan, Saudi Arabia Greater Ulsan Metropolitan Area, South Korea

SK E&C is a South Korean engineering and construction company SK Advanced, an affiliate and gas subsidiary of the SK group of companies
committed to developing cities and infrastructure. The company created that includes SK E&C, recently completed a factory to produce propane
the Mobile 3D Model as a solution for accessing 3D design data at dehydrogenation. SK E&C’s Plant Engineering Technical Support team and
construction sites where high-end workstations are impractical. The project coordinator developed a 3D model that integrated the 3D design
Mobile 3D Model improves communication and cooperation among model with construction information for use in a mobile environment
stakeholders at the worksite by instantly displaying a 3D view of on-site.
construction status.
The 3D construction model incorporated drawing and document
Using Bentley’s i-model Composer and i-model Transformer, SK E&C information, purchasing and materials information, installation and
converts 3D models from engineering design applications to the iModel process planning information, and construction planning information.
format. ProjectWise provides mobile access to project information, and Upon completion of construction, the digital plant model will be expanded
Navigator Mobile links the iModels to both the 3D design data and the to include maintenance. Bentley’s i-model Composer and i-model
2017 INFRASTRUCTURE YEARBOOK

on-site construction information. Because design errors are more easily Transformer were used to integrate the information. The utilization
detected in the visual format, construction rework has been reduced of Navigator Mobile to access the 3D models in the field improved
by 2 percent and mechanical work has been shortened by one month. communication and accuracy, reducing on-site costs by 10 percent.
Project Playbook: MicroStation, Navigator Mobile, ProjectWise Project Playbook: Navigator Mobile, ProjectWise

75
BIM Advancements in CONSTRUCTION

Taesung SNI Takahashi Architect


The Second Namhae Bridge-Suspension Bridge Model Twin Pointed Roof House
Namhae-gun, Gyeongsangnam-do, South Korea Dazaifu, Fukuoka Prefecture, Japan

The KRW 180 billion second Namhae Bridge connects Namhae Island Known for 3D BIM design innovation, Takahashi Architect was retained
with Hadong County in South Gyeongsang province in South Korea. Under by a private family to design and supervise construction of a custom home
construction by the EPC contractor GS Engineering & Construction, the in Dazaifu, Fukuoka Prefecture, Japan. Challenges included working with
single-span suspension bridge is 990 meters long, with an 890-meter a team separated by 1,500 kilometers—with the family in Kobe, the
main span supported by two pylons. The design features two A-shaped designer in Tokyo, and the builder in Fukuoka—and cutting the estimated
concrete towers that lean backwards at an 8-degree angle. cost from JPY 40 million to JPY 30 million.

Taesung SNI joined the team after construction began to provide The designer used Bentley Architecture to achieve the goals of high-quality
simulations for installation of the pylons and cabling. The 3D modeling design, shorter project duration, and reduced construction costs. Using
was used to visualize cable positioning and installation, and to 3D models to communicate design intentions, the designer aggregated
troubleshoot interferences for work performed 150 meters above ground. the content of all designs as 3D hypermodels, ensuring consistency
Each cable required a 10-stage construction sequence. MicroStation was and eliminating rework. Bentley software shortened the overall project
used to execute a 3D model for each stage, then convert the model to a from 18 to 15 months and reduced construction costs by 25 percent.
3D PDF. Without using MicroStation, Taesung SNI would not have been Project Playbook: Bentley Architecture
able to complete the project on time. Project Playbook: MicroStation

76
Volgogradnefteproekt, LLC
Construction Management of Conductor Supported
Platform on Filanovsky Field
Volgograd, Volgograd Oblast, Russia

Vladimir Filanovsky Field is an offshore field where more than 25 platforms


are planned for construction. Current development includes seven
platforms. Volgogradnefteproekt, LLC, is responsible for consolidating
all engineering information for the USD 9 million self-standing satellite
platform, scheduling building works, preparing assembly packages, and
submitting all documentation for construction management.

Volgogradnefteproekt provided a complex information model for use


from construction through the platform’s lifecycle. Built on Bentley
technology, the model provides quick access to project data from a single
data source. The solution will decrease LUKOIL’s construction expenses
by up to 30 percent. Project Playbook: AECOsim Building Designer,
2017 INFRASTRUCTURE YEARBOOK

AssetWise, Bentley Raceway and Cable Management, ConstructSim,


ConstructSim Planner, ConstructSim Work Package Server, MicroStation,
Navigator, OpenPlant, ProStructures

77

Bentley’s collaborative management platform provides a timely
and accurate information environment for China Construction
Sixth Engineering Division Corp, Ltd, and all project participants.


[The project team] realizes centralized storage and access,
thus shortening the project period.

– Weiguo Tian, Chief Engineer, China Construction Sixth


Engineering Division, Tianjin University of Technology

78
ENVIRONMENTAL
ENGINEERING
Projects in this category demonstrate excellence in sustaining our environment and advancing land
development projects through the innovative application of engineering or geospatial technology.

79
BIM Advancements in ENVIRONMENTAL ENGINEERING
W I N N E R

NJS Engineers India Pvt. Ltd.


JICA Assisted Ganga Action Plan II I Varanasi, Uttar Pradesh, India

On the west bank of India’s holiest river, the ancient city of Varanasi attracts thousands of pilgrims but is ill-equipped to treat their waste. The city collects
only 33 percent of sewage and discharges the remainder of the waste into the Ganges River and its tributary. Uttar Pradesh Jal Nigam retained NJS Engineers
India Pvt. Ltd. (NJSEI) for an INR 450 crore project aiming to achieve a 90 percent treatment rate prior to discharge.

NJSEI analyzed more than 800 kilometers of sewer network and recommended improvements with Bentley applications. The team prepared a web-based
GIS database, developed sewage zones, updated the sewerage network inventory, modeled existing and proposed sewerage systems, prepared system
rehabilitation and expansion plans, and proposed more efficient operating strategies. SewerGEMS helped the team save 100 resource hours and INR 18 crore
in project costs. Project Playbook: MicroStation, SewerGEMS, STAAD.Pro, Geo Web Publisher, AssetWise

80
F I N A L I S T F I N A L I S T

Stream Environment Pte. Ltd. (Stream)


Raymond Vogel Landschaften AG Automated Waste Collection System
New Landscape for the New Hydropower Plant in Hagneck for Changi Airport Terminal 4
Hagneck, Bern, Switzerland Singapore

Constructed 130 years ago, Hagneck channel detours Aare River into Lake The culmination of a major expansion project, Changi Airport Singapore
Biel in the Swiss canton of Bern. This historically significant and nationally Terminal 4 (T4) is expected to handle up to 16 million passengers per
important landscape is the setting for a hydropower plant, owned and year. Security concerns about manual refuse collection indicated the
operated by BKW Energie AG. The CHF 18 million project, carried out by need for a better waste collection solution. Stream Environment Pte Ltd
Raymond Vogel Landschaften AG, converted the landscape surrounding (Stream) designed, engineered, supplied, installed, and maintains a SGD
this infrastructure into a landscape park for recreation. 3.2 million automated waste collection system (AWCS) that conveys 6 to
8 tons of waste per day without on-site personnel.
The project focused on protection and preservation of natural
areas in sequence with the intensively used and maintained plant To deliver the AWCS on deadline, Stream adopted MicroStation and
environment. The project team modeled terrain, woods, and views Promis.e for 3D modeling, visualization, and electric engineering with
in and around the lake and used LumenRT to illustrate the terrestrial support from Bentley Channel Partner Hertford MES Sdn. Bhd. The
and aquatic requirements and planned plant growth. The landscape software enabled Stream to complete accurate schematics in less than
2017 INFRASTRUCTURE YEARBOOK

design created new watercourses that showcased lake vistas while three days, compared to 14 days using AutoCAD, and with one engineer
keeping the plant appearance low and compact within the landscape. as compared to three on comparable projects. Stream saved an estimated
Project Playbook: LumenRT SGD 100,000 using Bentley technology. Project Playbook: MicroStation,
Navigator, Promis.e

81
BIM Advancements in ENVIRONMENTAL ENGINEERING

A14 Integrated Delivery Team Arup


A14 Huntingdon to Cambridge Improvement Scheme Sector C-14
Cambridge, Cambridgeshire, United Kingdom Málaga, Spain

The A14 Integrated Delivery Team (IDT) is a joint venture of Highways Sector C-14 is a EUR 2 million development to be constructed in the
England and six major contractors—Costain, Balfour Beatty, Carillion, province of Málaga, Spain. Forty-four isolated residences will be built,
Atkins, Skanska, and CH2M—contracted to deliver the GBP 1.8 billion each on an average plot of 1,630 square meters. The community will span
A14 Huntingdon to Cambridge Improvement Scheme. The project includes 8.3 hectares of mountainous land with steep slopes, deep valleys, and
widening seven miles of the A14 in each direction, a major new bypass looping roads. Arup designed the urbanization works for Sector C-14,
south of Huntingdon, widening a three-mile section of the A1, and including civil works and roads, land movement and drainage, and all
demolishing a viaduct at Huntingdon. service networks.

A14 IDT used SITEOPS to create conceptual site designs, and quickly PowerCivil modeled the earthmoving and coordinated the design of
and easily deliver drawings and revisions. The software helped assess water, sewerage, drainage, electricity, lighting, and communications.
design options, explore layouts, calculate earthworks, and analyze Arup performed extensive geometric and analytical modeling to study
costs, all within a short time. These advancements enabled the team to the options for balanced excavation. Bentley’s interoperable software
develop the most efficient design within the allotted space, including reduced earthmoving analysis time by 40 percent and network
provisions for environmental protection such as 18 wildlife areas. modeling time by 50 percent. The coordinated design limited collisions
Project Playbook: SITEOPS between service networks, which reduced construction time by
15 percent. Project Playbook: MicroStation, OpenRoads, PowerCivil,
SewerCAD, WaterCAD

82
Daniel Winther Checchia
City of Montreal Proposed Case Study of BIM Application in Safety
Rio Tinto Alcan Planetarium of Montreal Engineering for Heliports
Montreal, Quebec, Canada São Paulo, Brazil

Montreal’s CAD 48 million Rio Tinto Alcan Planetarium completes In the complex environment of heliport design and construction, there
the Space for Life nature and science complex, which includes the are numerous technical, safety, occupational, and management factors
Biodôme, Botanical Garden, and Insectarium. Featuring an exhibition to consider when managing risk. For this BRL 50,000 study, electrical
hall, auditorium, and two dome theatres, the 8,000-square-meter engineer Daniel Winther Checchia used BIM technology to create and
building earned LEED Platinum certification by following strict modify a modeling environment that allowed for the individual analysis of
sustainable development criteria. The City of Montreal incorporated the various phases of an engineering project.
planetarium in the cadastre of Quebec with 3D models created before and
after construction. Checchia applied specialist knowledge of safety engineering in the
workplace to define best practices in the implementation of a new
The survey team developed a site survey that recorded project boundaries heliport project, with a focus on preventive and corrective maintenance.
and delineated constraints posed by existing installations before BIM applications provided the tools to model that environment and
construction using 3D surveying technology and Power InRoads. An as- analyze every aspect, from project launch through closure, to assess and
2017 INFRASTRUCTURE YEARBOOK

built construction model was erected upon completion. MicroStation, reduce risk. This research was part of post-graduate study in health and
Descartes, and Leica Cloudworx processed the point-cloud data and safety engineering. Project Playbook: Bentley Instrumentation and
created an accurate, highly detailed 3D model with 2D notated plans. Wiring, Bentley Raceway and Cable Management, Bentley Substation,
Bentley technology increased the team’s productivity by 10 percent. MicroStation, MicroStation PowerDraft
Project Playbook: Descartes, MicroStation, Power InRoads

83
BIM Advancements in ENVIRONMENTAL ENGINEERING

M. K. Soil Testing Laboratory


Henan Province Water Conservancy
Geotechnical Investigation of Railway Track for Dedicated
Survey and Design Research Co., Ltd. Freight Corridor Corporation of India
Water Management Project of South to North Water Diversion Ahmedabad, Mehsana, Palanpur, Siddhpur,
Shijiazhuang, Hebei, China and Balaram, Gujarat, India

Henan Province Water Conservancy Survey and Design Research is Under the administration of the Ministry of Railways, Dedicated Freight
examining the water dispatching plan and creating a management design Corridor Corporation of India Ltd. (DFCCIL) is a government enterprise
of a retreatment river course for the South to North Water Diversion committed to constructing dedicated freight corridors across the country.
Project, a large-scale water diversion venture that will channel fresh DFCCIL retained M.K. Soil Testing Laboratory to complete geotechnical
water from southern China to the north, easing a water shortage. Based investigations associated with an expansion project parallel to existing
on analyses, the project team is selecting the best retreat dispatch mode tracks in Ahmedabad, Mehsana, Palanpur, Siddhpur, and Balaram.
and river management program to guarantee flood control safety of the
downstream river after the retreat of the main channel. The project team carried out the soil investigations, developed cross
sections and grain size distribution curves, and graphed shear values
The team used ContextCapture to create a reality model that accurately with gINT. Project locations were found quickly by connecting gINT
reflected the existing environment and a hydrodynamic model was to Google Earth. Reports took 40 to 50 percent less time to generate
constructed based on that reality model. The two models were then using Bentley software. The investigation results will contribute
combined to analyze the current situation, flooding process, and flooding to railway expansion and heavy traffic mitigation on existing lines.
impact. Design accuracy helped the program quickly pass review, saving Project Playbook: gINT
construction costs, and the eradication of outdoor survey inputs shortened
a planned two-month design cycle to one month. Project Playbook:
AECOsim Building Designer, LumenRT, ContextCapture, MicroStation,
OpenRoads, ProjectWise, SITEOPS
84
ReNew Power
Neutral Design Co., Ltd. PV Mounting Structure to Cover Carports at Delhi
Seismic Diagnosis and Reinforced Design Metro Stations
Saitama Prefecture, Japan New Delhi, Delhi, India

Neutral Design provided the third-party verification of a completed plant’s A solar power project that will generate clean energy and reduce carbon
structural safety prior to it commencing operations. Located in Saitama emissions transpired because of a power purchase agreement between
Prefecture in the Kanto region of Honshu Island, the local government ReNew Power and Dehli Metro Rail Corporation (DMRC). The idea was
owns the environmental plant. The scope of work for this JPY 300 to mount photovoltaic (PV) modules on top of carports at DMRC metro
million project included design of the steel structure reinforcements stations. Designed and installed by ReNew Power, the project cost INR
and verifying the safety of the temporary construction work involving 10 million per megawatt of electricity generated.
reinforced concrete.
The PV module design met three requirements: withstand wind speeds
STAAD.Pro enabled the project team to run numerous simulations until of up to 170 kilometers per hour, resist forces within the seismic zone,
the optimal reinforcement method was found. This capability significantly and utilize the space covering metro station carports. STAAD.Pro helped
reduced the volume of steel used. The project team also considered the the team develop an efficient, cost-effective design, and calculations took
workability of the solution and selected a reinforcement method that less time than if they were conducted manually. The PV module mounting
2017 INFRASTRUCTURE YEARBOOK

featured advanced industrial design. Using Bentley software shortened structure served the dual purpose of shielding cars from the sun’s rays and
design time by 50 percent and reduced reinforcement costs by 80 percent. producing clean energy. Project Playbook: STAAD.Pro
Project Playbook: STAAD.Pro

85
BIM Advancements in ENVIRONMENTAL ENGINEERING


LumenRT is brilliant for showing terrestrial and
aquatic requirements. It is perfect for controlling


the design and influencing of the buildings in the
landscape and nature. It is fast and easy to use.

– Raymond Vogel, CEO, Raymond Vogel


Landschaften AG

Ultragaz S.A.
Ultragaz Extrafarma Sustainable Resale
Fortaleza, Ceará, Brazil

Part of the Grupo Ultra conglomerate, Ultragaz bottles, stores, and


distributes 1.7 tons of liquefied petroleum gas (LPG) each year. To make
operations more sustainable, Ultragaz launched the Sustainable Resale
project to accommodate two Grupo Ultra businesses in one installation:
the Extrafarma pharmacy and Ultragaz LPG distribution point. Meeting
the different needs of a pharmacy and a gas distribution point in one
construction project posed engineering and architectural challenges.

The BRL 1 million project took just four months to complete with a lean
project team using MicroStation. From 2D floor plans to sustainable
construction materials, MicroStation enabled Ultragaz to fully develop
the project in-house. The 3D modeling visualizations expedited
management approvals. MicroStation also helped organize contract
notices and set budget milestones. In-house development reduced
project costs by 30 percent, with design completed in one month.
Project Playbook: MicroStation

86
MANUFACTURING
This award category acknowledges projects that demonstrate excellence in the planning, engineering
(especially structural integrity analysis), and/or construction of any factory or manufacturing facility, including
onshore and offshore oil and gas production facilities, petrochemical and chemical plants, continuous metals
processing, food and pharmaceutical production, automotive, CPG, semi-conductors, hi-tech, batch food and
pharmaceutical plants, and equipment manufacture, or demonstrate the industrial fabrication of large-scale
building or other infrastructure components.

87
BIM Advancements in MANUFACTURING
W I N N E R

SATRIA Technologies Sdn. Bhd.


Sustainable Solutions for Control and Protection Systems I Klang, Selangor, Malaysia

Tenaga Nasional Berhad (TNB), the largest electricity utility in Malaysia, contracted SATRIA Technologies Sdn. Bhd. (SATRIA) to design and supply
33-kilovolt/11-kilovolt control relay panels for a new substation in Pandamaran, a constituent of the Klang district in the state of Selangor. This MYR 500,000
project required six different types of panels and a total of 19 units.

SATRIA previously standardized the design process with Promis.e and tailored projects to TNB requirements. For this project, TNB required
drawings within 20 days, rather than the usual month. With intelligent functions already in place, SATRIA submitted drawings that were on
time and compliant with TNB standards. Automated cross-referencing for installation and maintenance took seconds instead of days. Schematic
drawings for each panel took one day instead of two. Estimated to take 40 days, the work was reduced to 20 days, saving an estimated RM 20,000.
Project Playbook: MicroStation, Navigator, Promis.e

88
F I N A L I S T F I N A L I S T

CPC Corporation, Taiwan PJSC Giprotyumenneftegaz


Talin No.12 Topping Unit Project Central Production Facility, Novoportovskoye Field
Kaohsiung, Taiwan Tyumen Region, Yamal-Nenets Autonomous District, Russia

To replace the 40-year-old, obsolete, nine-unit crude oil topping plant, PJSC Giprotyumenneftegaz initiated an integrated development
CPC Corporation is planning to build a USD 640 million 12-unit topping approach for the design and construction of the Central Production
plant at its Talin Refinery in Kaohsiung, Taiwan. The new topping unit Facility (CPF) at Novoportovskoye Field to treat and subsequently
will have the capacity to treat 150,000 barrels per stream day (BPSD) of transport oil to the delivery and acceptance point. A complex facility,
crude oil, 50,000 BPSD of condensate oil. It is expected to enhance energy the project required numerous design and engineering disciplines, and
efficiency, reduce operation costs and hazardous emissions, and improve included an estimated 65,000 files, exceeding 110 gigabytes in size. The
company competitiveness and profitability. objective was to produce high-quality design documentation and shorten
design execution with 3D modeling and use the information model
The project team used OpenPlant for 3D modeling and design, and throughout the construction phase.
ProjectWise as the collaborative platform for information sharing,
data storage, and configuration and project management throughout The team used Bentley applications to produce a digital terrain model
handover and lifecycle operations and maintenance. ProjectWise and 3D information model for use at the construction site. Bentley’s BIM
2017 INFRASTRUCTURE YEARBOOK

allowed the team to manage over 9,000 transmittals and 20,000 technology accelerated information exchange and automated otherwise
technical documents in a single, secure repository. Bentley’s integrated manual processes to reduce errors and design time by 1.5 times for a
technology reduced document review time by 30 percent and search 15-20 percent reduction in design costs. Bentley applications helped
time by 40 percent, shortening data handover from months to weeks. optimize material use, reducing metal consumption of structural units
Project Playbook: OpenPlant, ProjectWise by 20 percent. Project Playbook: AutoPIPE, Descartes, MicroStation,
Navigator, OpenPlant, Pointools, Promis.e, ProSteel
89
BIM Advancements in MANUFACTURING

Arush Gas Technology Services LLP Burken Ltd.


HFO Mundra Bunkering System 3D Inventory (UFA AG)
Mundra, Gujarat, India Herzogenbuchsee, Bern, Switzerland

As part of the development of a USD 4 million bunker facility in Mundra, UFA AG requested up-to-date as-built documentation for its 25,000-square-
Gujarat, India, Arush Gas Technology Services provided process design meter milling complex in Herzogenbuchsee, Bern, Switzerland to provide
and detailed engineering for the HFO Mundra Bunkering System a clear inventory of the interior and exterior facilities. The site consisted of
comprising storage tanks, screw pumps, and two 16-inch-diameter, three main buildings and the surrounding area with ancillary buildings,
4.4-kilometer-long pipelines. The system required detailed modeling and a railway loading station. Burken Ltd. had two days to survey the site
and surge analysis to ensure integrity, as the pipelines were long and and 15 days to create a detailed 3D model.
carried highly viscous fuel oils. The proposed design ensures flexibility for
independent and simultaneous bunkering to all berths. Burken processed point cloud data in AECOsim Building Designer,
which provided engineers with the versatility to model architectural,
The project team configured HAMMER according to project specifications mechanical, and structural features, as well as to provide an expansive
and carried out modeling and analysis of pipelines, optimizing optioneering component library. The software also offered freely shaped solids
and efficiently testing various scenarios to avoid any pipeline surge to model irregular elements. The information-rich 3D model was
issues. Using Bentley HAMMER saved significant time during the analysis easily converted to an ARCHICAD file for architectural purposes.
and delivered accurate results. The software enhanced engineering by Using the 3D BIM approach, Burken delivered the complete as-built
using less resources, allowing the team to control project delivery costs. documentation to support further MEP design, which the customer’s
Ultimately, the solution enabled the team to maintain safety of the design team managed to finish in three days, a significant savings over
pipelines and the pumps.Project Playbook: AutoPIPE, HAMMER the three weeks it would have taken using the traditional 2D approach.
Project Playbook: AECOsim Building Designer
90
T.T.U. Urbanowicz Sp. z o.o. Plast Instal SKB Sp. z o.o.
Project Installation of Atmospheric Distillation in Group Lotos Installation of Flue Gas Desulfurization in Power Plant
Gdansk, Poland Police, Poland

This EUR 3 million infrastructure modernization project for installing The flue gas desulfurization installation is part of a EUR 100 million
atmospheric distillation in Gdánsk, Poland involved designing 15 new investment to build a new absorber, drainage building, and technological
pipelines, modifying 25 existing ones, and upgrading the atmospheric pressure vessels at a power plant in Police, Poland. Plast Instal SKB
distillation column. The team created a 3D model of the current installation (SKB) was responsible for modeling the pipeline routes, equipment, and
and added the planned modifications, including core pipelines, structures, control instrumentation, generating isometric drawings, and adapting
and equipment to enable full visualization of the modernized installation. the corresponding steel structure supports to deliver a solution to the
investor. Given the complexity of the design, the pipeline routes required
Using OpenPlant, ProSteel, and AutoPIPE, the project team modeled continuous revision and adjustment to the structure.
each of the existing and new elements, conducted structural and stress
analyses of piping and equipment, and assembled a final model of the SKB adopted a collaborative design approach with Bentley applications.
installation that was remotely accessible by all engineers. The use Working in a 3D modeling environment accelerated installation,
of iModels facilitated information exchange among stakeholders and eliminating potential conflicts and collisions of pipelines and equipment.
2017 INFRASTRUCTURE YEARBOOK

efficiently prepared visualizations. Bentley technology allowed the team Using iModels for presentations facilitated information exchange among
to accurately render the status of existing objects and easily incorporate stakeholders and improved decision making during the design stage.
changes within the model. The software capabilities also eliminated the Bentley technology enabled SKB to complete the project within three
need to perform time-consuming and problematic field measurements, months, with a 60 percent ROI. Project Playbook: AutoPIPE Advanced,
saving significant time and project costs. Project Playbook: AutoPIPE MicroStation, and OpenPlant
Advanced, MicroStation, OpenPlant, ProSteel
91
BIM Advancements in MANUFACTURING

Changsha Design and Research Institute


of Nonferrous Metallurgy Co., Ltd.
100kt/a Electrolytic Zinc Smelting Project of Huixin Citec Engineering India, Pvt. Ltd.
Lead-Zinc Smelting Co., Ltd. of Huili County of Sichuan Refinery Project
Huili, Sichuan, China India

As part of its strategy to create a coordinated industrial chain of mining, Citec Engineering was retained to provide detailed engineering services
beneficiation, and metallurgy, Sichuan Huili Lead-zinc Limited Liability related to the acid gas removal and sulfur recovery units for a refinery in
Company is building a CNY 1.3 billion electrolytic zinc smelting production India. The scope of the project included analysis and design of tall steel
facility in Huili, Sichuan, China. Changsha Design and Research Institute and concrete structures at the plant, which is located in a seismic zone
implemented a collaborative 3D modeling approach to efficiently design subject to high winds. Citec needed to perform seismic and dynamic
the plant and optimize subsequent construction work. The completed analysis of the structures on a tight schedule to ensure structural integrity
project will involve world-class technology for environmental protection, amid the environmental challenges.
energy conservation, and efficient resource utilization.
The project team used STAAD.Pro for finite element analysis and to
The project team used Bentley applications for coordinated modeling determine the forces in order to design the superstructure and the
among the multiple design disciplines to identify errors and collisions, equipment foundations. Using Bentley software reduced computational
enhance information sharing, and ensure design accuracy. The 3D time and optimized material resources, saving costs and resulting in
design approach eliminated rework and reduced project delivery time timely project delivery. STAAD.Pro capabilities enabled the team to
by two months. More than 7,600 collisions were identified during the minimize errors, ensuring structural integrity in compliance with country
design phase, which minimized on-site problems, shortened installation codes. Project Playbook: STAAD.Pro
time by 20 days, and reduced construction costs by CNY 5 million.
Project Playbook: AECOsim Building Designer, MicroStation, Navigator,
OpenPlant, ProjectWise
92
CS Softdesk DI Soyuzhimpromproekt FSBEI HPE KSTU
Natural Gas Compressor Station at PGNiG Gas Field Zuchlów Isoprene Production
Stara Góra, Poland Nizhnekamsk, Republic of Tatarstan, Russia

In operation for more than 35 years, Zuchlów natural gas field is the To increase the production of isoprene, the raw material used to produce
largest deposit in the Gora Mining Center. Over its life, the compressor synthetic rubber, a RUB 15 billion project was initiated at the Isoprene
station has had many retrofits, repairs, and additional installations. After Monomer Plant in Nizhnekamsk, Tatarstan, Russia, for the construction of
a recent project, damaging vibration was occurring, and CS Softdesk was new process units. DI Soyuzhimpromproekt created a 3D model of the two
tasked with determining the cause and designing a solution to eliminate process units, which is expected to increase production by 300,000 tons
problems to ensure cost-effective operation. To accomplish this task, the per year, ultimately enabling the growth of PJSC Nizhnekamskneftekhim’s
team performed pulsation simulation and conducted static and dynamic production of rubber to one million tons annually by 2020.
analyses on a 3D model of the complete installation.
Using Bentley applications, the company designed pipelines, cable
The 3D model of the installation was created using AutoPLANT and was routes, equipment, and building structures, and combined the models
imported into AutoPIPE for CS Softdesk to perform the research and into a single 3D information model accessible to the project team and
iterative analysis. CS Softdesk produced visual results of their analyses stakeholders via ProjectWise. The team used Navigator for conflict
2017 INFRASTRUCTURE YEARBOOK

using Bentley software to show investors where the pulsations generated management and clash detection, improving decision making and
and how the newly designed solution diminished the vibrations. Bentley’s avoiding rework. Bentley applications saved 13,000 design hours,
interoperable technology streamlined workflows and automated tasks improved productivity by 10 percent, and reduced costs by RUB 15
to save an estimated 50 percent in time compared to using other million. Project Playbook: AutoPIPE, Bentley Raceway and Cable
software. Project Playbook: AutoPIPE, AutoPLANT, MicroStation, Management, MicroStation, Navigator, OpenPlant, ProjectWise,
Navigator, ProSteel Promis.e, ProStructures
93
BIM Advancements in MANUFACTURING

DI Soyuzhimpromproekt FSBEI HPE KSTU


Water Block No. 3 with Cooling Towers BMG-2000 Etpro Sumit Designs Co., Ltd.
at OJSC TANECO Wellgrow Plant
Nizhnekamsk, Republic of Tatarstan, Russia Chachongsao Province, Thailand

For this RUB 1 billion design project, Soyuzhimpromproekt Design Institute Delta Electronics (Thailand) Public Company Ltd. (DET), a leading
(SDI) was responsible for delivering technology, electro-technology, producer of power supplies and electronic components, retained
construction, and plumbing design documentation for Water Block No. Etpro Sumit Designs Co., Ltd. to renovate and expand a factory in
3 in the JSC Taneco oil refinery and petrochemical plant in Nizhnekamsk, Chachongsao Province, Thailand. The THB 750 million project was
Russia. The facility is the most advanced technical water supply complex completed on a tight schedule with support from Bentley Channel Partner,
in Russia’s industrial enterprises, designed to operate efficiently by being REI Software Co., Ltd.
fully automated and using energy-saving equipment.
A 3D BIM approach communicated the cost-efficient design intent to
Facing the challenge of producing all project documentation in eight all parties. The project team used the RAM and STAAD capabilities to
months, SDI implemented a coordinated modeling approach to incorporate visualize the design concept for DET, quickly generate plans for permitting,
pipelines, building structures, cable routes, and electrical equipment into and produce all technical drawings for construction. Bentley applications
a single comprehensive 3D model using OpenPlant, ProSteel, Bentley provided local steel section libraries, choice of design codes, and low-cost
Raceway and Cable Management, and Promis.e. Bentley software material options. Accurate quantity take-offs minimized waste, and error-
automated workflows and accelerated the design process, enabling the free documents saved time and reduced costs by more than 10 percent.
team to deliver design documentation three months ahead of schedule and Project Playbook: RAM Connection, RAM Structural System, STAAD.Pro,
complete the project in just five months. Project Playbook: AutoPIPE, STAAD Foundation, Sectionwizard
Bentley Raceway and Cable Management, OpenPlant, ProjectWise,
Promis.e, ProSteel
94
EZ Structure Consulting Engineers GEA Equipamentos e Soluções LTDA
Colourtex Plant Building Coffee Extract Concentration Plant
Vilayat, Gujarat, India Cornélio Procópio, Paraná, Brazil

The Colourtex dye manufacturing plant in Vilayat, Gujarat, India contains To meet the growing demand for coffee production, GEA Equipamentos
pressurized reactors that require blast-resistant walls, which protect the e Soluções (GEA) designed, constructed, and commissioned a coffee
rest of the plant and area communities from life-threatening impact in concentration plant in Paraná, Brazil with an evaporator installed in the
the event of failure. EZ Structure Consulting Engineers was retained to drying system to double the client’s production. The BRL 12 million plant
perform design and analysis to ensure structural integrity of the walls needed to be designed to occupy a small physical space, be simple to
around the reactors. install and operate, and be fully compliant with technical, health, and
safety requirements.
The organization used STAAD.Pro to study structural behavior under
various scenarios where multiple reactors could fail under the worst GEA used OpenPlant to design the plant’s piping and extract isometrics,
loading conditions. Using the software reduced design time and project Navigator to identify clashes and minimize errors during construction, and
costs by 50 percent and enabled the team to meet project deliverables 20 MicroStation to streamline project processes. The team used ProjectWise
days ahead of schedule. Project Playbook: STAAD.Pro and iModels to securely manage and share information among the
2017 INFRASTRUCTURE YEARBOOK

multiple design disciplines and with the client. Using Bentley applications
to reuse and expand its catalog of custom components prevented errors
and waste in materials purchasing. The team completed the project
in 35 days with an expected ROI to be realized within 23 months.
Project Playbook: MicroStation, Navigator, OpenPlant, ProjectWise

95
BIM Advancements in MANUFACTURING

GEA Equipamentos e Soluções S.A. Hyundai Engineering


Centrifugal Recovery of Beer RPLC Deep Conversion Project
Lages, Santa Catarina, Brazil Puerto la Cruz, Venezuela

To optimize operations, reduce disposal costs, and improve profits at a As part of the USD 3 billion project to expand the existing 200,000 barrels-
brewery located in Lages, Santa Catarina, Brazil GEA Equipamentos e per-day oil refinery in Puerto la Cruz, Venezuela, Hyundai Engineering
Soluções (GEA) was contracted to design an expansion to the brewery’s formed a consortium responsible for all tasks related to engineering,
existing yeast disposal plant that would minimize waste disposal of procurement, and construction. The newly designed facility is expected to
yeast. GEA determined that using a centrifugal process was the optimal increase oil barrel production by 60 percent.
solution, expected to reduce yeast disposal by 55 percent.
The team used STAAD.Pro and RAM to perform material analysis and
The team used OpenPlant and MicroStation to produce detailed meet the client’s design criteria. The design compatibility between the
floor plans and isometrics, and configure piping and equipment in technology facilitated efficient design processes, saving 25 resource
accordance with the current plant layout. Navigator helped the project hours per connection compared to manual design and calculation
team identify potential clashes during the design stage. ProjectWise methods. The team used Bentley’s integrated structural modeling
streamlined workflows among the multiple design disciplines, and software and iModels as containers to share infrastructure data
optimized communication with the client. Using Bentley’s interoperable between the consortium and engineers, streamlining workflows and
applications reduced design production time by 20 percent, delivery allowing for quick error resolution. Bentley’s 3D modeling and structural
time by 10 percent, and optimized material extractions to reduce analysis technology reduced modeling time required for production
surplus purchases and save costs. Project Playbook: MicroStation, drawings and helped the team maintain the project completion schedule.
Navigator, OpenPlant, ProjectWise Project Playbook: Navigator, RAM, and STAAD.Pro

96
Ichemad-Profarb Korea Heat Exchanger
Water-based Paints Production Line Al-Zour New Refinery
Bócsa, Hungary Kuwait

Ichemad-Profarb was contracted to provide a complete turnkey solution For this USD 6 million cooling tower plant design and construction project,
for expanding a paint manufacturing plant in Bócsa, Hungary. The Korea Heat Exchanger performed structural analysis and design of 105
completed installation will increase paint production capacity by 7,000 bay air coolers for Al-Zour New Refinery. The project required Korea
liters-per-hour. Heat Exchanger to meet the client’s design specifications and deliver the
coolers within a tight timeframe.
The multi-discipline project team used OpenPlant for coordinated
modeling, design, and the generation of isometric drawings for each The company used STAAD.Pro and RAM to optimize design on a limited
pipeline to deliver fully prefabricated pipe segments, significantly reducing budget and meet the delivery date. Using Bentley’s integrated technology
assembly time. Bentley software streamlined workflows, minimizing minimized construction costs, reduced design data loss, and accelerated
collisions and enabling efficient installation. Compared to traditional information exchange to shorten the design period and construction time.
design methods, OpenPlant optimized material resources and saved an Project Playbook: RAM, STAAD.Pro
estimated 40 percent in design time, equivalent to approximately EUR
2017 INFRASTRUCTURE YEARBOOK

90,000. Project Playbook: OpenPlant

97
BIM Advancements in MANUFACTURING

LLC TyumenNllginprogaz
Lineacurva Addition of the Second Experimental Section of Achimov
Keydi Lamps Deposits of the Urengoy Oil and Gas Field for Full Development
Casale Monferrato, Italy Urengoy, Yamalo-Nenets Autonomous Okrug, Russia

Keydi lamps are a new concept in lamps where shadows are combined The Urengoy gas field in Yamalo-Nenet Autonomous Okrug, Russia has
with the most advanced LED technology. The lamps resemble a blank the third-largest gas reserves in the world, exceeding 10 trillion cubic
painting canvas when in the “off” mode and are available in three sizes, meters, with the Achimov deposits representing the most extensively
depending on the user’s lighting needs. Italian architectural design studio developed area of the gas field. USD 10 billion has been invested in the
Lineacurva was responsible for design of the eco-sustainable lamps, Achimov deposits, and LLC TyumenNllginprogaz designed the second,
as well as the packaging for and distribution to both residential and fourth, and fifth sections of the deposits.
business markets. To meet the needs of the two different retail channels,
Lineacurva analyzed numerous alternatives to determine the optimal The project team used MicroStation as the platform for coordinated
design and packaging. modeling among all engineering disciplines to improve productivity, and
ProjectWise as the single source of reliable information to manage, share,
The studio used MicroStation to create the initial concept as a 3D model. and store data. Integrating the automated capabilities of Promis.e reduced
Using the precise modeling and visualization capabilities of the software design errors and accelerated document generation, enabling the team to
enabled the project team to deliver the initial prototypes immediately save 30 percent of design time and complete the project several months
following the design phase. The interoperability of MicroStation improved ahead of schedule. Project Playbook: Bentley Map, MicroStation,
information mobility and stakeholder collaboration. With real-time design OpenPlant, ProjectWise, Promis.e
verification, MicroStation facilitated design efficiency and accelerated
project delivery. Project Playbook: MicroStation

98
OOO Oglaend System
MCC Capital Engineering & Research
Creating Multi-discipline Support Systems and Cable Support
Incorporation Limited Systems to Implement Design Solutions in the Development
Newly Built Ardakan Electric Furnace of Vladimir Filanovsky Field
Ardakan, Iran Caspian Sea, Astrakhan Region, Russia

To build this EUR 131.8 billion billet electric furnace steel making plant The Vladimir Filanovsky Field, one of the largest offshore oil fields
in Iran, MCC Capital Engineering (MCC) implemented China’s innovative located on the Russian shelf of the Caspian Sea in Astrakhan, Russia is
standardized approach to metals processing. The project involved 10 in its second stage of development, with new facilities currently being
design standards requiring numerous engineering specialties, many designed and constructed. OOO Oglaend System (OOO) is developing
complex pipeline systems, and different equipment materials resulting technical solutions and creating support systems for the cables and
in an enormous volume of design data. MCC used a collaborative utilities to support these new facilities, facilitating collaborative, multi-
BIM approach to deliver the project, which has greatly impacted discipline design and engineering among the project team.
Iran’s metallurgical industry, promoting economic development and
infrastructure construction. Faced with a high concentration of utilities, electrical calculations, and
numerous engineering divisions on the project, OOO relied on Bentley
MCC used OpenPlant to design the piping layout, Navigator for collision Raceway and Cable Management for 3D modeling. Using the software
detection, and ProjectWise to enable the multiple disciplines to share to reduce the manual labor associated with routing cables, calculating
2017 INFRASTRUCTURE YEARBOOK

data in real time. Bentley’s BIM technology increased design efficiency lengths, and generating 2D drawings, specifications, and cable lists, OOO
by 10 percent and identified more than 400 collisions during the design increased design speed. The software enabled the team to track and
phase, resulting in zero collisions on the construction site. The team monitor clashes, facilitated collaboration among electrical engineering,
estimates they saved 2 percent of project costs. Project Playbook: architecture, and construction, and process units, and improved the
AECOsim Building Designer, Navigator, OpenPlant, ProjectWise quality of technical support. Project Playbook: Bentley Raceway and
Cable Management
99
BIM Advancements in MANUFACTURING

Reliance Engineering Group RISE Structural Design, Inc.


DTA HNUU Platform Revamp Piping Stress Analysis at Methanol Production Plant
Jamnagar, Gujurat, India Japan

To improve the effectiveness of existing reactors at its domestic tariff RISE Structural Design (RISE) was tasked with performing pipe stress
area (DTA) refinery in Jamnagar, Gujurat, India, Reliance Industries is analysis around the furnace at a methanol plant in Japan. During these
revamping its platform unit. Reliance Engineering Group is responsible for analyses, the division of labor relating to piping, furnace, and equipment
detailed design and engineering of the heat exchangers. It has the goal often leads to delays and increased design costs that can affect the
of improving design and vendor document review quality, complying with overall project schedule.
QMS procedures, improving customer satisfaction, and securing on-time
project completion. RISE eliminated barriers between design departments by integrating
the piping and structural models, streamlining highly accurate analyses
The project team used Bentley applications to produce quality deliverables to ensure design integrity while reducing design time and costs. The
on a tight timeline. Using AutoPIPE Vessel enabled error-free, cost- organization used AutoPIPE and STAAD.Pro to integrate the individual
efficient design, and is estimated to have saved 250 resource hours. models from the different disciplines in a short amount of time,
ProjectWise streamlined information sharing, contributing to a shortened linking individual piping and structural models to perform coupling
delivery time. Project Playbook: AutoPIPE Vessel, MicroStation, analyses. These capabilities improved efficiencies in design workflow
STAAD.Pro, ProjectWise and analysis, resulting in a substantial reduction in project costs.
Project Playbook: AutoPIPE Advanced, STAAD.Pro

100
Tamco Switchgear (Malaysia) Sdn. Bhd.
Simon India Ltd. Integrated Systems of a Switchgear with Control
50,000 MTPY Caprolactam Quality Project Relay Panel System
Vadodara, Gujarat, India Al Ahmadi, Kuwait

To expand production of high quality caprolactam at its plant in Vadodara, Tamco Switchgear was tasked with the design, engineering, procurement,
Gujarat, India, GSFC retained Simon India Ltd. to perform detailed design and installation of an 11 kilovolt HV switchboard, remote control panels,
and engineering services through to commissioning of a new caprolactam and other associated equipment as part of Kuwait Oil Company’s strategy
distillation facility. The newly proposed facility is expected to reach a to increase sustainable oil production at the North Kuwait oil fields in
production capacity of 50,000 metric tons per year. Al Ahmadi, Kuwait. The project required that all equipment at various
locations be integrated into one model to overcome the challenges
The project team used AutoPLANT to model piping and equipment, of manually designing schematics, cross-referencing components,
AutoPIPE to conduct pipe stress analysis, and STAAD.Pro to undergo generating reports, and checking design errors.
structural analysis. The interoperability of Bentley software allowed
for seamless integration with other software packages, eliminating the The project team used Bentley applications as the intelligent, integrated
need to invest in new technology. Using Bentley’s 3D design and analysis design solution. Promis.e enabled cross-referencing functions and
applications reduced project costs and enabled the team to complete the associated diagrams to be completed within two hours, compared to
2017 INFRASTRUCTURE YEARBOOK

project on time. Project Playbook: AutoPIPE, AutoPLANT, STAAD.Pro two weeks using manual methods. The collaborative and automated
capabilities of Bentley software improved data sharing and design
precision, which reduced design production time by 50 percent,
while accelerating project deliverables with 99 percent accuracy.
Project Playbook: MicroStation, Navigator, Promis.e

101
BIM Advancements in MANUFACTURING

Toyo Engineering India Pvt. Ltd. Tractebel Engineering Pvt. Ltd.


Global Petrochemical Ethylene Complex Chittaurgarh Cement Plant - Rajasthan
Malaysia Chittaurgarh, Rajasthan, India

Global Petrochemical contracted Toyo Engineering to design, build, and Lafarge Cement retained Tractebel Engineering to design a
commission a large-scale ethylene plant in Malaysia. The large-scale 200-millimeter-long, 27-meter-high curved steel truss structure for coal
project required detailed engineering across multiple global locations and storage in Rajasthan, India where extreme temperature variations and
strict quality compliance with local codes on a tight timeline. intense winds presented structural design challenges. To simulate the
steel structure with its curved profile under such harsh climate conditions,
The company used STAAD.Pro and STAAD Advanced Concrete to coordinate Tractebel Engineering relied on comprehensive structural design and
among the geographically dispersed engineering team and deliver detailed, analysis software.
uniform designs, drawings, and reports in compliance with all design
codes. The software enabled the team to design and check more than Using STAAD.Pro, the project team modeled, analyzed, and
700 load combinations. Bentley’s integrated modeling software improved simulated the entire structure under extreme loading parameters,
design efficiency and accelerated workflow by 30 percent, resulting in the and seamlessly communicated results to the client with ProjectWise.
completion of conceptual design and detailed engineering in 18 months STAAD.Pro optimized structural design, which reduced materials,
and early approval by the client. Project Playbook: MicroStation, STAAD costs, and time. Bentley software facilitated accurate data exchange
Advanced Concrete Design, STAAD.Pro to deliver a sustainable infrastructure for the local community.
Project Playbook: STAAD.Pro, ProjectWise

102
White Martins Gases Industriais
Air-Gas Separation Plant – Ouro Branco, T1600S
Ouro Branco, Minas Gerais, Brazil

White Martins was contracted to design a new air-gas separation plant


situated on an existing site in Ouro, Branco, Minas Gerais, Brazil. The
company was responsible for engineering and construction through to
commissioning of the 1,600 ton-per-day plant, while ensuring the existing
plant remained in normal operation. Now operational, the new air-gas
separation plant reduces the production costs of oxygen, nitrogen, and
argon supplied to the client, as well as increases the purity of oxygen.

To minimize impact on project completion times and routine operations,


coordination among the various teams was crucial. White Martins
implemented a collaborative BIM approach using Bentley applications.
The technology’s flexibility and interoperability improved accurate
2017 INFRASTRUCTURE YEARBOOK

information sharing and workflows among the project team to reduce


design errors, avoid surplus expenses related to rework during
construction, and deliver the project on time. The plant entered operations
70 days ahead of schedule at 9.7 percent below estimated costs.
Project Playbook: AutoPIPE, AutoPLANT, Navigator, ProjectWise,
Promis.e, ProSteel, STAAD.Pro
103

With ProjectWise we can easily manage over 9,000 transmittals
and 20,000 technical documents in a single repository. Also, it’s
easy for the EPC subcontractor to collect the related documents/


drawings for closed-out reports. ProjectWise has shortened the
preparing time of closed-out reports.

– Bao Jia Chen, Project Manager, CPC Corporation

104
MINING AND OFFSHORE
ENGINEERING
Projects in this award category demonstrate excellence in planning, design, structural analysis —
especially structural integrity analysis, engineering, construction, operations, and decommissioning of
mines, mining facilities, marine, and offshore and onshore infrastructure and structures including oil and
gas production facilities (topsides and platforms).

105
BIM Advancements in MINING AND OFFSHORE ENGINEERING
W I N N E R

Offshore Oil Engineering Company Limited


Oil Field Jacket Design and Development of ‘Fixed Offshore Structure Design Tool’ I Tianjin, China

Located in Bohai Bay off China’s northeastern coast, the CNY 8.8 billion Bohai Development Project is a joint venture between China National Offshore Oil
Corporation (CNOOC) and ConocoPhillips China Inc. The project will expand existing facilities to include two 40-slot well head platforms, a central platform,
and associated pipelines and cables. The EPCI contractor is CNOOC Offshore Oil Engineering Co., Ltd. (COOEC).

SACS’ 3D modeling capabilities helped COOEC to quickly build and adjust analysis models, according to changing design parameters. MOSES provided
reliable simulation of the float-over installation for the central platform. These efficiencies allowed COOEC to complete joint-design work two weeks ahead of
schedule and platform structure design four weeks ahead of schedule. COOEC also customized SACS and MOSES to exchange data for use in post-processing.
Project Playbook: MOSES, SACS

106
F I N A L I S T F I N A L I S T

Volgogradnefteproekt, LLC
AMEC Foster Wheeler Design of Electro-Technical Solutions and Systems for the
Gruyere Project Conductor Supported Platform of Filanovsky Field
South Dorothy Hills, Western Australia, Australia Caspian Sea, Astrakhan Region, Russia

Discovered by Gold Road Resources, the Gruyere gold deposits in South As part of developing the Filanovsky Field, Volgogradnefteproekt LLC
Dorothy Hills, Western Australia are among the largest undeveloped provided detailed design services and technical support for building an
gold deposits in Australia. Gold Road is developing the resource in joint offshore, ice-resistant, stationary satellite platform that can operate
venture with Gold Fields Ltd., and awarded AMEC Foster Wheeler the autonomously via remote control. Consisting of energy systems and power
EPC contract with construction partner Civmec. The AUD 500 million grids, the design had to consider structural positioning and environmental
project includes a large-scale open pit mine feeding a 7.5 million ton per susceptibility, and meet industry standards for mass load that required
year processing plant. complex calculations. Using 3D modeling to design the satellite platform
enabled the multiple engineering disciplines to work within a single
AMEC Foster Wheeler deployed Bentley applications as part of an model simultaneously, optimizing coordination and project workflows.
integrated engineering solution founded on centralized data with
change control. The solution produces data-rich 3D design models for Using Bentley applications, the team reduced time spent correcting errors
automatic drawing production, shop detailing, fabrication, construction by 40 percent, and delivered the design documentation three months ahead
2017 INFRASTRUCTURE YEARBOOK

simulation, progress tracking, and eventual asset management. of the deadline. Bentley Raceway and Cable Management automated
This solution eliminates the need for 2D deliverables, reducing the cumbersome process of calculating mass load in compliance with
design costs by 25 percent and shop detailing costs by 20 percent. regulations, saving 70 percent in time and reducing the risk of errors.
Project Playbook: AECOsim Building Designer, LumenRT, MicroStation, Project Playbook: AECOsim Building Designer, AssetWise, Bentley
MineCycle Material Handling, Navigator, OpenPlant, OpenRoads, Raceway and Cable Management, MicroStation, Navigator, OpenPlant,
OpenPlant PID, ProjectWise Promis.e, ProStructures
107
BIM Advancements in MINING AND OFFSHORE ENGINEERING

AAEngineering Group AngloGold Ashanti Project Engineering Services


EPC + Operations in Gold Mining 120 Level - Incline for Atic Rock Handling
Almaty, Kazakhstan Carletonville, Gauteng, South Africa

Altyn Extraction Company (AltynEx), a leading gold mining company in TauTona Mine, a portion of AngloGold Ashanti’s gold mining operations
Kazakhstan, is developing a greenfield mining operation on an existing in Gauteng province, South Africa, is the world’s deepest mine at 3.9
brownfield site. AAEngineering Group won the USD 200 million contract kilometers below ground. The company’s in-house design office, Project
with a BIM-oriented tender that includes engineering, procurement, Engineering Services (PES), designed a nearly ZAR 2.7 million incline
construction, and operations until the first bar of gold is produced. Upon structure on 120 Level, about 2 kilometers underground, for use in the
transfer, AltynEx will receive a working factory with asset performance excavation and the dispersal of non-ore bearing rock for the Atic Mine
management procedures in place. Deepening Project.

To meet the tight project schedule, AAEngineering Group deployed The structure accommodated a 6-ton skip that hoists rock 130 meters up
Bentley technology for 3D plant design, reality modeling, structural a 23.2-degree incline. It included a drop rail to load the skip onto the
analysis, electrical engineering, civil engineering, and asset rails and a 4-ton crawl structure to move the skip to the tipping area.
management. ProjectWise created a common environment for PES surveyed the site using laser scanning, imported the point cloud
all participants, including subcontractors and steel fabricators. data for design in ProStructures, and identified installation constraints.
Having shared information streamlined approvals and revisions. The structure was fabricated in components and assembled at 120 Level.
The BIM approach reduced resource hours by a factor of two. Project Playbook: MicroStation, ProjectWise, ProSteel, ProStructures
Project Playbook: AECOsim Building Designer, AssetWise, LumenRT,
Bentley Raceway and Cable Management, ContextCapture, OpenPlant,
ProjectWise, Promis.e, STAAD.Pro
108
Aryatech Marine & Offshore Services Pvt. Ltd.
Aryatech Engineering Consultants FZE Installation of New Lifeboat Platform for FRC Boat
Shale Shaker Platform Modification on Jack-up Rig on Jack-up Rig
Dubai, United Arab Emirates Delhi, India

Aryatech Engineering Consultants FZE is the UAE-based office of Aryatech Owned by Shelf Drilling International, Inc., and positioned in the Persian
Marine & Offshore Services. Aryatech was retained to assess the Gulf, High Island VII is a jack-up rig that underwent top-side upgrades,
structural adequacy of a shale shaker platform on a jack-up rig owned by including installation of a new platform for a fast rescue boat (FRB).
Shelf Drilling International, Inc. The scope included checking primary and Aryatech Marine & Offshore Services was awarded a fast-track USD
secondary members against critical combinations of static and dynamic 7,000 project to perform a structural adequacy check for the recently
loads that developed during the rig’s lifespan. designed FRB support structure.

To meet the schedule, the team used STAAD.Pro to check for local failures STAAD.Pro allowed the structural elements to be analyzed for different
in the primary and secondary members, as well as for maximum deflection load combinations, including static and dynamic loads that might develop
against the critical load factors. STAAD.Pro’s built-in features increased during the design life of the jack-up rig. Aryatech checked for local
the pace of work while maintaining a high degree of accuracy. Compared failures in primary and secondary members, as well as for the maximum
to performing manual calculations, STAAD.Pro significantly reduced deflection obtained against critical load combinations. The client trusted
2017 INFRASTRUCTURE YEARBOOK

resource hours and project costs. Project Playbook: STAAD.Pro STAAD.Pro’s fast and accurate results, and Aryatech reduced resource
hours and project costs. Project Playbook: STAAD.Pro

109
BIM Advancements in MINING AND OFFSHORE ENGINEERING

Aryatech Marine & Offshore Services Pvt. Ltd.


Replacement of Existing Compressor and Air Dryer with Aryatech Marine & Offshore Services Pvt. Ltd.
New Units for Jacket Platform Stability Analysis of Jack-up Rig Using MOSES
Delhi, India Ras al-Khaimah, United Arab Emirates

As part of an asset life extension assessment project for a process Aryatech Marine & Offshore Services is an engineering and consulting
platform owned by Oil & Natural Gas Corporation Ltd., Aryatech Marine company headquartered in New Delhi, India. Aryatech has made MOSES
& Offshore Services checked for critical load combinations that could an analysis mainstay for offshore installation projects. For this project,
potentially result from replacing an existing compressor and air dryer with Aryatech performed a stability analysis of an American Bureau of Shipping
new units. The scope of work included assessing the structural adequacy (ABS)-class jack-up rig to check allowable center of gravity (KG) values for
of primary and secondary members against static and dynamic loads that various drafts using new lightship data.
could develop during the jacket platform’s lifetime.
Evaluating the rig under both intact and damaged conditions, Aryatech
The project involved checking for local failures in secondary members and used the tip-of-can positions, specified in the Marine Operations Manual,
maximum deflection in primary members when subjected to critical load to check different drafts. The study compared hydrostatics, allowable
combinations. SACS performed these functions quickly and reliably, using KG value/intact condition, and allowable KG value/damaged condition
built-in features that ensured a high level of accuracy. Fewer resource against the ABS-approved report. Based on the analyses with MOSES,
hours were required as a result of the software’s reduction in analysis the jack-up rig was confirmed to be stable for the draft values provided.
time, saving considerable project costs. Project Playbook: SACS Project Playbook: MOSES

110
ASV Global Daewoo Shipbuilding & Marine Engineering Co., Ltd.
C-Worker 7 Block B12/27 in Ubon Field
Portchester, Hampshire, United Kingdom Gulf of Thailand, Thailand

ASV Global, a leading supplier of unmanned and autonomous marine As part of Chevron’s oil and gas exploration and production in Block 12/27
systems, designed and manufactured the C-Worker 7 to complement its of Ubon Field in the Gulf of Thailand, the company retained Daewoo
existing fleet. The 5,500-kilogram surface vehicle can carry a 900-kilogram Shipbuilding & Marine Engineering (DSME) to cost-effectively launch,
payload, operate in high seas for up to 30 days, and be transported by air self-upend, and lower a 7,685-metric-ton central processing platform
and road. In-house experts on three continents collaborated to develop (CPP) jacket into 76.4 meters of water.
this GBP 2 million vehicle.
DSME performed a launching and self-upending optimization study using
The team’s primary challenge was to create a viable hull form. Based MOSES to determine the sling length, number and size of buoyancy tanks,
on structural models predicting load and weight distribution, MAXSURF and capacity of the derrick crane barge. The analyses and 3D simulations
automatically generated hundreds of solutions. These were narrowed predicted factors, such as center of gravity shift, jacket trajectory, bottom
down to three hull shapes by operational and constructability requirements. clearance, and structural stability from pre-tipping to post-separation.
Computational fluid dynamics predicted the shape of the hull with optimal Based on MOSES results for multiple load cases, DSME recommended
2017 INFRASTRUCTURE YEARBOOK

drag. This approach enabled the team to develop the C-Worker 7 in two critical design requirements to minimize risks and estimate the CPP jacket
weeks instead of 12 weeks. Project Playbook: MAXSURF installation costs. Project Playbook: MOSES

111
BIM Advancements in MINING AND OFFSHORE ENGINEERING

Diplamar Servicios de Ingeniería S.A. de C.V. Dongyang P&F Co., Ltd.


Finite Element Analysis for an Offshore Platform KNPC Clean Fuels Project Coke Handling System
Tampico, Tamaulipas, Mexico Kuwait

Diplamar Servicios de Ingeniería S.A. de C.V. (Diplamar) performed Kuwait National Petroleum Company’s (KNPC) USD 23 million clean
installation analyses for the 1,652-ton jacket of a USD 60 million drilling fuels project involves the upgrade and integration of the Mina Abdulla
platform. Installed on eight piles offshore of Tampico, Tamaulipas, Mexico, and Mina Al Ahmadi refineries, including the pet coke handling systems.
the jacket required a general collapse joint check based on problems that Dongyang was tasked with the design, manufacturing, and delivery of 2.5
became evident during analyses for load out, transportation, and launch. kilometers of conveyor structures, requiring a cantilever for installation
Diplamar provided an alternative solution using finite element analysis. to traverse the road. The completed project will increase the combined
capacity of the refineries to 800,000 barrels per day and lower the sulfur
Using SACS and the FEMGV Module, Diplamar applied a method of content of petroleum by 5 percent.
analysis that integrated mesh generation with results assessment. By
modeling a detailed joint mesh for each problem joint in the jacket model, Dongyang used STAAD.Pro to design and deliver the conveyors
FEMGV avoided additional time-consuming checks, analyses, and reports. within the required timeframe. Using Bentley’s Integrated Structural
Diplamar also optimized a required reinforcement structure to minimize Modeling, the team converted the structural analysis model to a
the added weight to the jacket. Bentley software saved at least 2,000 coordinated 3D model, accelerating design time among the different
resource hours on the project. Project Playbook: ProjectWise, SACS design companies and reducing modeling time for production drawings.
Project Playbook: STAAD.Pro

112
Fagundes-Construção E Mineração Ineração S.A. GeoMarine Ingeniería
Feasibility Study – Access Ramp Full Review of FPSO Pump Hosting for Maintenance
Catal, Goiás, Brazil Ciudad del Carmen, Campeche, Mexico

Fagundes-Construção E Mineração Ineração S.A. (Fagundes Constru) When a floating, production, storage, and offloading (FPSO) unit owned by
was contracted to conduct a feasibility study for elevating the crest Petróleos Mexicanos (Pemex) required servicing, GeoMarine Ingeniería
of a containment dam for mine tailings in Goiás, Brazil including the designed the structural systems necessary for lifting and supporting the
construction of necessary access ramps. The organization provided crude oil and ballast pumps. The USD 1.2 million maintenance project
viable options to its client to construct the crest and access ramp, as involved engineering these maneuvers and performing pump hoisting
well as proffered design and engineering services related to earthmoving analysis and design, pump room review and reinforcement, and pump
operations and raising the embankment of the dam. motor tackle design.

The company used topoGRAPH to conduct the study with its innovative GeoMarine performed a full structural study with STAAD.Pro to model
capabilities to facilitate conceptual and detailed design. The use of the pump room and lifting system for each pump. Avoiding complicated
topography enabled more realistic visualizations of the engineering schemes for removing pumps or dismantling facilities was paramount.
process, streamlined workflows, and avoided rework to save significant Space limitations also made placement of hydraulic lifting jacks
2017 INFRASTRUCTURE YEARBOOK

time. The comprehensive software allowed the team to quickly, and impractical. GeoMarine designed an efficient structural system (lifting
precisely, evaluate options for the crest and access ramp, reducing total lugs, cables/slings, accessories, reinforcements, and supports) for
costs to the client by 7 percent. Project Playbook: topoGRAPH temporary structural supports. This design reduced costs and lowered the
safety risks involved. Project Playbook: SACS, STAAD.Pro

113
BIM Advancements in MINING AND OFFSHORE ENGINEERING

Hilong Petroleum Marine Engineering


Grupo Especializado en Obras Marinas S.A. de C.V. Services (Shanghai) Co., Ltd.
Structural Evaluation of Process Pipelines Sanya New Airport Artificial Island Project
Campeche, Mexico Sanya, Hainan, China

A drilling platform in the Gulf of Mexico experienced excessive vibration The CNY 95.2 billion airport in Sanya, Hainan, China is being constructed
in mixing head piping that was connected to the production platform via on a 28-square-kilometer artificial island with revetments comprising of a
a bridge. To reduce the risk of piping failure and damage to the platform, square caisson on the north bank and a very large steel cylinder cofferdam
Grupo Especializado en Obras Marinas S.A. de C.V. (GEOMSA) determined on the south bank. Transporting the 30-meter diameter cylinder to the
the cause of the vibration and how to maintain the integrity of the piping site created an enormous challenge for the project, and Hilong Petroleum
for this USD 5 million project. Marine Engineering Services (Shanghai) designed the scheme to ship the
cylinder and sub-grid 1,285 nautical miles.
The team used AutoPIPE Advanced to produce a 3D model with dynamic
flexibility analysis, which quickly detected the problem. GEOMSA isolated The cylinder’s thin walls made it prone to buckling and deformation.
the issue to an increase in flow caused by a new branch pipe, and it The project team used SACS to check the strength and stability of the
recommended upgrading and reinforcing the pipeline support system. floating crane and self-propelled transporter that carried the cylinder
This temporary measure lowered the risk until production from the to the barge. MOSES analyzed the barge’s buoyancy, stability, and
branch pipe was rerouted to a new head that was installed in parallel. strength for travel through the Taiwan Straits. SACS performed added
Project Playbook: AutoPIPE Advanced analyses for fixing pieces and sub-grid, reducing calculation times.
Project Playbook: MOSES, SACS

114
Hilong Petroleum Marine Engineering Huaneng Rudong Baxianjiao Offshore
Services (Shanghai) Co., Ltd. Wind Power Generation Co., Ltd.
Study on Compacting Effect of Drilling Ship Huaneng Rudong 300MW Offshore Wind Farm
Shanghai, China Rudong, Jiangsu, China

China Petroleum & Chemical Corporation (Sinopec) retained Hilong Located 25 kilometers off the coast of Rudong County, Jiangsu Province,
Petroleum Marine Engineering Services (Shanghai) to study the effects of China, the Huaneng Rudong Offshore Wind Farm, which spans 82 square
pile shoe, soil, and pile foundation interaction. The team was to look at kilometers and includes 70 wind turbines, will generate 300 megawatts
when a jack-up drilling rig is used to complete a well and the pile shoes of power. The CNY 5.4 billion project includes two 110-kilovolt booster
are close to the edge of the pile foundation as such operations could have stations, one 220-kilovolt booster station, and a production management
impacts on platform safety. center. Huaneng Rudong Baxianjiao Offshore Wind Power Generation was
responsible for feasibility, design, bidding, and technical construction of
The project team used SACS’ finite element model to simulate the the onshore facilities.
bottoming of the pile shoes, the displacement of the soil at the pile
foundation, and the load generated by the compacting of soil on the The project team implemented Bentley’s 3D design solutions on the
pile foundation. The CNY 300,000 study quantified the impact of the pile ProjectWise platform to achieve an efficient, effective workflow.
shoes on the pile foundation during the drilling process under various Compared to parts of the project that used traditional 2D design, the
2017 INFRASTRUCTURE YEARBOOK

wave angles and load conditions. Batch processing with SACS saved 3D designs were of higher quality and contained fewer errors. The
significant project time. Project Playbook: SACS 3D approach optimized space utilization, reduced collision rates, and
ensured timely construction, which was completed six months ahead of
schedule. Project Playbook: AECOsim Building Designer, MicroStation,
ProjectWise, ProSteel

115
BIM Advancements in MINING AND OFFSHORE ENGINEERING

Institute of Engineering and Ocean Technology


Institute of Engineering and Ocean Technology Structural Integrity Assessment in View of Additional Facilities
Relocation of Existing Jacket Platform and Damages on a Well Head Platform
Western Offshore, India Western Offshore, India

Oil & Natural Gas Corporation Limited (ONGC) operates more than 270 Oil & Natural Gas Corporation Limited (ONGC) is adding facilities
fixed jacket platforms located offshore of India. ONGC considered the onto existing platforms in India’s Western Offshore as part of a field
technical and economic constraints of relocating wellhead platforms to redevelopment program. After a supply vessel hit a wellhead platform,
new locations because well productivity is declining. The Institute of the Institute of Engineering and Ocean Technology (IEOT, an institute of
Engineering and Ocean Technology (IEOT, an institute of ONGC) assessed ONGC) ascertained structural integrity, recommended strengthening/
the structural adequacy of three jacket platforms for the USD 45 million mitigation measures, and documented the platform’s fitness to
relocation and re-usage project in the Western Offshore Basin. accommodate additional facilities.

Using SACS and SACS Collapse, IEOT developed a methodology for The USD 5 million project assessed the damage caused by the accident
evaluating structural adequacy, predicting performance under modified and determined the requisite repairs needed to ready the platform for
loading conditions, and determining required strengthening/mitigation eight new risers and a riser guard. The analyses carried out with SACS
measures. This analysis included an integrity check for 100-year extreme and SACS Collapse identified the failure mechanism of the jacket
storm conditions and a foundation design approach at various water structure. After the repair, the applications established the “fit for
depths. Relocation would save the expense of platform disposal and avoid purpose” status, which ensured continued production with the new
new construction, resulting in cost savings of USD 25 million per platform. facilities and avoided constructing a new USD 40 to 45 million platform.
Project Playbook: SACS, SACS Collapse Project Playbook: SACS, SACS Collapse

116
Institute of Engineering and Ocean Technology
Structural Integrity Assessment of an Existing Structure iSpatial Global Systems South Africa
for Additional Living Capacity Glencore Rock Engineering Solution
Mumbai-Western Offshore, Maharashtra, India Witbank, Gauteng, South Africa

The government of India’s Oil & Natural Gas Corporation Limited (ONGC) Glencore Coal South Africa has interests in open-cut and underground
operates production facilities off the west coast of India. The Institute coal mines in South Africa, Australia, and South America, and exploration
of Engineering and Ocean Technology (IEOT, an institute of ONGC) was projects in North America. Glencore Coal’s rock engineering department
charged with determining whether an existing offshore jacket platform worked with iSpatial Global Systems South Africa (iGlobe) to develop a
could accommodate additional living quarters and the associated 125-ton ZAR 400,000 geographic information system (GIS) for capturing spatial
load. The USD 5 million project found the platform was able to carry the data used to design mining operations.
extra load.
iGlobe used Bentley Map schema with an SQL spatial database to provide
IEOT used SACS to create a structural model of the existing platform a single source of truth. Several departments stipulated desired features
that incorporated the proposed living facility from the available as-built and attributes for nine master categories, each with multiple details and
drawings. Structural analysis studies assessed the structure’s ability to varied contents. The GIS enabled spatial data to be shared seamlessly
support this load based on present-day criteria. When structural integrity among departments, allowing multiple users to view information
2017 INFRASTRUCTURE YEARBOOK

could not be confirmed due to changes in design standards, an ultimate simultaneously. Implementing standards for map generation reduced
strength analysis was carried out to ensure integrity, avoiding construction redundancies. Project Playbook: Bentley Map, MicroStation
of a new USD 30 million platform specifically for the new living quarters.
Project Playbook: SACS

117
BIM Advancements in MINING AND OFFSHORE ENGINEERING

Kazgiprotsvetmet Ltd.
Bystrinsky Ore Mining and Processing Plant—Dressing Works Keystone Engineering
for Processing and Dressing Gold, Iron, and Copper Ores WOG Coelacanth Fabrication
Bystrinskoye Field, Zabaykalsky Krai, Kazakhstan Ingleside, Texas, United States

As Kazakhstan’s main institute in mining and metallurgy, Kazgiprotsvetmet The 32,000-ton jacket for the Coelacanth field at Ewing Bank block 834
Ltd. provided detailed design for the USD 1.1 billion Bystrinsky Ore in the Gulf of Mexico was built by Gulf Marine Fabricators (GMF) at its
Mining and Processing Plant at Bystrinskoye Field in Zabaykalsky Krai. yard in Ingleside, Texas. As GMF’s engineering contractor, Keystone
This priority project is being developed by Norilsk Nornickel, a leader in Engineering developed the plan for fabricating this massive, 1,250-foot
the metals and mining industry in Russia, for annual production of copper tall structure and moving it to the launch barge without inflicting damage
(65.8 thousand metric tons), iron (2.1 million metric tons), gold (6.9 metric on the jacket or the barge.
tons), and silver (35.9 metric tons).
The jacket’s designer provided a verified structural model in SACS,
The institute used Bentley Raceway and Cable Management (BRCM) to saving Keystone at least USD 50,000 and several months’ modeling time.
create 3D models of the cable support systems, supports, and equipment. Keystone used SACS to simulate potential load imbalances, develop
BRCM integrated with other software solutions to deliver the client’s tolerance envelopes, and optimize operational windows. Collaboration
required format. BRCM allowed the institute to divide electrical design among the client, jacket designer, and certified verification agent
among users and have the latest information available to all team produced a safe lift and loadout process for this USD 200 million project.
members in a single database. BRCM’s 3D design capabilities accelerated Project Playbook: SACS
design by 30 percent. Project Playbook: Bentley Raceway and Cable
Management, Promis.e

118
Oiltech Engineering (India) Pvt. Ltd. PetroVietnam Marine Shipyard
FPSO Cyrus Tam Dao 05 Jack-up Rig
Offshore, United Arab Emirates Vung Tàu, Bà Ria-Vung Tàu, Vietnam

Located at the South Pars field, FPSO Cyrus is the first floating, production, Vietsovpetro, a Russian-Vietnamese joint venture in oil and gas
storage, and offloading (FPSO) vessel deployed in the Middle East. The exploration, retained EPC contractor PetroVietnam Marine Shipyard (PV
USD 9.63 million vessel is capable of handling 35,000 barrels of oil Shipyard) in Vung Tàu, Vietnam to build the Tam Dao 05 Jack-up Rig,
production per day, storing 714,000 barrels, and offloading 700,000 which can operate at a depth of 120 meters and can drill to a depth of
barrels in 24 hours. Oiltech Engineering (India) designed and constructed 9,000 meters. With a carrying capacity of 18,000 tonnage, the jack-up rig
the FPSO. will enhance Vietsovpetro’s drilling productivity.

Oiltech finished the engineering design within 12 months using SACS. PV Shipyard applied SACS for offshore structural analysis and design,
The project team saved time on this fast-track project by modeling the and used MOSES for transportation and installation analysis. SACS
FPSO topside modules, then merging these models to create a master automatically generated 3D models, performed required analyses, and
model. This technique produced accurate results with no technical generated load combinations. Used collaboratively with AutoPIPE and
errors in a short amount of time. FPSO Cyrus was delivered to the ProjectWise, the software exchanged synchronized data and detected
2017 INFRASTRUCTURE YEARBOOK

client and achieved production capacity within the expected time. clashes. After 32 months of design and construction, PV Shipyard
Project Playbook: SACS cut the expected transport and installation schedule by 50 percent.
Project Playbook: AutoPIPE, MOSES, ProjectWise, SACS

119
BIM Advancements in MINING AND OFFSHORE ENGINEERING

Shanghai Water Engineering Design


& Research Institute Co., Ltd. Sinotech Engineering Consultants, Ltd.
Nanhui Dongtan N1 Reservoir Area Reclamation Project TPC Offshore Power Generation Project Phase 1
Shanghai, China Taipei City, Taiwan

Shanghai Water Engineering Design & Research Institute is the Taiwan Power Company (Taipower) is deploying Taiwan’s first large-
engineering designer and consultant for the USD 295 million Nanhui scale offshore wind power project near Taipei City, Taiwan. Sinotech
Dongton N1 Reservoir Reclamation Project, located south of the Shanghai Engineering Consultants is responsible for basic design and creation of the
Pudong International Airport. Situated on a high-sediment area of the BIM model for this USD 600 million program. Upon completion, Taipower
Yangtze River estuary, the 1,467-hectare project area will absorb 39 will use the BIM technology for facilities management in conjunction with
million cubic meters of construction dregs, making the land resources the intelligent facilities and equipment management system.
available for reuse.
Sinotech chose AECOsim Building Designer as the BIM platform,
The project team applied BIM technology to overcome the shortcomings ProjectWise as the collaboration platform, and SACS as the stationary
of a 2D design, using Bentley software to model cross-section platform analysis software. Bentley application usage by all project
components, modify parameters, calculate quantities, visualize participants will enable the use of BIM technology in design review,
reclamation design, create excavation schemes, and simulate closing construction simulation, and progress visualization. Utilizing BIM
techniques for beach protection. The 3D parametric modeling saved at technology will help avoid design conflicts, control engineering quality,
least three weeks of design time and shortened the modification period. accelerate construction, and support asset and equipment management.
Project Playbook: AECOsim Building Designer, AssetWise, Descartes, Project Playbook: AECOsim Building Designer, ProjectWise, SACS
LumenRT, ContextCapture, MicroStation, Navigator, OpenRoads
ConceptStation, OpenRoads Designer, Power GEOPAK, ProjectWise

120
SNC-Lavalin UK Ltd. Tebodin Middle East Ltd.
Johan Sverdrup LQ Jacket FFS & Life Extension Study for Offshore Platform Structures
Norwegian Sector, North Sea, Norway Abu Dhabi, United Arab Emirates

Statoil S.A. is developing the Johan Sverdrup field, located in the An Abu Dhabi-based oil company retained Tebodin Middle East Ltd. to
Norwegian sector of the North Sea, where water depth is approximately carry out a Fitness for Service and Life Extension Study of 20 offshore
113 meters. Dragados Offshore S.A. and SNC-Lavalin UK Ltd. are platforms located between Qatar and Abu Dhabi, United Arab Emirates.
performing detail design of the living quarter (LQ) jacket. The USD 312,000 project ensured the structural integrity of single, multi,
and complex production and injection well head platforms that were
Weighing up to 28,000 tons, the LQ jacket is a four-legged lifted structure installed in the early 1980s.
with skirt piles at the corners. Abyssal Technologies calculated the
DAF using an irregular time domain analysis for each direction. Using Tebodin used SACS to model the platforms and perform in-service,
SACS’ option to run multiple analyses in one batch file streamlined the pushover, boat-impact, and spectral fatigue analyses. Structural
project and reduced resource hours. The results included static and strengthening and mitigation measures were established for platforms
dynamic components, making it easy to calculate the DAF in less time. with remnant lives less than 20 years. SACS’ interoperability and
Project Playbook: SACS incorporation of site conditions saved 540 resource hours. The Cloud
2017 INFRASTRUCTURE YEARBOOK

Service Subscription saved USD 25,000 compared to licensing.


Requalifying platforms for 20 more years of service deferred the
expense of new construction, saving up to USD 25 million per platform.
Project Playbook: SACS

121
BIM Advancements in MINING AND OFFSHORE ENGINEERING

Toyo Construction Co., Ltd.


TechnipFMC plc Self-Propelled Multipurpose Working Vessel
Lifting of Well Jumpers Construction Project
Kongsberg, Norway Tokyo, Japan

TechnipFMC, a global leader in subsea, onshore/offshore, and surface Toyo Construction created realistic 3D models of August Explorer, a JPY
projects for the oil and gas industry, commenced a EUR 100,000 project 4.5 billion vessel, to gain design consensus and ensure the safety of the
to lift eight well jumpers of various shapes and sizes from a quayside vessel for offshore work. Electronic files for the self-propelled multi-
location to a transportation barge in Kongsberg, Norway. The challenge purpose working vessel were also provided to model manufacturers for
was to use a single spreader bar and sling set with the fewest possible use with 3D printers and die cast molds. The files were also supplied to
modifications to keep project costs at a minimum. advertising agencies for production of pamphlets and technical materials.

TechnipFMC used STAAD.Pro to perform multiple iterations of the basic Working from 2D drawings prepared by the shipbuilder, Toyo used
lifting arrangement, sling positions, and spreader bar until a stable model MicroStation to construct models that replicated each part of the vessel.
was achieved for each well jumper. The results were reported to the Then, Toyo integrated the models for rendering and animation creation.
stakeholders, who suggested changes based on anticipated challenges. Separating the files by parts manufacturer made it easier for the project
After rerunning the analysis several times, STAAD.Pro delivered a team to handle design changes later. Toyo created photorealistic graphics
workable well jumper lifting design in 90 percent less time than prior to test distinctive color patterns for visibility offshore. Sharing the graphics
projects. Project Playbook: STAAD.Pro among the team reduced review time. Project Playbook: MicroStation

122
Zakum Development Company
Volgogradnefteproekt, LLC Managing a Major Offshore Complex Structure:
Conductor Supported Platform of Filanovsky Field Substructuring Technique
Volgograd, Volgograd Oblast, Russia Abu Dhabi, United Arab Emirates

As part of developing the Filanovsky Field, Volgogradnefteproekt LLC Zakum Development Company (ZADCO) owns and operates Zakum Central
provided detailed design services for building an offshore, ice-resistant, Complex, a 375-by-46-meter offshore complex in the Persian Gulf with
stationary satellite platform amidst harsh environmental conditions and nine jackets, eight interconnected decks, and three riser support towers.
ecological risks involved in offshore projects. The goal is to provide the With jackets nearing the end of their operating lives, ZADCO performed
customer with a complex 3D information model that optimized equipment a structural integrity assessment and requalification as part of the life
and cable arrangement, considered simultaneous drilling of and extraction extension process. The process also identified critical welded joints and
from the oil wells, and reduced the risk of potential accidents. updated risk-based inspection frequency.

The company used Bentley applications to incorporate process, structural, Using updated SACS models, ZADCO verified design-level assessments
and electrical engineering and design of the platform. The 3D design and relevant data generated by independent contractors. Each deck
capabilities increased productivity by 30 percent, shortening the design substructure underwent structural analysis in SACS, and each jacket
cycle by four months and saving RUB 75 million in capital expenditures. was subjected to non-linear push-over analysis using SACS Collapse.
2017 INFRASTRUCTURE YEARBOOK

The team cut construction costs and minimized risks using Bentley Using split-up deck and jacket models, ZADCO’s analyses took 30
applications to provide documentation and a 3D model to the client. Once percent fewer resource hours, which saved USD 180,000, and halved
operating, the team is expecting to reduce total costs by approximately 15 the duration of required inspections, saving USD 165,000 per campaign.
to 20 percent. Project Playbook: AECOsim Building Designer, Bentley Project Playbook: SACS, SACS Collapse
Raceway and Cable Management, MicroStation, OpenPlant, ProStructures

123
BIM Advancements in MINING AND OFFSHORE ENGINEERING

Zentech Engineering Co., Ltd. Zentech Engineering Co., Ltd.


Bahrain LNG Import Terminal Offshore Wind Turbine Substructure
Hidd, Khalifa bin Salman Port, Bahrain Seoul, South Korea

To meet increasing energy demands, Nogaholding has been tasked with South Korea set a national goal for using renewable energy and invested in
building a facility to import liquefied natural gas (LNG) in the event that offshore wind farms in two west coast locations near Seoul, South Korea.
Bahrain’s domestic production requires supplementation. The USD 500 Korea Institute of Energy Technology Evaluation and Planning developed
million LNG terminal in Khalifa bin Salman Port, Bahrain is being designed the 5-megawatt wind turbines for this KRW 1 billion project, and Zentech
to re-deploy and trade around the floating assets to optimize use of the Engineering designed two types of jacket substructures. The goal was to
facility. Zentech has been subcontracted to cost effectively design safe reduce installation costs by optimizing the substructure design.
and reliable marine superstructures amid the harsh offshore environment.
Using SACS’ wind turbine module, Zentech performed ultimate limit
Zentech used Bentley SACS to model the terminal, analyze environmental state, fatigue limit state, and serviceability limit state analyses, as well
loads and foundation, and consider shipping, transportation, and offshore as integrated analysis using SACS and GH Bladed. This design approach
installation to ensure structural integrity of the marine facility. A fully allowed the project team to reduce structural weight while maintaining
coordinated design was facilitated with Bentley software and both sufficient structural capacity and strength given the wind and wave
deadlines and quality were met. The use of 3D models compared to 2D loading. Construction of the optimal design took 20 percent less time with
drawings eliminated conflicts, accelerated design time, and improved Bentley applications. Project Playbook: SACS
client and stakeholder communication. Project Playbook: SACS

124
Zentech Engineering Co., Ltd. Zhongcheng International Marine
TUAS Terminal Phase 1 Reclamation, Wharf Construction Engineering Survey & Design Co., Ltd.
and Dredging Qingdao Oriental Movie Metropolis Yacht Wharf Project
Tuas, Singapore Qingdao, Shandong, China

The Tuas Terminal project is an investment in Singapore’s port Wanda Studios is building the CNY 50 billion Qingdao Oriental Movie
infrastructure, expanding the port in four phases over a span of 30 years. Metropolis on a 5.4 million square-meter area of China’s Shandong
Zentech was retained for the USD 500 million Phase 1 reclamation, wharf province. The film and television industry project includes tourist
construction, and dredging to perform transportation, launching, towing, attractions, production facilities, and a full-service marina. Zhongcheng
and stowing analysis for 222 caissons that will form the wharf’s retaining International Marine Engineering Survey & Design was responsible for
structure. When completed, the entire mega-terminal will have a total preliminary design and construction drawings for the CNY 450 million
capacity of up to 65 million TEUs and is expected to position Singapore as Yacht Wharf Project.
a global hub port and international maritime center.
The wharf will hold 230 yachts and sailing berths, plus facilities for
Zentech used MOSES to perform ship mooring and transportation analysis yachting functions. The north and south breakwaters, inner and outer
and conduct stability examination in suspension. The team used the revetments, and the floating dock presented challenges. The project
software to complete the basic transportation schedule and determine the team used AECOsim Building Designer to develop 3D models that
2017 INFRASTRUCTURE YEARBOOK

marginal environmental load to deliver the project on time. By simulating illustrated design intent; these models assisted the owner in making
real-world situations for each operating stage, Zentech communicated the decisions about problematic design issues. The 3D approach reduced
designer’s intentions to the field. MOSES enabled the team to reduce time errors by 70 percent and shortened the design period by 20 days.
and costs required to analyze the process for the port construction site. Project Playbook: AECOsim Building Designer, OpenRoads Designer
Project Playbook: MOSES

125

The BRCM program module, which helped achieve technically complex
engineering solutions and deliver the project on time, became our


trusted tool for designing the energy systems, electrical networks,
and automation networks of the satellite platform.

– Vasily Vasilievich Kalinin, First Deputy Director General,


Volgogradnefteproekt, LLC

126
MUNICIPAL OPERATIONS
Projects included in this award category have demonstrated excellence in advancing and sustaining local and
regional government infrastructure and have leveraged project delivery, geospatial, 3D city modeling, mapping,
engineering, or asset management solutions.

127
BIM Advancements in MUNICIPAL OPERATIONS
W I N N E R

Huadong Engineering Corporation Limited, PowerChina


Application of BIM Strategy for Shenzhen Qianhai Municipal Infrastructure I Shenzhen City, Guangdong, China

In Shenzhen, Guangdong, China, the Qianhai Cooperation Zone is undergoing intense development, with nearly CNY 390 billion of dense construction
covering an area of 14.92 square kilometers. The planned activity includes more than 180 kilometers of roads and 32 kilometers of rail lines aboveground
and belowground, and CNY 68.2 billion in infrastructure. Huadong Engineering Corporation (PowerChina) is responsible for the infrastructure and other
major projects.

Huadong Engineering’s daily management and coordination of BIM implementation ensured that the team leveraged the technology to solve the
numerous challenges. A 3D reality model of the zone, used with the project’s multi-discipline 3D design models, created a GIS-based view for resolving
errors, omissions, collisions, and deficiencies. Using the 3D collaborative design helped save more than CNY 21 million in averted rework alone.
Project Playbook: AECOsim Building Designer, Bentley Raceway and Cable Management, ContextCapture, Descartes, LumenRT, MicroStation, Navigator,
OpenRoads Designer, OpenRoads Navigator
128
F I N A L I S T F I N A L I S T

Tianjin Municipal Engineering


Design & Research Institute
AAM Group Construction and Design General Contracting of Retrofit
Creating Singapore’s National 3D Map Using Mobile Mapping Project at Haiyu East Line Municipal Road
Singapore Sanya, Hainan, China

The Singapore’s Smart Nation Program has, at its core, a highly accurate In Sanya, Hainan, China, programs are underway to restore the urban and
3D digital map of the entire country. The Singapore Land Authority was natural environments, and install systems to collect and reuse rainwater.
charged with creating the map and awarded AAM Group the SGD 4.4 Tianjin Municipal Engineering Design & Research Institute is the lead for a
million contract to conduct a vehicle-based mobile mapping survey of the CNY 1.235 billion EPC contract to retrofit a 9.42-kilometer municipal road
nation’s 5,500-kilometer road network and produce highly detailed 3D in Haitang Bay. Owned by Haitang Bay Development and Construction
models of the roads and city furniture. Co., Ltd., the road project includes bridges, culverts, drainage, water
supply, comprehensive pipe rack, and other works.
AAM’s mobile survey produced 3 million high-resolution images and
600,000 million LiDAR points. Using the open source CityGML standard The project team relied upon Bentley applications to solve complex
data format, MicroStation’s precise modeling capabilities helped technical problems at the design and construction stages. To
achieve an accuracy level of 0.3 meters while allowing the AAM date, the applications helped avoid pipeline collisions, saving CNY
team to work at a rate of 2.5 kilometers per day. AAM’s Singapore 600,000; avert a 15-day construction delay, saving CNY 2 million;
2017 INFRASTRUCTURE YEARBOOK

and Australia offices collaborated using ProjectWise to manage and optimize raw water transmission line design, shortening design time
share data and documents. The combined effort took about 2,200 by 1 month; avoid an emergency shutdown, saving CNY 3 million;
resource days, compared to 5,200 resource days using other software. and adjust a pipeline procurement scheme, saving CNY 10 million.
Project Playbook: MicroStation, ProjectWise Project Playbook: Descartes, LumenRT, Pointools, Bentley Subsurface
Utility Engineering, ContextCapture, gINT, HAMMER, MicroStation,
OpenPlant, OpenRoads, PowerCivil, ProjectWise
129
BIM Advancements in MUNICIPAL OPERATIONS

GKU CODD
DAVID Holding Company Bentley ProjectWise System for Digital Reviewing
Sofia Municipality Improves Management of Street Lighting and Processing Traffic Management Projects
Sofia City Province, Bulgaria Moscow, Russia

Sofia Municipality is an administrative region of Bulgaria with 24 districts As part of the Moscow Department for Transport and Road Infrastructure
and 1.3 million residents. The municipality’s Transport Infrastructure Development, the Traffic Management Center (GKU CODD) is responsible
Department contracted DAVID Holding Company to develop, implement, for managing all road signs and traffic lights. Aimed at modernizing the
and maintain a software solution for managing street lighting within the urban transport environment, the Comprehensive Traffic Management
province. The BGN 447,054 GIS-based system introduced a visual way to Map (KSODD) project provided the impetus to replace the existing process
inventory the quantity and condition of facilities. for updating and archiving hard-copy street maps with a digital version
that provided a single repository for all traffic management information.
DAVID Holding used Bentley OpenUtilities to create a customized
data model of the street lighting based on the pre-configured electric Using ProjectWise for information management and Bentley Map for
data model provided with the product. The supported data formats digital editing, GKU CODD enabled stakeholders to correct and endorse
reduced the time for field data processing and database population. projects in digital form. The system shortened review cycles, reduced
DAVID developed additional functionalities, using the developer paper document storage, and established a single database of current
capabilities included with the software. The department is using versions. The added transparency made stakeholder comments clear to
the application to improve customer service, budget planning, all. The KSODD project designed more than 150,000 signs over 2,793
engineering, operations, and maintenance, all while reducing kilometers. Project Playbook: Bentley Map, ProjectWise
operational costs. Project Playbook: Bentley OpenUtilities Designer,
Bentley OpenUtilities Map

130
Guangzhou Municipal Engineering
Design & Research Institute JSTI Group
Chebei Road - Xinjiao East Road Tunnel Project Xuzhou Yingbin Road Rapid Retrofit Project
Guangzhou, Guangdong, China Xuzhou, Jiangsu, China

The CNY 1.54 billion Chebei Road - Xinjiao East Road Tunnel Project The CNY 3.78 billion Xuzhou Yingbin Road Rapid Retrofit Project will
in Guangzhou, Guangdong, China extends for 2.07 kilometers, with a alleviate congestion on the main connector route for Xuzhou City in
1,547-meter tunnel section passing under the Pearl River for 492 meters. Jiangsu, China. The combined length of the 10.18-kilometer project area
Constrained by existing roads, subways, embankments, and other encompasses a 6.8-kilometer viaduct section, a 1.26-kilometer ground
barriers, the project required multiple engineering disciplines to develop section, seven entrances and exits, and three grade-separated junctions.
optimal solutions. Guangzhou Municipal Engineering Design & Research Xuzhou City Transportation Bureau selected JSTI Group to design the
Institute assumed that responsibility. retrofit and develop a construction management platform.

The Institute used BIM technology for a collaborative approach that JSTI adopted a BIM approach using Bentley software to solve the
elevated design quality and optimized constructability. The contractor project’s technical challenges. The technology decreased the error rate by
is using a pipe sinking construction method for the section below the 95 percent, reduced review and modify time by 60 percent, saved nearly
river to reduce environmental impact, and BIM technology supports the CNY 1 million in design costs, and achieved millimeter-level accuracy
2017 INFRASTRUCTURE YEARBOOK

implementation of this relatively new technique. The intelligent data in the construction models. Using BIM technology for 5D construction
will also inform operation and maintenance. Bentley solutions provided simulation added the dimensions of quantity, cost, and schedule, making
a real-time collaborative environment for 3D BIM delivery, reducing the MicroStation-based platform an effective management solution.
communication time and cost. Project Playbook: Descartes, LumenRT, Project Playbook: Descartes, LumenRT, ContextCapture, gINT,
Navigator, OpenBridge Modeler, OpenRoads Designer MicroStation, OpenBridge Modeler, OpenRoads Designer, OpenRoads
Navigator, ProjectWise
131
BIM Advancements in MUNICIPAL OPERATIONS

Ministry of Municipal and Rural Affairs,


MCC TianGong Group Corporation Limited Kingdom of Saudi Arabia
Newly Built Comprehensive Gymnasium of Tianjin Study to Optimize Reality Modeling and Topographic Data
University of Finance and Economics Compilation Procedure
Tianjin, China Al Bahah, Al Bahah Region, Saudi Arabia

A core company of Metallurgical Corporation of China Ltd. (MCC), MCC The Ministry of Municipal and Rural Affairs for the Kingdom of Saudi
TianGong Group Corporation Limited (CTMCC) was the construction Arabia maintains large-scale (+/- 10-centimeter accuracy) topographic
general contractor for a CNY 86 million gymnasium at Tianjin University maps and spatial data for urban and suburban areas. Rapid urbanization
of Finance and Economics in Tianjin, China. CTMCC implemented BIM and changes in urban infrastructure have made it challenging to maintain
technology for detailed design, material quantity extraction, construction spatial data. The Ministry undertook a SAR 1.8 million study to evaluate
simulation, quality control, risk reduction, and other critical functions. methods for maintaining up-to-date spatial data in support of local
governance and municipal services.
Bentley software fully supported the lifecycle BIM approach, from
structural and piping solutions during detailed design to on-site ContextCapture produced high-quality reality meshes and true
construction management. For more efficient communications, CTMCC orthophotos from nadir and oblique perspectives, as well as terrestrial
dispatched iModels to mobile devices, creating portable terminals that imagery. Descartes enabled 3D topographic vector feature compilation
used hyperlinks to carry out entry of construction information. Bentley’s from digital surface models and true orthophotos. Bentley’s interoperable
BIM advancements improved the quality of engineering and saved CNY software provided an efficient solution for the mapping engine, reducing
1.12 million in construction costs by enabling CTMCC to optimize the the time and resources required for reality modeling and true-orthophoto
construction scheme. Project Playbook: AECOsim Building Designer, mapping by 80 percent and topographic data compilation by 50 percent.
Bentley Raceway and Cable Management, LumenRT, MicroStation, Project Playbook: ContextCapture, Descartes, MicroStation
Navigator, OpenPlant, PlantWise, ProSteel, ProStructures, STAAD.Pro

132
Shenzhen Municipal Design &
Research Institute Co., Ltd. Survey of India
Shahe West Road Rapid Retrofit Project Advancement in Map Printing
Shenzhen, Guangdong, China Dehradun, Uttarakhand, India

In China’s Guangdong province, the Transport Commission of Shenzhen Survey of India prints topographic maps for various agencies and
Municipality launched the Shahe West Road Rapid Retrofit Project to departments across India. The offset printing technologies used in the
improve the road network structure, increase traffic capacity, facilitate past have been outmoded by high-speed color printing, making Survey
vehicle exit/entrance, and shorten travel time. Shenzhen Municipal of India’s publishing system obsolete. Survey of India developed an
Design & Research Institute Co., Ltd. won the CNY 1.6 billion contract application to create vector PDF files with the correct color scheme,
to design all aspects of the project, which comprises 7.43 kilometers of line weights, and fonts for topographic map features covering the entire
roadway, junctions, auxiliary roads, and overcrossings. country at a 1:50,000 scale.

Using ContextCapture, the Institute created a reality mesh as an Based on Bentley Map Enterprise, the new system meets user
accurate basis for the design scheme. The visual environment provided requirements for both computer-to-plate offset printing and high-speed
a powerful decision-making tool for evaluating the complex BIM designs color printing. Survey of India used the map finishing capabilities to
developed with Bentley software. ProjectWise provided a collaborative configure specific settings in accordance with organizational standards.
2017 INFRASTRUCTURE YEARBOOK

environment to allocate tasks, manage models, and control progress. Bentley software reduced the time required to print a map sheet from one
Bentley technology helped the Institute increase design efficiency day to one hour at no added cost. This new publishing system averted
by 10 percent and complete the project 28 days ahead of schedule. the capital investment in modernizing large-scale offset printing setups.
Project Playbook: LumenRT, ContextCapture, OpenBridge Modeler, Project Playbook: Bentley Map Enterprise
OpenRoads ConceptStation, OpenRoads Designer, ProjectWise

133
BIM Advancements in MUNICIPAL OPERATIONS

Tianjin Municipal Engineering Xiamen Municipal Pipe Rack Investment


Design & Research Institute Management Co., Ltd. / Xiamen Municipal
Application of BIM in East Grade-separated Junction Engineering Design Institute Co., Ltd.
Engineering of Yangang, Shenzhen Comprehensive Pipe Rack Project in Maluan Bay
Shenzhen, Guangdong, China Xiamen, Fujian, China

In China’s Guangdong province, the Shenzhen municipal government The sponge city pilot program in Xiamen, China’s Maluan Bay aims
retained Tianjin Municipal Engineering Design & Research Institute to to counter the problems of urban flooding and water scarcity by
design a grade-separated junction for a multi-road crossing in Yangang. collecting and using rainfall. It is integral to the CNY 1 billion new town
The complex intersection covered 236,000 square meters and required development covering 3.3 square kilometers with three subway tracks
expertise in bridge and tunnel engineering, among six other disciplines. and an underground business district. Xiamen Municipal Pipe Rack
The Institute’s approach for this CNY 1.19 billion project was to adopt Investment Management Co., Ltd. is responsible for the project’s seven
collaborative BIM technology. comprehensive pipe racks totaling 9.7 kilometers.

From initial reality modeling of the project site with ContextCapture The pipe rack team implemented Bentley’s BIM applications throughout
to renderings with LumenRT for final design reviews, Bentley the project lifecycle. The 3D collaborative platform solved such issues
software provided a unified 3D design platform that allowed the as complex nodes, blind areas, and a cabin for stormwater and other
Institute to work quickly and accurately. By establishing a standard facilities to support sponge city objectives. BIM technology increased
for visual management, the Institute enabled every discipline design efficiency by 70 percent, decreased defect rates by 90 percent,
to find and eliminate conflicts, which saved one month during and shortened construction by six months. The 3D information
preliminary design. The BIM process reduced costs by 12 percent. model provided the platform for smart pipe rack management.
Project Playbook: LumenRT, ConstructSim, ContextCapture, Project Playbook: AECOsim Building Designer, Bentley Raceway and
MicroStation, Navigator, OpenRoads Designer, ProjectWise Cable Management, ContextCapture, LumenRT, Navigator, OpenPlant,
OpenRoads Designer, ProjectWise, ProStructures
134
POWER GENERATION
The projects in this category demonstrate excellence in planning, designing, modeling, analyzing
(especially structural integrity analysis), and/or construction of any power generation plants including
fossil fuel, renewable energy, cogeneration, and nuclear power plants.

135
BIM Advancements in POWER GENERATION
W I N N E R

China Water Resource Pearl River Planning Surveying & Designing Co., Ltd.
Wugachong Reservoir Project in Pu’an County of Guizhou Province I Pu’an County, Qianxinan Buyei and Miao Autonomous Prefecture,
Guizhou Province, China

The CNY 565 million Wugachong Reservoir project is in the Pu’an County of Qianxinan Prefecture in the Guizhou Province of China, where complex topographic
and geological conditions limit the project space and present site excavation and structural design challenges. The project team pioneered BIM technology
to implement collaborative 3D modeling to verify construction drawings for the reservoir that, upon completion, will improve water supply, irrigation, and
electricity generation for rural and urban communities and surrounding industrial sites.

The establishment of the 3D geological model using MicroStation accurately reflects the complex environmental conditions of the area and provides a
solid foundation for the design and layout scheme, resolving excavation and road design and construction issues. By adapting Bentley technology,
the team completed the 3D design model within two months, using Navigator for collision detection to improve design quality and reduce rework.
Project Playbook: AECOsim Building Designer, Bentley Map, Bentley Raceway and Cable Management, LumenRT, MicroStation, Navigator, OpenPlant,
OpenRoads, ProjectWise, Bentley Substation
136
F I N A L I S T F I N A L I S T

PowerChina Zhongnan Engineering


COBA – Engineering and Environmental Consultants Corporation Limited
Kholombidzo Hydroelectric Power Plant Digital Delivery of Qiongzhong Pumped Storage Power Station
District of Blantyre, Malawi Qiongzhong, Hainan, China

COBA Engineering and Environmental Consultants (COBA) was retained to The CNY 4.11 billion, 600 megawatt Qiongzhong Pumped Storage
conduct a feasibility study and deliver preliminary engineering designs for Hydropower Station is Hainan province’s first pumped storage project
the planned EUR 1.6 million, 200-megawatt Kholombidzo Hydroelectric located in Qiongzhong County. The project consists of upper and lower
Power Plant along Malawi’s Shire River. The project included the design reservoirs, a water delivery system, and a power generating plant with
and analysis of a complex dam structure and surface powerhouse. It complex pipelines, requiring multi-discipline engineering on a tight
required field investigation; specifications for civil, mechanical, and construction period. Zhongnan Engineering Corporation was responsible
electrical works; cost estimates; and delivery of projected construction for the feasibility study, survey, and design of the station, delivered
schedule through completion. COBA implemented a collaborative 3D as a 3D digital system to be used during construction and for asset
digital modeling approach to determine the optimal design for the plant, lifecycle management.
which is expected to help improve the reliability of Malawi’s electric
supply and meet future power requirements. The project team used ProjectWise for information sharing and
management, which improved design efficiency and helped avoid rework.
2017 INFRASTRUCTURE YEARBOOK

Using AECOsim Building Designer, MicroStation, and OpenRoads Using Bentley applications, the team optimized earthworks planning, the
Designer, the project team generated 14 geo-coordinated 3D models and excavation scheme, and design layout. Bentley applications shortened
integrated them into a coordinated digital representation of the projected design time by two months and reduced design errors by 90 percent, saving
infrastructure. The use of the 3D model improved productivity for drawing more than CNY 20 million in design costs. Project Playbook: AECOsim
production and cost estimates by 15 percent. Project Playbook: Building Designer, Bentley Raceway and Cable Management, GEOPAK,
AECOsim Building Designer, MicroStation, OpenRoads Designer MicroStation, Navigator, OpenPlant, ProjectWise, Bentley Substation
137
BIM Advancements in POWER GENERATION

ZRE Katowice S.A. Energotechnika Engineering Sp. z o.o.


Power Station EDF Ward in Rybnik Waste Incineration Plant
Rybnik, Silesia Province, Poland Wilno, Lithuania

This EUR 3 million project involved the design and production of As part of the Lithuanian government’s initiative to modernize and
technical documents for the reconstruction of venting pipelines, drains, reorganize the heating sector, Energotechnika Engineering (EE) was
injections, and desalination installations, as well as the modernization retained to work with a consortium to perform complex design services
of a 200-megawatt power unit at the EDF Polska coal-fired power plant for the construction of a waste incineration plant and auxiliary systems in
in Rybnik, Poland. The design included 180 pipelines. The project team Vilnius, Wilno, Lithuania. The power plant included a waste-fired power
used Bentley applications to automate each of the design phases, from unit and turbine hall with components enabling best usage of wastes and
creating the 3D model to generating the bills of material. biofuel combustion heat to generate electricity and heat for the Vilnius
municipal network.
Using OpenPlant, the team generated the specifications and created the
3D model and isometric drawings. AutoPIPE enabled the performance of EE implemented a collaborative BIM approach using ProjectWise to
compensation calculations. The interoperability of OpenPlant facilitated share and manage data among the design teams and contractors in
collaboration and coordination among project participants, and allowed three countries. Navigator was instrumental in identifying collisions
the team to export designed pipelines directly into AutoPIPE for quick accelerating optioneering, while the ability to directly export designed
verifications and corrections to the designed fastenings. Bentley pipelines to AutoPIPE enabled quick verification and correction of
software accelerated the design workflow, shortened the documentation designed attachments. Bentley’s software facilitated a coordinated design
distribution time, and simplified the process of making changes to the process that streamlined workflows to shorten project delivery time.
model, minimizing modification costs. Project Playbook: AutoPIPE, Project Playbook: AECOsim Building Designer, AutoPIPE, MicroStation,
MicroStation, OpenPlant Navigator, OpenPlant, ProjectWise, ProSteel, ProStructures
138
ETD Transmission & Distribution Sdn. Bhd. Hangzhou Bole Computer Technology Co., Ltd.
Supply of Control and Protection Panels for Landfill Renewable The Biomass Combined Heat and Power Project in Pingdu
Energy System Comprehensive New Area of Qingyuan County
Bukit Tagar, Perak, Malaysia Lishui City, Zhejiang, China

The Bukit Tagar Sanitary Landfill (BTSL) in Perak, Malaysia is targeted as Qingyuan County produces a large amount of bamboo and wood
a source of renewable energy for the country. ETD Transmission serves processing residue. Hangzhou Bole Computer Technology was tasked with
as a technology partner, providing design and manufacturing of control implementing a comprehensive BIM design approach, including document
and protection relay panels for BTSL’s waste-to-energy plant. For this and asset management for full lifecycle operation of a biomass direct
project, ETD Transmission was tasked with supplying the site with 10 combustion power generation facility in Pingdu, Qingyuan, Zhejiang,
panels, delivered with comprehensive design drawings that comply with China. Once in operation, the plant will reduce Qingyuan County’s logging,
Malaysian standards. The panels will be capable of reusing waste to bucking, and processing of residue waste and shoddy in the forestry area.
meet the increasing demands for electricity in nearby areas.
On this CNY 160 million project, the team used OpenPlant for 3D
The project team used Promis.e to automate its electrical design drawings, modeling, design, and component coding and adopted ProjectWise as the
creating intelligent symbols and device categories to facilitate engineering, collaborative platform for document management. Bentley’s integrated
calculations, reporting, and cross-referencing. Bentley applications design and workflow capabilities shortened modeling time by 20 percent
2017 INFRASTRUCTURE YEARBOOK

allowed for a consistent, standardized design process that eliminated and reduced loss of data and information by 10 percent. The use of
design errors to produce accurate drawings. The automated functions in AssetWise ALIM is expected to increase the efficiency and accuracy of
Bentley’s comprehensive schematic layout and design technology saved up asset management and reduce resource hours, saving an estimated CNY
to 50 percent in design and production time, enabling the team to deliver the 1 million annually on the country’s first small and medium-sized intelligent
10 panels in 11 days, compared to 30 days with traditional CAD software. digital power plant. Project Playbook: AECOsim Building Designer,
Project Playbook: Navigator, Promis.e AssetWise ALIM, Navigator, OpenPlant, ProjectWise, ProSteel
139
BIM Advancements in POWER GENERATION

Inner Mongolia Electric Power


IAAN Soft Survey & Design Institute Co., Ltd.
Osan Thermal Power Plant Huolinhe Air Cooling System’s Steel Structure Platform
Osan, Gyeonggi-do, South Korea Holingol City, Inner Mongolia, China

The Osan Thermal Power Plant is located in Gyeonggi, South Korea. The Huolinhe Power Plant is a 2x300 megawatt air-cooled condensing
IAAN Soft was tasked with expansion planning and constructing newly system located in Holingol City in Inner Mongolia, China. Inner Mongolia
installed equipment and piping by accurately assessing the existing Electric Power Survey & Design Institute was responsible for designing
plant and identifying the changed parts through 3D modeling. The project the cooling system, equipment, and steel structure platform. Upon
is expected to serve as a construction case study for applying 3D BIM completion, the CNY 80 million coal-fired power plant will make efficient
technology to existing facilities. use of coal resources while minimizing environmental impact through
desulfurization processes.
The company used ContextCapture to generate a 3D reality mesh of the
existing plant and OpenPlant to design the new equipment and piping The project team used STAAD.Pro for load calculations, analysis, and
facilities to consistently and accurately fit within the existing worksite. structural modeling of the most advanced air-cooled condenser system.
The team conducted collision and interference checks with Navigator Using Bentley software shortened the design cycle, reduced material
and modified errors in the design models. Using Navigator Mobile costs, and improved efficiency, gaining valuable time for construction
improved access to design information for the on-site construction crew. of the facility. The accurate design ensured that the direct air-cooling
Bentley’s 3D modeling and analysis software optimized construction system could be operated continuously, safely, and efficiently.
work and enabled the team to verify the validity of the plant’s operation Project Playbook: RAM, STAAD.Pro
management system within 10 days. Project Playbook: ContextCapture,
Navigator, Navigator Mobile, OpenPlant

140
IPIP – Engineering and Design Institute for Oil Refineries
and Petrochemical Plants Part of Kraftanlagen Group
Technical Evaluation of the 130-H1, H2, H3 Heaters from 130 Korea District Heating Engineering
RC2-Platforming Unit at Petrobrazi Refinery 3D Pipe Supports for Power Plant
Ploiesti, Prahova, Romania Osan, Gyeonggi-do, South Korea

To increase heater efficiency from the 130 RC2 Platform Unit heaters To support construction of the Osan Combined Heat and Power Plant,
at the Petrobrazi Refinery in Prahova, Romania, IPIP proposed adding Korea District Heating Engineering initiated a project to standardize
a wall between two heating stages. Given that the heaters were design methods for 3D pipe supports and automate the generation of
originally designed almost 50 years ago under far less restrictive standard production drawings. The company created a standard 3D library
seismic codes, IPIP conducted a feasibility study to ensure structural for pipe supports, which increased business competitiveness and the
stability of a wall addition. The project team modeled the entire heating value of digital information for the construction of power plants.
structure and heating coil and analyzed different solutions to optimize
structural integrity. Using OpenPlant and STAAD.Pro, the organization developed and shared
the library of standard pipe supports with project team members, ensuring
Using STAAD.Pro for modeling and analysis enabled IPIP to design data consistency among the designers. The standardized design process
three different options while reducing design time by 40 percent. enabled accurate 3D modeling with reduced errors. Bentley’s integrated
The interoperability of Bentley software allowed the team to alter 3D plant design solution shortened design time by one-and-a-half months
2017 INFRASTRUCTURE YEARBOOK

the solutions and create different models from the original, providing and automated construction drawing generation to improve efficiencies
an integrated design process and eliminating manual calculations. by 20 percent. Project Playbook: OpenPlant, STAAD.Pro
Project Playbook: STAAD.Pro

141
BIM Advancements in POWER GENERATION

Korea District Heating Engineering Korea District Heating Engineering


Construction of the Seokmun Combined Heat and Power Plant Osan Combined Heat and Power Plant Construction
Osan, Gyeonggi-do, South Korea Osan, Gyeonggi-do, South Korea

The 12,018-square-meter Seokmun National Industrial Complex is The Osan Combined Heat and Power Plant consists of a heat cogeneration
a 38.9 megawatt combined heat and power plant being constructed system that generates heat and electricity and can produce 474.4
in Gyeonggi-do, South Korea. Korea District Heating Engineering megawatts of power. To design and build the power plant with excellent
(KDHE) was tasked with the design, engineering, procurement, and performance and reliability, and ensure operational efficiency, Korea
construction of the facility, and ensuring productivity through design District Heating Engineering implemented collaborative 3D modeling to
standardization. To increase efficiency, KDHE created a standard library design the system configuration.
for piping supports and developed programs for detailed automatic
report generation. The company used Bentley applications to perform 3D modeling
and resolve conflicts prior to construction. By using ProjectWise
The organization used OpenPlant and STAAD.Pro to design 3D and Navigator to share project data and verify construction through
models and establish an industry standard library of components simulation, the team ensured data consistency, reduced errors,
in each field, producing precise construction drawings for piping, improved construction quality, and cut costs. The real-time exchange
electricity, and structural elements. ProjectWise was the collaborative of information took place while working within a connected design
platform used for data sharing, ensuring data consistency to reduce environment; this improved communication and saved time and costs
project errors and eliminating printing costs for 2D drawings. associated with printing 2D drawings. Project Playbook: OpenPlant,
Project Playbook: OpenPlant, ProjectWise, STAAD.Pro Navigator, ProjectWise, STAAD.Pro

142
Koyna Design Circle PowerChina Henan Engineering Corporation
Patagon Hydro Electric Project Puyang Longfeng 2x660 MW Power Plant Project
Taluka Budargad, Kolhapur District, Maharashtra, India Puyang, Henan, China

Koyna Design Circle was retained to provide structural design details and Henan Investment Group invested nearly CNY 5.6 billion to build two
drawings for the construction of the Patagon Hydro Electric Power Plant in 660-megawatt, ultra-supercritical, coal-fired heating units at the Puyang
Taluka Budargad in the Kolhapur District of Maharashtra, India. The new Longfeng Power Station in Henan, China. PowerChina Henan Engineering
plant will provide agricultural irrigation and power generation to local Corporation (PowerChina) provided secondary design services for the
farmers and the surrounding community. plant’s small-diameter pipelines and small bridges and cables. Using
BIM technology for these designs, PowerChina provided the construction
The company used STAAD.Pro to accurately model and design the team with an accurate 3D model to guide on-site construction of
almost INR 249 million plant, enabling the team to efficiently perform these components.
and manage the large volume of changes and recalculations throughout
the project. Using the software reduced design time by 10,000 hours to The company used Bentley applications to implement collaborative
save INR 4 million and deliver the project 200 days ahead of schedule. design and generate precise 3D models of the piping and cable
Project Playbook: STAAD.Pro layouts. Through these models, the team identified and corrected
2017 INFRASTRUCTURE YEARBOOK

collisions prior to construction. Having accurate models reduced


material waste by 27 percent and construction time by 6.7 percent.
Project Playbook: AECOsim Building Designer, Bentley Raceway and
Cable Management, ContextCapture, LumenRT, MicroStation, Navigator,
OpenPlant, ProjectWise

143
BIM Advancements in POWER GENERATION

Rosatom State Nuclear Energy Corporation SID Consultants


Electrical Design in Russian-Finnish Project on the Construction Hydro Power Plants on Miyagam Branch Narmada
of Nuclear Power Plants Hanhikivi-1 Canal, Vadodara
Pyhajoki, Northern Ostrobotnia, Finland Vadodara, Gujarat, India

Russian organization Rosatom State Nuclear Energy Corporation SID Consultants (SID) was contracted to design six small capacity
(Rosatom) and Finnish company Fennovima Oy are partnering to construct hydropower plants on the Miyagam branch canal route in Vadodara as
the USD 8.2 billion Hanhikivi 1 nuclear power plant (NPP) in Pyhajoki, part of Sardar Sarovar Narmada Nigam Ltd.’s green power initiative
Northern Finland. Structural designs for the buildings were completed along the Narmada Canal network, which is spread across thousands
last year using AECOsim Building Designer. Rosatom is designing the of kilometers in Gujarat, India. The INR 1.4 billion project included the
electrical structures, supports, and equipment for the facility, which is design of a large underground hydropower structure to accommodate
scheduled to commence operations in 2024. heavy machinery loads and water current thrust as well as canal-related
ancillary structures. Upon completion, the plants will enable energy
Faced with Finland’s unique NPP safety standards and a short time frame to generation for the community from the natural fall of canal water.
meet client deadlines for the electrical construction of the plant, Rosatom
used Bentley applications to develop accurate designs in accordance SID used STAAD.Pro to model the structure and perform a 3D finite
with the strict regulations. Working in a connected design environment element analysis for various loads and appropriate load combinations.
enhanced decision making, accelerated design time by 50 percent, and The software enabled the team to efficiently visualize the elevations
improved documentation quality by 70 percent. Leveraging Bentley using a grid system to facilitate planning. Using STAAD.Pro to calculate
Raceway and Cable Managment with AECOsim Building Designer to all loads accelerated optioneering to reduce structural design time by 30
design 13 electrical structures of the nuclear island reduced design costs. percent compared to manual efforts. Project Playbook: STAAD.Pro
Project Playbook: AECOsim Building Designer, Bentley Raceway and
Cable Management, MicroStation, Navigator, ProjectWise
144
Tata Power Company Limited
Provision of Seasonal Tilt Arrangement for Solar Structure
Mumbai, Maharashtra, India

To improve the capacity of existing solar plants in India, Tata Power


Company initiated an INR 100 million project to convert fixed tilt structures
to a seasonal tilt arrangement for a 150-megawatt solar power plant in
Mumbai, Maharashtra. By adopting different inclination angles between
5 and 30 degrees, the company expects a rise in power generation of 2.5
percent.

The team used STAAD.Pro for modeling, analysis, and optioneering


to determine the optimal design to increase power capability and
revenue. Compared to manual efforts, Bentley software saved 75
resource hours and optimized material costs to save INR 50 million.
Project Playbook: STAAD.Pro
2017 INFRASTRUCTURE YEARBOOK

145

Through Bentley 3D design software… over 1,000 engineering drawings
at the construction stage were completed. The development of 3D design
shortened the design time by over two months, and reduced design error


rate by 90 percent. Through the digital delivery system, models, drawings,
and engineering information were delivered seamlessly.

– Mei Huang, Chief Engineer of Electromechanical Design, Zhongnan


Engineering Corporation Limited, POWERCHINA Group

146
PROJECT DELIVERY
This category recognizes excellence in project delivery as the result of improved project collaboration,
accelerated information sharing, enhanced information mobility, and content management, which spans
the planning, design, and construction of a single project or across a project portfolio.

147
BIM Advancements in PROJECT DELIVERY
W I N N E R

Mott MacDonald and the Costain, VINCI Construction Grands Projets, Bachy Soletanche Joint Venture
East Section of the Thames Tideway Tunnel I London, England, United Kingdom

The Thames Tideway Tunnel is a GBP 4 billion design-build project to resolve the problem of overflow from London’s Victorian-era sewers and meet
environmental standards. Mott MacDonald is lead designer for the Costain Ltd., VINCI Construction Grands Projets, and Bachy Soletanche Joint Venture on
the Tideway East contract, including 10 kilometers of tunnel works running 70 meters below central London and six shafts in public view.

Founded on BIM Level 2 technology, the project approach engenders clear communication, collaboration, and assurance among 12 design disciplines,
numerous contractors, and stakeholders. The team used ProjectWise to establish a common data environment for users at more than 15 locations throughout
Europe, enabling documents to be delivered 80 percent faster. The team’s pioneering model-based delivery method was 30 percent more productive,
shortening design delivery time by six months. Project Playbook: AECOsim Building Designer, LumenRT, Pointools, ContextCapture, MicroStation,
Navigator, ProjectWise, STAAD

148
F I N A L I S T F I N A L I S T

A Natural Gas Company


Implementation of a Comprehensive Technical Records and Ghafari Associates, LLC
Information Management Program Powered by ProjectWise General Motors Productivity Improvement Program
Canada Various Locations, Michigan, United States

This Canadian natural gas company developed, implemented, and is In preparation for the launch of its next-generation truck and SUV lines,
sustaining a comprehensive program to improve the governance and General Motors has rolled out the largest single building program in the
administration of asset designs, engineering project collaboration, automaker’s history to establish new production facilities at locations
and the construction/commissioning of projects. The CAN 8.5 million throughout North America. Ghafari Associates, LLC is providing full
technical records and information management (TRIM) program enhanced architecture, engineering, and construction administration services for
project execution and ensured compliance with legal and regulatory the program.
requirements by improving the systematic capture, conversion, access,
and migration of project documents. Internal and external team members, including those at four construction
sites, collaborated using ProjectWise. Having all project data in one
The team selected ProjectWise as the technology foundation for the centralized location provided a single source of information and helped
project and, in the first four years, delivered a return on investment of save one-third of the time the team would typically spend searching
nearly 2,000 percent. Easy access to reliable and usable content has for data or correcting mistakes. Using a BIM workflow integrated with
2017 INFRASTRUCTURE YEARBOOK

resulted in more informed risk-based and asset management decisions, ProjectWise, the team improved collaboration and accountability, and
saving more than CAN 165 million. Furthermore, electronic approval of completed designs quickly with fewer errors, saving about USD 200,000
design drawings continues to decrease turnaround time by 40 percent per year on this multi-year project. Project Playbook: ProjectWise
and concurrent engineering has reduced the design cycle by 15 percent.
Project Playbook: Descartes, MicroStation, Navigator, OpenPlant,
OpenRoads, ProjectWise
149
BIM Advancements in PROJECT DELIVERY

China Water Resources Beifang Investigation,


AlmassTronics Design and Research Co., Ltd.
Canopy of a Metro Station Pakistan Kohala Hydropower Station
New York, New York, United States Pakistan

AlmassTronics was retained for a USD 10,000 project in New York, New Located on the Jhelum River in northeastern Pakistan, the CNY 15 billion
York to perform modeling of an entrance canopy for a metro station. The Kohala Hydropower Station will provide a total installed capacity of
project engineer elected to use AECOsim Building Designer for modeling 1,118 megawatts to help alleviate a severe power shortage. China Water
and ProjectWise Explorer for project delivery. Resources Beifang Investigation, Design and Research Co., Ltd. used a
collaborative 3D design approach to meet the tight construction schedule
AECOsim Building Designer’s BIM advancements allowed AlmassTronics and deliver the detailed design within four months instead of six months.
to explore various building options for iterative refinement, saving time
and improving quality. The ability to model the canopy from any view or ProjectWise provided a collaboration platform with standardized workflow
angle avoided costly errors. Upon completion, the model and relevant data and work space. Bentley software provided 3D modeling capabilities that
were delivered via ProjectWise. Project Playbook: AECOsim Building improved design quality and efficiency, effectively reducing collisions
Designer, ProjectWise Explorer between specialties and avoiding associated rework. The collaborative
environment engaged participants from design, construction, and
ownership, which helped to improve design efficiency by one-third and
saved about CNY 3 million in design costs. Project Playbook: AECOsim
Building Designer, LumenRT, MicroStation, Navigator, OpenPlant,
OpenRoads Designer, ProjectWise

150
The Danish Road Directorate EDCO Joint Venture Partnership
Managing Data for the Project Roskilde Fjord VivaNext Urban Rapid Bus Transitway Design-Build-Finance
Roskilde Fjord, Zealand, Denmark York Region, Ontario, Canada

The Danish Road Directorate is building a new 10-kilometer-long, four-lane The VivaNext Rapidways will dedicate lanes for Bus Rapid Transit on 34.6
highway connecting Frederikssund and Hornsherred, and a 1.4-kilometer- kilometers of urban arterial roads in the Greater Toronto Area. A major
long bridge crossing Roskilde Fjord between Marek and Tousles Hagel. initiative of Metrolinx, one of Canada’s three regional transportation
The USD 300 million project aims to replace a severely congested existing authorities, the rapidways are being installed in sections, with the EDCO
connection. The Danish Road Directorate is implementing BIM standards joint venture partnership awarded a CAN 500 million design-build-finance
on this and future projects to improve data management and reduce risk. contract for 12 kilometers in the York Region of Ontario.

As the primary collaboration platform, ProjectWise is being used during EDCO implemented ProjectWise for cloud-based collaboration, and a BIM
the construction phase for the first time on a major project. Bentley’s workflow with complete 3D modeling of all assets. ProjectWise eliminated
content and collaboration software provides an environment for all nearly 85 percent of email attachments, saved 800 hours with instant
collaborators to create, work with, and share the most current data, while data transfer, and avoided dedicating 2,680 hours to change control.
remaining in full compliance with standards and with minimal loss of The integrated BIM design accelerated the project to the construction
2017 INFRASTRUCTURE YEARBOOK

information. Based on estimates by the Conference of European Directors phase from 90 percent, shaving two months from the project schedule.
of Roads, BIM implementation will save this project approximately USD Project Playbook: MicroStation, Navigator, OpenRoads, ProjectWise
25 million. Project Playbook: Descartes, LumenRT, Bentley Map,
Navigator, Pointools, MicroStation, ProjectWise

151
BIM Advancements in PROJECT DELIVERY

Herøya Industripark AS Ingeniería Sísmica S.A.C.


Herøya Industrial Park INEN Building Extension
Porsgrunn, Telemark, Norway Lima, Peru

Herøya Industripark AS manages, operates, and develops Herøya Industrial Ingeniería Sísmica S.A.C. provided the structural design for the National
Park (HIP), which has more than 500 buildings and structures covering 1.5 Institute of Neoplastic Diseases’ new outpatient cancer treatment building
square kilometers in Porsgrunn, Telemark, Norway. HIP’s multiple archives in Lima, Peru. The design objective for this PEN 300 million project was
contained more than 400,000 documents with geographical, historical, to ensure that the building can maintain continuous functionality in the
technical, operational, and other information. The project team launched aftermath of a severe earthquake, in accordance with Ministry of Health
an NOK 400,000 project to combine the archives and provide a more of Peru requirements.
efficient, secure process for handling documents and data.
In Peru, hospitals are required to use seismic isolation, which is not
ProjectWise was already being used for handling technical drawings and supported by STAAD.Pro. Ingeniería Sísmica used an alternative approach
was the obvious choice for collecting the scattered archives and databases. based on an equivalent lateral forces procedure and developed an
ProjectWise made it simple to allow internal and external users to create, application to calculate the P-Delta effect. The application automatically
revise, approve, and control documents. The spatial functions enabled the transferred the effects to each column, regardless of whether it was
integration of maps and metadata, making information on buildings and isolated. Using STAAD.Pro and the custom application, Ingeniería Sísmica
structures quickly accessible. As a single solution, ProjectWise reduced reduced design time by 50 percent and design costs by 30 percent.
HIP’s software costs by several hundred thousand Norwegian kroners. Project Playbook: STAAD.Pro
Project Playbook: MicroStation, ProjectWise

152
INNIUS GTD GmbH Kokusai Kogyo Co., Ltd.
New South Entrance 3D Map Project for Areas Prone to Sediment Disaster
Düsseldorf, North Rhine-Westphalia, Germany Shizuoka Prefecture, Japan

Messe Düsseldorf GmbH is a leading trade fair organizer with 262,000 Intelligent 3D maps contribute to the understanding of areas where
square meters of hall space at its fairgrounds in Düsseldorf, North Rhine- natural disasters occur, such as earthquake zones and flood plains. The
Westphalia, Germany. The EUR 140 million New South Entrance will add maps aid in preventing loss of life, and in recovery and restoration in the
7,800 square meters overlooking the River Rhine and Düsseldorf skyline. aftermath. Kokusai Kogyo Co., Ltd. undertook a JPY 200 million project to
INNIUS GTD GmbH was commissioned to supplement the planning develop 3D maps for areas prone to sediment disaster. The maps covered
for this addition by converting existing 2D plans into a 3D model using a 1,700-square-kilometer area in Shizuoka Prefecture, Japan.
BIM methods.
Kokusai Kogyo used aerial laser surveying to generate high-quality
The model not only provided information for facility management and point-cloud data that captured detailed topography. MicroStation
daily operations, but also presented an opportunity to detect problems was used to create digital elevation models, which reduced the effort
prior to construction. Using MicroStation’s clash detection capabilities to create contour lines by one-tenth compared to other methods. To
in combination with custom-made technology for visualizing collisions confirm the data quality, the team used 3D PDFs to check the topographic
2017 INFRASTRUCTURE YEARBOOK

as 3D objects, INNIUS detected and eliminated conflicts that would conditions from any angle. Kokusai Kogyo expects this efficient
have been time consuming and expensive to modify during construction. process to become the cornerstone for its map production processes.
The application won acceptance for BIM technology among project Project Playbook: MicroStation, MicroStation PowerDraft
participants. Project Playbook: MicroStation

153
BIM Advancements in PROJECT DELIVERY

Lendlease Engineering Pty Limited


Lendlease Engineering VDC - Project Lifecycle Standards, Watercare Services Limited
Procedures, and Workflows to BIM Level 3 The Central Interceptor
Australia Auckland, New Zealand

As an operating entity of Lendlease, a fully integrated property developer, Watercare Services Limited supplies the Auckland region of New Zealand
builder, and owner, Lendlease Engineering Pty Limited is responsible with 354 million liters of water and treats around 392 million liters of
for projects ranging in value from AUD 500 million to more than AUD 6 wastewater every day. Watercare’s NZD 950 million Central Interceptor
billion. The company implemented virtual design and construction (VDC) project is a 13-kilometer-long wastewater tunnel with 200,000-cubic-
standards, procedures, and workflows to support the use of BIM Level 3 meter capacity, running 15 to 110 meters below ground and 15 meters
technology on projects of all sizes, throughout an asset's lifecycle, and by below Manukau Harbor. The project includes a new pump station and
all stakeholders. emergency pressure relief outfall.

VDC is built on a connected data environment powered by ProjectWise, During the detailed design stage, ProjectWise enabled collaboration
which provides a single source of truth, regardless of native among team members in New Zealand, Australia, and the United States.
software or global location. Bentley technology supports the VDC The software’s connected data environment ensured documentation
workflow from design collaboration to model mark-up and review to synchronization, saved time spent sharing information, improved
5D Advanced Work Packaging. The standards eliminate repetitive information accuracy and decision making, and enforced file naming
drawing production, resolve issues earlier in the lifecycle, and improve conventions and metadata management. Extensive use of ProjectWise for
construction quality and efficiency. Project Playbook: AECOsim document control, storage, and collaboration ensured on-time, on-budget
Building Designer, ContextCapture, MicroStation, Navigator, OpenRoads delivery. Project Playbook: ProjectWise
ConceptStation, ProjectWise

154
RAIL AND TRANSIT
This award category acknowledges projects that demonstrate excellence in planning, engineering, design,
analysis, or project delivery of rail or transit systems.

155
BIM Advancements in RAIL AND TRANSIT
W I N N E R

Mass Rapid Transit Corporation Sdn. Bhd.


Klang Valley Mass Rapid Transit Project - Sungai Buloh-Serdang-Putrajaya Line I Kuala Lumpur, Malaysia

The Klang Valley Mass Rapid Transit (KVMRT) Sungai Buloh-Serdang-Putrajaya Line is the second mass rapid transit line being developed for the Greater Kuala
Lumpur-Klang Valley region of Malaysia, and the first metro project in Asia to adopt a BIM Level 2 strategy. The MYR 32 billion railway project spans 52.2
kilometers, of which 13.5 kilometers are underground, includes 35 stations, and upon completion will serve approximately 2 million people. MRT Corporation
(MRT Corp) mandated a BIM methodology, including 3D photogrammetry for verification at critical milestones, to improve design collaboration, construction
feasibility, and accuracy of as-built information, and ensure sustainability of asset information throughout the project lifecycle.

MRT Corp used ProjectWise to streamline the design process among the numerous design disciplines and AssetWise for lifecycle information management.
Bentley applications provided a connected data environment for all disciplines to work with a federated model for coordinated design, and enabled the
integration of design and asset information with the operation and maintenance system to ensure optimal asset performance throughout the project lifecycle.
Project Playbook: AECOsim Building Designer, AssetWise, Bentley Rail Track, ComplyPro, ContextCapture, ProjectWise, STAAD.Pro
156
F I N A L I S T F I N A L I S T

China Railway Eryuan Engineering Group Co., Ltd.; Jacobs/Zephyr UAS


Yungui Railway Yunnan Co. Ltd. Mapping 42 Miles of California High Speed Rail Corridor
Application of BIM Strategy for Dali to Ruili Railway Project Utilizing UAVs
Baoshan, Yunnan Province, China Burbank to Los Angeles to Anaheim, California, United States

The 330-kilometer Dali-Ruili Railway in the Yunnan province of China The California High Speed Rail Authority (Authority) is planning the first
will include the world’s longest span bridge, the Nujiang Four-Line Bridge high-speed rail system in the United States for passengers to travel from
with a total length of 1,024.2 meters, and the longest railway tunnel in San Francisco to Los Angeles in under three hours at speeds greater than
Asia, the Gaoligong Mountain Tunnel running 34.5 kilometers. The China 200 miles per hour. Jacobs/Zephyr UAS is developing engineering design
Railway Eryuan Engineering Group, along with Yungui Railway Yunnan Co. plans to support environmental assessment of the potential impact of the
Ltd., China Railway 18 Bureau Group Co. Ltd., and China Railway Tunnel USD 3 billion project on surrounding infrastructure. The engineering team
Group Co. Ltd. has been tasked with implementing a 3D BIM approach for used UAVs to obtain aerial mapping of rail corridor, enabling the Authority
these two projects. The team developed 3D models, performed structural to determine right-of-way impacts with improved accuracy, reducing the
analysis, and created a construction management platform based on BIM environmental footprint of the project.
technology that managed the quality, safety, and progress of construction.
Using MicroStation and Power Rail Track, Jacobs/Zephyr UAS prepared
Using Bentley applications improved design efficiency by nearly base maps for the track plans from the aerial mapping data obtained from
2017 INFRASTRUCTURE YEARBOOK

100 times, shortened design time by 1,000 hours, and saved the UAVs. The geographically dispersed project team used ProjectWise
resource hours on this CNY 4.5 billion project. With ProjectWise, for efficient file sharing and version control. Combining the use of UAVs
the multi-discipline team streamlined workflows and enhanced with Bentley technology allowed for mapping to be completed in eight
collaboration to deliver the project 100 days ahead of schedule. weeks, as opposed to 18 weeks using manned vehicles, for a 78 percent
Project Playbook: Descartes, LumenRT, MicroStation, OpenRoads, reduction in delivery time and an 87 percent reduction in mapping costs.
PowerCivil, ProjectWise, ProStructures Project Playbook: MicroStation, Power Rail Track, ProjectWise
157
BIM Advancements in RAIL AND TRANSIT

AECOM-GHD Joint Venture Clove Technologies Pvt. Ltd.


Level Crossing Removal Project – Technical Advisory Services 3D BIM Modeling for Nagpur Metro
Melbourne, Victoria, Australia Nagpur, Maharashtra, India

The Victorian government initiated a AUD 2.4 billion project to remove 50 As part of the INR 86.8 billion Nagpur Metro Rail project to provide a
of Melbourne’s most dangerous level crossings over the next eight years. sustainable means of transportation in Nagpur, India, Nagpur Metro
AECOM-GHD Joint Venture was responsible for integrating a widespread Rail Corporation Limited retained Clove Technologies to produce geo-
project team of over 30 organizations and consultants to facilitate referenced 3D models for 10 metro stations and a 6.7-kilometer viaduct
information collection, engineering, coordination, and reporting. Removal to enable better control on inventory and avoid cost overruns. By creating
of these congested level crossings is expected to transform travel across separate models for each component, the project team enabled NMRCL
metropolitan Melbourne and improve safety for drivers and pedestrians. to extract accurate bills of quantities for procurement and cost planning.

With over eight rail and road configurations to evaluate at each of the The team used Bentley applications to implement a federated modeling
50 sites, the team needed an elevated level of engineering accuracy. approach among the multiple disciplines and generated a master iModel
OpenRoads ConceptStation streamlined conceptioneering and optimized that could be shared with and reviewed by the client and stakeholders.
detailed engineering design, reducing the evaluation cycle from 10 The ability to visually simulate the construction schedule in AECOsim
hours to three hours, per site. Integrating OpenRoads technology during Building Designer minimized impact on city traffic and enhanced safety
the conceptual design phase enhanced configuration accuracy and during construction. Bentley’s integrated BIM technology improved
reduced design time by more than 30 percent. Automated workflows accuracy in bills of quantity estimation, helped resolve clashes,
in ProjectWise reduced review time and rework by more than avoided rework, and saved construction time and overall project costs.
50 percent. Project Playbook: gINT, OpenRail, OpenRoads Project Playbook: AECOsim Building Designer, ProjectWise
ConceptStation, OpenRoads Designer, Power Rail Track, ProjectWise
158
Delhi Metro Rail Corporation Dubai Roads and Transport Authority
Alignment Design for Proposed Majlis Park to RK Ashram Configuration Management and Collaborative Information
for Delhi MRTS Corridor – Phase IV Management for Dubai Rail Networks
New Delhi, Delhi, India Dubai, United Arab Emirates

As part of its Phase IV expansion to improve rail connectivity between As part of Dubai’s Innovation and Smart City Program, the Road and
India’s capital city of Delhi and outer areas, Delhi Metro Rail Corporation Transport Authority’s (RTA) Rail Agency implemented a configuration and
(DMRC) is proposing a metro railway line connecting Majlis Park to the collaborative information framework and BIM initiative to improve its
current RK Ashram metro station. The new rail corridor includes nine rail networks. Lacking defined processes and an adequate collaborative
interchange stations and passes through congested areas of mixed traffic. platform to manage information, RTA initiated the estimated USD 20
The INR 25 billion project required the team to review the detailed project billion project to achieve smarter maintenance powered by better data,
report and provide design revisions to optimize land use and maintain increased access to accurate and transparent information, and more
safe distances from historical monuments. informed decision making to allow for proactive planning.

Using Power Rail Track, DMRC identified numerous changes to the initial RTA will integrate all existing and future railway operations and
track alignment and optimized the design to minimize property acquisition maintenance systems with AssetWise to create baseline data that can
and integrate densely populated areas while preserving the city’s cultural be maintained, controlled, and shared with stakeholders. AssetWise
2017 INFRASTRUCTURE YEARBOOK

heritage. Bentley’s 3D rail track design software enabled the team to was integrated with ProjectWise to provide stakeholders a collaborative
finalize designs in less than three months, reducing resource hours and platform for reliable information in a structured environment. RTA
project costs. Project Playbook: Power Rail Track anticipates a 12 percent reduction in capital expenditure and an estimated
10 to 15 percent savings in operational expenses within three years of
implementation. Project Playbook: AssetWise, ProjectWise

159
BIM Advancements in RAIL AND TRANSIT

Dubai Roads and Transport Authority Ircon International Limited


Route 2020 Anji Bridge Construction
Dubai, United Arab Emirates Reasi, Jammu and Kashmir, India

In preparing to host the World Expo 2020, Dubai Roads and Transport To provide a connected railway service in the remote areas of Jammu
Authority (RTA) is planning a link between the existing Dubai Metro Red and Kashmir, India, Northern Railway initiated an INR 3.6 billion project
Line and the expo site near Dubai’s Al Maktoum International Airport. to construct a cable-stayed bridge in the Himalayas located over a deep
The AED 10.5 billion Route 2020 project will add 14 kilometers of track gorge where the height of the bridge deck is approximately 190 meters
and seven new metro stations, and will be a pilot project for RTA’s above the river bed. Given the inaccessibility of the sloping terrain on
implementation of a BIM Level 2 strategy. either side of the river, the project team needed to visualize and analyze
the alignment of the bridge approaches to ensure structural integrity.
RTA used ProjectWise to streamline workflows among the multi-
discipline project team during design and construction. Integrating Ircon International used drones to survey the area and imported the data
AssetWise ensured effective asset management throughout the lifecycle into Power Rail Track, creating a digital terrain model to visualize the
for optimal operations and maintenance. Working in a connected exact inclination of the slopes and analyze bridge alignment options.
data environment using Bentley’s integrated BIM advancements, RTA Using Bentley applications, engineers determined there was insufficient
reduced modeling time and overall costs by 18 percent. As a leader area for the bridge approaches and that the bridge span needed to be
in the adoption of BIM strategies, RTA aims to change the culture of extended. Identifying this issue by using Power Rail Track prior to
delivering CAPEX projects through improved collaboration and asset construction saved the significant time and costs of potential rework.
information management using Bentley’s interoperable technology. Project Playbook: Power Rail Track
Project Playbook: AssetWise, ProjectWise

160
Italferr Land Transport Authority
Itinerary Naples C8801 – Kim Chuan Depot Extension
Apice, Benevento and Avellino, Italy Singapore

As part of the infrastructure and technology upgrade of the high-speed, To meet future demands aligned with the planned 4-kilometer Circle
high-capacity railway route from Naples to Bari, Italy, Italferr is designing Line 6 extension of Singapore’s mass rapid transit system, the Land
a EUR 1.1 billion, 19-kilometer extension amid landslide-prone topography. Transit Authority is expanding the Kim Chuan Depot. The new depot will
To optimize design, the organization implemented a collaborative BIM provide additional train stabling and maintenance areas for the MRT, and
approach working in a common data environment to manage inter- will nearly double its capacity—from 70 to 133 trains. The integrated
discipline data flow during planning and design. The completed railway underground depot will house 550 buses, enabling the LTA to optimize
axis will play a key role in the development of Southern Italy. land use for the project.

The team used ProjectWise as the collaborative platform and Descartes Using AECOsim Building Designer provided an integrated BIM environment
enabled the production and processing of point clouds quickly and for the multi-discipline design team, facilitating seamless, integrated
dynamically, which were used to help generate 3D models of the track in workflows, and accelerating design of the complex buildings to meet
Power Rail Track. Bentley’s applications facilitated optioneering, enabling tight project deadlines. Bentley’s iModel technology helped the team
2017 INFRASTRUCTURE YEARBOOK

the team to reach an optimal solution in a shorter timeframe and reduce convert Revit models for use in AECOsim Building Designer and improved
project costs. Working in a single federated model using Navigator design coordination, eliminating design errors and costly construction
for clash detection allowed for resolution of potential errors prior to rework. Using Bentley applications helped the engineers deliver assets
on-site construction. Project Playbook: Descartes, LumenRT, gINT, that can be managed and maintained throughout their entire lifecycles.
MicroStation, Navigator, OpenRoads, Power Rail Track, ProjectWise Project Playbook: AECOsim Building Designer

161
BIM Advancements in RAIL AND TRANSIT

Maharashtra Metro Rail Corporation Limited PLH Architects


Nagpur Metro Rail Baltica
Nagpur, Maharashtra, India Riga, Latvia

Nagpur Metro is an INR 86.8 billion urban mass transit project in European Railroad Lines contracted PLH Architects to design Rail Baltica
Nagpur, India. Maharashtra Metro Rail Corporation Limited implemented as a beautiful gateway to Riga, Latvia. The project includes designing
a comprehensive BIM approach with a consortium of engineering the station, railway, bridge with pedestrian path, and overpass as one
consultants from conceptual design through construction, operation, coherent piece of infrastructure with an objective of increasing the
and maintenance. The project team used Power Rail Track to model and amount of green in the city to help strengthen the sense of Riga as a
analyze the metro track alignment, OpenBridge Modeler for the viaduct, vibrant metropolis. Upon completion, Rail Baltica will serve as a city
Promis.e for designing traction and signaling, and AECOsim Building hub connecting regional areas with local communities via different
Designer to design the station buildings. transportation modes and provide a public space for recreation and
commercial activities. Project Playbook: MicroStation
Using Bentley technology to produce the entire project model enhanced
collaboration, accelerated design time, and improved project reliability,
saving 50 percent in engineering time and costs. Implementing a
3D BIM approach enabled real-time collaboration and simulation,
minimizing changes and avoiding rework. The BIM strategy allows for
asset management throughout operations and maintenance for lifecycle
infrastructure management. Project Playbook: AECOsim Building
Designer, ContextCapture, MicroStation, Navigator, OpenBridge Modeler,
Power Rail Track, Promis.e
162
State Unitary Enterprise MosgortransNIIproject
Queensland Rail Program for the Overhaul of Tramways in the
Railway Signaling Information Modeling City of Moscow, 2017-2019
Brisbane, Queensland, Australia Moscow, Russia

Railway Signaling Information Modeling (Rail SIM) is Queensland Rail’s One of the key elements for development of municipal passenger
initiative to introduce collaborative intelligence into conventional rail transport in Moscow, Russia is the modernization of existing tram
signaling design for improving accuracy, efficiency, and compliance infrastructure. State Unitary Enterprise MosgortransNIIproject is the
with General Signal Specification design standards. Implementing general designer responsible for the overhaul of 54 kilometers out of the
the system required content migration to link metadata to 3D models, existing 440-kilometer tram network. The project required quick design
automated features for accurate conceptual design based on applied decisions to meet changing track profiles, roadway layout, and baseline
programming, customizable capabilities for automated equipment checks, data, while ensuring documentation complied with registration rules. The
documentation detailing design workflows, and a collaborative interface, reconstructed sections of the track will meet operating requirements of
allowing multiple user access to the system in a controlled environment. the upgraded tram park and ensure safety of the municipal tram system.

Rail SIM used Promis.e for intelligent rail signaling design and ProjectWise Using Bentley's Power Rail Track for 3D design reduced resource hours
as the collaboration platform, providing a complete lifecycle management required to reissue project documentation to accommodate changes
2017 INFRASTRUCTURE YEARBOOK

approach to any signaling design project. Based on a recent project in by 40 to 50 percent, increasing the ROI by 25 to 30 percent. The
the Northgate suburb of Brisbane, using Rail SIM the team completed application’s automated functions for designing and generating compliant
the design of a power equipment room in two weeks instead of 10, at documentation and reports avoided manual errors, saving 50 days in
an estimated 20 percent cost savings per location. Automating various project review time. Project Playbook: Bentley Map, MicroStation,
analysis reports is estimated to save 35 percent in overall costs per OpenRail, Power Rail Track
location. Project Playbook: MicroStation, ProjectWise, Promis.e
163
BIM Advancements in RAIL AND TRANSIT

SUDOP PRAHA a.s. Track Access Services Ltd.


Reconstruction of Masaryk Station in Prague Track Access Portal – An Online Railway Information System
Prague, Czech Republic United Kingdom

The Czech Republic’s SZDC railway infrastructure administrator retained Track Access Portal is a hosted online system that provides mapped
SUDOP PRAHA to conduct a feasibility study for the reconstruction of video coverage of the on-track railway network throughout the United
Prague’s oldest railway station. The EUR 62 million project required the Kingdom, offering industry users an instant virtual visit to all main areas
project team to create a more efficient pedestrian access and connections of the UK rail network. The GBP 750,000 information system was initiated
to the railway station, while integrating historic buildings of the existing to increase the productivity of drivers at DB Cargo Freight Operating
station with modern structures to complement the surrounding urban Company, ensuring they have extensive knowledge of each route
infrastructure. The newly designed station will improve passenger comfort they drive to maintain competency and efficiency. Prior to the system,
and is expected to increase capacity from 40,000 to 52,000 travelers daily many resource days were lost to drivers taking cab rides to familiarize
by 2020. themselves with their routes.

Using Bentley applications facilitated 3D design coordination of The project team needed to incorporate current route information as
the pedestrian platform above the station and the corridor, linking well as monitor and update the system to reflect engineering changes
significant areas in the territory. MicroStation for 3D design was to ensure content is accurate and easily accessible. Leveraging Bentley
instrumental in creating the visualizations that served as a basis technology optimized the sharing of accurate information, resulting in
for negotiations with different stakeholders throughout the project. significant annual cost savings. DB Cargo saved 50 percent in drivers’
Project Playbook: MicroStation, ProjectWise route training times, and improved route efficiency for an estimated
savings of GBP 500 million. Project Playbook: MicroStation, OpenRail,
Power Rail Track, ProjectWise
164
WSP Consultants India Pvt. Ltd.
Hallsberg-Stenkumla
Hallsberg, Sweden

The Swedish Transport Administration (Trafikverket) proposed building


a new railway corridor between Hallsberg and Stenkumla, Sweden to
increase travel capacity and offer more opportunities for eco-friendly
travel. This SEK 3.24 billion project includes building double tracks
stretching 14 kilometers in length and a 2-kilometer underground tunnel
along the railroad. WSP Consultants India was tasked with providing
detailed design services for the entire project, including track alignment,
drainage, and ground, electrical, and structural works.

The WSP team delivered a 3D model of the proposed design using Bentley
applications. Bentley’s integrated civil design and analysis technology
reduced time, ensured accurate material quantities, improved information
2017 INFRASTRUCTURE YEARBOOK

mobility, and enhanced design efficiency. Power Rail Track optimized


optioneering to determine a solution that minimized cut and fill volumes.
Visualization of the 3D model accelerated real-time collaboration and
enhanced communication among the team and with stakeholders.
Project Playbook: MicroStation, OpenRoads, Power Rail Track

165

The ProjectWise common data environment allows CVBJV to easily


access the information and has improved and simplified design approvals.

– Chebli Matta, Design & Engineering Manager, Mott MacDonald/CVB


Joint Venture

166
REALITY MODELING
Reality modeling is the process of capturing and visualizing the real-world context of an asset to better
understand existing conditions and more clearly communicate designs within their environmental context.
These projects demonstrate excellence in reality capture and/or visualization that solved a specific design,
construction, or operations challenge, enabled better decision making, and/or streamlined the process of
collaboration or approvals through improved communication.

167
BIM Advancements in REALITY MODELING
W I N N E R

CEDD-AECOM-The Earth Solutions


Development of Anderson Road Quarry Site I Hong Kong

To address the housing shortage in Hong Kong, the Anderson Road Quarry site will provide about 40 hectares of land for residential, commercial, and other
development. The estimated USD 1 billion project involves civil infrastructure including site formation, road networks, drainage system including stormwater
retention tank and artificial flood lake, sewerage system, underground utilities, and green space to serve the future community. AECOM was engaged by the
Civil Engineering and Development Department (CEDD) of the Government of the Hong Kong Special Administrative Region to design and administer the civil
infrastructure works for the first Hong Kong project to use Bentley applications throughout the construction process.

The team used Bentley software to manage and share data among the multiple engineering disciplines, for design modeling, to apply BIM methodologies, for
monitoring construction progress, and to create visual animations to showcase the project to the public. Working in an integrated environment using reality
modeling increased site safety by reducing risk of laborers working on site, improved collaboration with stakeholders, minimized time and resources required,
streamlined workflows, and minimized costly rework. Project Playbook: AECOsim Building Designer, ContextCapture, LumenRT, MicroStation, OpenRoads,
168 Pointools, ProjectWise
F I N A L I S T F I N A L I S T

Pennsylvania State University,


Department of Architectural Engineering Sanborn Map Company, Inc.
Virtual Penn State Campus Sanborn3D HD Maps for Autonomous Driving: Santa Clara
University Park, Pennsylvania, United States Santa Clara County, California, United States

The University Park campus located in State College, Pennsylvania is Operating self-driving vehicles safely will require the cars to have
Penn State University’s largest of 24 campuses, featuring almost 1,000 purpose-built, map-based data sets that contain detailed mapping
buildings and structures with numerous assets contained within each information with absolute, precise accuracy compared to the results
facility. To more efficiently meet campus operations and maintenance from current geospatial positioning system resources. To address this
demands, the university developed a reality model of the campus that need, the Sanborn Map Company developed proprietary HD mapping
integrates geospatial and asset work order data. technology that created high-precision, 3D maps of California’s Santa
Clara area, specifically for use in autonomous vehicle models. The
Using Bentley software, the team generated a detailed, geospatially company needed a way to showcase the quality of its mapping data to its
accurate 3D reality mesh of the campus and surrounding area from 2,500 partner automotive firms.
aerial images in less than two days. They integrated geospatial and asset
work order data from the university’s own geospatial information system The team used ContextCapture to generate a 3D reality mesh from
and computerized maintenance management system with the reality mesh. oblique imagery of Santa Clara County, and integrated its HD map
2017 INFRASTRUCTURE YEARBOOK

As the collaborative storage interface, ProjectWise provided web-based data to create a virtual simulation tool for testing autonomous cars.
access to the model, which eliminated the need for computer storage ContextCapture automated the process of creating a high-quality model
space and model transfer time, and also improved information sharing that, using traditional methods, would have required a team of 3D
among stakeholders to optimize campus facility and asset management. modelers working for six months at an estimated cost of USD 100,000.
Project Playbook: ContextCapture, MicroStation, ProjectWise Project Playbook: ContextCapture, Descartes

169
BIM Advancements in REALITY MODELING

3D ScanWorld Aerometrex
Energy Factory Knappenrode Parramatta Light Rail Project
Knappenrode, Saxony, Germany Parramatta, New South Wales, Australia

The Energy Factory Knappenrode in Saxony, Germany is a former To accommodate the projected 2036 shift of more than half of Sydney’s
industrial facility that is now a museum. Because the numerous assets population to the Greater Parramatta area, the Parramatta Light Rail Project
are difficult and expensive to maintain in their original size and capacity, will improve public transport in a very congested traffic area. Aerometrex
machines that are redundant or visually unappealing will be dismantled. was commissioned to create a 3D reality mesh of a 19.6-square-kilometer
To preserve the cultural heritage of the structure and assets, authorities area that includes the proposed 12-kilometer rail route. The reality mesh
mandated comprehensive documentation to be compiled prior to will be used as a unifying data source for all aspects of planning, route
renovations. 3D ScanWorld worked with community agencies to perform selection, cost, and material estimations, and for community consultation.
3D laser scanning to capture the layout of the entire factory.
The project team captured 60,000 photographs over a six-week period and
The team used the dataset from the scans to create architectural processed the images in ContextCapture to generate a high-resolution, 3D
drawings of floor plans and cross sections as point clouds and imported model of the area in less than three weeks, with total data delivery reaching
them into Pointools for visualization and integration into the digital eight terabytes. Using Bentley’s reality modeling solution to create a 3D
historical building stock. Using Pointools allowed the team to remove framework that can display disparate datasets significantly improved
distracting elements and focus on essential components, develop visual collaboration among the public and all stakeholders. The 3D model serves
documentation with elaborate image retouching multiple times faster as the foundation for a holistic, interdisciplinary dataset on this long-term
than with classic photo documentation, and navigate point clouds for AUD 3.5 billion project, which is expected to reach completion in May
review. As a result, a uniform set of architectural plans is now available 2023. Project Playbook: Bentley AXSYS, ContextCapture, OpenRail
for different disciplines. Project Playbook: Pointools
170
BES Engineering Corporation BM Engineering S.r.l
Photomesh and BIM for House Selling Revamping ABS Steelworks
Taipei, Taiwan Buttrio, Udine, Italy

BES Engineering Corporation (BES) provides multi-discipline engineering The steel mills in Udine, Italy require expansion and modernization
and construction services in Taiwan. To promote housing sales to high-end to minimize environmental impact of the production fumes extraction
buyers in the Taipei region, BES sought to create Taiwan’s first housing system. The modernization of the site required a comprehensive survey
reality modeling system for sales personnel to use on mobile devices. The of approximately 43 hectares, including structures, systems, piping inside
goal was to present customers with a detailed view of the inside of the the plant, and difficult-to-access external areas.
house and surrounding landscape.
The project team used various survey methods to capture the complex
BES used ContextCapture to produce a 3D reality model from infrastructure, processed the data into point clouds within Pointools, and
photography captured by UAVs, and combined it with the BIM generated a 3D reality mesh using ContextCapture, linking the information
information in MicroStation. The team developed applications to in MicroStation and AECOsim Building Designer for rapid generation
publish the 3D model and used LumenRT to animate the model and of the BIM objects. Using ContextCapture to reconstruct the roofs of
present dynamic visualizations to investors. Using Bentley’s integrated the industrial buildings from the photo survey eliminated the need for
2017 INFRASTRUCTURE YEARBOOK

software enabled BES to generate the reality modeling solution quickly dangerous on-site surveys and associated temporary provisions, saving
and cost effectively, which is anticipated to boost housing sales. at least EUR 70,000. The interoperability and automated capabilities
Project Playbook: ContextCapture, LumenRT, MicroStation of Bentley technology reduced post-processing times allowing the
final deliverable to be completed within 45 days of the surveys.
Project Playbook: AECOsim Building Designer, ContextCapture,
MicroStation, Pointools
171
BIM Advancements in REALITY MODELING

Brussels Regional Public Service, CEDARVILLE Engineering Group, LLC


Monuments and Sites Directorate Eastern State Penitentiary Historic Site
Recording of the Archaeological Heritage in Brussels Infrastructure Characterization
Brussels, Belgium Philadelphia, Pennsylvania, United States

The Monuments and Sites Directorate of the Brussels Regional Public CEDARVILLE Engineering Group was tasked with creating a 3D reality
Service manages and documents property, and moveable and natural model to be used in the design of a green stormwater infrastructure
heritage in the Brussels-Capital region, and makes it available to the retrofit project for the historic Eastern State Penitentiary. The project
public upon request. Obtaining documentation on built heritage requires includes an existing conditions plan that will serve as the basis for the
incorporating development and restoration work on old buildings, infrastructure design. CEDARVILLE performed a detailed topographic
which traditionally involved manual surveys and drawings that are then and site feature survey and created a high-resolution 3D model to
scanned and made available online using MicroStation. The Directorate serve as the foundation for a standard topographic survey, creating a
recently implemented reality modeling in the process to optimize survey compelling visual of existing site conditions to help secure funding for the
work, improve decision making, and provide easy access to more restoration program.
comprehensive documentation.
The team used ContextCapture to generate a reality mesh of the site from
The agency used photogrammetry and ContextCapture to capture the aerial and ground photos. Using Descartes, the model was incorporated
condition of a heritage site at a precise moment and generate a 3D with field survey data prepared with OpenRoads and ground penetrating
model. Bentley’s reality modeling technology enabled rapid production of radar, with corresponding points incorporated into the design environment
the documents, utilized fewer resources and resulted in a more timely for underground utility locations. Bentley applications helped the team
closure of the site. The 3D modeling solution was six times more efficient complete the initial project phases on time with an unprecedented
and produced significantly more accurate deliverables than traditional level of detail. Project Playbook: ContextCapture, Descartes,
methods. Project Playbook: ContextCapture, MicroStation MicroStation, OpenRoads
172
Clove Technologies Pvt. Ltd. Clove Technologies Pvt. Ltd.
3D Digital Documentation of Heritage Structure Krishna River Walk Proposal
Thorur, Warangal, Telangana, India Vijayawada, Andhra Pradesh, India

The Andhra Padesh Tourism Department is planning to build the world’s The capital city of Amaravati is planning to build a world-class river
first mythological and spiritual theme park in Tripathi, Pradesh, India. walk community along the banks of the Krishna River in Andhra Pradesh,
Known as Devlok, the project consists of four floors housing miniature India. Clove Technologies was tasked with providing a virtual 3D model
replicas of 108 Indian temples, a virtual reality arena, museum, libraries, that combines existing data with planned environmental development
spiritual merchandise and gardens, ice temples, and a snow park and and facility designs, as well as highly precise models for engineers,
snow restaurant. Clove Technologies was tasked with providing a detailed architects, designers, and city officials to use for conceptual planning
3D reality mesh of an existing historic temple in Thorur, India as a proof and cost analysis. The proposed 14-kilometer project site across the river
of concept for using as-built 3D digital models of ancient structures that presented terrain challenges capturing the area amid islands and hills.
can be stored and preserved in an electronic library for future research.
Using ContextCapture, the project team created a 3D reality mesh from
The project team used UAVs, laser scanning, and other sources to capture UAV images and DGPS data with 3.2-centimeter accuracy and used
images of the temple arches, finely carved statues, and surrounding LumenRT to animate the proposed solution for beautifying the shores,
2017 INFRASTRUCTURE YEARBOOK

area. ContextCapture enabled engineers to process images and extract as well as creating flood simulations for flood management planning.
details to produce a 3D texturized reality mesh, as-built point clouds, and Bentley’s integrated and automated technology saved significant time
drawings. The software also supported 3D printing and web publishing generating the reality mesh compared to traditional survey and modeling
for improved collaboration with stakeholders. ContextCapture saved methods and improved collaboration among stakeholders. The model
significant time and costs and reduced risks associated with an otherwise facilitated detailed planning and analysis for this INR 1.5 million project.
manual survey. Project Playbook: ContextCapture, MicroStation Project Playbook: ContextCapture, LumenRT, MicroStation
173
BIM Advancements in REALITY MODELING

Damwon Co., Ltd.


Comparison of 3D Model Accuracy Based Enord LLC
on Drone Photography Colombia Mining Sites Survey
Seongnam, Gyeonggi-do, South Korea Bogota, Colombia

Damwon Co., Ltd. piloted the use of UAVs to survey an inaccessible Mining plays an important role in Colombia’s gross domestic product
project site affected by a landslide from an earthquake. Using the survey and foreign trade. To facilitate better decision making regarding mining
information, the team generated a reality mesh and topographic map of locations and associated costs, the Colombian government retained
the area using ContextCapture to process 4,000 photos in just one night. industry leading aerial surveyor Enord to survey tens of thousands of
acres of mining sites to document and analyze the mining environment.
Compared to traditional survey methods, Damwon saved 14 days and The project team captured and consolidated numerous data files, and
KRW 84 million in costs by using the drones and ContextCapture. The produced designs and reporting metrics to help the government better
automated processing capabilities of Bentley’s reality modeling software understand the changing landscape.
enabled the team to produce a coordinated, geospatially accurate
3D model in less than 24 hours for a total cost of KRW 6 million. Using OpenRoads and Descartes, Enord performed calculations and
Project Playbook: ContextCapture, MicroStation generated reality meshes of the terrain from the captured survey data
with volumetric accuracy. Bentley applications automated an otherwise
manual process, saving significant time. Reality modeling facilitated
precise measurement for slopes, angles, and elevation, enabling cost
efficient analysis and improving safety by identifying and avoiding
accident-prone areas. Project Playbook: Descartes, OpenRoads,
OpenRoads Designer

174
Expert Engineering Company Eye-bot Aerial Solutions
Reconstruction of the Administrative Complex Springdale Monopole
Moscow, Russia Springdale, Pennsylvania, United States

The seven-story, 15,260-meter administrative complex in Moscow, Russia Springdale Monopole is a reality modeling project for a cell tower
has undergone numerous renovations over the years, with the most recent antenna located in Springdale, Pennsylvania. Drone service company
one changing the spatial layout, which increased the loads on foundations. Eye-bot Aerial Solutions initiated this project to help achieve improved
To improve structural integrity, the facility is being reconstructed. LLC fidelity and workflows by modeling vertical monopole structures that
Expert Engineering Company is responsible for construction oversight, feature transparent complex cross bracing. Because modeling these
supervising the execution of work in strict accordance with design and cost towers solely with UAV photogrammetry is extremely difficult, Eye-bot
solutions. The project team used reality modeling to visually demonstrate sought to incorporate LiDAR scanning as part of the data-capture process,
and communicate with project stakeholders and the on-site construction and needed software to accommodate both survey methods.
team for improved decision making and optimal building control.
The project team used ContextCapture to process images from
The team generated a 3D model of the premises, integrated the reality different data sources, and generated a precise 3D reality mesh to
meshes for more accurate design and construction modeling, and stored share among stakeholders. The reality mesh helps eliminate risks
2017 INFRASTRUCTURE YEARBOOK

the model on ProjectWise for real-time collaboration. Bentley technology associated with manual inspection, allows for precise measurements
saved 30 days of measurement work and reduced costs by 35 percent. of the structure, and enables new designs to be incorporated into the
Using the reality mesh as the basis for the BIM design improved modeling existing environment for planning and expansion. The capabilities
accuracy and design integration efficiency, reducing design time by three of ContextCapture and reality modeling demonstrate tremendous
months. Project Playbook: ContextCapture, Descartes, OpenRoads potential for improved efficiencies in the telecommunications industry.
Designer, ProjectWise Project Playbook: ContextCapture
175
BIM Advancements in REALITY MODELING

Flightline Geographics LLC FlyingJoy VR


Ethanol Processing Plant FlyingJoy VR Formosa
Liberal, Kansas, United States Taipei, Taiwan

To demonstrate to the local municipality that expanding an operating A participant in Taiwan’s annual cultural and creative competition themed
industrial ethanol production plant in Liberal, Kansas would not negatively “Smart Life Changes with Culture and Creation” for 2016, FlyingJoy VR
impact neighboring properties, Flightline Geographics was retained to initiated a concept to develop virtual reality modules based on 3D reality
provide site survey and reality modeling services for a drainage study. modeling obtained from full-field image surveying. The team combined
Flightline had to complete its deliverables within a short timeline and on reality modeling with virtual reality technology to integrate the diversity of
a tight budget. Using small unmanned aircraft vehicles (sUAV), the team Taiwan’s natural environment with a multi-cultural society. This capability
surveyed the 200-acre site and delivered a 3D reality mesh to illustrate enabled users to better experience and understand the country’s beauty
that existing containment and drainage systems were adequate to handle and international culture.
the expanded plant capacity.
The FlyingJoy team chose High Heels Church in Chiayai and the Jinguashi
ContextCapture processed over 1,000 images captured in one hour into Geological Park as the cultural sites for reality modeling. Using UAVs,
a 3D reality mesh in two days. The engineers used the reality mesh to they captured photos of the two locations and generated reality meshes
quickly calculate results for the drainage and construction study, and the with ContextCapture, which were then imported into virtual reality
plant received its permit within one week. Using ContextCapture enabled technology to incorporate self-sensing devices. ContextCapture’s
Flightline to process the large dataset three times faster than traditional automated processing capabilities shortened reality modeling time from
methods and to complete the project ahead of time and under budget. two months to one-and-a-half weeks, saving associated costs as a result.
Project Playbook: ContextCapture Project Playbook: ContextCapture, Descartes

176
Foth Infrastructure & Environment, LLC GeoINT
Mobile LiDAR and sUAS Case Study Analysis of an Area around a Transmission Tower
Des Moines, Iowa, United States Greater Gwangju Metropolitan Area, South Korea

The City of Des Moines Engineering Department contracted Foth To determine the optimal site for relocating a transmission tower in
Infrastructure & Environment to perform engineering and design services the Greater Gwangju Metropolitan Area, South Korea, GeoINT was
for the reconstruction of the Hubbel Avenue Corridor to improve safety on tasked with surveying and modeling the area surrounding the structure.
the highly accident-prone urban roadway in Des Moines, Iowa. As part Tackling the rough terrain was a major challenge. To ensure safety of the
of the USD 14.7 million project, Foth collected survey data and built a surveyors, GeoINT used UAVs to photograph the landscape and obtain
digital terrain model of the existing ground conditions. To achieve desired accurate terrain information for the client to make an informed decision
accuracy while ensuring safety of survey personnel, the geospatial on where to move the facility.
team chose a unique combination of aerial-based LiDAR using a small
unmanned aircraft system (sUAS) and ground-based mobile scanning to The project team used ContextCapture to process the photos and
collect the data, and used reality modeling to produce near real-time site generate a 3D reality mesh of the area. Using LumenRT, the project team
conditions, enabling the design team to make more informed decisions. provided realistic visualizations for the client to help analyze and identify
the optimal relocation site. Aerial photogrammetry and ContextCapture
2017 INFRASTRUCTURE YEARBOOK

Using Bentley software, the team reduced field time by more than two reduced resource hours required for surveying on site, improving safety,
weeks, taking only a few days to perform post-processing and mapping and enabling the team to build the realistic 3D mesh at 30 percent of
functions, optimizing safety and minimizing costs while producing a actual project costs and deliver the final model in just two weeks.
quality deliverable that exceeded client expectations. Project Playbook: Project Playbook: ContextCapture, LumenRT
ContextCapture, Descartes, MicroStation, OpenRoads, ProjectWise

177
BIM Advancements in REALITY MODELING

SPECIAL RECOGNITION AWARD WINNER

Guangdong Hydropower Planning & Design Institute


GeoINT Guangdong Pearl River Delta Water Resources
Gyeonggi-do Pottery Museum Virtual Experience Reality Model Allocation Project
Gwangju, Gyeonggi-do, South Korea Guangdong, China

The Gyeonggi-do Pottery Museum operates diverse facilities in Gwangju, The Pearl River Delta Water Resources Allocation project is a CNY 34.7
Gyeonggi-do, South Korea and is the only museum dedicated to the billion urban water conservation and supply initiative in the Guangdong
collection, preservation, study, and exhibition of historic Korean ceramics. province of China. It includes 114.9 kilometers of water lines and shield
In an effort to promote and educate people about the museum, GeoINT tunnels running through four cities. Guangdong Research Institute
initiated a project to create a virtual tour of the facilities’ exhibitions, of Water Resource and Hydropower is responsible for planning and
which helped popularize and revitalize the history of traditional designing the project, which is expected to resolve water shortage issues
Korean ceramics. and improve water supply.

The project team used ContextCapture to create a 3D reality mesh from UAV The project team used Bentley applications to generate and refine 3D
photos taken of the museum and the surrounding environment. Integrating reality models of the planned locations and to produce animations that
LumenRT, the team provided accurate cyber tours of the museum through provided stakeholders with an intuitive understanding of the project.
realistic visualization of the site. Bentley’s reality modeling applications The team used Bentley software for clash detection, which reduced
helped the team complete the project within five weeks while reducing costs. design time by 1,500 hours and saved nearly CNY 250,000 in design
Project Playbook: ContextCapture, LumenRT costs. Streamlined workflows enabled the team to deliver the project
23 days ahead of schedule. Project Playbook: AECOsim Building
Designer, Bentley Raceway and Cable Management, ContextCapture,
Descartes, LumenRT, Bentley Map, MicroStation, Navigator, OpenRoads,
OpenRoads ConceptStation, OpenRoads Designer, OpenRoads Navigator,
178 ProjectWise, Bentley Substation
Haiwei Spatial Information Technology LLC Hatch
3D Reality Modeling of Yangzhou City Rock Dump Geotech Inspection
Yangzhou, Jiangsu, China Sudbury, Ontario, Canada

The Yangzhou Municipal Planning Bureau retained Haiwei Spatial Hatch was retained to perform a visual inspection of a rock dump in
Information Technology to perform data acquisition and reality modeling Sudbury, Ontario and prepare a remediation report for its client, indicating
services to establish an accurate 3D city model for decision making, necessary repairs to ensure structural integrity and safe operation of the
planning, and development of Yangzhou, China. The resulting model facility. The rock dump is an 80-foot deep, open-cut excavation with three
gave government officials and planning designers the ability to visualize rock faces making it difficult, time-consuming, and unsafe for personnel
potential development initiatives and served as a basis for using reality to access for photo surveying. Hatch proposed the use of UAVs to collect
modeling for urban development in other Chinese cities. all images for analysis and completed the assessment using a 3D model.

Using ContextCapture, the project team processed 800,000 photos The project team captured 1,140 aerial photos in less than four hours
captured with UAVs and generated a 3D reality mesh in 20 days, and, using ContextCapture, generated a 3D reality mesh. ContextCapture
compared to 10 months using manual processes. Descartes enabled the reproduced a detailed 3D visualization of the rock faces, allowing teams
team to edit 400 surface models in three days. MicroStation provided to take measurements and perform a comprehensive assessment to serve
2017 INFRASTRUCTURE YEARBOOK

the interoperability to integrate multi-sourced data and produce a as a baseline for future inspections to monitor the conditions over time.
digital, urban 3D GIS platform. Bentley’s integrated applications Hatch saved 25 percent on visual inspection costs and 40 percent on post
allowed the team to deliver the project 10 days ahead of schedule analysis costs and completed the project three weeks ahead of schedule.
and save an estimated CNY 1.2 million on this CNY 4.5 million project. Project Playbook: ContextCapture, LumenRT, MicroStation
Project Playbook: ContextCapture, Descartes, MicroStation

179
BIM Advancements in REALITY MODELING

Hebei Third Surveying and Mapping Institute Henan Water & Power Engineering
Aided Design for Planning of 2016 Tangshan World Consulting Co., Ltd.
Horticultural Exposition Zhengzhou Guanyin Lake Water Diversion and Storage Project
Tangshan, Hebei, China Zhengzhou, Henan, China

Tangshan, China held the 2016 Horticultural Exposition over a period of To guarantee water delivery capacity and operational security in northern
171 days with estimated audiences of more than 10 million people. To China, the Zhengzhou Guanyin Lake Water Diversion Project focuses on
improve planning, construction processes, and management of the event, construction, planning, and development of water diversion facilities in
Hebei Third Surveying and Mapping Institute used reality modeling and the rapidly growing city of Zhengzhou. Henan Water & Power Engineering
BIM advancements to build a virtual Tangshan Expo. Consulting was responsible for planning and designing the water diversion
and storage system, shape of the lake, and ecological landscape to ensure
Using ContextCapture, the project team generated a 3D reality model water quality and flood control safety, while minimizing occupation of
from historical data captured prior to constructing the Expo park, and cultivated surrounding areas.
additional data gathered after completion of the park. The project team
integrated Bentley’s Descartes, BIM applications, and LumenRT to render The company used UAVs to capture aerial photos of existing landforms,
scene animations to improve planning and construction efficiency. The villages, and towns surrounding the lake in three days, and, using
combined solution enabled the team to complete the modeling for both ContextCapture, processed those images into a reality mesh in just two
stages in just two months at a cost of just over CNY 600,000, compared days. The team implemented a BIM strategy to design and model the
to nine months and CNY 2.7 million using traditional modeling methods. sluices, pump stations, and other facilities using MicroStation, which
Project Playbook: AECOsim Building Designer, ContextCapture, saved an estimated 30 percent in design time. Using LumenRT, the team
Descartes, LumenRT produced an advertising video in four days, compared to three weeks
using traditional computer graphics. Project Playbook: ContextCapture,
Descartes, LumenRT, MicroStation, ProjectWise
180
IAAN Soft
IAAN Soft View the Location Information of Samsung
Transmitter and Receiver Aging Management Electronics Facilities
Seoul, South Korea Giheung, Gyeonggi-do, South Korea

To determine the operating status and develop a maintenance plan for With a goal of implementing a maintenance management system for
a wireless communication base station and surrounding facilities in the Samsung Electronic’s existing facilities in Giheung, Gyeonggi-do, South
district of Geumcheon-go in Seoul, IANN Soft used reality modeling for Korea, IANN Soft used reality modeling to conduct a feasibility study
accurate data collection and analysis. The virtual reality model of the to determine the status of Samsung’s underground structures. Studying
relay device and communication cables helped identify the status of aging the underground areas using virtual models integrated with associated
equipment and improved decision making for maintenance planning. geospatial data provided a viable solution for building an operations
management system for Samsung’s current facilities.
Using ContextCapture, the company created accurate 3D site situations
within four hours, reducing resource hours and improving work efficiency Using ContextCapture, the team generated a 3D reality mesh of the
by 50 percent, saving an estimated 27 percent in project costs. The team worksite and used Descartes to refine the reality mesh. AECOsim
refined the 3D reality mesh using Descartes and modeled replacement Building Designer allowed the team to share the 3D model and add
devices using MicroStation, which identified problems before performing location information, including additional operational data that could
2017 INFRASTRUCTURE YEARBOOK

maintenance operations. With Bentley’s interoperable reality modeling be linked to the model throughout the facilities management stage.
and analysis technology, the team completed the project in just two days. Bentley technology enabled the project team to verify the feasibility
Project Playbook: ContextCapture, Descartes, MicroStation of implementing an operations management system within one week.
Project Playbook: AECOsim Building Designer, ContextCapture, Descartes

181
BIM Advancements in REALITY MODELING

JSC Kovdorsky GOK, Eurochem


iSpatial Global Systems South Africa Management of Engineering Data for the Operation
iGTMS of the Facilities of JSC Kovdorsky GOK
Pretoria, Gauteng, South Africa Kovdor, Murmansk, Russia

The iGlobe Tower Management System (iGTMS) is a proof of concept Located in the southwest of the Murmansk region of Russia, JSC
project in Gauteng, South Africa to demonstrate the benefits of using Kovdorsky GOK occupies 2,500 hectares and is the only mining production
a combination of UAVs, 3D reality modeling software, geographical facility in the region. A 40,000-cubic-meter rock collapse in the facility’s
information systems, and collaborative project management capabilities iron ore quarry suspended mining operations and development on this
as a solution for structural inspections in difficult-to-access, remote site. To redevelop the site, the project team monitored and surveyed the
areas. The project required the team to accelerate inspection time, reduce complex plant configuration and used reality modeling as the basis for
risks associated with manual site surveys, and produce an integrated, implementing a technical study for re-commissioning the quarry, which
geospatially accurate 3D model that can be accessed by a dispersed will enable the development of 155 million tons of ore and generate a
engineering team in real time. RUB 2.5 billion profit for the region.

Bentley applications provided a solution for quickly and safely The project team used aerial photography to complete the survey and
capturing accurate survey data and photos, creating models, storing the processed the images with ContextCapture to generate 3D reality meshes
geographical information, and managing all project files on a shared that enabled precise calculation of raw materials and finished products in
platform in a managed environment. Project Playbook: Bentley Map, stockpiles. Based on the simplicity, reliability, and mobility of Bentley’s
ContextCapture, Descartes, MicroStation, ProjectWise reality modeling solution, future facility surveys are planned and expected
to deliver a 40 percent increase in efficiency of the work performed.
Project Playbook: ContextCapture

182
MMC Gamuda KVRMT Sdn. Bhd.
and AECOM Perunding Sdn. Bhd. NSW DFSI Spatial Services
MRT Sungai Buloh-Serdang-Putrajaya Line Smart State NSW
Kuala Lumpur, Malaysia New South Wales, Australia

MMC Gamuda KVRMT (MGKT) was awarded the underground works Initiated by Spatial Services, Smart State NSW is a transformational
package as part of the construction of Kuala Lumpur’s 52.2-kilometer MRT project in New South Wales, Australia that aims to produce highly
Sungai Buloh-Serdang-Putrajaya Line (SSP Line). The USD 3.97 billion detailed reality meshes of public and private infrastructure, assets,
project involves the design and construction of the tunnels, stations, and landscapes, and entire town and city-wide areas. It is designed to provide
associated structures along the 13.5-kilometer stretch of underground a visual platform for analysis of spatial data to improve decision making
alignment. Upon completion, the SSP Line will serve a population of and reduce budgets through access to more relevant and higher quality
approximately 3 million people with an estimated ridership of 529,000 data and information. These capabilities will enhance the lives of state
passengers daily and is expected to alleviate traffic congestion. residents and improve safety of emergency personnel.

MGKT used ContextCapture to create 3D reality meshes from The project team used ContextCapture to quickly and intuitively produce
orthographic photos of the construction sites to monitor site progress, precise, web-ready 3D models of New South Wales infrastructure from
review as-built conditions compared to BIM designs, and provide a better a variety of photographic sources and further enhance visualization
2017 INFRASTRUCTURE YEARBOOK

understanding of site constraints to design consultants. Compared to and sharing of the models with LumenRT, which resulted in significant
the estimated two-week timeframe using traditional survey means, stakeholder buy-in. Using ContextCapture allowed for automated
using drone photography and ContextCapture allowed MGKT to process processing during model reconstruction, enabling the team to create
photos and generate an accurate 3D reality mesh of a construction more reality meshes in a shorter timeframe and minimize project costs.
site in just four to six hours, saving valuable time for site surveyors. Project Playbook: ContextCapture, LumenRT
Project Playbook: ContextCapture, MicroStation, ProjectWise
183
BIM Advancements in REALITY MODELING

Sabah Lands and Surveys Department


RealWorld Engineering Consultants 3D Modeling for New Trail Section of Post-Quake
Smart City of New Taipei City Mount Kinabalu
New Taipei City, Taipei, Taiwan Ranau, Sabah, Malaysia

RealWorld Engineering Consultants was tasked with surveying a At 4,095 meters, Mount Kinabalu in the Ranau district of Sabah is the
1,000-hectare area of New Taipei City, Taiwan, and producing a 3D reality highest mountain standing between the Himalayas and New Guinea,
model that included more than 4,000 houses to be used for urban design attracting thousands of climbers from around the globe. In June 2015,
planning and review. The survey was conducted by acquiring aerial a deadly 6.0 magnitude earthquake hit Ranau, making Mount Kinabalu
photos and oblique imagery, which were then processed into 3D models climbing trails unsafe and decimating the 3,200-meter part of the
on a 3D GIS platform for use by the design team and relevant disciplines Timpohon trail from Panalaban leading to the summit. Sabah Lands and
for analysis. Surveys Department (SLSD) was tasked with assessing the damage and
creating a 3D model of the mountain to determine when the trail could
Using ContextCapture provided the hybrid processing necessary to be reopened.
generate a high-precision 3D reality mesh from the multi-sourced data
survey, and it simplified data transfer in multiple formats among the SLSD used large format digital airborne cameras to capture 620 photos of
different design units. The combined survey techniques improved data- the mountain totaling 30 gigabytes in size. Using ContextCapture, SLDS
capture accuracy by 20 to 30 percent and ContextCapture produced the processed the photos and created a geospatially accurate, textual 3D
3D models 10 times faster than traditional methods, saving at least 80 reality mesh of Mount Kinabalu in just 42 hours. The reality mesh aided
percent in costs. Project Playbook: ContextCapture decision making, resulting in the partial reopening of Timpohon trail just
three months after the seismic event, and the reopening of the summit
trail within six months. Project Playbook: ContextCapture

184
Sangji University
Sabah Lands and Surveys Department Research Project Consisting of Realistic Modeling
Sabah 3D Subsidiary Title Information System Video Production
Kota Kinabalu, Sabah, Malaysia Yongin, Gyeonggi-do, South Korea

Sabah Lands and Surveys Department (SLSD) performs and maintains Sangji University conducted a feasibility study to verify the quality and
records of property surveys and issues all land titles in Sabah, Malaysia, accuracy of using aerial photos to produce reality meshes of an area
the bulk of which include individual and subsidiary titles. To enable in Yongin, Gyeonggi-do, South Korea. The completed study provided
interested parties access to subsidiary title information in a more user- evidence that the survey methods and reality modeling provided accurate
friendly format from any device, SLSD developed a 3D subsidiary title terrain information for analyzing the environment.
information system relying on reality modeling, BIM, and GIS data.
Using aerial photography and ContextCapture to generate the 3D
The project required SLDS to build a geospatially accurate, high- engineering-ready reality mesh reduced the manual labor required
resolution 3D model of Kota Kinabalu. The model indicated the positions for on-site surveying and exploration, saving project costs. LumenRT
of the buildings that were issued subsidiary titles and converted provided enhanced visualization capabilities, optimizing information
hardcopy subsidiary survey plans to 3D buildings, which made the mobility and collaboration with stakeholders. Bentley reality modeling
information accessible in a 3D environment through cloud-based technology enabled the team to complete the project within one month.
2017 INFRASTRUCTURE YEARBOOK

services. SLDS used ContextCapture to produce the model in less than Project Playbook: ContextCapture, LumenRT
two months, which allowed the government to allocate MYR 2 million
for this 3D subsidiary title project. The 3D reality mesh of the city
was completed in less than one month from the time of data capture.
Project Playbook: ContextCapture, Descartes

185
BIM Advancements in REALITY MODELING

SPECIAL RECOGNITION AWARD WINNER

Shanghai Hangyao Information Technology Co., Ltd.


SEIKEY Enterprise Drone Solutions 3D Digital Mapping Project of the Tian Qi Mausoleum
Cell Tower Inspections 4G and 5G and Linzi Tombs
Caronno Pertusella, Varese, Italy Beijing, China

SEIKEY technological partner of Telecom Italia initiated a data capture For many years, the Linzi District Cultural Relics Bureau relied on field
and reality modeling project to standardize the inspection of Italy’s 11,800 exploration and 2D satellite images to protect traditional cultural relics of
radio base stations (RBS) and accelerate information exchange among the Tian Qi Mausoleum and Linzo Tombs. Using these methods resulted
stakeholders for improved plant maintenance and asset management. The in inaccurate representations and unclear visualizations for protection
3D real-time modeling approach optimized maintenance and inspection of cultural relics. The district tasked Shanghai Hangyao Information
activities, enhancing signal strength of RBS facilities for more effective Technology with surveying 159 difficult-to-access tombs scattered
phone coverage from the operators. across complex geographical terrain and generating reality models to
determine current conditions and enable the client to implement effective
The project team used drones for high-precision aerial capturing of preservation methods.
the stations to perform the inspections in just six hours, compared
to five days per facility. ContextCapture enabled a detailed Using UAVs, the project team captured tilted aerial images of the tombs
photogrammetric reconstruction from more than 400 terabytes of and produced 3D reality models, avoiding direct contact while accurately
data for each plant. They used MicroStation and Bentley Map to link demonstrating the condition of the relics without any negative impact.
data and geospatial information to the model. The reality modeling ContextCapture improved stakeholder collaboration and optimized costs,
solution allows for safer, more precise preventative intervention and enabling the client to reduce direct project costs by millions of Yuan.
maintenance, improving operational efficiency and reducing costs. Project Playbook: ContextCapture
Project Playbook: Bentley Map, ContextCapture, Descartes,
MicroStation, ProjectWise
186
Shanghai Hangyao Information Technology Co., Ltd. Shanghai Hangyao Information Technology Co., Ltd.
Aerial Photography by Unmanned Aerial Vehicles for Technical Cooperation Agreement for Making 3D Models
Shanghai Disney Resort by UAV Oblique Aerial Photography in Duoba Region
Shanghai, China Beijing City, Beijing, China

The Shanghai Disney Resort is located in the Pudong New Area of As part of the 13th Five-Year Plan to develop the municipal area of
Shanghai and is the first Disneyland in mainland China. Prior to its official Xining, China, Duoba was identified as one of the towns for the urban
opening in June 2016, Shanghai Hangyao Information Technology used planning initiative. Shanghai Hangyao Information Technology Co., Ltd.
UAVs to capture aerial photography of the 9.78-square kilometer resort was retained by the Xining Surveying and Mapping Institute to survey
area and surrounding terrain to produce full-scale, live action 3D models. and generate a 3D model of the high-altitude region along the Hongshui
The survey and reality modeling provided a means for collecting overall River, which features long, narrow basins, strong erosive bedrock, and
information on the resort that will be used to optimize security, improve crisscrossed ravines. The reality model provided a geospatially accurate
area construction, promote tourism, and serve as effective advertising. representation of Duoba that significantly contributed to the planning and
development of Xining and the whole province of Qinghai.
The project team used ContextCapture to generate 3D reality information
models from multiple data types. These accurate models helped To survey the constrained area, the project team used low-altitude UAV
streamline collaboration among the resort’s construction, operations, and aerial photography, and, using ContextCapture, processed the images to
2017 INFRASTRUCTURE YEARBOOK

maintenance teams, improve communication among stakeholders, and reconstruct a 3D reality mesh of the environment. ContextCapture helped
made the model accessible by diverse users via a web-based application. the team to streamline collaboration and save resource time and materials,
Bentley’s reality modeling technology enhanced modeling accuracy and which enabled them to meet the project deadline. The interoperability
efficiency by several times and reduced direct costs by millions of Yuan. and computing capabilities of ContextCapture significantly improved
Project Playbook: ContextCapture efficiency, reducing direct costs by hundreds of thousands of Yuan, and
shortening delivery time. Project Playbook: ContextCapture
187
BIM Advancements in REALITY MODELING

Shanghai IFA Technology


Shanghai Hangyao Information Technology Co., Ltd. Application of “Four-in-one” Physical Design Approach
Technical Services for Oblique Aerial Photography for the Protection and Renovation of Historical and
of the West Lake Cultural Street Blocks
Beijing, China Harbin, Heilongjiang, China

Hangzhou West Lake in the Zhejiang province of Beijing is one of the The Chinese baroque historical and cultural street, Harbin Laodaowai in
top-10 scenic areas and a major tourist destination in mainland China. Harbin, China is one of the oldest areas of the city. It features traditional
It has been established as the only cultural heritage lake in the country. Chinese building façades and is home to significant national events. To
To guarantee a safe, successful Hangzhou G20 Summit, and to protect develop a planning and design program to preserve the cultural heritage
the surrounding landscape from pollution due to rapid urbanization, the of such historic areas, Northern China University of Technology initiated
city retained Shanghai Hangyao Information Technology to obtain aerial an approach that integrates historical construction information in multiple
images and generate a reality model for geological analysis, planning, dimensions for management and visualization using 3D reality modeling.
and development.
The project team captured 60,000 aerial images within a 2-square-
The project team used multi-view oblique photography to acquire images kilometer area of Laodaowai and used ContextCapture to generate
of the complex geographic surroundings and ContextCapture to generate a precise 3D reality model. MicroStation enabled the team to edit
live-action 3D reality models. Bentley technology enabled the team to and embellish the mesh and integrate different data forms, and
construct the models with superior effects within a compressed time LumenRT to convert the data into videos, saving CNY 200,000
period to meet customer demands. The reality demonstrations improved with its material library and powerful rendering effects. Bentley’s
collaboration among stakeholders and saved materials and labor reality modeling technology ensured data consistency, improved
resources. Compared to traditional methods, ContextCapture significantly decision making, and shortened the work period by 75 percent.
enhanced efficiency and reduced the client’s direct costs by millions of Project Playbook: ContextCapture, Descartes, LumenRT, MicroStation
Yuan. Project Playbook: ContextCapture
188
Shanghai IFA Technology SiteSee
Creating a Virtual Reality System of the Ancient City of Pingyao Automated Recognition of Antenna on a Cell Tower
Pingyao, Shanxi, China Brisbane, Queensland, Australia

The ancient city of Pingyao in Shanxi, China serves as a well-preserved Telecommunications tower inspections typically require a site to be shut
example of the Ming and Qing Dynasties with its traditionally exquisite down and an expert rigging team to climb the tower to allow for close-
architecture, making it a historical and world cultural heritage site. up assessment of the antenna and equipment. To perform the asset
Shanghai IFA Technology was tasked with providing reality modeling inspection on the Telstra Tower located on Black Mountain in Canberra,
services to create a 3D repository for panoramic photos, videos, and Australia, SiteSee deployed UAVs and relied on reality modeling for its
historical and cultural information and creating an immersive virtual project deliverables. The tower, its antenna, and surrounding area were
experience for prospective visitors to promote global tourism in the city. all captured in 3D and modeled, optimizing analysis to deliver an accurate
record of the state of the site and tower equipment.
Using ContextCapture, the project team created a high-resolution 3D
reality mesh of the 400-meter area of main city blocks from 30,000 SiteSee used ContextCapture to produce a detailed 3D engineering-ready
photos captured from UAVs and handheld digital cameras in 15 days, reality mesh of the infrastructure assets and surrounding area from the
saving CNY 250,000. Descartes enabled the dilution of triangulation in UAV imagery. The software enabled the project team to export a dense
2017 INFRASTRUCTURE YEARBOOK

the 3D mesh, greatly reducing the volume of data, and LumenRT rendered point cloud for further comprehensive analysis and identify antenna
vivid animations to offer tourists a virtual glimpse into the ancient city. equipment and asset corrosion. The collaborative approach reduced asset
Bentley’s reality modeling solution eliminated file format compatibility inspection and maintenance costs by 69 percent and reduced project
issues, which saved 80 percent in time and reduced costs by 60 percent. delivery time by 86 percent. Project Playbook: ContextCapture
Project Playbook: ContextCapture, Descartes, LumenRT

189
BIM Advancements in REALITY MODELING

TAC Engineering Co., Ltd., Rikuzentakata


Shimizu Joint Venture
Rikuzentakata-shi Reconstruction Project – 3D Modeling UCB
Using Fixed-wing UAV UCB Environmental Improvement Project
Rikuzentakata, Iwate, Japan Braine-l’Alleud, Walloon Brabant, Belgium

The large-scale tsunami that occurred off the coast of Tohoku in 2011 UCB SA is a global biopharmaceutical company with a research and
demolished the city of Rikuzentakata in Japan. Reconstruction efforts production facility located in Braine-l’Alleud, Walloon Brabant, Belgium.
began in 2012 and included constructing hills and creating embankments The company initiated an environmental project to progressively reduce
to elevate the city center as a countermeasure against future tsunamis. carbon dioxide emissions over 13 years to reach neutrality by 2030 using
The JPY 17 billion project required a three-kilometer-long belt conveyor solar panels on-site as a viable solution to help reach its target. To
to excavate and transport 12 million cubic meters of sand and rock on a perform the necessary analyses required for integrating solar panels and
300-hectare site to create a site for redevelopment of a new downtown. determining optimal locations for the panels, UCB decided to create a 3D
model of the 50-hectare site.
The project team used aerial surveying and reality modeling to manage
soil volume and construction progress and to convey information The project team used ContextCapture to generate an accurate 3D reality
and regenerate residential and economic interest in the area. Using model from aerial and ground photography and integrated scanner point
ContextCapture, the team generated a 3D reality mesh of the entire city clouds using Descartes to improve depictions during final modeling. The
from approximately 4,000 photos captured with fixed-wing UAVs. The accurate 3D model enabled rapid, accurate analysis and optioneering,
high-definition modeling capabilities of ContextCapture enabled the rapid and allowed UCB to calculate actual and planned quantities, as well as
reproduction of construction facilities and provided a visual understanding obtain precise measurements for construction companies and internal
of the status of on-site construction. Project Playbook: ContextCapture management for installing the solar panels. Project Playbook: AECOsim
Building Designer, ContextCapture, Descartes, MicroStation

190
WHY Inc. Wood & Grieve Engineers
ContextCapture for Comms Bushmead
Mexico City, Mexico Perth, Western Australia, Australia

WHY Inc. currently helps telecommunication network providers develop Bushmead is a Cedar Woods Properties (CWP) multi-stage residential land
integral solutions to improve their work processes and profits. The development project located in Perth, Western Australia. CWP retained
company initiated a project in Mexico City, to optimize workflow for Wood & Grieve Engineers (WGE) to provide engineering consultancy
surveying and designing telecommunication networks through more design and supervisory services to assist with the delivery and sale of
efficient and accurate digital collection and representation of client and approximately 1,000 residential lots prior to completion of construction.
field data. The goal is to get the industry to adopt reality modeling within WGE developed a reality modeling solution that provided a realistic,
current workflows to gather precise and reliable data and information, immersive experience for stakeholders, authorities, and prospective
quickly and efficiently, which can then be displayed and analyzed in a purchasers, while minimizing risk of lost sales contracts.
virtual environment for optimal network planning and design.
WGE used MicroStation to refine the initial designs, automate data
The surveyors digitally capture pictures and videos and send them to the generation, and model any additional 3D objects. The team exported
digitization team to create 3D models using ContextCapture. The models are the models into LumenRT and created a custom, dynamic Google map to
2017 INFRASTRUCTURE YEARBOOK

then oriented, scaled, and geo-referenced in MicroStation where additional replace traditional PDF sales plans. Bentley’s integrated reality modeling
features of the assigned zones are drawn before being imported through technology allowed design issues to be identified within the model,
Bentley Map. Using Bentley’s integrated technology accelerated and avoiding costly rework, accelerating sales, and reducing overhead costs
streamlined the workflow, which is estimated to reduce costs by 85 percent. for the developer. Project Playbook: LumenRT, MicroStation
Project Playbook: Bentley Map, ContextCapture, MicroStation

191

The Virtual Penn State initiative using Bentley ContextCapture … has
provided both initial and potential benefits for maintenance activities for the
Office of Physical Plant. An immediate benefit of the initiative was the ability
to visualize accurate locations of work orders. Future benefits include the
availability of the virtual model to perform façade inspections, and develop


work orders from the campus model based on critical repairs that influence
life-safety.

– Craig R. Dubler, Facility Asset Management (FAM) Program Manager,


Department of Architectural Engineering, Pennsylvania State University
192
ROADS
Projects in this award category demonstrate excellence in planning, engineering, design, analysis, or project
delivery of roads or highways.

193
BIM Advancements in ROADS
W I N N E R

CCCC First Highway Consultants, Co., Ltd.


Application of BIM Strategy on the Meiguan Expressway to Urban Road Design Project I Shenzhen City, Guangdong, China

The CNY 9.4 billion Meiguan Expressway retrofit and expansion project spans approximately 8.5 kilometers and includes eight interchanges between the
Meilin Inspection Station and Qinghu in Shenzhen, China. CCCC First Highway Consultants (CCCC) provided design services from planning through preliminary
design and construction for the expansion of the original expressway and the newly built auxiliary roads. Faced with a dense road network, heavy traffic flow
in the project area, and a nine-month design cycle, CCCC implemented a collaborative BIM approach to meet its deliverables.

The project team used Bentley’s integrated BIM solutions, reality modeling, and OpenRoads technology for parametric 3D design. It also used ProjectWise to
manage, store, and share information among the different design disciplines and stakeholders. Using Bentley applications to implement a 3D collaborative
design workflow enabled project delivery 43 days ahead of schedule while reducing costs by CNY 2.2 million. Project Playbook: ContextCapture, LumenRT,
MicroStation, OpenBridge Modeler, OpenRoads Designer, ProjectWise

194
F I N A L I S T F I N A L I S T

AECOM
Road Design and Inter-disciplinary Coordination CH2M Fairhurst JV
of the E10 Avvakko-Lappeasuando Project A9 Dualling - Glen Garry to Dalraddy
Gällivare kommun, Norrbottens län, Sweden Dalwhinnie, Highlands, United Kingdom

To improve roadway safety and ensure accessibility of the 18-kilometer As part of Scotland’s A9 Dualling program, CH2M Fairhurst JV (CFJV)
E10 Avvakko-Lappeasuando roadway in Gällivare, Sweden, the route was appointed to carry out engineering, environmental assessment, and
is being widened and rebuilt to include 2+1 road, 12 junctions, a design work for the 43-kilometer central section between Glen Garry and
10-kilometer network of new local roads, a pedestrian bridge, and two Kincraig, and provide BIM management provisions to meet the client’s
large underpasses with fences to ensure the safety of abundant wildlife. mandated BIM Level 2 deliverable. Implementing BIM processes improved
The AECOM team in Poland was tasked with providing road design, data collaboration among multiple participants and stakeholders, design
management, and interdisciplinary coordination for the project. consistency, and decision making to meet the demanding schedule, data
exchange challenges, and environmental constraints.
AECOM configured ProjectWise to meet workflow requirements and used
it as the common data platform to store and share not only the design The team used Bentley applications to generate data-rich 3D models
data but also project management and administrative documents. The by creating dynamic modeling links that enabled robust, well-
team used OpenRoads to accelerate road design during optioneering, and coordinated design, reducing rework and resulting in significant cost
2017 INFRASTRUCTURE YEARBOOK

relied on iModels for client reviews, which reduced costs and resource savings. OpenBridge Modeler saved up to 75 percent in drafting
hours by eliminating time-consuming drawings. Project Playbook: time for each bridge structure, while iModels provided a successful
ContextCapture, gINT, LEAP, LumenRT, MicroStation, Navigator, format for exchanging the project information model with the client.
OpenBridge Modeler, OpenRoads, ProjectWise Project Playbook: ContextCapture, Descartes, LumenRT, MicroStation,
Navigator, OpenRoads, ProjectWise

195
BIM Advancements in ROADS

Accrete Consulting Engineers Pvt. Ltd.


Strengthening and Widening of Two-Lane National Highway
Accrete Consulting Engineers Pvt. Ltd. to Two Lanes with Paved Shoulder for Manoharpur to Dausa
Designing a Road Network for Raya Resort Section of NH-11A (New NH-148)
Mysore, Karnataka, India Jaipur, Rajasthan, India

On this INR 1 billion roadway project, the National Highway Authority of The National Highway Authority of India initiated an INR 3.31 billion
India retained Accrete Consulting Engineers to perform design services roadway project to upgrade the 62-kilometer section from Manoharpur
and deliver a detailed report on the road network for Raya Resort in to Dausa on NH-11A Rajasthan, India. The project owner retained
Mysore, Karnataka, India. The team performed contour and earthworks Accrete Consulting Engineers to provide a detailed project report, which
analysis to determine the optimal solution for the roadway, as it is included design and analysis for the two-lane highway with paved
positioned in a mountainous region. The completed project will offer a shoulder and a proposal for a partial cloverleaf as part of the solution. The
safe and serviceable road infrastructure, improving travel to and from renovated roadway will improve India’s road infrastructure by reducing
the resort. traffic conflicts and travel time.

Accrete used Bentley applications for dynamic 3D modeling and analysis The company used Bentley applications for alignment design and
of the roadway alignment, mapping trees and other objects to ensure surface analysis. These capabilities for modeling and iterative
appropriate sight distance along the hilly route. Using Bentley software analysis improved engineering efficiencies and reduced design
optimized earthworks quantities and enhanced efficiency to reduce error, which enabled the team to deliver the project on time.
optioneering design time. Project Playbook: MicroStation, OpenRoads Project Playbook: MicroStation, OpenRoads

196
Alabama Department of Transportation Almondz Global Infra Consultant Ltd.
Roundabout Bibb County Four Lanning of Bhavnagar Talaja of NH 8E
Centreville, Alabama, United States Bhavnagar, Gujarat, India

The Alabama Department of Transportation (ALDOT) initiated a USD 2 As part of its initiative to improve port connectivity throughout India,
million project to improve the intersection at State Route 5 and County the National Highway Authority initiated an INR 8.02 billion project to
Road 58 in Centreville, Bibb County, Alabama. The proposed solution was reconfigure the 48-kilometer, existing Bhavangar Talaja roadway from
a roundabout design that would connect all roads and elevate dangerous Alang to Ahmedabad in Gujarat, India from two lanes to four lanes.
side road connections. As a new design concept, the project faced public Almondz Global Infra Consultant needed to provide a detailed design of
opposition, and ALDOT needed to incorporate public and stakeholder the highway and associated structures. The completed project will reduce
opinion and achieve buy-in. Upon completion, the new roundabout will travel time by nearly one hour when coming from Alang Port.
reduce accidents by improving safe traffic flow in the area.
The company used OpenRoads and MXROAD to create a digital terrain
ALDOT used Bentley applications to combine a 3D model of the model of existing conditions, design the new roadway features, and
proposed roadway, a drone-captured photogrammetry reality mesh, generate accurate construction drawings. Using Bentley’s automated,
and real-time projected traffic into a rendered environment to interoperable capabilities reduced design time, eliminated expensive
2017 INFRASTRUCTURE YEARBOOK

visualize the project for better understanding. Generating the reality and redundant data conversions, and saved overall project costs.
mesh using ContextCapture saved three weeks, while LumenRT Project Playbook: MicroStation, MXROAD, OpenRoads
simplified the otherwise time-consuming incorporation of 3D features
to significantly reduce costs. Project Playbook: ContextCapture,
LumenRT, MicroStation

197
BIM Advancements in ROADS

Arcadis Arcadis
Buangor Bypass State Road 9B Construction
Buangor, Victoria, Australia Jacksonville, Florida, United States

The Western Highway is one of the busiest rural roads in Victoria, State Road 9B is a new, four-lane interstate being constructed in three
Australia and a significant interstate freight route. The roadway is phases in Jacksonville, Florida. The third phase is a 2.3-mile section from
currently undergoing duplication works, including the 7-kilometer I-95 to Country Road 2209, and includes a new interchange, eight bridges,
duplicated carriageway known as the Buangor Bypass project. Arcadis five storm water retention ponds, and widening a span of a four-lane
performed detailed design work for the AUD 44.1 million bypass project, arterial road. The Florida Department of Transportation retained Arcadis
which was expected to reduce the flow of heavy freight vehicles and and Superior Construction Company to design and construct this USD 80
interstate drivers through the Buangor community, improving roadway million project phase.
safety and traffic conditions.
To meet Superior’s requirements of using automated machine guidance
Arcadis used MicroStation and InRoads to optimize earthworks (AMG) for grading, asphalt, and concrete paving, Arcadis used OpenRoads
design during the optioneering stage and for design of the roadway to deliver proposed surface models in formats that could be utilized by
corridors. Using the software enabled the production of an accurate AMG construction technologies. OpenRoads enabled accurate modeling
earthworks volume report and significantly reduced the amount of to complete construction three months ahead of schedule, reducing
overlay pavement thickness, saving design time and construction costs. costs. The project team used ProjectWise to efficiently share data
Project Playbook: InRoads, MicroStation, OpenRoads among the project team. Leveraging Bentley technology reduced design
time and identified potential errors for an accurately designed project.
Project Playbook: MicroStation, OpenRoads, ProjectWise

198
Arup Atkins
A120 Bypass (Little Hadham) and Flood Alleviation Scheme Project Neon
Little Hadham, Hertfordshire, United Kingdom Las Vegas, Nevada, United States

The Hertfordshire County Council and Environmental Agency proposed a Project Neon is Nevada’s largest public works initiated by Nevada
GBP 31 billion scheme for a 3.9-kilometer northern bypass of the village Department of Transportation (NDOT) to reconfigure the state’s busiest
of Little Hadham along the A120 in Hertfordshire, England. The agency stretch of roadway, spanning 3.7 miles along Interstate 15. The highway
commissioned Arup to perform detailed design of the roadway, including carries 300,000 vehicles a day. Atkins is the lead designer on this USD 1
two roundabouts, bridges, and river flow control structures to act as flood billion project, responsible for overseeing and designing portions of three
storage reservoirs. Upon completion, the project is expected to reduce new local arterials and associated infrastructure elements. The project is
traffic congestion and the risk of severe flooding in Little Hadham. expected to reduce the number of merge and diverge sections, improving
traffic flow and safety.
Arup used OpenRoads, MicroStation, Navigator, and ProjectWise to
implement a collaborative BIM process to produce 3D inter-discipline Atkins used InRoads, MicroStation, and ProjectWise to implement a
models in a common data environment. Using Bentley software simplified collaborative BIM process among the multi-discipline project team to
optioneering through automated parametric modeling links, minimizing model new and existing roadways, utilities, and bridge foundations;
2017 INFRASTRUCTURE YEARBOOK

costs associated with changes and saving significant time for on-schedule perform clash detection; generate thousands of plan sheets; and manage
project delivery. The integrated design capabilities enabled maintenance more than 170,000 documents and over 660 gigabytes of data. ProjectWise
and operations to better visualize the assets and make better decisions. provided a common data environment to streamline workflows, minimizing
Project Playbook: MicroStation, Navigator, OpenRoads, ProjectWise rework to save countless design hours. Project Playbook: InRoads,
LEAP, MicroStation, OpenRoads, ProjectWise, STAAD.Pro

199
BIM Advancements in ROADS

Aurecon South Africa AVI P.C.


Nekkies Roundabout West Belt Loop Road
Knysna, Eden, South Africa Casper, Wyoming, United States

Situated on South Africa’s N2 highway near Knysna, the Nekkies The Wyoming Department of Transportation initiated the West Belt Loop
Roundabout is being upgraded within a larger footprint to improve safety Road project to provide a bypass route for freight traffic and to reduce
for motorized and non-motorized travelers. With the area facing rapid congestion on existing streets in Casper, Wyoming. WDOT awarded AVI
urbanization and high pedestrian and informal housing volumes, Aurecon the project management, roadway design, and construction support for
South Africa, as part of its final design deliverables, built a simulation this three-phase design project, presenting site and size constraints that
model capable of estimating at what stage the new roundabout will included balancing earthworks, providing access to landowners, and
reach capacity. meeting construction schedules and budgets. The completed bypass will
facilitate safe and efficient traffic flows, improve the surface transportation
Using OpenRoads, Aurecon imported a photographic point-cloud survey system in Casper, and provide access to previously inaccessible lands.
and designed a full roundabout solution, which was exported as a digital
terrain model to LumenRT to further render the visualization, including The project team used MicroStation and GEOPAK extensively throughout
pedestrian and vehicle interaction. The project team used the LumenRT each phase of the design process. Using GEOPAK accelerated earthworks
video at meetings and as part of the public participation process, reducing calculations and production of design documents, enabling the design
uncertainties and ultimately reducing contractors’ prices. Integrating team to meet project deadlines and create accurate construction plans
Bentley capabilities enabled a more accurate determination of the for the contractor. The construction model enabled constructors to
roundabout’s capacity to optimize the engineering solution and return on implement an innovative approach to concrete paving that enhanced
investment. Project Playbook: LumenRT, OpenRoads paving time, completing the project nearly a year ahead of schedule.
Project Playbook: MicroStation, OpenRoads, GEOPAK
200
SPECIAL RECOGNITION AWARD WINNER

Finnmap Infra Oy HNTB Corporation


Highway 3 Arolampi Interchange I-94 Modernization Project
Riihimäki, Finland Detroit, Michigan, United States

The EUR 10.4 million road design project in Riihimäki, Finland will connect The I-94 Ford Freeway modernization project involves the complete
Highway 3 via a new teardrop interchange at Arolampi. Finnmap Infra reconstruction of 6.7 miles of urban, depressed freeway in Detroit,
Oy provided design and reality modeling services to ensure unhindered Michigan. Initial plans were underway to advance the project
traffic flow during construction. The new interchange will enable zoning toward construction.
for new industrial and residential areas of the region and improve access
to operating businesses in the area. However, high residential and commercial growth and land-use changes
along the corridor required modifications to more effectively meet the
The project required design and construction of ramps, junctions, and an demands of the community. The design also had to accommodate a
underpass; relocation of a frontage road; removal of an old bridge; and growing reliance on bicycle transit. When completed, the renovated
construction of two new bridges. Finnmap used OpenRoads to create local roadway network is expected to improve area facilities and
machine control models and ContextCapture to monitor construction services, economics, and vehicular, bicycle, and pedestrian mobility.
progress through photogrammetry. The machine control models improved Project Playbook: Descartes, gINT, LEAP, LumenRT, MicroStation,
2017 INFRASTRUCTURE YEARBOOK

the execution accuracy of earth-moving works and saved 5 percent in Navigator, OpenRoads ConceptStation, OpenRoads Designer, OpenRoads
project costs. Project Playbook: ContextCapture, LumenRT, OpenRoads Navigator, ProjectWise

201
BIM Advancements in ROADS

Indian Technocrat Limited


Horrocks Engineers Construction of a Flyover and Underpass at Hero Honda Chowk
Cul De Sac Canyon Passing Lane, Phase 2 and Lapwai Creek on Delhi-Gurgaon Section of Access Controlled Highway
Bridge Replacement on NH-8 in Haryana on EPC Mode
Winchester, Idaho, United States Gurgaon - Delhi, Haryana, India

The Cul De Sac Canyon Passing Lane and Lapwai Creek Bridge The National Highway Authority of India proposed an INR 1.38 billion
Replacement are companion projects initiated by the Idaho Department initiative to construct a flyover and underpass at Hero Honda Chowk
of Transportation (IdDOT). The projects include the design of a new along the Delhi-Gurgaon Expressway (NH-8), where vehicles from
2.5-mile uphill climbing lane along U.S. Highway 95, north of Winchester, multiple points converge, resulting in severe bottlenecks. To widen the
Nez Perce County, Idaho, and replacement of nine pipe culverts that intersection and reduce traffic congestion, a 1.4-kilometer flyover and
prevent native fish migration in the creek. The USD 15 million project underpass, including bridges and service roads, are being constructed.
will improve traffic flow in the canyon and restore the creek habitat,
revitalizing the fishery resources relied upon by the Nez Perce people The project team used OpenRoads and STAAD.Pro to design the roadway
living on the Lapwai Creek reservation lands. infrastructure, automating otherwise time-consuming calculations to
reduce project time and deliver cost-effective designs in compliance
Using OpenRoads and ProjectWise, Horrocks Engineers modeled three with local standard specifications. Bentley’s interoperable technology
conceptual design options within a few days and presented the civil models improved collaboration with stakeholders and simplified design changes.
to IdDOT, enabling changes and adjustments in real-time to enhance Project Playbook: MicroStation, OpenRoads, RM Bridge, STAAD.Pro
decision making. Bentley’s roadway capabilities enabled the project team
to complete conceptual design services in 213 hours, compared to 314
hours on a similar project, reducing project delivery costs by one-third.
Project Playbook: Bentley Map, MicroStation, OpenRoads, ProjectWise

202
Infra Support Engineering Consultants
Pvt. Ltd., Bengaluru
Consultancy Services for the Development of Eastern Road Land Transport Authority
Corridor and City Bypass to Enable Decongestion of Jamshedpur BIM Model Facility of Buildings of North-South Corridor
Jamshedpur, Jharkhand, India Singapore

The town of Jamshedpur in Jharkhand, India experiences heavy traffic At 21.5 kilometers in length and connecting Singapore’s northern towns
congestion due to the large number of commercial vehicles traveling to with the city center, the North-South Corridor (NSC) is the country’s first
the numerous factories in the area. This project proposes the development integrated transport corridor, featuring continuous bus lanes and cycling
of a four-lane elevated corridor, approximately 10 kilometers in length, to paths for public transport users and pedestrians. The project includes
bypass the city and connect over 10 factories. Infra Support Engineering facility buildings necessary to support the tunnel section of the transport
Consultants provided conceptual designs and associated cost estimates. network. Upon completion, the NSC is expected to improve travel time
The newly proposed roadway will decongest the roadways by having a and reduce traffic congestion generated by new developments in the
dedicated corridor for commercial traffic, which will improve transportation north-eastern sectors of Singapore.
time to the factories.
Land Transport Authority used AECOsim Building Designer to implement
The company used OpenRoads to model existing conditions from a collaborative BIM approach for the design of the facility buildings.
topographical surveys and to design three alignment options for the AECOsim facilitated an integrated design process that enabled the multi-
2017 INFRASTRUCTURE YEARBOOK

client within three months. Bentley applications facilitated information discipline team to complete the project on a tight timeline, eliminating
mobility among the team and stakeholders, and enabled real-time costly design errors and reducing rework. Bentley’s interoperable
design changes. Using Bentley's collaborative design software iModel technology improved workflow coordination with the ability
minimized risk management and reduced project delivery and operation to retain REVIT modeling information throughout the design process.
costs to deliver an estimated 20 percent return on investment. Project Playbook: AECOsim Building Designer
Project Playbook: OpenRoads
203
BIM Advancements in ROADS

Larsen & Toubro Limited


Development and Two-Lane Upgrade with Paved Shoulder of Maricopa Department of Transportation
Bijapur-Homnabad Section of NH-50 from Km 195 to Km 415 Vulture Mine Recreational Areas
Bijapur-Gulbarga-Homnabad, Karnataka, India Wickenburg, Arizona, United States

The National Highway Authority of India proposed an INR 5.23 billion The Maricopa Department of Transportation and Parks and Recreation
initiative to upgrade the existing 220-kilometer roadway section between Department are working together to renovate the road network, park
Bijapur and Homnabad along India’s NH-50. access, and camping areas to alleviate existing and future traffic
safety problems on Vulture Mine Road in Wickenburg, Arizona, and
The project team used MicroStation, OpenRoads, and STAAD.Pro accommodate an expected increase in public use of Vulture Mountain
for geometric design of the entire length of the corridor, including Cooperative Recreation Management Area. The USD 11.48 million project
designing pavement and intersections. Project Playbook: MicroStation, includes realigning of Vulture Mine Road and new park roads, which will
OpenRoads, STAAD.Pro provide a single point of access to the park and campground, eliminate
safety hazards, and preserve a natural wildlife corridor.

Using Bentley software, the project team worked in a collaborative


environment, incorporating roadway alignments and reality meshes to
generate an integrated 3D design and render visualizations to facilitate
communication and stakeholder understanding. The software enabled
the team to utilize disparate geometry and reality meshes from existing
structures, photos, and terrain models to create a comprehensive model
in a short period of time. Project Playbook: ContextCapture, LumenRT,
MicroStation, OpenRoads ConceptStation
204
Mott MacDonald Sweco NTT Data/Texas Department of Transportation
A96 Hardmuir to Fochabers TxDOT SH-358
Elgin, Moray, United Kingdom Corpus Christi, Texas, United States

The proposed upgrade of the A96 trunk road between Hardmuir and Texas Department of Transportation (TxDOT) initiated a USD 38 million
Fochabers to a dual carriageway is part of the larger dualing infrastructure project to reconfigure State Highway 358 to improve congestion, safety,
network project between Inverness and Aberdeen, expected to be and hurricane evacuation to handle the estimated 21 percent population
completed by 2030. Transport Scotland retained Mott MacDonald Sweco growth by 2050 in Corpus Christi. TxDOT divisions managed all aspects
(MMS) to implement a BIM Level 2 approach and provide conceptual of the project and NTT Data provided IT support. A lane addition and
design, site survey, environmental assessment, and construction the reversal of ramps from a diamond to an “X” pattern on the four mile
documentation for the 46-kilometer section of roadway. The renovated stretch of freeway on one of Corpus Christi’s busiest corridors is expected
corridor is expected to reduce traffic congestion and improve road safety. to greatly increase traffic capacity.

Using OpenRoads ConceptStation and MXROAD, the team designed The project team used GEOPAK to coordinate alignment of the ramps
eight individual route options and performed cut and fill analysis. and relocation of frontage roads, generate 3D models and cross sections,
Using LumenRT, the team produced live cubes for meetings and client and design storm sewers without affecting water lines or other utilities.
2017 INFRASTRUCTURE YEARBOOK

presentations. MMS used ProjectWise as the platform for its common The team also used ProjectWise for file management and control of
data environment, streamlining workflows and enabling the team to link drawings, and real-time updates for a coordinated design process.
their data model to AssetWise for further use in design, construction, and Leveraging Bentley software optimized planning document generation
operation. Bentley’s technology improved efficiency by 50 percent, saving and reduced project delivery costs. Project Playbook: AssetWise,
time and costs. Project Playbook: AssetWise, LumenRT, MXROAD, GEOPAK, MicroStation, OpenRoads Designer, ProjectWise
OpenRoads ConceptStation, ProjectWise
205
BIM Advancements in ROADS

Primove Infrastructure Development


Consultants Pvt. Ltd.
Preparation of a Feasibility Study and Detailed Project
Operations Report of Access Controlled Nagpur-Mumbai Super
EOS DOT LiDAR Communication Expressway
Whitestown, Indiana, United States Nagpur, Maharashtra, India

Still in its conceptual stage, this USD 1 million project involves The Government of Maharashtra, India is proposing an 89.2-kilometer,
implementing a construction site monitoring system for precast concrete super-communication expressway, connecting Mumbai to Nagpur.
structures that can identify potential errors early in the design and Primove Infrastructure Development Consultants (Primove) was retained
construction process and in real time, making remediation simple and to conduct a feasibility study and deliver a detailed project report to
inexpensive. As a result, the system would reduce failure rate of precast evaluate the technical, financial, and economic viability of the roadway
concrete structures and optimize construction methodology. infrastructure. The new highway is expected to drastically reduce travel
time between the two cities to within 10 hours and promote economic
To monitor the construction site, the project team is using a tower-mounted development in the state, connecting at least 24 districts to the
LiDAR scanner, configured to provide data to a processor and determine commercial capital of India.
the height of fill material at a job site. The scanner can also communicate
remotely back to the individuals responsible for reviewing and comparing Using drones and ContextCapture, Primove surveyed the entire
the data with predetermined parameters to identify potential problems. stretch of corridor and produced a 3D reality mesh from the photos
Integrating Bentley technology as part of this solution would enable of the area in just eight days, as opposed to 45 days using traditional
the generation of an accurate digital terrain model to perform the survey methods. OpenRoads was used for detailed road design in
analysis and clash detection necessary to implement corrective action. compliance with local requirements. Bentley technology enhanced
Project Playbook: Navigator stakeholder understanding of the proposed roadway alignment
through accurate visualizations and reduced project time and costs.
Project Playbook: ContextCapture, OpenRoads
206
PT. Hutama Karya PT. Wijaya Karya (Persero) Tbk
Trans-Sumatra Toll Road Balikpapan-Samarinda Toll Road Project, Sections 2, 3, and 4
Medan, North Sumatra, Indonesia Balikpapan, East Kalimantan, Indonesia

The Trans-Sumatra Toll Road is a USD 20 billion government initiative, As part of a national strategic project in Balikpapan, Indonesia, the
consisting of 2,048 kilometers of toll road in North Sumatra, Indonesia. Balikpapan-Samarinda Toll Road is a 99.2-kilometer highway being
For the 15.8-kilometer section between Medan and Binjai, PT Hutama executed in five sections with a short deadline. PT Wijaya Karya (Persero)
Karya is performing roadway alignment and detailed 3D design, including Tbk (PTWK) was awarded the design-build contract for the 65-kilometer
shop drawings for production and construction. The toll road will improve stretch, comprising sections two, three, and four of the project. The
transportation and facilitate community development on Sumatra Island. company was required to implement BIM methodology to ensure accurate
designs for use during construction. Upon completion of the roadway,
The project team used Bentley applications for engineering data the new toll road will shorten travel time between Balikpapan City and
management, which provided flexibility and streamlined workflows Samarinda by one-and-a-half hours.
in the execution of this infrastructure project. ProjectWise provided
the single source of truth for comprehensive work sharing, reducing PTWK used Bentley applications to generate a 3D reality mesh, digital
rework associated with incomplete or incorrect information. Working terrain and digital surface models, and provide an animated walkthrough
2017 INFRASTRUCTURE YEARBOOK

in a collaborative, integrated environment, the project team increased for a 14-kilometer stretch of the project. Bentley technology enabled
productivity, improved decision making, and shortened approval cycles the team to deliver accurate roadway designs within three days. Based
for timely delivery and greater cost savings. Project Playbook: LEAP, on the success of this portion of the project, the BIM team expects
LumenRT, MicroStation, OpenRoads ConceptStation, OpenRoads to deliver the remaining 51-kilometer section within two weeks.
Designer, OpenRoads Navigator, ProjectWise Project Playbook: ContextCapture, LumenRT, OpenRoads Designer

207
BIM Advancements in ROADS

QDVC Reveron Consulting


New Orbital Highway 2 Project Information Management System
Doha, Qatar Kuching, Sarawak, Malaysia

To relieve growing congestion in Doha, Qatar Ashghal Public Works Spanning 1,060 kilometers, the Pan Borneo Highway Sarawak is the
Authority initiated a QAR 4.1 billion roadway project, known as the largest engineering initiative to be undertaken in Sarawak, Malaysia.
New Orbital Highway 2 (NOH2), to bypass Doha City by connecting local The MYR 16.49 billion project includes designing and constructing the
roads and existing highways. QDVC performed collaborative design and upgrade of a two-lane, single carriageway trunk road to a four-lane dual
structural analysis services for the 14-lane road network, including bridges, carriageway. With no less than 13 work packages consisting of 60- to
viaducts, underpasses, and tunnels, with a provision for an additional four 90-kilometer spans, spread among multiple disciplines and diverse
future lanes of traffic. When completed, the NOH2 will provide access to contractors, Reveron Consulting implemented an efficient project delivery
existing and planned developments via eight interchanges. system and the creation of a collaborative information model to be used
for asset lifecycle maintenance.
QDVC used Bentley applications for highway, structural, and drainage
modeling and analysis. The integrated modeling solution helped the team ProjectWise provided a common data environment to implement
build a highly precise 3D geometric model in a collaborative environment, collaborative BIM methodologies, resulting in development of an
optimizing GIS, mapping, BIM, and engineering workflows. Leveraging accurate 3D model the team used for highway asset and information
Bentley applications allowed for consistency throughout the lifecycle of management. Bentley technology helped optimize efficiency, reduce
the project, which reduced maintenance costs, improved decision making, costs, improve productivity, minimize risks, and enable the creation of a 3D
and met regulatory compliance requirements. Project Playbook: intelligent model for better asset and inventory management, operations,
LumenRT, MicroStation, ProSteel, ProStructures, StormCAD and maintenance. Project Playbook: AECOsim Building Designer,
MicroStation, ProConcrete, ProjectWise
208
RITES Limited
RITES Limited Preparation of Detailed Project Report for Construction of
Preparing a Detailed Project Report for Rail/Road Connectivity Bridge across Hasdeo River
Kanyakumari, Tamil Nadu, India Korba, Chhattisgarh, India

To support accelerated growth, India’s Ministry of Shipping proposed A bridge over the Hasdeo River is being constructed to enable the
construction of an INR 3.11 billion container trans-shipment port located development of future ash dike for disposing ash generated by the
between Enayam and Colachel in the Kanyakumari District, close to the National Thermal Power Corporation’s thermal power station in the district
east-west international shipping route. The Ministry contracted RITES of Korba, India. National Thermal Power retained RITES as a consultant
to prepare the detailed project report for the rail/road connection from to conduct an engineering study and prepare a detailed project report,
Enayam Port to Unnamalaikadai (NH-47). Development of the new seaport including bills of quantity and technical specifications, for construction of
will open a gateway for export and import trade and improve India’s cargo the bridge, service roads, and pipeline routing.
handling capacity.
RITES used MXROAD and OpenRoads to generate a digital terrain model
RITES used OpenRoads for alignment design and 3D modeling to from drone surveys, and model three options of the proposed bridge and
communicate the details of the project to the stakeholders. Using the roadway alignment for the client. The software simplified the geometric
software reduced costs associated with design changes, improved design and optimized processing of the survey data, minimizing costs and
2017 INFRASTRUCTURE YEARBOOK

stakeholder understanding, and accelerated decision making, which reducing design time by 40 percent to deliver the project on schedule.
enabled report delivery ahead of schedule. Project Playbook: OpenRoads Project Playbook: OpenRoads, MXROAD

209
BIM Advancements in ROADS

SA Infrastructure Consultants Pvt. Ltd.


RODIC Consultants Pvt. Ltd. Feasibility Report, Preliminary Design for Alternative
SH-101, NH-23/32 Highway to Gangtok in the State of Sikkim
Gaya/Dhanbad-Ranchi, Bihar/Jharkand, India Gangtok, Sikkim and West Bengal, India

RODIC Consultants was tasked with preparing the detailed project report As part of the government’s initiative to upgrade national highways to
for the INR 4.5 billion railway being constructed between Bihar and two-lane configurations, SA Infrastructure was retained to conduct a
Jharkhand, India. When completed, the project will connect the two tribal feasibility study and prepare a detailed project report for the rehabilitation
areas, improving their lifestyles and economies. of National Highways (NH) 717A and 717B in Sikkim and West Bengal,
India. The newly proposed road will provide an alternate route to the
RODIC used MXROAD and STAAD.Pro to design the transportation congested, landslide prone NH-31.
infrastructure, generate alignment reports, and provide cross-
sections and quantity estimations for construction. The project Given the mountainous, challenging terrain in the areas, the
team used the software to complete these tasks in one-to-two company used Bentley applications for optioneering to model and
hours for a one-kilometer corridor section, saving time and costs. analyze retaining structures and determine a feasible alignment,
Project Playbook: MXROAD, OpenRoads, STAAD.Pro balancing cut and fill. The software provided a cost-effective, iterative
analysis-based process, streamlining workflow and improving
productivity to reduce production time and project delivery costs.
Project Playbook: OpenRoads, STAAD.Pro

210
Sichuan Provincial Transport Department Highway
Planning, Survey, Design, and Research Institute SMEC South Africa (Pty) Ltd.
Interchange Hub Upgrade of National Road N4 Section 5B
Chengdu, Sichuan, China Belfast-Crossroads, Mpumalanga, South Africa

As part of the Chengdu Third Ring engineering, the Department of Trans African Concessions appointed SMEC South Africa (SMEC)
Transportation of Sichuan Province initiated a CNY 500 million project to conduct preliminary and detailed design for the renovation of the
for the grade separation at Shuangsheng interchange that crosses with 30-kilometer N4 between the Belfast and Crossroads interchanges
the existing Chengmian Double Line Expressway and the currently under in Mpumalanga, South Africa. The ZAR 600 million project involved
construction Chenglan Railway. The expressway had to remain operable investigating alternatives to upgrade the roadway to a four-lane freeway,
during construction at the interchange and safety of the parallel railway including designing 11 bridges and culverts, drainage systems, and a new
work was vital. interchange. Upon completion, the improvements to the existing N4 are
expected to greatly reduce pedestrian and vehicle accidents, as well as
The project team used LumenRT and OpenRoads Designer to perform provide greater accessibility to surrounding communities.
reality modeling and initiate a collaborative BIM approach to preliminary
design. Bentley's technology simplified complex issues through accurate SMEC used MicroStation PowerDraft and OpenRoads to produce the most
modeling and visualization of the design scheme, shortening survey efficient geometric layout and pavement renovation and reconstruction
2017 INFRASTRUCTURE YEARBOOK

time and preliminary design by at least two weeks. LumenRT clearly strategy. The team converted antiquated designs into usable information
demonstrated the project and enhanced stakeholder understanding. and performed numerous design iterations using Bentley’s software.
Project Playbook: MicroStation, LumenRT, OpenRoads Designer OpenRoads capabilities saved 380 resource hours of design modeling
time, which included five alternatives and enabled SMEC to deliver cost
estimates to the client 47.5 days ahead of schedule. Project Playbook:
AssetWise, MicroStation PowerDraft, OpenRoads, Pointools, StormCAD
211
BIM Advancements in ROADS

SOTEPA Ltda.
Adjustments to the Engineering Project
for Highway BR-280/SC Transys Consulting Pvt. Ltd.
Guaramirim, Schroeder, and Jaragua Do Sul, Structure Options for Proposed Agra Inner Ring Road Phase-II
Santa Catarina, Brazil Agra, Uttar Pradesh, India

Highway BR-280 is one of the most dangerous highways in Santa As part of a three-phased roadway improvement initiative that will connect
Catarina, Brazil and it is currently undergoing renovations to enhance the Agra-Noida Yamuna expressway with the Gwailor Highway in Uttar
safety and reduce travel time. The original designs for the project Pradesh, India Transys Consulting has been retained to deliver a detailed
failed to meet environmental licensing requirements by the Brazilian project report for the 7.13-kilometer second phase, from SH-62 Fatehabad
Institute of Environment and Renewable Natural Resources. SOTEPA to SH-218 Samsabad Road. The INR 4.5 billion project proposes alignment
was tasked with solutions and adjustments to the original designs to of a six-lane corridor, expandable up to eight lanes; grade separators; and
ensure environmental sustainability and minimize conflict with the local junction improvements. Once completed, the 23-kilometer inner ring road
community. The completed project will improve traffic flow and reduce upgrade will streamline traffic flow and reduce pollution.
the risk of accidents, while minimizing environmental impact.
The project team used OpenRoads Designer for preliminary design,
SOTEPA used PowerCivil for Brazil to design alternatives for changing taking into account existing structures, roads, and utilities. Using Bentley
the trajectory and geometry to optimize engineering solutions. technology provided accurate visualizations of proposed solutions in a
The team used CivilStorm to model the drainage system. Bentley’s 3D environment, enabling changes in real time to streamline the design
collaborative, intra-operable software enabled SOTEPA to use the process. Project Playbook: OpenRoads Designer
project’s original CAD files and streamline workflows, completing
months of work in one week. The team saved two-thirds of resource
hours and delivered the project nine to 11 months ahead of schedule.
Project Playbook: CivilStorm, OpenRoads, PowerCivil for Brazil
212
Voyants Solutions Pvt. Ltd.
Detailed Design and Approval for the Roadwork – Four-Laning
of Barhi – Hazaribagh Section of NH-33 Jharkhand on EPC Yenon-Research and Design Ltd.
Mode under NHDP – Phase III Highway 65-85
Barhi and Hazaribagh, Jharkhand, India Ami’ad, Israel

The National Highway Authority of India initiated a USD 52.14 million As part of the Highway 65-85 improvement initiative in Galilee, Israel
roadway project to renovate the 40-kilometer section of NH-33 between between the Golani interchange and Ami’ad intersection, this ILS 250
Barhi and Hazaribagh in the state of Jharkhand, which accounts for 40 million project includes designing an 8-kilometer stretch of highway with
percent of India’s mineral resources. The project involves upgrading two main bridges to recover and expose the natural environment of the
the two-lane highway to four-lanes, amid rolling terrain and partial Amud and Akbara stream. Faced with massive earthworks challenges,
forestry, and ensuring the current designs are aligned with the prior partial the multi-discipline engineering team implemented a design solution that
construction that has been deserted. Voyants Solutions is responsible enabled the flow of water in sections that had been blocked for decades.
for the planning, survey works, and modeling for this stretch of corridor
that is expected to provide better connectivity between the mine areas and The project team worked in a collaborative 3D modeling environment
state capitals, and improve traffic flow and safety. using MicroStation, OpenRoads, and RM Bridge, streamlining workflows
to save significant time and optimize design. Using Bentley software
Voyants used Bentley applications to model road alignment, facilitated innovative, sustainable solutions, enabling the team to shift
2017 INFRASTRUCTURE YEARBOOK

drainage, pavement, and grade separators, as well as calculate the original route of the roadway to protect hundreds of trees that
earthworks quantities. The interoperability of Bentley technology otherwise would have been uprooted. Project Playbook: MicroStation,
supported the different formats of the earlier design data, simplifying OpenRoads, RM Bridge
the design process, and avoiding rework to shorten the delivery
schedule by two months and reduce resource months by 30 percent.
Project Playbook: OpenRoads, STAAD.Pro
213

We used [Bentley’s] BIM technology to solve many difficult issues
encountered in the project promotion process, winning a higher
reputation and more project opportunities for us in this field. We
believe that in the future, BIM technology will have a broad research,


development, and application prospect in China’s transportation.
[We] thank the Bentley team for the support to our company.

– Cheng Peng - FHCC President Assistant,


CCCC First Highway Consultants Co., Ltd.

214
ROAD AND RAIL
ASSET PERFORMANCE
This award category recognizes enterprise deployments that demonstrate excellence in the operation,
inspection, maintenance, and management of rail, transit, roads, or highways – providing improved
reliability, integrity, performance, operational efficiency and effectiveness, enhanced safety,
and reduced risk.

215
BIM Advancements in ROAD AND RAIL ASSET PERFORMANCE
W I N N E R

Highways England
Network Occupancy Management System (NOMS) – Strategic Road Network I England, United Kingdom

Responsible for operating, maintaining, and improving the 4,300 miles of motorways and major roads that make up England’s Strategic Road Network (SRN),
Highways England aims to reduce the number of lane closure events by 6,000 a month. The organization is developing a Network Occupancy Management
System (NOMS), which will be integrated with its asset lifecycle information to enhance stakeholder communication and resolve maintenance issues. The
effort will improve overall traffic flows and reduce road closures and associated costs. The integrated solution is expected to optimize collaboration across the
business by mapping and visualizing maintenance closures and related assets.

The project team used AssetWise to develop NOMS. With a target of reducing the road closures by 3,600 per year, Highways England estimates that it will
save GBP 7.02 million for an ROI of 1,651 percent in the first year, considering the GBP 425,000 cost of deploying the Bentley-based solution. Reducing the
number of road closures will also provide significant safety advantages for its workers, eliminating 14,400 hours of challenging nighttime work on the SRN.
Project Playbook: AssetWise
216
F I N A L I S T F I N A L I S T

SPECIAL RECOGNITION AWARD WINNER

New Jersey Department of Transportation


NJDOT / Public Private Partnership of a Bentley-Hosted
SUPERLOAD System for Oversize / Overweight Vehicle Oregon Department of Transportation
Permitting and Routing TransInfo — A Connected Data Environment for Transportation
Trenton, New Jersey, United States Salem, Oregon, United States

The New Jersey Department of Transportation (NJDOT) implemented With road network and feature information residing in a myriad of
an automated permitting and routing process for oversize/overweight local repositories that led to data and process duplication, the Oregon
vehicles in the state of New Jersey to improve efficiency of the review Department of Transportation (ODOT) sought to implement a new
and issuance of permits. The new 24/7/365 accessible, automated system comprehensive linear asset management solution for more efficient data
has improved public safety, promoted efficient interstate and intrastate capture, analysis, and information mobility. Known as TransInfo, the new
commerce, and increased industry compliance. system provided a connected data approach, integrating all network
assets and asset information systems, and enabling ODOT to meet
NJDOT used Bentley’s SUPERLOAD as the foundation for its automated reporting requirements.
oversize/overweight permitting, routing, and analysis system. Since
its launch in August 2009, the system has gone from an average auto AssetWise served as the foundation for TransInfo, providing a single
issuance rate of 33 percent in 2010 to 80 percent in 2016, with a peak source of truth for ODOT to manage all roadway asset information.
system issuance rate of 85 percent. Through better turnaround time The automated system streamlined data entry and reporting,
2017 INFRASTRUCTURE YEARBOOK

for permit applicants, NJDOT estimates that the industry has saved enhanced data accuracy, and reduced risk of error. Bentley’s
anywhere from USD 21 million to 95 million per year in idle time. In highly configurable, interoperable solution reduced time to enter
addition, the ability of the SUPERLOAD system to provide automated construction planning information by 15 percent and labor costs
reviews of every application and every trip significantly reduces risk related to data collection, entry, and maintenance by 10 percent. ODOT
of damage to the state’s infrastructure to the lowest possible level. realized a 66 percent increase in efficiency with the new system.
Project Playbook: AssetWise, SUPERLOAD Project Playbook: AssetWise
217
BIM Advancements in ROAD AND RAIL ASSET PERFORMANCE

Andhra Pradesh Road Development Corporation Maharashtra Metro Rail Corporation Limited
AP Road Database Management System (APRMS Project) Nagpur Metro
Vijayawada, Andhra Pradesh, India Nagpur, Maharashtra, India

As part of reforms in Roads Sector Project, under The World Bank loan For this INR 86.8 billion urban mass transit project in Nagpur, India,
assistance, AP Road Development Corporation (APRDC) has implemented Maharashtra Metro Rail Corporation Limited (Maha-Metro) implemented
‘Road Database Management System'' under APRMS project. The goal of a comprehensive BIM approach with a consortium of engineering
the INR 200 million project is to create a system to store and manage data consultants from conceptual design through construction, operation,
regarding present roadway conditions and traffic demand for economic and maintenance. The project team used ProjectWise and AssetWise to
analysis, improving decision making, and ultimately providing better create a connected data environment and improve design integration and
roads for the public for the state of Andhra Pradesh, India. collaboration among the design teams.

The project team used AssetWise ALIM (Bentley Exor) to host data Using Bentley’s integrated design applications to produce the entire
and information for 41,000 kilometers of roadway and bridges. The infrastructure model enhanced collaboration, accelerated design
interoperability of Bentley technology enabled the organization time, and improved project reliability, which helped save 50 percent in
to interface with World Bank approved Highway Development engineering time and costs. Implementing a BIM methodology enabled
and Maintenance analysis tool (HDM4) and create a rule-based real-time collaboration and simulation, which minimized changes and
homogeneous module within the system. Using Bentley software saved avoided rework. The intelligent BIM model allows for asset management
significant time in developing the Road Database Management System. throughout operations and maintenance for full lifecycle infrastructure
Project Playbook: AssetWise ALIM management. Project Playbook: AssetWise, MicroStation, Navigator,
OpenRail, ProjectWise

218
UTILITIES AND
INDUSTRIAL ASSET
PERFORMANCE
Projects in this award category demonstrate excellence in the operation, inspection, maintenance, and
management of utility plants and networks, power generation facilities, oil and gas production facilities,
or any other industrial site – providing improved reliability, integrity, performance, operational efficiency
and effectiveness, enhanced safety, and reduced risk.

219
BIM Advancements in UTILITIES AND INDUSTRIAL ASSET PERFORMANCE
W I N N E R

BP
Khazzan Central Information Store I Khazzan Field, Block 61, Oman

A global energy business with assets in 72 countries, BP is a major investor in Oman’s tight gas production at Khazzan field, Block 61. Over 30 years, 300 wells
will be drilled and 400 pipelines will be installed. BP Oman’s information management team created a central information store (CIS) to manage and maintain
asset information, ensure information integrity, and provide access to operations.

Bentley configured a custom system that deployed AssetWise ALIM for asset information management to support Khazzan facility operations.
Information was migrated in phases from the existing project information management system to the Khazzan CIS. The new system reduced information
search time by 30 percent and data exchange time by 70 percent. The project team improved efficiency of document coordination by 25 percent.
Project Playbook: AssetWise ALIM

220
F I N A L I S T

AES Indianapolis Power & Light Company


T&D Implementation of Asset Risk at Indianapolis
Power & Light
Indianapolis, Indiana, United States

Several publicly visible manhole events prompted Indianapolis Power &


Light Company (IPL), part of The AES Corporation, to curtail equipment
failures in its underground network distribution system. IPL’s T&D Asset
Management Group already tracked indicator data for substations and
added data for the downtown network. Inspectors also began using a
scoring method for asset health, criticality, risk, and work-order priority.

IPL used Bentley’s AssetWise Asset Reliability to track specific indicators


and indicator states for manholes, vaults, network transformers, and
network protectors. The team used the application to calculate an overall
health score for each asset based on weighted values. To date, monitoring
300,000 indicators for 20,000 assets and associated work order priorities
2017 INFRASTRUCTURE YEARBOOK

has decreased equipment failures in the network from 49 in 2011 to 15 in


2016. Substation transformer failures followed a similar downward trend.
Project Playbook: AssetWise Asset Reliability

221
BIM Advancements in UTILITIES AND INDUSTRIAL ASSET PERFORMANCE

SPECIAL RECOGNITION AWARD WINNER

Goldwind Science & Technology Co., Ltd. Outotec


Application of BIM Technology in Hybrid Concrete/Steel Design for Reliability Project in Counter Current
Wind Turbine Towers Decantation (CCD)
Dezhou, Shandong, China Helsinki, Finland

With an installed capacity of 100 megawatts, the CNY 4 million Xiajin As a global leader in minerals and metals processing technology, Outotec
Wind Power Plant in Dezhou, Shandong, China features hybrid concrete/ develops processes and equipment that help customers achieve higher
steel wind turbine towers developed by EPC contractor Goldwind Science production rates. The company’s new Counter Current Decantation (CCD)
& Technology Co., Ltd. Goldwind applied BIM technology to anticipate and circuits separate the solid and liquor components of a slurry feed in
solve problems during design, construction, operation, and maintenance, hydrometallurgical applications by using a liquor for washing. This project
resulting in significant savings at each phase. improved production by incorporating predictive maintenance in the
design phase of a CCD plant.
Introducing Bentley’s design applications facilitated collaboration and
accelerated modeling. The technology reduced drawing production Facilitated by AssetWise, Outotec created a baseline for CCD-circuit
time by 70 percent and cost estimation time by 80 percent. It shortened plants with optimized maintenance. The baseline included critical
the design period by 20 days and the construction period by 10 days. analysis for processes and equipment, asset hierarchies, and failure
Components also reduced manufacturing time by three days. Goldwind modes and effects analysis. Based on similar projects, Outotec estimated
expects the application of BIM technology to wind power projects will that predictive maintenance considered during the design phase of CCD
lessen the cost of electricity per kilowatt-hour. Project Playbook: plants in the mining industry can produce a net production yield increase
Navigator, ProConcrete, ProSteel, ProStructures, STAAD.Pro of 3 to 5 percent. Project Playbook: AssetWise, MicroStation

222
Outotec Stantec
Modular Flotation cPlant Resource Data Management System (RDMS)
Finland Australia

In the mining process, gold is recovered from tailings through crushing, The Australian Government Department of Defence spends nearly AUD
grinding, and flotation. Outotec supplied a EUR 10 million advanced 130 million on electricity and AUD 20 million on water for about 23,000
modular flotation cPlant comprised of pre-fabricated modules inside buildings at multiple sites. To reduce resource usage, the Department
container-sized steel frames for easy transport and installation, helping of Defense (DOD) initiated the National Sub-Metering Program (NSP)
to allocate resources as effectively as possible. in 2008, which meters usage and loads data into the Resource Data
Management System (RDMS). NSP is currently run by MWH, now part of
As part of the operation and maintenance support, Outotec implemented Stantec, and supported by AssetWise Operational Analytics to understand
AssetWise Asset Reliability to facilitate predictive maintenance and to usage profiles and maximize productivity from scarce resources.
minimize unplanned downtime. The maintenance plan covered the entire
flotation cPlant, from production process performance to equipment RDMS has more than 200 active users in 25 organizations who can
reliability, including failure mode effect analysis and asset criticality log comments and submit ideas for reducing consumption. MWH and
identification. By maximizing reliable production, the maintenance plan Bentley collaborated to develop a new data collector within AssetWise
2017 INFRASTRUCTURE YEARBOOK

is expected to increase the mine’s net production yield by 3 to 5 percent. Operational Analytics that made it easier to view and prioritize initiatives.
Project Playbook: AssetWise Asset Reliability, AutoPIPE, Descartes, The application also allows easy analysis of resource consumption as
MicroStation, OpenPlant, ProjectWise, STAAD.Pro changes are made. AssetWise has helped the DOD identify opportunities,
and make informed and timely decisions to reduce resource consumption
and costs. Project Playbook: AssetWise

223

I have worked with a lot of software systems over the years and the Bentley


software is one of the most flexible and configurable that I have ever used.
There seems to be no limit to what one can do with the software.

– Barry Feldman, Director T&D Asset Management, AES/IPL

224
UTILITIES
TRANSMISSION
AND DISTRIBUTION
This award category acknowledges utilities and communications network projects that have demonstrated
excellence in the planning, design, construction, operations, and maintenance of electric, gas, or
communications network infrastructure for distribution or transmission.

225
BIM Advancements in UTILITIES TRANSMISSION AND DISTRIBUTION
W I N N E R

PESTECH International Berhad


Automation and Integration of Substation Design Project I Kratié and Kampong Cham, Cambodia

Diamond Power Limited awarded a contract to PESTECH International Berhad (PESTECH) to design, supply, erect, and commission a 230-kilovolt substation
and transmission system from the town of Kratié to the city of Kampong Cham, Cambodia. A 25-year contract to operate and maintain the power transmission
system is also part of the USD 92.2 million project.

PESTECH replaced the manual design process of past projects with Bentley Substation, which provided a platform for integrated electrical and physical design.
Working with Bentley Channel Partner Hertford MES Sdn. Bhd., the project team also implemented ProjectWise, MicroStation, and Navigator to enhance
productivity, facilitate collaboration, minimize errors, and enforce standards. Bentley applications helped the team to cut design work from weeks to days,
saving an estimated 70 percent in project time. Project Playbook: Bentley Substation, MicroStation, Navigator, ProjectWise

226
F I N A L I S T F I N A L I S T

Hubei Electric Power Survey and Design Institute Pacific Gas & Electric Company
Macheng Caijiazhai Wind Farm Project Reality Modeling in Bentley Substation
Macheng, Hubei, China San Francisco, California, United States

The CNY 435 million Macheng Caijiazhai Wind Farm Project in China’s Pacific Gas & Electric Company (PG&E) owns and operates more than
Hubei province is generating 49.5 of the planned 80 megawatt capacity 1,000 transmission and distribution substations, spanning two-thirds of
for supplying power to Macheng City. As the general contractor, Hubei California. With 95 percent of its USD 1 billion substation budget spent
Electric Power Survey and Design Institute was responsible for designing on brownfield locations, PG&E had been manually converting existing 2D
and constructing the wind generating sets, pylons and bases, booster drawings to 3D models for use on retrofit projects. That time-consuming
station, and associated equipment. process has been replaced by reality modeling based on image capture
and processing.
Low mountain ridges and steep slopes posed a challenge for locating
the wind generating sets, designing the booster station access road, and The Substation Engineering Department has reduced the cost of
transporting large-scale equipment. The institute used Bentley technology substation modeling by 50 percent with the use of UAV imagery and
to create a landform reality model to resolve locations and routes. Hybrid processing with ContextCapture. Taking one-third less time than
models combining the reality model and 3D design models of the project previously used methods to create, the highly accurate 3D reality models
2017 INFRASTRUCTURE YEARBOOK

informed construction, saving more than CNY 200,000 and shortening the are referenced into Bentley Substation to model the existing substation
construction period by 20 days. Project Playbook: AECOsim Building in 3D for use in substation design. Using ProjectWise to share the models
Designer, Bentley Substation, ContextCapture, AssetWise ALIM, among design teams, PG&E now has one source of information in
LumenRT, OpenRoads, ProjectWise, ProStructures a centralized location. Project Playbook: Descartes, Bentley Substation,
ContextCapture, MicroStation, ProjectWise

227
BIM Advancements in UTILITIES TRANSMISSION AND DISTRIBUTION

Aurecon Cable Onda


Zillmere Substation Cable Onda Network Documentation in Panama
Brisbane, Queensland, Australia Panama

In South East Queensland, Energex builds, operates, and maintains the Cable Onda offers triple-play services to homes and businesses in
electricity distribution network serving Brisbane and other major urban Panama. The telecommunications company launched a pilot project last
areas. When a 57-year-old substation in the Zillmere zone needed year to replace an obsolete system that used Excel spreadsheets, and
refurbishment, Aurecon undertook primary design to replace 5-by-33- MicroStation plans to design and document the fiber and hybrid fiber-coax
kilovolt outdoor circuit breakers, 6-by-33-kilovolt bus disconnectors, networks. The error-prone, time-consuming system had made it difficult
lightning masts, and the AC board, as well as installing of a new to locate documentation on plant damage. The pilot project implemented
marshaling box. Bentley’s communications network engineering applications.

The AUD 2.5 million project involved integrating new equipment The Bentley applications reduced design time, improved precision
with existing equipment. The deliverables had to allow the client to and accuracy, and centralized network information. After successfully
complete construction with accuracy and efficiency. Rather than prepare documenting the province of Colón, Cable Onda documented four more
MicroStation 2D drawings alone, Aurecon developed a 3D model in provinces and expects to complete the entire network in 2018. The geo-
Bentley Substation based on as-built 3D renderings. The 3D models were referenced system enables the company to quickly and efficiently find
reviewed by distributed stakeholders through virtual reality. This capability information, audit designs for accuracy, identify and document damaged
allowed the team to address any constraints before construction. equipment, and model asset performance. Project Playbook: Bentley
Project Playbook: Bentley Substation, MicroStation Coax, Bentley Expert Designer Communications, Bentley Fiber, Bentley
Map, MicroStation

228
China Energy Engineering Group Zhejiang
Electric Power Design Institute Co., Ltd. Estaco S.A.
Daishan Convertor Station Armored Transmission Towers
Zhoushan, Zhejiang, China Medellín, Antioquia, Colombia

Part of the island power supply network for Zhoushan, Zhejiang, China, During the long-running conflict with a leftist rebel group, Colombia’s
the 300-megawatt Daishan Converter Station is the hub of the Zhoushan electricity infrastructure came under repeated attack. The group used
multi-terminal, flexible, DC power transmission demonstration project. explosives to destroy transmission towers, cutting power to millions of
China Energy Engineering Group Zhejiang Electric Power Design Institute people. Estaco S.A. was part of the design team that worked with the
Co., Ltd. (CEEC-ZEPDI) designed the CNY 641.18 million station for State Colombian armed forces to design armored transmission towers for
Grid Zhejiang Electric Power Company as part of a project to interconnect Colombian energy provider ISA that could withstand the explosives and
island grids and improve offshore wind power utilization. continue to transmit electricity.

With Bentley Substation, CEEC-ZEPDI achieved a collaborative process The goal of this USD 3.5 million project was to design a tower that would
that shortened the design cycle to 30 days for this project. STAAD.Pro not collapse when subjected to an explosion. Estaco used STAAD.Pro
was used to create a simulation model where wind resistance design of to model the tower based on as-built information and simulate attack
a large-span steel roof truss structure could be researched to pinpoint scenarios created by explosives engineers. By testing different structures
2017 INFRASTRUCTURE YEARBOOK

the optimum design solution. Additionally, 3D design in Bentley and materials, the team came up with an armored tower design that could
Substation solved complex design questions for the engineering be installed in areas most critical to power supply. Live tests proved the
team. Accurate 3D simulations saved CNY 2.2 million in live tests. design’s ability to survive attack. Project Playbook: STAAD.Pro
Project Playbook: AECOsim Building Designer, Bentley Substation,
MicroStation, Pointools, ProjectWise, STAAD.Pro

229
BIM Advancements in UTILITIES TRANSMISSION AND DISTRIBUTION

Inner Mongolia Electric Power Survey


GEOFIT & Design Institute Co., Ltd.
3D Surveying and Modeling of an Electrical Substation Hohhot Youyouban 220-kilovolt Substation Project
Aix-en-Provence, France Hohhot, Inner Mongolia, China

RTE (Réseau de Transport d’Électricité), operator of France’s high-voltage Located in Hohhot, Inner Mongolia, China, this 220-kilovolt substation will
electrical network, found an innovative, safe solution for preparing contribute to the power supply for two new metro rail transit lines. The
maintenance crews to work on energized equipment at electrical dense urban area has a high passenger volume, and the substation will
substations. The company provided 3D virtual inspection simulators that be one of four built to guarantee a reliable power supply. Inner Mongolia
immerse its operators in realistic interactions, including intervention Electric Power Survey & Design Institute Co., Ltd. (IMPSDI) met the urgent
kinematics and safety procedures. GEOFIT developed the EUR 100,000 need with the rapid design of the Youyouban station.
simulation based on a comprehensive substation survey and complete
3D modeling. IMPSDI’s BIM solution, comprising an internal production management
system used in conjunction with Bentley software, enabled the project
Using lasergrammetry, GEOFIT surveyed a 10-hectare substation with team to coordinate work among specialties and share visual design
more than 120 types of electrical equipment. The team assembled and information with the construction units. This level of cooperation
georeferenced point-cloud data, reconstructed the station in 3D, prepared increased the team’s efficiency throughout the lifecycle of the project.
a mock-up to integrate with the simulator, and produced a 3D equipment Modeling with AECOsim Building Designer effectively shortened the
repository. Descartes boosted productivity by 10 to 15 percent, with design cycle for the substation. Project Playbook: AECOsim Building
advanced capabilities that allowed the point cloud to be divided among Designer, LumenRT
three teams. Project Playbook: Descartes, MicroStation

230
PT. Link Net Tbk REI Software Co., Ltd.
Link Net FTTH Expansion CH3 Broadcast Communication Tower
Jakarta, Indonesia Khorat, Nakhon Ratchasima, Thailand

PT. Link Net Tbk (Link Net) has provided cable services to customers in The Thailand Television Channel 3 Broadcast Communication Tower in
Jakarta, Surabaya, Medan, and Bandung, Indonesia since 2000 via a Khorat, Nakhon Ratchasima reaches people in the northeastern region
hybrid fiber-coax architecture. The company is upgrading and expanding of Thailand. REI Software Co., Ltd. designed the THB 20 million tower in
its services with a fiber-to-the-home (FTTH) architecture that will reach the tight timeframe of one week. A primary goal was to deliver a storm-
200,000 homes in major cities throughout Indonesia. The ambitious resistant, earthquake-safe design.
schedule for the USD 4 million project was five months.
REI used STAAD.Pro to ensure the tower met the latest design code
Using Bentley applications enhanced productivity by ensuring the FTTH requirements. STAAD.Pro calculated wind loads for the 152-meter
network design accurately aligned with community requirements. It tower to meet safety standards in storm conditions. The software also
also improved integration with hardware vendors by providing accurate guided REI on selection of steel sections from the library that were
bills of material. Structured, manageable work packages for third-party optimized by weight. The lightweight design reduced material costs by 10
contractors helped to roll out the network more quickly. As a result, Link percent. Design costs were also reduced, since performing 3D design in
2017 INFRASTRUCTURE YEARBOOK

Net delivered the project two to three months ahead of schedule and STAAD.Pro took just one week, compared to one month using 2D methods.
reduced project costs by up to 30 percent. Project Playbook: Bentley Project Playbook: STAAD.Pro
Fiber, Bentley Expert Designer Communications, MicroStation

231
BIM Advancements in UTILITIES TRANSMISSION AND DISTRIBUTION

Tata Consulting Engineers Limited


Tata Consulting Engineers Limited 640 Megawatts (AC) of Solar PV Projects-220/33 Kilovolt,
Akwa Ibom Transmission Project Phase II 110/33 Kilovolt, and 66/11 Kilovolt Substations
Odiok Itam, Akwa Ibom, Nigeria Chamarajanagar, Rajeshwar, Channapatna, Karnataka, India

As detailed engineering consultant to Income Electrix Limited, Tata Adani Green Energy Limited intends to become a leader in renewable
Consulting Engineers Limited designed the Transmission Company of energy with a target of 10,000 megawatts of solar power by 2022. This
Nigeria’s 132-kilovolt switching substation in Odiok Itam, Akwa Ibom. project furthered that mission with the installation of 220/33 kilovolt,
The project had to be completed in less than three months and included 110/33 kilovolt, and 66/11 kilovolt substations for a cumulative 640
drawing preparation and quantity estimation for the switchyard and megawatts of photovoltaic power. Tata Consulting Engineers Limited
control building. designed the substations, which export electricity to Karnataka,
India’s grid.
Tata used Bentley Substation to replace the usual 2D design process with
a 3D approach that saved resource hours, ensured safety clearances, Tata met the tight project schedule by performing 3D modeling
produced error-free deliverables, and standardized project data. The in Bentley Substation, which saved time with library modules for
ability to extract drawings reduced the overall project delivery time by completing layouts, lightning protection checks, bill of quantities
30 percent, and the high quality of the drawings reduced review time by generation, and 2D plan drawing extraction for civil design. Structural
10 percent. Producing an accurate bill of quantities took 30 percent less models were developed in STAAD.Pro and exported to compatible
time, compared to 2D engineering. Project Playbook: Bentley Substation software, with changes automatically reflected in the reference model.
Bentley software helped to deliver high-quality, error-free deliverables.
Project Playbook: Bentley Substation, STAAD.Pro

232
TRC
South Street Substation
Providence, Rhode Island, United States

TRC won the USD 50 million EPC contract to rebuild and replace National
Grid’s South Street Substation in Providence, Rhode Island. The project
included rebuilding the 115/11.5/23 kilovolt indoor substation, converting
supply circuits, rerouting feeder getaways, modifying remote terminals,
and installing fiber optic cable. TRC was required to integrate the new
construction with existing facilities so the substation would remain in
continuous operation.

TRC used Bentley solutions to achieve a design that incorporated


contributions from multiple subcontractors, using various 3D design
platforms. Bentley Substation integrated the different formats into a
single master design model that was used for cross-discipline checking.
2017 INFRASTRUCTURE YEARBOOK

This checking eliminated issues that would have led to construction


delays and cost overruns. A full 3D walkthrough of the station’s interior
and exterior helped the client visualize the design. Project Playbook:
Descartes, Bentley Substation, MicroStation, ProjectWise

233

Bentley ProjectWise offers tools to coordinate more than 1 million
documents and a total of 2TB of data, and provides the latest control
information to hundreds of project participants so that they can


confidently take actions. The repository provides a document basis
for ongoing asset management.

– Weigang Cai, Deputy Director of Construction Engineering


Department, Shanghai New Jinshan Investment Holding Group
Co., Ltd./Shanghai Jianke Cost Consulting Co., Ltd.

234
WATER AND
WASTEWATER PLANTS
Projects in this award category demonstrate excellence in planning, designing, and building water or
wastewater treatment plants.

235
BIM Advancements in WATER AND WASTEWATER PLANTS
W I N N E R

Beijing Institute of Water


Tongzhou Water Works of Beijing South-to-North Water Diversion Project I Beijing, China

In southeast Beijing, China, declining groundwater supplies caused water shortages for Tongzhou District. The CNY 354 million Tongzhou Water Works
will increase capacity to 2.8 times the amount in 2011 and drop reliance on groundwater from 74.2 to 21.4 percent. As part of the Beijing South-to-North
Water Diversion Project, this project will deliver 600,000 cubic meters of water per day by Phase 3. Beijing Institute of Water designed the waterworks and
ancillary buildings.

ProjectWise established 3D design and production standards for the 26 engineers completing the 3D modeling and 2D construction drawings. Producing
engineering statistics took half the time and saved 10 percent in construction costs for cable materials. Cross-discipline collision inspection shortened
drawing review time by 40 percent and saved 15 percent in construction costs. Bentley’s specialized software improved design accuracy, quality, and
efficiency throughout the project. Project Playbook: AECOsim Building Designer, Bentley Raceway and Cable Management, Bentley Substation, LumenRT,
MicroStation, Navigator, OpenPlant, OpenRoads Designer, ProConcrete, ProjectWise, ProSteel, ProStructures
236
F I N A L I S T F I N A L I S T

Shanghai New Jinshan Investment


Holding Group Co., Ltd.
MWH Ltd. (operating in CiM6 alliance) Xinjiang Water Purification No. 2 Plant
Netheridge STW and Supporting Pipe Network Project
Gloucester, England, United Kingdom Jinshan District, Shanghai, China

Serving the city of Gloucester in Gloucestershire, United Kingdom, Severn As the owners of the CNY 1.79 billion Xinjiang No. 2 Sewage Treatment
Trent Water’s Netheridge Sewage Treatment Works (STW) also operates Plant and Pipeline, Shanghai New Jinshan Investment Holding Group
as a sludge treatment center for more than 100 regional STWs and and Shanghai Jinshan Sewage Outfall Engineering are implementing 5D
regional and national trade waste. CiM6, a partnership between Costain BIM methods to improve construction management and quality. The pilot
and MWH (now part of Stantec), won a GBP 8.1 million contract to design project aims to set 5D BIM as the standard for construction sequencing
a new sludge and trade waste imports facility to maximize continuous and cost management of municipal infrastructure projects.
biogas production.
Shanghai Urban Construction Design and Research Institute
With engineers in the UK and modelers in India, CiM6 used ProjectWise delivered the plant 3D design, and Shanghai Jianke Cost Consulting
to provide a connected data environment for collaborative 3D design. consulted on BIM technology and project management. ProjectWise
The project team used OpenPlant Modeler for mechanical piping and provided the platform for data storage and resource integration.
equipment, AECOsim Building Designer for structural components, A secondary customized platform based on ProjectWise added the
2017 INFRASTRUCTURE YEARBOOK

Navigator for design reviews, and MicroStation for 2D deliverables. ability to directly extract cost data from BIM models. The 5D BIM
Bentley solutions optimized workflows and saved design time. approach eliminated 90 percent of design errors and unnecessary
MWH created an intelligent 3D model to facilitate construction. rework, conserved 300 resource days, and saved CNY 3.2 million.
Project Playbook: AECOsim Building Designer, MicroStation, Navigator, Project Playbook: ProjectWise Construction Management
OpenPlant Modeler, OpenPlant PID, ProjectWise

237
BIM Advancements in WATER AND WASTEWATER PLANTS

Yinchuan Planning Architectural Design


Saunrachana Strucon Pvt. Ltd. and Research Institute Co., Ltd.
Combined Water Supply Scheme to Vellore Upgrading and Reconstruction Project of No. 2 Sewage
Corporation Package-1 Treatment Plant
Vellore, Tamil Nadu, India Qingtongxia, Ningxia Hui Autonomous Region, China

In the past decade, a depleted water table, reduced storage capacity, The CNY 23.8 million Upgrading and Reconstruction Project for the
and alarming pollution threatened the Palar and Ponnaiyar rivers as the No. 2 Sewage Treatment Plant at Qingtongxia Sewage Treatment
main source of drinking water for Vellore district in Tamil Nadu, India. Center, located in Ningxia Hui Autonomous Region, China will expand
Tamil Nadu Water Supply and Drainage Board initiated an INR 12,950 capacity to 10,000 cubic meters per day and ensure that effluent quality
Combined Water Supply Scheme sourced from the Cauvery River and achieves current standards for discharging pollutants. Yinchuan Planning
retained Saunrachana Strucon Pvt. Ltd. to create the structural design of Architectural Design and Research Institute was responsible for the
the water treatment plant. design, which involved fitting the new building, plant, and pipelines into
the existing plant site.
The water treatment plant provides 135 liters of water per capita per day
(LPCD) for Vellore Corporation, which comprises two municipalities, six Designing the project with Bentley software provided significant
town panchayats, and 109 habitations in nine village panchayats. The advantages compared to traditional design. Using the ProjectWise
plant also supplies 90 LPCD for 11 municipalities, 70 LPCD for five town collaborative design platform with Navigator supported collision checking
panchayats, and 40 LPCD for 944 rural habitations. STAAD.Pro helped that improved quality. The 3D modeling process accelerated design, so
the project team reduce design time, compared to manual methods and the model was completed in 30 percent less time with 90 percent fewer
deliver a safe and optimized structure. Project Playbook: STAAD.Pro errors and 50 percent more depth. Project Playbook: AECOsim Building
Designer, LumenRT, MicroStation, Navigator, OpenPlant, ProjectWise

238
WATER NETWORKS
This award category recognizes projects that have demonstrated excellence in planning, designing,
building, modeling, and analyzing water, wastewater, or stormwater networks using hydraulics and
hydrology applications.

239
BIM Advancements in WATER NETWORKS
W I N N E R

AEGEA
AEGEA Prolagos Sewerage Master Plan 2041 I Região dos Lagos, Rio de Janeiro, Brazil

Prolagos provides water and sanitation services for five municipalities in Rio de Janeiro’s Region of the Lakes, where seasonal populations fluctuate from
nearly 400,000 to more than 2 million. As operator of the Prolagos concession, AEGEA Saneamento e Participações S.A. (AEGEA) prepared the BRL 570 million
Sewer Master Plan 2041 for expanding sewerage coverage from 76 to 90 percent and stopping contamination of Araruama Lagoon.

SewerGEMS enabled AEGEA to model the 900-kilometer drainage network, incorporating GIS, CAD, and SCADA data to accurately reflect the complex
region and compare multiple scenarios for improving operational efficiency. AEGEA determined that future network interventions could reduce untreated
discharges by 6.6 cubic meters per year, lower energy costs by BRL 700,000 per year, and reduce investments by 60 percent compared to prior plans.
Project Playbook: SewerCAD, SewerGEMS, WaterCAD, WaterGEMS

240
F I N A L I S T F I N A L I S T

Enorsul – Sanitation Services Manila Water Company, Inc.


Optimization of Water Distribution System Manila Water Natural Calamity Risk Resiliency
and Reduction of Losses and Mitigation Masterplan
Olinda, Pernambuco, Brazil National Capital Region, Rizal, Philippines

Compesa supplies water to the city of Olinda, Pernambuco, Brazil where Perched on the Pacific Ring of Fire, the Philippines is always threatened
the combination of spring-fed reservoirs and deep wells has been hit by devastating earthquakes, volcanic eruptions, and typhoons. To ensure
hard by drought. Enorsul Saneamento was retained for a BRL 134 million a reliable water supply for its 6 million customers in the event of disaster,
project to optimize Compesa’s water distribution system and reduce water Manila Water Company, Inc. prepared a resiliency and mitigation
losses by 56 percent. The scope included prioritization of infrastructure masterplan for its water and wastewater service area, covering the east
replacement and improvement, and implementation of 43 metering and zone of Metro Manila and Rizal Province.
control sectors (MCS).
WaterGEMS illustrated what happens if one or more interconnected
Enorsul used WaterCAD and WaterGEMS to produce hydraulic simulations system shuts down, and which facilities would cause the most harm
that were used to optimize operation of the 426-kilometer water supply if operating at less than full capacity. The results helped Manila
network, identify and reduce water loss, and determine changes needed Water prioritize facilities requiring resiliency measures to minimize
to meet present and future demand. The effective modeling shortened damage, and facilities needing contingency plans in case of loss.
2017 INFRASTRUCTURE YEARBOOK

the period for study and diagnostics from 18 to 10 months. Interventions These measures could limit property damage and business interruption
totaling BRL 130 million were expected to payoff within 6.5 years. to USD 380 million versus USD 520 million without such measures.
Project Playbook: WaterCAD, WaterGEMS Project Playbook: WaterGEMS

241
BIM Advancements in WATER NETWORKS

AECOM
Detailed Design of DS-158 Project – Amagua CEM
Main Transmission Pipelines Water Pressure Improvement in Daule-Samborondón
Jebel Ali, Dubai, United Arab Emirates Guayaquil, Guayas, Ecuador

As part of an irrigation network south of Dubai, United Arab Emirates, A member of the Inassa Group of companies providing water services
AECOM designed a 35-kilometer transmission pipeline along the Jebel Ali throughout Latin America, Amagua CEM provides potable water and
coast with a 7-kilometer sea outfall near Palm Jebel Ali Island. The AED sewage services in high-growth areas of Guayas province, Republic of
500 million project involved hydraulic analysis for the irrigation network Ecuador. When demand exceeded water network design capacity in the
master plan, calibration of an 1,800-millimeter pipeline, design of the Daule-Samborondón area, Amagua initiated a USD 780,000 improvement
2,000-millimeter pipeline, and upgrade of a pumping station to 300,000 project to supply adequate water to more than 10,000 families in the
cubic meters per day. neediest areas.

Hydraulic models for 256 scenarios determined the irrigation network WaterCAD simulated multiple design scenarios, including worst case
feasibility and optimum route for the outfall. Design time was reduced and best case, to help Amagua determine where and how to boost water
by three months using Bentley software to devise solutions, such as pressure and control generated demand. The optimal solution called for
integrating the network with existing infrastructure projects, and managing installing a booster pump and increasing pipe diameters to provide the
treated sewage effluent discharge with GIS-defined demand points. necessary capacity at a reasonable cost. WaterCAD also verified where
Project Playbook: AutoPIPE, AutoPIPE Vessel, Bentley Map, Haestad, leaks contributed to low pressure in the network. The software saved
HAMMER, MicroStation, Navigator, ProjectWise, WaterGEMS time and money on the project, as well as improved the security of the
supply system. Project Playbook: WaterCAD

242
CH2M HILL CIDCO of Maharashtra Ltd.
Parana Las Palmas Water Treatment Plant Pushpak Nagar Sewerage Scheme
Ingeniero Maschwitz, Buenos Aires, Argentina Navi Mumbai, Maharashtra, India

Agua y Saneamientos Argentinos S.A. (AySA) provides potable water and As one of the world’s largest greenfield airport projects, construction
sewage collection for the City of Buenos Aires and 24 municipalities in of Navi Mumbai International Airport in Maharashtra, India required
the metropolitan area. AySA retained CH2M HILL to design the pumping compensating the people whose lands were acquired. The packages
station for five water networks with pipelines ranging in diameter included developed plots with water supply, sewerage, and stormwater
from 3,800 to 4,300 millimeters. This ARS 150 million project included infrastructure. City and Industrial Development Corporation Ltd. (CIDCO)
controlling the transitory effects of electricity outages, pump failures, and of Maharashtra was tasked with developing Pushpak Nagar, comprising
other issues. 221.2 hectares for Project Affected Persons.

CH2M HILL used HAMMER to model the network branches separately When the appointed consultant failed to complete the infrastructure
and together, simulating an instant stop in the pumping line and analyzing design after nine months, CIDCO assumed responsibility for in-house
surge tank behavior to determine if more water volume was required. The design of the sewerage scheme using SewerCAD. Even with a change
simulation allowed CH2M HILL to specify a realistic combination of surge in layout that required redesigning the project, the effort took less than
2017 INFRASTRUCTURE YEARBOOK

tanks, valve closure times, reservoirs, pumping systems, and pipelines, one month when using SewerCAD. This application helped reduce design
ensuring that the system was not in danger of transitory effects. time by more than 15 percent and produced benefits that carried over to
Project Playbook: HAMMER, WaterGEMS the construction phase. Project Playbook: SewerCAD

243
BIM Advancements in WATER NETWORKS

CIDCO of Maharashtra Ltd. DRA Consultants Ltd.


R/R Vahal Sewerage Network Design Revamping of Intermittent System to a 24-by-7 Water Supply
Navi Mumbai, Maharashtra, India Ahmedabad, Gujarat, India

City and Industrial Development Corporation Ltd. (CIDCO) of Maharashtra Ahmedabad Municipal Corporation wants to convert the city’s metered
was tasked with developing 221.2 hectares of land for Project Affected water supply from intermittent (two to three hours) to continuous (24-by-
Persons whose land was acquired by the Navi Mumbai International 7) to improve service-level efficiency and provide an equitable supply of
Airport Project in Maharashtra, India. The compensatory packages safe drinking water. DRA Consultants Ltd. prepared the detailed project
include developed plots with water supply, sewerage, and stormwater report, including GIS-based water utility map, service-level benchmark,
infrastructure. This INR 93.8 million project included 78 hectares in assessment of non-revenue water, and hydraulic modeling of the city-
Sectors 24 and 25 near Amra Road. level network.

CIDCO designed the sewerage scheme using SewerCAD. Despite a The project area covered 466 square kilometers and 1.27 million
change in layout that required significant redesign, the effort took less connections. Using Bentley’s hydraulics and hydrology applications
than one month instead of the anticipated four months. As the common to model the system, DRA designed a scheme that optimized pipe
platform for all the design engineers, SewerCAD allowed changes to be sizing and pump capacities in 223 water distribution station command
made in 20 percent less time. Using SewerCAD reduced overall design areas. WaterGEMS and HAMMER helped develop short- and long-term
time by more than 15 percent and produced benefits that carried over to solutions to improve system efficiency and raise the service level, as well
construction. Project Playbook: SewerCAD as estimate implementation costs. The software reduced DRA’s analysis
time by 50 percent. Project Playbook: HAMMER, WaterGEMS

244
Electrosteel Castings Limited Engineers India Ltd.
Naranghi Oil India Limited Township Project AMRUT
Guwahati, Assam, India Bhubaneswar, Odisha, India

To ensure safe drinking water for employees living in Oil India Township The Atal Mission for Rejuvenation and Urban Transformation (AMRUT)
Naranghi, Guwahati, Assam, Oil India Limited (OIL) retained Electrosteel focuses on ensuring basic infrastructure services for the people of
Castings Limited to reinforce the drinking water network with ductile iron India. Engineers India Ltd. (EIL) is the project development management
pipe. OIL is a wholly owned government of India enterprise committed to consultant for AMRUT Odisha, responsible for preparing the state’s annual
safety, health, and environment and to socio-economic development in action plan, detailed project report, and tender for water supply schemes.
its areas of operation. The INR 50 million project will protect employee This project will deliver 24/7 water supply to nine cities, including the
health in this company-owned town. state capital, Bhubaneswar.

Electrosteel Castings performed the water analysis and design using Previously completed network analysis was time consuming and error
WaterGEMS, and installed new ductile iron pipes and appurtenances. prone. EIL implemented WaterGEMS to gain efficiency and accuracy
Pipe diameters were sized to optimize the hydraulic characteristics of in model editing and design. The software allowed existing network
ductile iron pipe. Pipe details were shared with the project estimator drawings to be integrated with the proposed model so the water supply
2017 INFRASTRUCTURE YEARBOOK

and construction team, and the WaterGEMS model was shared scheme could be optimized. WaterGEMS reduced design time by one-
with the network maintenance team. Using WaterGEMS shortened third, reduced errors, and produced intelligent deliverables that shortened
design time and reduced project costs. Project Playbook: HAMMER, construction time. Project Playbook: WaterGEMS
SewerGEMS, WaterGEMS

245
BIM Advancements in WATER NETWORKS

Facile Maven Pvt. Ltd. Federal Electricity & Water Authority


Sewerage System Scheme for Six Census Towns Transmission & Distribution Network
Dadra and Nagar Haveli, Union Territory, India Wadi Shaam, Ras Al Khaimah, United Arab Emirates

Dadra and Nagar Haveli Planning and Development Authority (DNH-PDA) The Federal Electricity & Water Authority (FEWA) undertook an AED
retained Facile Maven Pvt. Ltd. to design the optimal sewerage scheme 24.75 million project to build a new water transmission and distribution
for a 61.62-square-kilometer area, serving 230,000 people in six census network in Ras Al Khaimah, the northern-most emirate of the United Arab
towns within India’s DNH Union Territory. The INR 1.8 billion project Emirates. The project will provide potable water service 24/7 to more
included the pipeline network, sewage pumping station, and sewage than 20,000 people living in the six villages of Wadi Shaam, where the
treatment plant to be built in terrain ranging from 26 to 148 meters mean current intermittent well supply lacks a transmission system.
sea level.
The new transmission and distribution system will be supplied
To overcome design constraints associated with uneven terrain, from an elevated tank in Wadi Shaam. The network had to cross
Facile Maven integrated topographic data with the GIS platform, then difficult terrain to reach the far-flung villages. Using WaterGEMS
integrated the spatial database with SewerGEMS. Running current and HAMMER allowed FEWA to optimize the hydraulic model, given
and future scenarios allowed the team to configure and compare the physical constraints. The result was a network that met goals for
design approaches until selecting the optimal design. SewerGEMS service and constructability. FEWA completed the design one month in
solved the project challenges while reducing design time and project advance, reduced pipe lengths by 20 percent, and saved AED 500,000.
costs by nearly 20 percent, compared to conventional approaches. Project Playbook: HAMMER, WaterGEMS
Project Playbook: SewerGEMS

246
Hidroing d.o.o.
Implementation of GIS Database in Hydraulic Model Hyundai Heavy Industries
for Precise Modeling and Accurate Results Shuqaiq Steam Power Plant Project
Varaždin, Varaždin County, Croatia Jizan, Jizan Region, Saudi Arabia

Varkom D.D. is a water and wastewater utility serving Varaždin County, Located on the Red Sea coast, north of the port of Jizan in southwestern
Croatia. The 1,650-kilometer water supply network reaches 175,000 people Saudi Arabia, the Shuqaiq Steam Power Plant is an ultra-supercritical
in seven townships and 20 municipalities. Hidroing d.o.o., in partnership heavy oil-fired thermal power plant with a 2,640-megawatt capacity for
with three other companies, undertook a EUR 500,000 feasibility study to producing 600 megawatts of electricity. Hyundai Heavy Industries (HHI)
develop a precise hydraulic model to assess the network performance, was the EPC contractor for Saudi Electricity Company’s USD 3.2 billion
recommend improvements, and propose future development measures. project. For the 140-hectare storm drainage basin, HHI revised an existing
2D design to deliver an accurate analysis of the district.
The project consisted of 13 tasks completed within 12 months, including
gathering field data. The WaterCAD model incorporated a GIS database HHI revised the watershed properties to coincide with GIS properties,
for the water network, 3D terrain model, and geolocated database of then reconstructed the drainage network using StormCAD and CivilStorm.
41,000 meters. The work also included water loss analysis, control system The 1,000-node pipe network took about 10 resource hours to construct
extension, and district metered area zoning. Modeling with WaterCAD and analyze. By applying StormCAD, HHI maintained GIS compatibility
2017 INFRASTRUCTURE YEARBOOK

saved three months and enabled Varkom to reduce water loss by 2 million and worked quickly to meet the client’s deadline. Updates, changes, and
cubic meters per year. Project Playbook: WaterCAD 2D drawing output required no extra work and nearly eliminated errors.
Project Playbook: CivilStorm, OpenRoads, StormCAD

247
BIM Advancements in WATER NETWORKS

Infrastructure University Kuala Lumpur (IUKL) Khatib & Alami


Sewerage Reticulation Design Using SewerCAD Bawabat Makkah Infrastructure Design Consultancy
Mogadishu, Somalia Makkah, Western Province, Saudi Arabia

The Infrastructure University Kuala Lumpur (IUKL) collaborated with a Bawabat Makkah Company (BMC) is an extension of the municipal
graduate student from Mogadishu, Somalia to assess the feasibility of government of Makkah, Western Province, Saudi Arabia charged
installing a gravitational sewer collection system in Zone A of that city. with facilitating development of the city’s western suburbs. BMC
Currently, the lack of a sewerage reticulation system causes health and retained Khatib & Alami (K&A) for an SAR 1 million project to design
environmental issues. The MYR 80,000 study considered a low-cost, wet utility services, including water supply, firefighting, sewerage
durable, and sustainable solution for a 2.5-square-kilometer area. system, stormwater network, and irrigation water system using treated
sewage effluent.
SewerCAD automated the computations for hydraulic capacity,
sizing, and other parameters based on area population. The software The project area covers 87 square kilometers, with a planned 15-square-
allowed for parametric variation of velocity range, flow range, kilometer national park. Given the variations in site topography, locating
hydraulic grade, and other variables. The study team analyzed several facilities and controlling water pressure were major challenges.
scenarios before selecting the optimal solution for providing a self- K&A used WaterGEMS to model current and future scenarios,
cleansing system that could be expanded and upgraded in the future. optimize pipelines, locate facilities, and determine other factors
Project Playbook: SewerCAD to meet operational requirements. Bentley’s modeling applications
reduced design time by 40 percent, saving about SAR 1 million.
Project Playbook: HAMMER, SewerGEMS, StormCAD, WaterGEMS

248
Larsen & Toubro Construction Larsen & Toubro Construction
Bansujara Major Project, Madhya Pradesh Tumakuru Continuous Water Supply Scheme
Baldeogarh, Madhya Pradesh, India Tumakuru, Karnataka, India

The government of Madhya Pradesh Water Resource Department retained Karnataka Urban Water Supply and Drainage Board (KUWSDB) retained
Larsen & Toubro Construction to implement a piped distribution network Larsen & Toubro Construction (L&T Construction) to design and implement
for irrigation in the Tikamgarh district. This INR 8 billion project provides a water supply scheme that will upgrade the city of Tumakuru’s intermittent
water to a 75,000-hectare Culturable Command Area, where farmers can supply to a continuous supply of safe water. The INR 1.65 billion project
connect sprinklers directly to outlets at 1- to 2.5-hectare chaks (areas consists of improvements to two existing water treatment plants and
irrigated by individual outlets). The irrigation scheme had to conform to construction of new mains, two overhead tanks, and distribution pipes
strict allowances for power usage and residual head. and service connections.

The scheme lifts water from a reservoir at 300 meters elevation, pumps L&T Construction used WaterGEMS to model the pumping mains, feeder
it to a balancing reservoir and delivery chambers at 335 meters elevation, mains, and distribution network; demarcate district metered areas; and
and then splits it among four main lines for combined pumped and gravity evaluate tank capacities. It would have taken at least six to eight months
distribution over a 200-kilometer network. WaterGEMS modeled multiple to analyze one scenario for the 900-kilometer network using conventional
2017 INFRASTRUCTURE YEARBOOK

scenarios for pipe routing, diameter, and water demand. The software software but, with WaterGEMS, analysis of multiple scenarios took just
halved design time and reduced project costs by optimizing pipe sizes. two months. Utilizing Bentley software saved four to six months in design
Project Playbook: WaterGEMS time. Project Playbook: WaterGEMS

249
BIM Advancements in WATER NETWORKS

Manila Water Company, Inc. Minconsult Sdn. Bhd.


Hinulugang Taktak Sewerage System Project Network Analysis for a Medium-size Town
Hinulugang Taktak, Antipolo City, Rizal, Philippines Pahang, Malaysia

In the heart of Antipolo City, Rizal, Philippines, Hinulugang Taktak The water utility for the state of Pahang, Malaysia appointed Minconsult
waterfall and park is a popular attraction and protected landscape. Sdn. Bhd. to carry out a comprehensive study of the water supply system
In recent years, uncontrolled wastewater from rapid urbanization has for a mid-size town with nine water treatment plants serving 20,186
degraded water quality and repelled tourists. Manila Water Company, consumer accounts. The MYR 400 million study assessed conditions that
Inc. developed a USD 40 million master plan to implement a sewerage contribute to frequent water shortages and outages, and recommended
system in the affected catchment area and restore the waterfall to its measures to ensure reliable service until demand year 2030.
pristine condition.
WaterCAD imported the existing spatial database and CAD drawings
Serving 150,000 residents by 2021, the project will include a 20 million- quickly and error-free, with no data loss. Minconsult analyzed 28 different
liter-per-day sewage treatment plant and 12-kilometer sewerage network. design and operation scenarios before recommending the optimal design.
Manila Water used SewerGEMS to design and analyze alternatives for Completed within six months, the study required less than one half
network alignment, with scenarios mapped through GIS and integrated the time allotted using WaterCAD. Implementing the proposed asset
with land development plans. The software optimized the collection replacement and refurbishment plan will meet projected demand until
and conveyance system for pipe sizes, and pump capacities and heads 2030. Project Playbook: WaterCAD
to achieve the most economical capital and operating expenditures.
Project Playbook: SewerGEMS

250
Multi Media Consultants Pvt. Ltd.
Morrison Hershfield Limited Sewer Network Design with House Connections,
Kaliti Wastewater Treatment Plant Expansion Sewage Treatment Plants, and Allied Works
Akaky Kaliti, Addis Ababa, Ethiopia Tonk, Rajasthan, India

The Addis Ababa Water and Sewerage Authority awarded Morrison Tonk is one of six cities selected by the government of Rajasthan India
Hershfield (MH) a USD 90 million project to improve the existing sewage to receive water and sewerage services under the Rajasthan Urban
system in Addis Ababa, Ethiopia. Services included design of the Infrastructure Development Project (RUIDP). Multi Media Consultants Pvt.
sewerage collection system for the Kaliti catchment area, and preliminary Ltd. (MMCPL) designed facilities for a population of more than 165,000,
design of the 100-million-liters-per-day Kaliti Wastewater Treatment including a 254-kilometer sewer network with house connections spread
Plant (WWTP). MH also reviewed the final design, shop drawings, and over 45 wards.
equipment for the WWTP as part of a design-build team.
SewerGEMS modeled existing and future sewer systems, addressing
MH used SewerCAD to assess the hydraulic conditions for multiple every aspect of the project lifecycle from collection through treatment
scenarios and shift the sewer alignment to achieve optimum design. and disposal. SewerGEMS' scenario capability helped MMCPL make
SewerCAD also took into account the necessary vertical adjustments in fast, accurate decisions. Comprehensive evaluation of a hydraulic model
the sanitary trunk sewer to accommodate fluctuating terrain. The software that replicated operating conditions enabled the team to maximize
2017 INFRASTRUCTURE YEARBOOK

reduced the time needed to assess hydraulic performance when changes performance within budget constraints. The INR 2.5 billion project
were made during design and construction and helped keep the project on provided a centralized wastewater collection and disposal system that
schedule. Project Playbook: SewerCAD will dramatically improve health and hygiene in this historic town.
Project Playbook: SewerGEMS

251
BIM Advancements in WATER NETWORKS

Municipal Corporation of Greater Mumbai Municipal Corporation of Greater Mumbai


Improvement of Water Supply Along P.L. Lokhande Improvement in Supply at 2nd October Colony,
Marg, Chembur Jerbai Wadia Marg
Mumbai, Maharashtra, India Mumbai, Maharashtra, India

The INR 118.2 million water supply improvements along P.L. Lokhande The Municipal Corporation of Greater Mumbai (MCGM) sought to improve
Road in Chembur, a suburb of Mumbai, India, encountered problems when the water supply for the 2nd October Colony near Jerbai Wadia Road. The
a water main crossing a bridge was not approved. An alternative that area faced severe water shortages due to its elevation of 15-30 meters
involved tunneling under a railway crossing was also denied permission. higher than the pumps at the water supply point. The pumps provided a
The Municipal Corporation of Greater Mumbai (MCGM) needed a practical four-hour supply of water, but demand in that locality had increased from
alternative for improving supply to Lotus colony and Shivaji Nagar. 13.60 to 30 liters per second.

MCGM performed a network analysis using WaterCAD to find a solution, The narrow lanes in the colony constrained MCGM’s ability to enhance the
considering the constraints at the project site. Given demand of 20 existing delivery network. MCGM analyzed the network using WaterCAD,
million liters per day in the Shivaji Nagar zone and 15 million liters per and quickly determined the pump improvements that could be made
day in Lotus colony, WaterCAD generated multiple ways to eliminate to meet demand. New pumps were installed with 30 liters per second
the pipeline crossings. The solution called for removing the pumped discharging capacity and 70 meters of head, without disturbing the water
water supply at this locality and, instead, supplying water by gravity. delivery network. The INR 2.3 million project provided the needed supply
Project Playbook: WaterCAD, WaterGEMS to the colony. Project Playbook: WaterCAD, WaterGEMS

252
Municipal Corporation of Greater Mumbai
Improvement of Water Supply at Worli Koliwada NJS Engineers India Pvt. Ltd.
Locality in G/South Ward, Mumbai Guwahati Water Supply Project
Mumbai, Maharashtra, India Guwahati, Assam, India

In Mumbai, Maharashtra, India, the Municipal Corporation of Greater The Guwahati Jal Board aims to increase public water supply coverage
Mumbai (MCGM) G/South Ward locality of Worli Koliwada suffered from 30 to 100 percent of the city by 2025. NJS Engineers India Pvt. Ltd.
from insufficient water supply. The high-altitude location caused pump (NJSEI) is charged with project management and capacity development
discharge to lose head and fail to meet the required flow rate. MCGM for this INR 20 billion project. Other responsibilities include the hydraulic
invested INR 10.5 million in improving the water supply to the locality. design of the 435 million-liter-per-day system, development of asset
management and enterprise GIS systems for four water treatment
Using WaterCAD to analyze the situation, MCGM prepared a solution plants, 23 reservoirs, a 70-kilometer transmission network, and 250,000
that increased both the water pressure and the number of hours that the service connections.
water supply is available to Worli Koliwada inhabitants. Bentley software
helped to identify critical factors in the water network performance and, The state of Assam’s first world-class water and sewerage board was
at the same time, reduced the time required to perform the water network created to manage the citywide system, using advanced technology for
analysis. Project Playbook: WaterCAD, WaterGEMS resolving issues like high pressure and unaccounted-for water. NJSEI
2017 INFRASTRUCTURE YEARBOOK

introduced WaterGEMS for solving complex design and operational


control issues. Bentley Map and Geo Web Publisher were the delivery
mechanisms for the GIS-based water supply scheme. To date,
Bentley applications saved 1,634 resource months and INR 35 million.
Project Playbook: AssetWise, Bentley Map, Geo Web Publisher,
ProjectWise, STAAD.Pro, WaterGEMS
253
BIM Advancements in WATER NETWORKS

NJS Engineers India Pvt. Ltd.


Distribution Network Installation, Leakage Prevention, Pankaj Associates & Consultant Engineers
and Rehabilitation at PCM Area Kolar Gravity Feeder Main
Agra, Uttar Pradesh, India Bhopal, Madhya Pradesh, India

Uttar Pradesh Jal Nigam, the state corporation responsible for water Among other duties, Bhopal Municipal Corporation is responsible for
supply and sewerage services, initiated a water supply improvement ensuring efficient delivery of basic services like drinking water, sanitation,
scheme to address issues with intermittent water service in the city of and other projects. The INR 1 billion water supply project for the state
Agra. With the goal of delivering an adequate water supply to consumers of Madhya Pradesh’s capital city will distribute water 24/7 to areas that
24/7, the INR 40 billion project included a 144 million-liters-per-day water have had only intermittent access. The Kolar gravity feeder main designed
treatment plant; 130 kilometers of transmission pipeline and feeder by Pankaj Associates & Consultant Engineers will alleviate water scarcity
mains; and distribution network installation, leakage prevention, and in Kolar.
rehabilitation.
The Pankaj project team used WaterGEMS to design the feeder main and,
NJS Engineers India used Bentley software to prepare the GIS-based despite multiple revisions, delivered the design well before the deadline.
asset database, project area database, and land acquisition database; The software enabled the team to create various scenarios and select
and develop water network hydraulic models. These tools were essential the optimal scenario in conjunction with stakeholders. Being able to run
in planning system rehabilitation, improvement, and expansion, as well simulations and evaluate possible outcomes was crucial to the decision-
as establishing efficient operational strategies and reducing non-revenue making process. Project Playbook: WaterGEMS
water. Bentley tools saved about 300 resource-hours and INR 300 million
in basic project costs. Project Playbook: AssetWise, Bentley Map,
MicroStation, STAAD.Pro, WaterGEMS

254
Pankaj Tiwari Proensi - Projeto e Engenharia de Sistemas Ltda.
AMRUT Sewer Network Almirante Tamandaré
Datia, Madhya Pradesh, India Almirante Tamandaré, Paraná, Brazil

Nagar Palika Datia, the municipal council for the district of Datia in As part of the Metropolitan Region of Curitiba (MRC), Paraná, Brazil,
Madhya Pradesh, India engaged Pankaj Tiwari to design a sewer network Almirante Tamandaré receives water and sanitation services from
serving a population of nearly 106,000 people. The INR 550 million project Sanepar - Companhia de Saneamento do Paraná. Part of the city’s water
fell under the state government’s Atal Mission for Rejuvenation and Urban supply is integrated with the MRC network and part is isolated. Sanepar
Transformation (AMRUT), with the goal of improving basic infrastructure retained Proensi - Projeto e Engenharia de Sistemas Ltda. for a BRL
for water supply and sewerage services. 300,000 project to identify improvements that will enable the isolated
network to meet demand through 2030.
The project team finalized the design in less than three weeks,
using SewerGEMS to model the network that carried a load of 12.58 Serving 63 percent of the Almirante Tamandaré population, the isolated
million liters a day. Many possible scenarios were assessed before network covers 313 kilometers, contains seven reservoirs, and features
the recommended design and possible variations were delivered. 140-meter variations in topography. WaterCAD simulated the network
Stakeholders selected the optimal design from among options presented under various scenarios, adding 52.6 kilometers of new pipe and associated
2017 INFRASTRUCTURE YEARBOOK

as iModels and Google Map visualizations. The sewer network will pressure-reducing valves, boosters, and metering bays for optimal results.
improve hygiene and environmental conditions in the service area. The results also improved energy efficiency and reduced water losses for
Project Playbook: SewerGEMS a total investment of BRL 12.6 million. Project Playbook: WaterCAD

255
BIM Advancements in WATER NETWORKS

PT. PAM Lyonnaise Jaya Rural Water Supply and Sanitation


Using WaterGEMS to Reduce Water Loss Tandur 52 Kilometers
West Jakarta, Indonesia Hyderabad, Telangana, India

PT PAM Lyonnaise Jaya (PALYJA) improves access to clean water for Rural Water Supply and Sanitation (RWSS) is a department of the
residents of western Jakarta, with more than 405,000 connections Government of Telangana, India charged with providing drinking water
reaching more than 3 million people. The goal of this project in the B16 and sanitation facilities in rural areas. Various schemes are used to
Depag area of Jakarta was to reduce non-revenue water by half, from 30 supply drinking water, including bore wells with hand pumps, piped water
to 15 liters per second. The challenge was detecting leaks under concrete supply, and comprehensive protected water supply. The INR 1 billion
layer conditions. water supply scheme for Tandur covered 52 kilometers, with 636 junctions
and 4,300 household connections.
WaterGEMS detected 25 suspected leaks, which was nearly four times
what would normally be found in a traditional investigation. PALYJA RWSS used WaterGEMS to run various what-if scenarios and choose the
repaired the leaking pipes and noted an increase in network pressure. optimum design. WaterGEMS reduced design time by 30 percent, saving
The water savings gave households access to 5 liters of water per INR 20 million in project delivery costs. As a result, RWSS completed
second, which generated revenue of USD 6,750 per month. At a the project in just 40 days, which was months ahead of schedule. The
project cost of USD 18,500, the payback period was just three months. quality of the design deliverables also expedited the construction phase.
Project Playbook: WaterGEMS Project Playbook: WaterGEMS

256
Sabesp
Analysis of Real Losses in Potable Water Sabesp
Distribution Networks Safe Daily Transfer of 1.1 Trillion Liters of Water
São Paulo, São Paulo, Brazil São Paulo, São Paulo, Brazil

The Loss Control Division of Sabesp is responsible for detecting and Owned by the state of São Paulo, Brazil, Sabesp manages water and
controlling water loss in the state of São Paulo, Brazil, where the state- wastewater in 366 municipalities. In the Metropolitan Region of São
owned company provides water and wastewater management services. Paulo (RMSP), Sabesp serves more than 20 million inhabitants. For the
For this BRL 30,000 study, the division used hydraulic simulation to 9 million people in the drought-stricken Cantareira basin to receive
determine which sections of pipeline suffered the greatest losses in a water, Sabesp devised a plan to reduce water flow from the distressed
sector that had a high loss rate, an extensive pipe network, and dense Cantareira reservoir and draw water from the interconnected springs in
urban population. the Metropolitan Integrated System (SIM).

Using WaterGEMS to simulate 910 kilometers of pipeline, the team The BRL 150 million improvements to the metropolitan water supply
identified the most critical sections of pipeline and determined necessary system required several hydraulic simulations using WaterGEMS
actions to combat losses. Instead of taking up to 260 days to detect and HAMMER to identify safe solutions for water supply coverage.
leaks, the simulation produced results for a critical 14.7-kilometer After more than 80 simulations, Sabesp identified actions including
2017 INFRASTRUCTURE YEARBOOK

area within five days. The quick, accurate results reduced the time transferring water from multiple points in the SIM, expanding water
between detection and repair, saving water resources for the region. treatment plants, restoring a deactivated line, expanding or reversing
Project Playbook: WaterGEMS booster stations, and making alterations to the control structure.
Project Playbook: HAMMER, WaterCAD, WaterGEMS

257
BIM Advancements in WATER NETWORKS

Samara Utility Systems LLC SANOVA - Soluções para Gestão da Água


The Search for Unaccounted Losses in a Zone Water Loss Reduction Study for Rio Vermelho District
of the B-55 Waterway Water Supply System
Samara, Samara Oblast, Russia Florianópolis, Santa Catarina, Brazil

Samara Utility Systems LLC (SCS), a member of the Russian Communal SANOVA’s water supply survey for the state water utility, Companhia
Systems (RCS) Group of Companies, provides water and wastewater Catarinense de Águas e Saneamento (CASAN), diagnosed problems and
services to the city of Samara, Samara Oblast, Russia. RCS is focused identified improvements in the Rio Vermelho district of Florianópolis,
on developing municipal infrastructure of Russian cities and requires Santa Catarina, Brazil. Based on flow rate and pressure measurements for
group members to reduce water losses using hydraulic modeling. Samara a system serving about 15,200 residents plus summer tourists, SANOVA
undertook a RUB 4 million project in a local water supply zone. compiled performance indicators and developed a 20-year action plan to
guarantee water supply and reduce losses.
The B-55 conduit represented about 5 percent of the city’s water supply
network. SCS used WaterGEMS to build a hydraulic model and measure The WaterGEMS hydraulic model pinpointed leakages due to high
flow and pressure at the required points. WaterGEMS identified an area flow rate pressure, and simulated scenarios with and without a new
of possible leakage. A field survey confirmed the results. The detected water treatment station for five-year periods ending in 2036. Forecasts
leaks amounted to 2.65 million cubic meters per year, representing RUB considered peak consumption during summer months. The resulting plan
8.3 million per year. The repairs saved millions, improved water pressure, balanced financial and operational imperatives to phase investments over
and reduced runoff. Project Playbook: WaterGEMS five-year intervals. Rapid modeling with WaterGEMS reduced the time
spent on this step. Project Playbook: WaterGEMS

258
Shah Technical Consultants Pvt. Ltd. Sharjah Electricity and Water Authority
RUIDP PH-III (Smart Check - Monitoring Application) SEWA Water 2030
Multiple Locations, Rajasthan, India Sharjah, United Arab Emirates

The Rajasthan Urban Infrastructure Development Project (RUIDP) In arid and semi-arid regions of the United Arab Emirates, lack of fresh
Phase-III will improve the water supply, sewerage collection and water constrains development unless supply and demand are actively
treatment, wastewater recycling, and other services for six cities in managed. Sharjah Electricity and Water Authority (SEWA), serving the
the state of Rajasthan (Sri Ganganagar, Hanumangarh, Jhunjhunu, Pali, Emirate of Sharjah, chose WaterGEMS to help actively manage its water
Bhilwara, and Tonk). Shah Technical Consultants (STC) is providing network, model water supply patterns, plan maintenance, and reduce
program management, design, and construction supervision for this INR water leakage in the 3,400-kilometer water distribution network.
25,000 project.
The AED 1.25 million initiative, SEWA Water 2030, identified leaks
To monitor construction progress and performance at multiple project and high pressure in aging areas of the network. Regular replacement
sites, STC developed a mobile application that allows site engineers, programs and criticality studies reduced water loss by 7 to 10 percent,
contractors, and stakeholders to upload geo-tagged photos to a server. conserving potable water pumped into the network. The program enabled
Management can check work, read comments, and provide solutions SEWA to meet calculated demand of 115 million imperial gallons per day
2017 INFRASTRUCTURE YEARBOOK

from any location. SmartCheck-RUIDP uses data from WaterGEMS and with production of 100 million imperial gallons per day, generating a 98
SewerGEMS to identify components and locations. Bentley applications percent customer satisfaction rating. Project Playbook: WaterGEMS
also reduced RUIDP design time and cost by 20 percent and shortened
project delivery time by 15 percent. Project Playbook: SewerGEMS,
STAAD.Pro, WaterGEMS

259
BIM Advancements in WATER NETWORKS

Srijan Ecological Upliftment


Detailed Design of Water Supply Distribution Network in State Urban Development Authority
the District of North 24 Parganas and South 24 Parganas Ambikapur Water Supply
Kolkata, West Bengal, India Ambikapur, Chhattisgarh, India

The Public Health Engineering Department, Government of West Bengal, With an increasing number of people in Ambikapur suffering from water-
undertakes programs to implement water supply and sanitation services borne diseases from contaminated water, the State Urban Development
in the state of West Bengal, India. This INR 6.5 billion project funded by Authority (SUDA), Government of Chhattisgarh, India undertook an
the Asian Development Bank will provide an adequate water supply to INR 1.34 billion project to upgrade and augment the water supply
Bhangor in South 24 Parganas district, and Haroa and Rajarnat in North system serving that area. The detailed project report entailed demand
24 Parganas district. Srijan Ecological Upliftment designed the water forecasting, supply zone reorganization, water supply system layout and
pipe network. design, quantity and cost estimating, and tender document preparation.

Srijan Ecological Upliftment used WaterGEMS to model the supply zones SUDA used WaterGEMS to analyze the existing and proposed feeder
and create various scenarios for meeting water demand in each district. mains, calculate pump heads, and design the distribution network within
Once the optimal scheme was selected, the pipe summary was shared the client’s designated period. Using WaterGEMS, the team designed the
with the project estimator, pipe details were shared with the construction 320-kilometer distribution network in just 20 days, saving an estimated
team, and the model was shared with the maintenance team. WaterGEMS 25 days in the process. Upon implementation, the 225,000 people of
reduced design time and cost, and ensured that the project team chose Ambikapur will benefit from a continuous pressurized water supply.
the most economical pipe diameter. Project Playbook: WaterGEMS Project Playbook: WaterGEMS

260
State Urban Development Authority State Urban Development Authority
Durg Water Supply Raipur Water Supply
Durg, Chhattisgarh, India Raipur, Chhattisgarh, India

Durg is one of nine cities in the state of Chhattisgarh selected for The State Urban Development Authority (SUDA), Government of
infrastructure improvements under India’s Atal Mission for Rejuvenation Chhattisgarh, India recently added seven villages to the water supply
and Urban Transformation (AMRUT). The State Urban Development scheme for Raipur Municipal Corporation. The goal of this INR 1.86
Authority (SUDA) initiated the upgrade and augmentation of the city’s billion project was to upgrade and augment the existing Raipur water
water supply system with a feasibility study, detailed project report, and supply system to provide continuous pressurized water to the villages.
hydraulic design and layout. Phased development of the project targets The project team undertook the feasibility study, detailed project report,
design year 2050. design, and implementation with an on-site contractor.

The INR 1.45 billion project involved complete analysis and design The scope of work included replacing existing pumping machinery with
of the feeder main and distribution network. WaterGEMS provided higher capacity machinery at multiple locations and construction of a new
an easy-to-use solution for modeling the system in a short amount of 80-million-liter-per-day water treatment plant, seven overhead service
time. SUDA saved at least 30 days by using WaterGEMS to design the reservoirs, and a 215-kilometer water distribution network. Meters
2017 INFRASTRUCTURE YEARBOOK

525-kilometer distribution network, which was completed in 25 days. were installed throughout the water system and a supervisory control
The reorganized water supply scheme will allow the 640,000 people and data acquisition (SCADA) system was implemented. WaterGEMS
of Durg to access a continuous, contamination-free water supply. halved the time required to design the water distribution network.
Project Playbook: WaterGEMS Project Playbook: WaterGEMS

261
BIM Advancements in WATER NETWORKS

Tata Consulting Engineers Limited


Integrated and Comprehensive Stormwater Management Voyants Solutions Pvt. Ltd.
Facility for Salem City Augmentation of Water Supply for Thoothukudi City
Salem, Tamil Nadu, India Thoothukudi, Tamil Nadu, India

Tamil Nadu Urban Infrastructure Financial Services Limited (TNUIFSL) The acute scarcity of water supply in Thoothukudi, Tamil Nadu, India
appointed Tata Consulting Engineers Limited (TCE) to prepare a detailed restricts citizens’ water access to two-to-three hours once every three
project report for integrated and comprehensive stormwater management days. The city municipal corporation, Thoothukudi Corporation, has
facilities in the city of Salem, a municipal corporation covering 91.34 undertaken a USD 45 million scheme to augment the water supply from
square kilometers. 25 to 100 million liters per day by bringing water from the Thamirabarani
River. The plan to supply a 100-square-kilometer area involves
TCE analyzed the existing stormwater drainage system and developed improving and expanding the existing water supply network to achieve
a prioritized capital investments plan. TCE used StormCAD to analyze citywide distribution.
1,100 kilometers of existing drains and perform hydraulic modeling of
proposed drains. The software reduced design time by three months, Voyants Solutions Pvt. Ltd. (VSPL) is responsible for all aspects,
optimized drain sizes, and reduced project costs. With this INR 7.45 billion from source identification to design of the 700-kilometer distribution
project, TNUIFSL will help minimize flooding and improve stormwater system. VSPL designed the optimal network within eight months using
collection and conveyance in Salem city in the state of Tamil Nadu. WaterGEMS, which required 30 percent less time for hydraulic modeling.
Project Playbook: StormCAD Upon completion, the water supply scheme will provide 400,000 citizens
with 135 liters per capita per day. Project Playbook: Bentley Map,
HAMMER, WaterGEMS

262
Voyants Solutions Pvt. Ltd.
Augmentation of Sewerage Collection and Treatment Scheme
Tiruchirappalli, Tamil Nadu, India

In Tiruchirappalli, Tamil Nadu, India less than half of the sewerage


generated is collected and treated. The un-sewered periphery discharges
into the Cauvery River basin. Tiruchirappalli City Municipal Corporation
undertook a USD 160 million program to rehabilitate 350 kilometers of
existing sewerage system and implement 900 kilometers of new collection
and treatment works. Voyants Solutions Pvt. Ltd. (VSPL) recommended the
scheme, implementation strategy, and management system and designed
the works.

The master plan emphasized innovative technologies to optimize


implementation, cost, and construction. VSPL used SewerGEMS to assess
different techno-economic solutions, optimize the scheme, and deliver a
2017 INFRASTRUCTURE YEARBOOK

value-added design, while reducing resource hours by 30 percent and


finishing deliverables two months early. Successful completion of the
project will reduce pollution of the Cauvery River and ensure safe drinking
water for the city’s 1.6 million people. Project Playbook: SewerGEMS

263
The Be Inspired jury is comprised of several panels of dedicated industry experts and media professionals who
examine every nomination against the category criteria. Together, they choose three finalists in each category
who are invited to present in front of the jury at The Year in Infrastructure 2017 Conference. After the presentations,
the jury reconvenes to choose the winners, which are announced at the Be Inspired Awards ceremony.

Jonathan Andrews, Editor, Cities Today Mike Beehler, Vice President, Burns & McDonnell
PennWell International
BIM Advancements in Environmental Engineering
BIM Advancements in Municipal Operations BIM Advancements in Utilities Transmission and Distribution
Jonathan Andrews is editor of Cities Today, PFD Media’s flagship title on Mike Beehler is a vice president at Burns & McDonnell. He has written
urban management and development. He specializes in urban topics relating and presented extensively on security, reliability-centered maintenance,
to climate change, finance, and ICT, with a focus on data management and program management, and the smart grid. More recently, Beehler has
the application of IoT in cities. He has previously written for publications for written, presented, and consulted on industry megatrends, the integrated
the World Bank, UN-HABITAT, UNESCO, the Inter-American Development grid, and smart cities. He has a Bachelor of Science in Civil Engineering
Bank, the OECD, and for the Stockholm International Water Institute. Andrews from the University of Arizona and a Master of Business Administration
earned a bachelor’s degree in economics and international relations from the from the University of Phoenix. Beehler is a registered professional engineer
University of Sydney. in eight states, a member of IEEE, and a fellow in the American Society of
Civil Engineers.

264
Lindsey (L.T.) Cooper, Structural Engineering Manager, EDG, Inc. Laura Cornish, Editor, Mining Review Africa
BIM Advancements in Mining and Offshore Engineering BIM Advancements in Mining and Offshore Engineering
Lindsey (L.T.) Cooper has more than 30 years of structural design experience Laura Cornish is editor of Mining Review Africa and possesses a sound
in the offshore industry and is currently the structural engineering manager understanding of the entire mining value chain. She has edited some of South
for EDG, Inc., a privately held, global engineering consulting firm. He is a Africa’s most prestigious mining trade publications, earning several publishing
fellow in the American Society of Civil Engineers (ASCE) and a fellow in the excellence awards for her work as a journalist and editor, covering the mining
ASCE Structural Engineering Institute (ASCE-SEI). Cooper is a member of industry. Cornish earned an honor’s degree in journalism in 2004.
the API Committee on Standardization of Oilfield Equipment and Materials
Subcommittee on Offshore Structures (SC2), the lead structural engineer for
API Resource Group 19 (RG 19) for Helidecks. He holds a Bachelor of Science
degree in civil engineering from Tulane University.

Todd Danielson, Editor, Asian Surveying and Mapping/Informed Infrastructure Timm Dower, Group Publisher, PennWell
BIM Advancements in Reality Modeling BIM Advancements in Water and Wastewater Plants
Todd Danielson is the editorial director of Informed Infrastructure and V1 BIM Advancements in Water Networks
Media, determining and managing the content and editorial direction of Timm Dower serves as group publisher for PennWell’s Global Water Group
all the V1 Media brands, including Informed Infrastructure, Earth Imaging consisting of WaterWorld, Industrial WaterWorld, and Water and Wastewater
Journal, Sensors & Systems, Asian Surveying & Mapping, and the video International brands. With 18 years of experience in the water industry, he
news portal GeoSpatial Stream. With degrees in journalism and geology from has developed media partnerships globally, turning the group’s brands into
Miami University, he has more than 20 years of experience in all forms of market leaders in digital and print media. Dower is currently a member of the
media, covering geospatial and infrastructure brands and technology. American Water Works Association, Water Environment Federation, and the
Water and Wastewater Equipment Manufacturers Association. He earned his
2017 INFRASTRUCTURE YEARBOOK

bachelor’s degree in business from Newman University.

265
2017 BE INSPIRED AWARDS JURORS

Andrew Farr, Associate Editor, Benjamin Media, Inc. G. Ganapathiraman, ARC Advisory Group
BIM Advancements in Water Networks BIM Advancements in Utilities and Industrial Asset Performance
BIM Advancements in Water and Wastewater Plants
G. Ganapathiraman (Raman) is currently responsible for managing ARC
Andrew Farr is the associate editor of Water Finance & Management, a bi- Advisory Group’s operations in India. He brings over four decades of experience
monthly journal for executive decision makers in the municipal water sector. in the industry, focused on automation and enterprise. Ganapathiraman has
He also covers other construction markets for WF&M’s publisher, Benjamin been the head of ARC India operations since June 2012, responsible for
Media, and has been a finalist in the American Society of Business Publication supporting the global offices in preparation of market research reports for
Editors awards. Farr previously wrote for a weekly newspaper and earned his worldwide, regional, and India. He is a senior member in IEEE and ISA and is a
bachelor’s degree in journalism from Bowling Green State University. gold medalist in electrical engineering (B.E.) from Madras University.

Dale Granger, Freelance Editor, oil, gas, and mining industries Simon Hailstone, Head of Research, Cambashi
BIM Advancements in Mining and Offshore Engineering BIM Advancements in Utilities and Industrial Asset Performance
Dale Granger is a director of Sweetspot Media, which publishes resource- Simon Hailstone has a background of more than 30 years in the engineering
industry-focused magazines in Australia and also distributes them software industry. As a principal consultant and member of the Cambashi
internationally. He is editor of PESA News, has edited several oil and gas executive team, he leads the research program by providing market insights
publications in Australia, and has won a Folio Award with Hart Energy to technology companies that supply the AEC and manufacturing industries.
in 2015 for “Best Single Article.” Granger has over 20 years of experience Before joining Cambashi, Hailstone held a variety of positions, ranging from
in journalism, covering business, mining, courts, sports, general news, CAD R&D through business development and project management. Hailstone
and travel. holds a Bachelor of Science in civil engineering and a Master of Science in
computer-aided engineering from Cranfield University.

266
Teresa Hansen, Editor, PennWell Corporation Michael Harris, Editor - Hydro Group, PennWell Corporation
BIM Advancements in Utilities Transmission and Distribution BIM Advancements in Manufacturing
Teresa Hansen is editor-in-chief of PowerGrid International, Electric Light & BIM Advancements in Power Generation
Power, and Utility Products; anchor of the semi-weekly website video, Energy Michael Harris is a writer and editor for PennWell’s Hydro Group, which
News Wrap Up; and conference chairwoman for DistribuTECH Conference. publishes Hydro Review magazine and produces the HydroVision International
She has 22 years of experience as a technical magazine editor, with 19 years conference and exhibition. He also provides global daily news coverage
at PennWell. Hansen’s previous energy-related experience includes 13 years for HydroWorld.com, which focuses on the international hydroelectric
of service at a nuclear power plant and as a senior research analyst for an power sector.
energy marketing and trading company.

Andrew Heaton, Journalist, Sourceable Sean Higgins, Editor, SPAR


BIM Advancements in Buildings and Campuses BIM Advancements in Reality Modeling
BIM Advancements in Construction
Sean Higgins produces SPAR 3D's weekly newsletters for 3D scanning
BIM Advancements in Project Delivery
professionals and spar3d.com. He has previously worked as a technical
Andrew Heaton is an industry journalist covering business related topics for writer, a researcher, a freelance technology writer, and an editor for various
Sourceable, a news website for the architecture, construction, engineering, arts publications. Higgins has degrees from Hampshire College in Amherst,
and property industry in Australia. In this role, he researches and prepares Massachusetts, and the University of Aberdeen in Scotland, where he studied
news and feature articles on a wide range of relevant business-related topics. the history of sound-recording technologies.
Heaton is also the managing editor of Nonprofit News, a news website for the
community and not-for-profit sector in Australia. In this role, he researches
2017 INFRASTRUCTURE YEARBOOK

and prepares news and feature articles on a wide range of topics that are
relevant to managers and professionals who work within the charity and
nonprofit sector in Australia.

267
2017 BE INSPIRED AWARDS JURORS

Jon Hind, Global Service Leader, Aurecon Steve Jacoby, Exec. Dir. Queensland Government Dept. of Natural
BIM Advancements in Bridges Resources and Mines and Science, and Engineering Faculty, Institute of
BIM Advancements in Roads Future Environments, Queensland University of Technology

Jon Hind has over 35 years of experience in planning, design, construction, and BIM Advancements in Reality Modeling
management of a large scope of road infrastructure projects. He is currently Steve Jacoby is executive director of land and spatial information (LSI) in the
based in New Zealand where he has worked for 12 years with Aurecon. Hind Department of Natural Resources and Mines (DNRM). He has chaired the
is currently project director on four Roads of National Significance (RoNS) on Queensland Spatial Information Council (QSIC) since 2009 and represents the
the Western Ring Route in Auckland (New Zealand). He is also project director state government on several spatial information expert panels, peak bodies,
on the Southern Corridor Improvements and Northern Corridor Improvements. committees, and boards.
He has a strong technical background and provides interpretative skills
Jacoby holds a Bachelor of Applied Science from RMIT University and a
for geometrics, safety, and the operational aspects of highways. Hind is
Research Master of Surveying Science (Information Technology) from the
Aurecon's Global Service Leader for Roads and Transport Networks and is
University of Melbourne. Jacoby is an adjunct professor with the Institute
responsible for developing Aurecon's related skillsets company wide.
for Future Environments at the Queensland University of Technology. He was
awarded the Public Service Medal for services to land and spatial information
in the 2014 Queen’s Birthday Honors List.

Jayashree Mendes, Editor, Construction Week India, Terrence O'Hanlon, CEO, Reliabilityweb
and Manufacturing Today
BIM Advancements in Utilities and Industrial Asset Performance
BIM Advancements in Buildings and Campuses
Terrence O'Hanlon, CMRP, is publisher of Reliabilityweb.com®, RELIABILITY ®
BIM Advancements in Construction
magazine, and Uptime ® magazine. He is certified in asset management
BIM Advancements in Project Delivery
by the Institute of Asset Management, and is a certified maintenance and
Jayashree Mendes is the editor of Construction Week and Manufacturing reliability professional by SMRP. O’Hanlon is the acting executive director of
Today. With a work experience of 22 years, she has written extensively on the Association for Maintenance Professionals (AMP). He is a member of the
various subjects that include construction, supply chain, IT, and manufacturing. Institute of Asset Management, American Society of Mechanical Engineers,
She has also taken classes for budding journalists in reputed colleges in the Association of Facilities Engineers, Society of Maintenance and Reliability
Mumbai, India. Mendes’ articles have been printed in government magazines, Professionals, and the Society of Tribologists and Lubrication Engineers.
circulated for a closed group.

268
Lance Parve, Engineer, WisDOT Richard Roberts, Editor-in-Chief, Mining Journal and Managing Editor,
BIM Advancements in Bridges Aspermont Media UK
BIM Advancements in Roads BIM Advancements in Mining and Offshore Engineering
Lance Parve works as a senior project engineer/BIM-CIM coordinator in the Richard Roberts is a mining and business journalist, editor, and publisher
SE Freeways-SE Region for the Wisconsin DOT. He has more than 25 years who has covered this field for more than 20 years. He currently leads the
of industry experience involving digital project delivery and holds a Master Aspermont UK media group in London, where he is also editor of Mining
of Science in engineering, a Master of Science certificate in urban planning Journal. Roberts has written about mining projects all over the world,
GIS, and a Bachelor of Science in geological sciences from the University of covering and analyzing the industry from both an investment and technical
Wisconsin-Milwaukee. standpoint. He has expanded high-level coverage of technology trends and
the mining technology services and sectors in HighGrade.net, an Australian
weekly e-magazine, and in Mining Journal.

Gene V. Roe, Editor, LiDAR News Monica Schnitger, Principal, Schnitger Corporation
BIM Advancements in Reality Modeling BIM Advancements in Manufacturing
Gene V. Roe is the founder of MPN Components, Inc., a 15-year-old geomatics BIM Advancements in Power Generation
consulting firm specializing in strategic market research and technology Monica Schnitger has developed industry forecasts, market models, and
development. He is also the founder of LiDAR News, a leading 3D laser market statistics for the CAD/CAM, CAE, PLM, GIS, infrastructure, AEC, and
scanning publication. Roe is the current chair of the ASTM E57.04 Data plant design software markets since 1999. She writes and speaks on these
Interoperability Subcommittee for 3D Imaging Systems, which has recently topics for technology buyers, investors, and developers, drawing on 30 years
completed 10 years of work on a terrestrial laser scanning data exchange of experience in engineering, software, and market analysis. Schnitger holds
format. During his career, he has focused on the development and adoption a Bachelor of Science in naval architecture and marine engineering from MIT
of innovative technologies, such as CAD, GIS, GPS, and 3D laser scanning, and an honors Master of Business Administration from the F.W. Olin School of
2017 INFRASTRUCTURE YEARBOOK

primarily for the transportation industry. Management at Babson College.

269
2017 BE INSPIRED AWARDS JURORS

Michael A. Semeraro, Jr., Managing Principal, Langan Sahana Singh, Editor, Asian Water
BIM Advancements in Environmental Engineering BIM Advancements in Water and Wastewater Plants
Michael Semeraro, Jr. is a professional engineer and a managing principal BIM Advancements in Water Networks
of Langan Engineering and Environmental Services, Inc. He joined the firm Sahana Singh is an engineer-turned writer and editor who writes on a variety
in 1979 and is responsible for numerous multi-discipline land development of issues, including water management, environment, and Indian history.
design projects throughout the United States and Latin America. Semeraro She has won several awards for journalism, such as the Developing Asia
oversees the civil, environmental, and geotechnical disciplines of the project Journalism Award awarded by Asian Development Bank Institute in 2008.
work, as well as other required disciplines. He has held various national Singh’s articles have been published in Asian Water Magazine, Reader’s
offices within several computer user organizations and has given many Digest, The Washington Post, Discovery Channel Asia, Swarajya, IndiaFacts,
presentations on standardization, integration, and increasing productivity and other publications. Singh has also moderated panel discussions at World
in civil engineering through computerization. Semeraro holds a Bachelor of Water Forum, WEX Global, and other conferences.
Science in civil engineering from Lehigh University, a Master of Science in
geotechnical engineering from MIT, and an MBA from Rutgers University.

Katherine Smale, Technical Reporter, New Civil Engineer Angus Stocking, Freelance Writer
BIM Advancements in Rail and Transit BIM Advancements in Environmental Engineering
BIM Advancements in Road and Rail Asset Performance BIM Advancements in Municipal Operations
Katherine Smale is a technical reporter at New Civil Engineer. The magazine Angus W. Stocking, L.S. is a licensed land surveyor who has been writing
covers a range of topics about the civil engineering industry. Before writing about infrastructure since 2002. Case studies and feature articles by Stocking
for NCE, she was a structural engineer with SKM, Techniker Ltd., and Lyons have appeared in more than 50 infrastructure trade journals, including
O’Neill. Smale earned her civil engineering degree from Cambridge University. Professional Surveyor, Cadalyst, ENR, Wastewater Digest, Municipal Sewer
& Water, ArchDaily, LiDAR News Magazine, POB, Public Works, and xhHt.

270
Richard Thompson, Editorial Director, MEED Abigail Tomkins, Managing Editor of Publications, Civil Engineering
BIM Advancements in Rail and Transit Surveyor and Geospatial Engineering
BIM Advancements in Road and Rail Asset Performance BIM Advancements in Rail and Transit
Richard Thompson is the editorial director of MEED responsible for all its BIM Advancements in Road and Rail Asset Performance
content. He joined MEED in 2002 and has witnessed the dramatic events Abigail Tomkins is managing editor for the Chartered Institution of Civil
that have shaped the Middle East over the past 15 years. Thompson is a Engineering Surveyors and responsible for the monthly journal Civil
keen student of Middle East political and economic affairs and is a regular Engineering Surveyor and the annual Geospatial Engineering publication.
speaker and commentator on the regional economy and current affairs. He She has been writing about the geospatial industry for the past 16 years and
has a master’s degree in international relations and a bachelor’s degree in civil has edited papers for the Survey4BIM special interest group of the United
engineering with management law. Kingdom BIM Alliance. Tomkins has a degree in English from the University
of Stirling.

Janice Tuchman, Editor-in-Chief, Engineering News-Record Bernhard D. Valnion, Editor-in-chief, Economic Engineering
BIM Advancements in Buildings and Campuses BIM Advancements in Manufacturing
BIM Advancements in Construction BIM Advancements in Power Generation
BIM Advancements in Project Delivery
For 20 years, Bernhard D. Valnion, Ph.D. has been editor-in-chief with special
As editor-in-chief of Engineering News-Record (ENR), Janice Tuchman leads interest magazines reporting on engineering IT and the digital transformation
the editorial team creating content for the entire enterprise—online, in print, journey. He is the founder and president of Institute for Innovation and
and at live events. She has developed a broad network of industry sources Market Success, which publishes d1g1tal AGENDA magazine and its special
who help keep ENR on top of the latest trends and innovations. Tuchman is insert CAPITAL PROJECT, reporting exclusively on successful IT and project
active in industry groups such as the National Academy of Construction and processing strategies for the large manufacturing plant industries. In 1998,
the ASCE Industry Leaders Council, and she serves on the board of nonprofit Valnion completed his Ph.D. in experimental nuclear physics at the University
2017 INFRASTRUCTURE YEARBOOK

Bridges to Prosperity as well as serves on the National Research Council’s of Munich.


Board on Infrastructure and the Constructed Environment. Tuchman received
the Carroll H. Dunn Award from the Construction Industry Institute for
“outstanding contributions to improving the cost effectiveness of the United
States construction industry.”

271
2017 BE INSPIRED AWARDS JURORS

Wim van Wegen, Editor, GIM International Bob Vavra, Content Manager/Editor, CFE Media
BIM Advancements in Reality Modeling BIM Advancements in Manufacturing
Wim van Wegen is content manager at Geomares Publishing. He is BIM Advancements in Power Generation
responsible for the print and online publications of GIM International, one of Bob Vavra has edited Plant Engineering magazine since 2005, a role that has
the world’s leading trade media brands in the geomatics sector. He also writes allowed him to cover the rise, fall, and rebirth of manufacturing in the U.S.
columns and feature articles himself, often interviewing renowned experts and around the world. He has been a journalism professional for more than
in the geospatial industry. Besides reporting on the latest technological 40 years, including 25 years in the newspaper industry. In his career in trade
and commercial developments in mapping and surveying, van Wegen publishing, Vavra has covered such industries as retail petrol, retail grocery,
is a keen advocate of the application of geomatics to solve modern-day and safety.
societal challenges.

Bill Vavrik, Vice President, Applied Research Associates Mischa Wanek-Libman, Managing Editor, Railway Track & Structures,
BIM Advancements in Bridges International Railway Journal, and Railway Age
BIM Advancements in Roads BIM Advancements in Rail and Transit
Bill Vavrik is a vice president, principal engineer, and manager of the BIM Advancements in Road and Rail Asset Performance
Transportation Infrastructure Division of Applied Research Associates, Inc. Mischa Wanek-Libman reports on the engineering, construction, and
(ARA). He has experience in diverse infrastructure applications, including maintenance side of North America’s railroad industry. Railway Track &
local roads and streets, rural roads, highways, airports, ports, and intermodal Structures, Railway Age, and International Railway Journal make up The
yards. Vavrik is the program manager in ARA’s support of the Federal Railway Group at Simmons-Boardman Publishing. Wanek-Libman joined the
Highway Administration (FHWA) Innovation Deployment Program, where RT&S as assistant director in 2001, before being named managing editor in
he oversees the support team to FHWA’s deployment of Every Day Counts 2008, and editor in 2010. She earned a Bachelor of Arts in journalism and
(EDC) technologies. mass communication from Drake University.

272
Paul Wilkinson, Director, pwcom.co.uk Pamela Wolfe, Editor-in-Chief, World Water
BIM Advancements in Buildings and Campuses BIM Advancements in Water and Wastewater Plants
BIM Advancements in Construction BIM Advancements in Water Networks
BIM Advancements in Project Delivery
Pamela Wolfe has been the editor of international publications that specialize
Paul Wilkinson is deputy chair of the information systems panel at the Institution in water and environmental issues for more than 25 years. She is the
of Civil Engineers and involved with COMIT (Construction Opportunities for editor-in-chief of World Water, World Water Chinese Edition, Water Reuse
Mobile IT), Constructing Excellence, and chairs the construction and property & Desalination, and Stormwater Management. Wolfe manages content
group of the Chartered Institute of Public Relations, among other honorary development and production and is a frequent contributor of commentary
roles. He is also a visiting lecturer at the University of Westminster. His articles, interviews, and features.
blog, Extranet Evolution, covers construction-related developments in cloud
computing, SaaS collaboration, BIM, and mobile. Wilkinson also writes for
other industry publications and websites.

Mike Woof, Editor, World Highways Geoff Zeiss, Editor, “Between the Poles”
BIM Advancements in Bridges BIM Advancements in Utilities Transmission and Distribution
BIM Advancements in Roads
Geoff Zeiss has been tracking the contribution of geospatial technology to the
Mike Woof is editor of World Highways magazine, the globe’s leading title digitization of construction, operation, and maintenance of energy, building,
for road construction. He graduated with a degree in mechanical engineering and transportation infrastructure in his blog “Between the Poles” since 2007.
and worked in the engineering industry. Woof later switched to the trade From 2014 to 2016, he was editor for Energy and Building with Geospatial
press, where he has been working as a journalist specializing in construction Media. Zeiss has more than 20 years’ experience in the geospatial IT industry,
and mining for over 25 years. He is now considered a world authority in working with utilities, communications, and public works in enterprise
these sectors. IT around the world. He received the Geospatial Ambassador Award at
Geospatial World Forum 2014 in Geneva, Switzerland.
2017 INFRASTRUCTURE YEARBOOK

273
Index – Alphabetical by Organization
Organization Name Project Name Page

3D ScanWorld Energy Factory Knappenrode 170

Implementation of a Comprehensive Technical Records and Information Management Program


F A Natural Gas Company 149
Powered by ProjectWise

A14 Integrated Delivery Team A14 Huntingdon to Cambridge Improvement Scheme 82

AAEngineering Group EPC + Operations in Gold Mining 108

F AAM Group Creating Singapore's National 3D Map Using Mobile Mapping 129

Accrete Consulting Engineers Pvt. Ltd. Designing a Road Network for Raya Resort 196

Strengthening and Widening of Two-Lane National Highway to Two Lanes with Paved Shoulder
Accrete Consulting Engineers Pvt. Ltd. 196
for Manoharpur to Dausa Section of NH-11A (New NH-148)

AECOM Detailed Design of DS-158 Project Main Transmission Pipelines 242

F AECOM Pearl Harbor Memorial Bridge 23

AECOM Perth Stadium Station 32

F AECOM Road Design and Inter-disciplinary Coordination of the E10 Avvakko-Lappeasuando Project 195

AECOM-GHD Joint Venture Level Crossing Removal Project – Technical Advisory Services 158

W AEGEA AEGEA Prolagos Sewerage Master Plan 2041 240

Aerometrex Parramatta Light Rail Project 170

F AES Indianapolis Power & Light Company T&D Implementation of Asset Risk at Indianapolis Power & Light 221

Al Shaffar Steel Engineering (ASSENT) Mohammed Bin Rashid Library 32

Alabama Department of Transportation Roundabout Bibb County 197

Alberta Pipe Trades College Alberta Pipe Trades College Construction Academy 66

AlmassTronics Canopy of a Metro Station 150

Almondz Global Infra Consultant Ltd. Four Lanning of Bhavnagar Talaja of NH 8E 197

Amagua CEM Water Pressure Improvement in Daule-Samborondón 242

F AMEC Foster Wheeler Gruyere Project 107

Andhra Pradesh Road Development Corporation AP Road Database Management System (APRMS Project) 218

AngloGold Ashanti Project Engineering Services 120 Level - Incline for Atic Rock Handling 108

Arcadis Buangor Bypass 198

Arcadis State Road 9B Construction 198

F Arcadis-WSP/PB Joint Venture Citylink Tulla Widening 23

Architect Group 5 (AG5) Multi-functional Sports Enclosure 33

Arup A120 Bypass (Little Hadham) and Flood Alleviation Scheme 199

Arup Sector C-14 82

Arush Gas Technology Services LLP HFO Mundra Bunkering System 90

Aryatech Engineering Consultants FZE Shale Shaker Platform Modification on Jack-up Rig 109

 Winner  Finalist  Special Recognition Award Winner


274
Index – Alphabetical by Organization
Organization Name Project Name Page

Aryatech Marine & Offshore Services Pvt. Ltd. Installation of New Lifeboat Platform for FRC Boat on Jack-up Rig 109

Aryatech Marine & Offshore Services Pvt. Ltd. Replacement of Existing Compressor and Air Dryer with New Units for Jacket Platform 110

Aryatech Marine & Offshore Services Pvt. Ltd. Stability Analysis of Jack-up Rig Using MOSES 110

ASV Global C-Worker 7 111

Atkins Project Neon 199

Aurecon Zillmere Substation 228

Aurecon South Africa Nekkies Roundabout 200

AVI P.C. West Belt Loop Road 200

Avijit Ghosh Abhijit Tea Company 33

Backbone Structural Consultants, Jaipur Hissar Commercial Complex 34

Baldridge & Associates Structural Engineering, Inc. (BASE) The Ritz-Carlton Residences Waikiki Beach, Phase 1 34

Beijing Housing Construction Co., Ltd. First Section of Binhu Embellished Garden Prefabricated Residential Project 66

Beijing Institute of Architectural Design Swimming Pool of Hangzhou Olympic Sports Center 35

W Beijing Institute of Water Tongzhou Water Works of Beijing South-to-North Water Diversion Project 236

BES Engineering Corporation Photomesh and BIM for House Selling 171

Bina Puri Sdn. Bhd. Sabah State Administrative Centre 67

BM Engineering S.r.l Revamping ABS Steelworks 171

W BP Khazzan Central Information Store 220

Brussels Regional Public Service, Monuments and Sites Directorate Recording of the Archaeological Heritage in Brussels 172

Burken Ltd. 3D Inventory (UFA AG) 90

Cable Onda Cable Onda Network Documentation in Panama 228

Cad Connect Architectural Project 67

W CCCC First Highway Consultants Co., Ltd. Application of BIM Strategy on the Meiguan Expressway to Urban Road Design Project 194

CCCC Water Transportation Planning Design Institute Co., Ltd. Ningbo – Container Terminal Project in Meishan Port Area of Zhoushan Port 35

CEDARVILLE Engineering Group, LLC Eastern State Penitentiary Historic Site Infrastructure Characterization 172

W CEDD-AECOM-The Earth Solutions Development of Anderson Road Quarry Site 168

Plast Install SKB Sp. z o.o. Installation of Flue Gas Desulfurization in Power Plant 91

ZRE Katowice S.A. Power Station EDF Ward in Rybnik 138

T.T.U. Urbanowicz Sp. z o.o Project Installation of Atmospheric Distillation in Group Lotos 91
2017 INFRASTRUCTURE YEARBOOK

F CH2M Fairhurst JV A9 Dualling - Glen Garry to Dalraddy 195

CH2M HILL Parana Las Palmas Water Treatment Plant 243

Changsha Design and Research Institute of Nonferrous Metallurgy Co., Ltd. 100kt/a Electrolytic Zinc Smelting Project of Huixin Lead-Zinc Smelting Co., Ltd. of Huili County of Sichuan 92

 Winner  Finalist  Special Recognition Award Winner


275
Index – Alphabetical by Organization
Organization Name Project Name Page
China Construction Sixth Engineering Division Corp., Ltd.,
SR F Tianjin University of Technology, and Tianjin Tianhe-Cloud Building Sanya New Airport Reclamation Project 17, 65
Engineering Technology Co., Ltd.
China Energy Engineering Group Zhejiang Electric Power Design
Daishan Convertor Station 229
Institute Co., Ltd.
China Railway Eryuan Engineering Group Co., Ltd.; Yungui Railway
F Application of BIM Strategy for Dali to Ruili Railway Project 157
Yunnan Co. Ltd.

W China Water Resource Pearl River Planning Surveying & Designing Co., Ltd. Wugachong Reservoir Project in Pu'an County of Guizhou Province 136

China Water Resources Beifang Investigation, Design and Research Co., Ltd. Pakistan Kohala Hydropower Station 150

CIDCO of Maharashtra Ltd. Pushpak Nagar Sewerage Scheme 243

CIDCO of Maharashtra Ltd. R/R Vahal Sewerage Network Design 244

Citec Engineering India, Pvt. Ltd. Refinery Project 92

City of Montreal Rio Tinto Alcan Planetarium of Montreal 83

Clove Technologies Pvt. Ltd. 3D BIM Modeling for Nagpur Metro 158

Clove Technologies Pvt. Ltd. 3D Digital Documentation of Heritage Structure 173

Clove Technologies Pvt. Ltd. Krishna River Walk Proposal 173

CNI Ingenieros Consultores SAS /La Rotta Arquitectos Edificio Gerardo Arango - Facultad de Artes 36

F COBA – Engineering and Environmental Consultants Kholombidzo Hydroelectric Power Plant 137

Copenhagen Airport A/S Building Information Modeling in Existing Buildings 36

F CPC Corporation, Taiwan Talin No. 12 Topping Unit Project 89

CS Softdesk Natural Gas Compressor Station at PGNiG Gas Field Zuchlów 93

Daelim Industrial Co., Ltd. CPMS+ 68

Damwon Co., Ltd. Comparison of 3D Model Accuracy Based on Drone Photography 174

Daniel Winther Checchia Proposed Case Study of BIM Application in Safety Engineering for Heliports 83

Danish Road Directorate Managing Data for the Project Roskilde Fjord 151

DAVID Holding Company Sofia Municipality Improves Management of Street Lighting 130

Daewoo Shipbuilding & Marine Engineering Co., Ltd. Block B12/27 in Ubon Field 111

Delhi Metro Rail Corporation Alignment Design for Proposed Majlis Park to RK Ashram for Delhi MRTS Corridor – Phase IV 159

Design (R&B) Circle Construction of District Court Building 37

Design (R&B) Circle Construction of Girls Hostel at Government Polytechnic, Ahmedabad 37

Design (R&B) Circle Government Colony, Multi-story Two Tower 38

DI Soyuzhimpromproekt FSBEI HPE KSTU Isoprene Production 93

DI Soyuzhimpromproekt FSBEI HPE KSTU Water Block No. 3 with Cooling Towers BMG-2000 at OJSC TANECO 94

Diplamar Servicios de Ingeniería S.A. de C.V. Finite Element Analysis for an Offshore Platform 112

Dongguan Huajian Property Investment Co., Ltd. Kaida Science & Technology Design Center (Phase 1) No. 12 Office Building 68

 Winner  Finalist  Special Recognition Award Winner

276
Index – Alphabetical by Organization
Organization Name Project Name Page

Dongyang P&F Co., Ltd. KNPC Clean Fuels Project Coke Handling System 112

DRA Consultants Ltd. Revamping of Intermittent System to 24-by-7 Water Supply 244

Dubai Roads and Transport Authority Configuration Management and Collaborative Information Management for Dubai Rail Networks 159

Dubai Roads and Transport Authority Route 2020 160

EDCO Joint Venture Partnership VivaNext Urban Rapid Bus Transitway Design-Build-Finance 151

Electrosteel Castings Limited Naranghi Oil India Limited Township Project 245

Energotechnika Engineering Sp. z o.o. Waste Incineration Plant 138

Engineers India Ltd. AMRUT 245

Enord LLC Colombia Mining Sites Survey 174

Enord LLC Spanish River 69

F Enorsul-Sanitation Services Optimization of Water Distribution System and Reduction of Losses 241

Estaco S.A. Armored Transmission Towers 229

ETD Transmission & Distribution Sdn. Bhd. Supply of Control and Protection Panels for Landfill Renewable Energy System 139

Etpro Sumit Designs Co., Ltd. Hua Hin Condominium 38

Etpro Sumit Designs Co., Ltd. Kasetsart Univeristy - Si Racha Campus 39

Etpro Sumit Designs Co., Ltd. Wellgrow Plant 94

Expert Engineering Company Reconstruction of the Administrative Complex 175

Eye-bot Aerial Solutions Springdale Monopole 175

EZ Structure Consulting Engineers Colourtex Plant Building 95

Facile Maven Pvt. Ltd. Sewerage System Scheme for Six Census Towns 246

Fagundes-Construção E Mineração Ineração S.A. Feasibility Study – Access Ramp 113

Fantawild Design Institute (Shenzhen) Co., Ltd. Oriental Heritage 39

Federal Electricity & Water Authority Transmission & Distribution Network 246

Finnmap Infra Oy Highway 3 Arolampi Interchange 201

Flightline Geographics LLC Ethanol Processing Plant 176

FlyingJoy VR FlyingJoy VR Formosa 176

Fontemaggi Srl AMB for interpack 40

Foth Infrastructure & Environment, LLC Mobile LiDAR and sUAS Case Study 177

GEA Equipamentos e Soluções LTDA Coffee Extract Concentration Plant 95


2017 INFRASTRUCTURE YEARBOOK

GEA Equipamentos e Soluções S.A. Centrifugal Recovery of Beer 96

GEOFIT 3D Surveying and Modeling of an Electrical Substation 230

GeoINT Analysis of an Area around a Transmission Tower 177

 Winner  Finalist  Special Recognition Award Winner


277
Index – Alphabetical by Organization
Organization Name Project Name Page

GeoINT Gyeonggi-do Pottery Museum Virtual Experience Reality Model 178

GeoMarine Ingeniería Full Review of FPSO Pump Hosting for Maintenance 113

F Ghafari Associates, LLC General Motors Productivity Improvement Program 149

GKU CODD Bentley ProjectWise System for Digital Reviewing and Processing Traffic Management Projects 130

Goldwind Science & Technology Co., Ltd. Application of BIM Technology in Hybrid Concrete/Steel Wind Turbine Towers 222

Grupo Especializado en Obras Marinas S.A. de C.V. Structural Evaluation of Process Pipelines 114

SR Guangdong Hydropower Planning & Design Institute Guangdong Pearl River Delta Water Resources Allocation Project 15, 178

Guangzhou Municipal Engineering Design & Research Institute Chebei Road - Xinjiao East Road Tunnel Project 131

Guizhou Transportation Planning Survey & Design Academe Co., Ltd. The Hongshui River Bridge on Huiluo Express, Guizhou Province 24

Haiwei Spatial Information Technology LLC 3D Reality Modeling of Yangzhou City 179

Hangzhou Bole Computer Technology Co., Ltd. The Biomass Combined Heat and Power Project in Pingdu Comprehensive New Area of Qingyuan County 139

Hatch Rock Dump Geotech Inspection 179

Hebei Third Surveying and Mapping Institute Aided Design for Planning of 2016 Tangshan World Horticultural Exposition 180

Henan Province Water Conservancy Survey and Design Research Co., Ltd. Water Management Project of South to North Water Diversion 84

Henan Water & Power Engineering Consulting Co., Ltd. Zhengzhou Guanyin Lake Water Diversion and Storage Project 180

Herøya Industripark AS Herøya Industrial Park 152

Hidroing d.o.o. Implementation of GIS Database in Hydraulic Model for Precise Modeling and Accurate Results 247

W Highways England Network Occupancy Management System (NOMS) – Strategic Road Network 216

Hilong Petroleum Marine Engineering Services (Shanghai) Co., Ltd. Sanya New Airport Artificial Island Project 114

Hilong Petroleum Marine Engineering Services (Shanghai) Co., Ltd. Study on Compacting Effect of Drilling Ship 115

SR HNTB Corporation I-94 Modernization Project 16, 201

Horrocks Engineers Cul De Sac Canyon Passing Lane, Phase 2 and Lapwai Creek Bridge Replacement 202

W Huadong Engineering Corporation Limited, PowerChina Application of BIM Strategy for Shenzhen Qianhai Municipal Infrastructure 128

Huaneng Rudong Baxianjiao Offshore Wind Power Generation Co., Ltd. Huaneng Rudong 300MW Offshore Wind Farm 115

F Hubei Electric Power Survey and Design Institute Macheng Caijiazhai Wind Farm Project 227

Hyundai Engineering RPLC Deep Conversion Project 96

Hyundai Engineering Co. Ltd. Construction of CPF Complex and Development of Kandym Group of Fields 69

Hyundai Heavy Industries Shuqaiq Steam Power Plant Project 247

IAAN Soft Osan Thermal Power Plant 140

IAAN Soft Transmitter and Receiver Aging Management 181

IAAN Soft View the Location Information of Samsung Electronics Facilities 181

Ichemad-Profarb Water-based Paints Production Line 97

 Winner  Finalist  Special Recognition Award Winner


278
Index – Alphabetical by Organization
Organization Name Project Name Page
Construction of a Flyover and Underpass at Hero Honda Chowk on Delhi-Gurgaon Section
Indian Technocrat Limited 202
of Access Controlled Highway on NH-8 in Haryana on EPC Mode
Consultancy Services for the Development of Eastern Road Corridor and City Bypass to Enable
Infra Support Engineering Consultants Pvt. Ltd., Bengaluru 203
Decongestion of Jamshedpur

Infrastructure University Kuala Lumpur (IUKL) Sewerage Reticulation Design Using SewerCAD 248

Ingeniería Sísmica S.A.C. INEN Building Extension 152

Inner Mongolia Electric Power Survey & Design Institute Co., Ltd. Huolinhe Air Cooling System's Steel Structure Platform 140

Inner Mongolia Electric Power Survey & Design Institute Co., Ltd. Hohhot Youyouban 220-kilovolt Substation Project 230

INNIUS GTD GmbH New South Entrance 153

Institute of Engineering and Ocean Technology Relocation of Existing Jacket Platform 116

Institute of Engineering and Ocean Technology Structural Integrity Assessment in View of Additional Facilities and Damages on a Well Head Platform 116

Institute of Engineering and Ocean Technology Structural Integrity Assessment of an Existing Structure for Additional Living Capacity 117

IPIP – Engineering and Design Institute for Oil Refineries


Technical Evaluation of the 130-H1, H2, H3 Heaters from 130 RC2- Platforming Unit at Petrobrazi Refinery 141
and Petrochemical Plants Part of Kraftanlagen Group

Ircon International Limited Anji Bridge Construction 160

iSpatial Global Systems Namibia Elisenheim GIS 70

iSpatial Global Systems South Africa Glencore Rock Engineering Solution 117

iSpatial Global Systems South Africa iGTMS 182

Italferr Itinerary Naples 161

F Jacobs/Zephyr UAS Mapping 42 Miles of California High Speed Rail Corridor Utilizing UAVs 157

F JMC2 Heaven Sent 65

John McAslan + Partners The Burrell Collection 40

John Portman & Associates 615 South College 41

John Portman & Associates Hotel Indigo at 230 Peachtree Street 41

John Portman & Associates Union Tower West 42

JSC Kovdorsky GOK, Eurochem Management of Engineering Data for the Operation of the Facilities of JSC Kovdorsky GOK 182

JSTI Group Xuzhou Yingbin Road Rapid Retrofit Project 131

JVTek Company Vam Cong Cable-Stayed Bridge 24

Karnataka Public Works Department Building Division CMM Court Premises 42

Bystrinsky Ore Mining and Processing Plant—Dressing Works for Processing and Dressing
Kazgiprotsvetmet Ltd. 118
Gold, Iron, and Copper Ores

KDC Division 4 Kanher Power Station 70


2017 INFRASTRUCTURE YEARBOOK

Keystone Engineering WOG Coelacanth Fabrication 118

Khatib & Alami Bawabat Makkah Infrastructure Design Consultancy 248

KLCC Projeks Sdn. Bhd. Mövenpick Spa & Resort 43

Kokusai Kogyo Co., Ltd. 3D Map Project for Areas Prone to Sediment Disaster 153

 Winner  Finalist  Special Recognition Award Winner


279
Index – Alphabetical by Organization
Organization Name Project Name Page

Korea District Heating Engineering 3D Pipe Supports for Power Plant 141

Korea District Heating Engineering Construction of the Seokmun Combined Heat and Power Plant 142

Korea District Heating Engineering Osan Combined Heat and Power Plant Construction 142

Korea Heat Exchanger Al-Zour New Refinery 97

Koyna Design Circle Patagon Hydro Electric Project 143

Kutumbale Consultants & Engineers Pvt. Ltd. Seismic Strengthening of Preheater Building at Purbanchal Cement 43

La Bottega del Legno Snc Old Wood Interiors 44

Land Transport Authority BIM Model Facility of Buildings of North-South Corridor 203

Land Transport Authority C8801 – Kim Chuan Depot Extension 161

Larsen & Toubro Construction Bansujara Major Project, Madhya Pradesh 249

Larsen & Toubro Construction Mega Lift Irrigation Project - Cluster XII 71

Larsen & Toubro Construction Tumakuru Continuous Water Supply Scheme 249

Development and Two-Lane Upgrade with Paved Shoulder of Bijapur-Homnabad Section


Larsen & Toubro Limited 204
of NH-50 from Km 195 to Km 415

W Leighton Asia Hong Kong Boundary Crossing Facilities, Hong Kong-Zhuhai-Macao Bridge 64

Lendlease Kingsford Smith Drive Upgrade 71

Lendlease Engineering Pty Limited Lendlease Engineering VDC - Project Lifecycle Standards, Procedures and Workflows to BIM Level 3 154

Lineacurva Keydi Lamps 98

Addition of the Second Experimental Section of Achimov Deposits of the Urengoy Oil
LLC TyumenNIIginprogaz 98
and Gas Field for Full Development

W Long Jian Road & Bridge Co., Ltd. Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge Project 22

M. K. Soil Testing Laboratory Geotechnical Investigation of Railway Track for Dedicated Freight Corridor Corporation of India 84

Maharashtra Metro Rail Corporation Limited Nagpur Metro 162

Maharashtra Metro Rail Corporation Limited Nagpur Metro 218

Mallikarjun Associates Bangalore REVA Grand Staircase 72

Malmi Airport Development Group Helsinki-Malmi Airport Development Project 44

Manila Water Company, Inc. Hinulugang Taktak Sewerage System Project 250

F Manila Water Company, Inc. Manila Water Natural Calamity Risk Resiliency and Mitigation Masterplan 241

Maricopa Department of Transportation Vulture Mine Recreational Areas 204

W Mass Rapid Transit Corporation Sdn. Bhd. Klang Valley Mass Rapid Transit Project - Sungai Buloh-Serdang-Putrajaya Line 156

MCC Capital Engineering & Research Incorporation Limited Newly Built Ardakan Electric Furnace 99

MCC Capital Engineering & Research Incorporation Limited Bridge Construction Project over Hondlon River in Baotou City 25

MCC TianGong Group Corporation Limited Newly-built Comprehensive Gymnasium of Tianjin University of Finance and Economics 132

Metal Projekt Krakow Power Plant Modernization 72

 Winner  Finalist  Special Recognition Award Winner


280
Index – Alphabetical by Organization
Organization Name Project Name Page

Minconsult Sdn. Bhd. Network Analysis for a Medium-size Town 250

Ministry of Municipal and Rural Affairs, Kingdom of Saudi Arabia Study to Optimize Reality Modeling and Topographic Data Compilation Procedure 132

MMC Gamuda KVMRT Sdn. Bhd. and AECOM Perunding Sdn. Bhd. MRT Sungai Buloh-Serdang-Putrajaya Line 183

W Morphosis The Bloomberg Center 30

Mott MacDonald and the Costain, VINCI Construction Grands Projets,


W East Section of the Thames Tideway Tunnel 148
Bachy Soletanche Joint Venture

Mott MacDonald Sweco A96 Hardmuir to Fochabers 205

Multi Media Consultants Pvt. Ltd. Sewer Network Design with House Connections, Sewage Treatment Plants, and Allied Works 251

Municipal Corporation of Greater Mumbai Improvement in Supply at 2nd October Colony, Jerbai Wadia Marg 252

Municipal Corporation of Greater Mumbai Improvement of Water Supply Along P.L. Lokhande Marg, Chembur 252

Municipal Corporation of Greater Mumbai Improvement of Water Supply at Worli Koliwada Locality in G/South Ward, Mumbai 253

Municipal Engineering Co., Ltd., of CREC Shanghai Group Application of Bentley Technology to Yangjialing Bridge Project of Menghua Railway 73

F MWH Ltd. (operating in CiM6 alliance) Netheridge STW 237

Nagesh Consultants Coleroon River Bridge 25

Nagesh Consultants Meditation Hall 45

National Center for Research on Earthquake Engineering Using ContextCapture for 3D Model Analysis of Structural Collapse in Earthquake 45

National Taipei University of Technology Ancient Folk Culture Village 46

Neutral Design Co., Ltd. Seismic Diagnosis and Reinforced Design 85

NJDOT / Public Private Partnership of a Bentley-Hosted SUPERLOAD System


F New Jersey Department of Transportation 217
for Oversize / Overweight Vehicle Permitting and Routing

NJS Engineers India Pvt. Ltd. Distribution Network Installation, Leakage Prevention, and Rehabilitation at PCM Area 254

NJS Engineers India Pvt. Ltd. Guwahati Water Supply Project 253

W NJS Engineers India Pvt. Ltd. JICA Assisted Ganga Action Plan II 80

F North Caspian Operating Company N.V. Managing Corrosion and Inspection with Bentley APM in the Kashagan Project 221

NSW DFSI Spatial Services Smart State NSW 183

NTT Data/Texas Department of Transportation TxDOT SH-358 205

W Offshore Oil Engineering Company Limited Oil Field Jacket Design and Development of ‘Fixed Offshore Structure Design Tool’ 106

Oiltech Engineering (India) Pvt. Ltd. FPSO Cyrus 119

Creating Multi-discipline Support Systems and Cable Support Systems to Implement


OOO Oglaend System 99
Design Solutions in the Development of Vladimir Filanovsky Field

Operations EOS DOT LiDAR 206

SR F Oregon Department of Transportation TransInfo — A Connected Data Environment for Transportation 14, 217
2017 INFRASTRUCTURE YEARBOOK

Outotec Modular Flotation cPlant 223

SR Outotec Design for Reliability Project in Counter Current Decantation (CCD) 19, 222

PT. Shinryo Indonesia Aeon Mall – Jakarta Garden City 73

 Winner  Finalist  Special Recognition Award Winner


281
Index – Alphabetical by Organization
Organization Name Project Name Page

PT. Taikisha Indonesia Engineering Yamaha Manufacturing Indonesia 74

F Pacific Gas & Electric Company Reality Modeling in Bentley Substation 227

Pankaj Associates & Consultant Engineers Kolar Gravity Feeder Main 254

Pankaj Tiwari AMRUT Sewer Network 255

F Pennsylvania State University, Department of Architectural Engineering Virtual Penn State Campus 169

W PESTECH International Berhad Automation and Integration of Substation Design Project 226

PetroVietnam Marine Shipyard Tam Dao 05 Jack-up Rig 119

F PJSC Giprotyumenneftegaz Central Production Facility, Novoportovskoye Field 89

PLH Architects Rail Baltica 162

Plotini Allestimenti City after the City 46

PLS snc di Paolo & Loretta Segato Camera 2 47

PowerChina Henan Engineering Corporation Puyang Longfen 2×660 MW Power Plant Project 143

F PowerChina Zhongnan Engineering Corporation Limited Digital Delivery of Qiongzhong Pumped Storage Power Station 137

PPS Tech LLP Alstom Bharat Forge Power Ltd. 47

Precision Precast Solutions Pvt. Ltd. The North Country Mall 48

Preparation of a Feasibility Study and Detailed Project Report of Access Controlled


Primove Infrastructure Development Consultants Pvt. Ltd. 206
Nagpur-Mumbai Super Communication Expressway

Proensi - Projeto e Engenharia de Sistemas Ltda. Almirante Tamandaré 255

PT PAM Lyonnaise Jaya Using WaterGEMS to Reduce Water Loss 256

PT. Hutama Karya Trans-Sumatra Toll Road 207

PT. Link Net Tbk Link Net FTTH Expansion 231

PT. Wijaya Karya (Persero) Tbk. Balikpapan-Samarinda Toll Road Project, Sections 2, 3, and 4 207

PT. Wijaya Karya (Persero) Tbk. Rehabilitation of School Building Package 1 48

QDVC New Orbital Highway 2 208

Queensland Rail Railway Signaling Information Modeling 163

R&B Design Circle Construction of ROB on Dungri Link Road Mumbai Delhi Route of Western Railway in Valsad District 26

F Raymond Vogel Landschaften AG New Landscape for the New Hydropower Plant in Hagneck 81

RealWorld Engineering Consultants Smart City of New Taipei City 184

REI Software Co., Ltd. CH3 Broadcast Communication Tower 231

Reliance Engineering Group DTA HNUU Platform Revamp 100

RendArk Monnalisa Shop São Paulo, Brazil 49

RendArk TUUM Store Assisi 49

ReNew Power PV Mounting Structure to Cover Carports at Delhi Metro Stations 85

 Winner  Finalist  Special Recognition Award Winner


282
Index – Alphabetical by Organization
Organization Name Project Name Page

Reveron Consulting Project Information Management System 208

RISE Structural Design, Inc. Piping Stress Analysis at Methanol Production Plant 100

RITES Limited Preparing a Detailed Project Report for Rail/Road Connectivity 209

RITES Limited Preparation of Detailed Project Report for Construction of a Bridge across Hasdeo River 209

Roark Consulting Engineers LLP Jai Prakash Narayan International Convention Center 50

RODIC Consultants Pvt. Ltd. SH-101, NH-23/32 210

Rosatom State Nuclear Energy Corporation Electrical Design in the Russian-Finnish Project on the Construction of Nuclear Power Plants Hanhikivi-1 144

Rural Water Supply and Sanitation Tandur 52 Kilometers 256

SA Infrastructure Consultants Pvt. Ltd. Feasibility Report, Preliminary Design for Alternative Highway to Gangtok in the State of Sikkim 210

Saanvi Infrastructure Pvt. Ltd. Feasibility Study and Detailed Project Report for Proposed High Level Bridge Near Kumrabad 26

Sabah Lands and Surveys Department 3D Modeling for New Trail Selection of Post-Quake Mt. Kinabalu 184

Sabah Lands and Surveys Department Sabah 3D Subsidiary Title Information System 185

Sabesp Analysis of Real Losses in Potable Water Distribution Networks 257

Sabesp Safe Daily Transfer of 1.1 Trillion Liters of Water 257

Samara Utility Systems LLC The Search for Unaccounted Losses in a Zone of the
​​ B-55 Waterway 258

F Sanborn Map Company, Inc. Sanborn3D HD Maps for Autonomous Driving: Santa Clara 169

Sangji University Research Project Consisting of Realistic Modeling Video Production 185

Sanni, Ojo & Partners Church Auditorium 50

Sanni, Ojo & Partners Multi-story Office Building 51

SANOVA - Soluções para Gestão da Água Water Loss Reduction Study for Rio Vermelho District Water Supply System 258

W SATRIA Technologies Sdn. Bhd. Sustainable Solutions for Control and Protection Systems 88

Saunrachana Strucon Pvt. Ltd. Amul Cattle Feed Plant 51

Saunrachana Strucon Pvt. Ltd. Cattle Feed Plant at Sumul Dairy 52

Saunrachana Strucon Pvt. Ltd. Combined Water Supply Scheme to Vellore Corporation Package-1 238

Saunrachana Strucon Pvt. Ltd. SRFDCL House at Sabarmati Riverfront 52

Scon Pvt. Ltd. Structural Designs Basis Report of Ashiana Anantara 53

SR SEIKEY Enterprise Drone Solutions Cell Tower Inspections 4G and 5G 18, 186

Shah Technical Consultants Pvt. Ltd. RUIDP PH-III (Smart Check - Monitoring Application) 259

F Shalom Baranes Associates Cannon House Office Building Renewal 31


2017 INFRASTRUCTURE YEARBOOK

Shanghai Hangyao Information Technology Co., Ltd. 3D Digital Mapping Project of the Tian Qi Mausoleum and Linzi Tombs 186

Shanghai Hangyao Information Technology Co., Ltd. Aerial Photography by Unmanned Aerial Vehicles for Shanghai Disney Resort 187

Shanghai Hangyao Information Technology Co., Ltd. Technical Cooperation Agreement for Making 3D Models by UAV Oblique Aerial Photography in Duoba Region 187

 Winner  Finalist  Special Recognition Award Winner


283
Index – Alphabetical by Organization
Organization Name Project Name Page

Shanghai Hangyao Information Technology Co., Ltd. Technical Services for Oblique Aerial Photography of the West Lake 188

Application of "Four-in-one" Physical Design Approach for the Protection


Shanghai IFA Technology 188
and Renovation of Historical and Cultural Street Blocks

Shanghai IFA Technology Creating a Virtual Reality System of the Ancient City of Pingyao 189

F Shanghai New Jinshan Investment Holding Group Co., Ltd. Xinjiang Water Purification No. 2 Plant and Supporting Pipe Network Project 237

Shanghai Water Engineering Design & Research Institute Co., Ltd. Nanhui Dongtan N1 Reservoir Area Reclamation Project 120

Sharjah Electricity and Water Authority SEWA Water 2030 259

Shenzhen Municipal Design & Research Institute Co., Ltd. Shahe West Road Rapid Retrofit Project 133

Shree Prefab Steel Pvt. Ltd. Mother Dairy Plant Building 53

Shree Prefab Steel Pvt. Ltd. Process House Building of Nandan Denim Limited 54

Shree Prefab Steel Pvt. Ltd. Show Room Building 54

Sichuan Provincial Transport Department Highway Planning, Survey,


Interchange Hub 211
Design, and Research Institute

SID Consultants Hydro Power Plants on Miyagam Branch Narmada Canal, Vadodara 144

Silicon Engineering Consultants Pvt. Ltd. BRTS – Chhattisgarh (Workshop, Control Building, and Bus Shelters) 55

Silicon Engineering Consultants Pvt. Ltd. Educational Hub at Diu 55

Simon India Ltd. 50,000 MTPY Caprolactam Quality Project 101

Simon India Ltd. Caustic Soda Project - KLJQ 74

SimpsonHaugh Library Walk 56

Sinotech Engineering Consultants, Ltd. TPC Offshore Power Generation Project Phase 1 120

SiteSee Automated Recognition of Antenna on a Cell Tower 189

SK E&C Mobile 3D Model 75

SK E&C SK A Project 75

SKA Consulting Engineers, Inc. Steven Tanger Center for the Performing Arts 56

Skeleton Consultant Pvt. Ltd. ICSS Complex at SGPC, Gurdwara Rakab Ganj Sahib 57

Skeleton Consultant Pvt. Ltd. Sri Sathya Sai Sanjeevani Hospital 57

Skematic Consultants Library Building for NIT Agartala 58

SMEC South Africa (Pty) Ltd. Upgrade of National Road N4 Section 5B 211

Smith Structures India Pvt. Ltd. Industrial Complex at Ditasan 58

SNC-Lavalin UK Ltd. Johan Sverdrup LQ Jacket 121

SOTEPA Ltda. Adjustments to the Engineering Project for Highway BR-280/SC 212

Srijan Ecological Upliftment Detailed Design of Water Supply Distribution Network in the District of North 24 Parganas and South 24 Parganas 260

Stantec Resource Data Management System (RDMS) 223

State Unitary Enterprise MosgortransNIIproject Program for the Overhaul of Tramways in the City of Moscow, 2017-2019 163

 Winner  Finalist  Special Recognition Award Winner


284
Index – Alphabetical by Organization
Organization Name Project Name Page

State Urban Development Authority Ambikapur Water Supply 260

State Urban Development Authority Durg Water Supply 261

State Urban Development Authority Raipur Water Supply 261

Stemas 02PLDF Filmatrice Doppia 59

F Stream Environment Pte. Ltd. (Stream) Automated Waste Collection System for Changi Airport Terminal 4 81

Structcon Designs Pvt. Ltd. Approaches around Mumbai Airport 27

Strukad Consultant Construction of Railway ROB on Karjan Bypass Road 27

SUDOP PRAHA a.s. Reconstruction of Masaryk Station in Prague 164

Sunil Mutalik & Associates Vallonia 59

Survey of India Advancement in Map Printing 133

TAC Engineering Co., Ltd., Rikuzentakata Shimizu Joint Venture Rikuzentakata-shi Reconstruction Project – 3D Modeling Using Fixed-wing UAV 190

Taesung SNI The Second Namhae Bridge-Suspension Bridge Model 76

Takahashi Architect Twin Pointed Roof House 76

Tamco Switchgear (Malaysia) Sdn. Bhd. Integrated Systems of a Switchgear with Control Relay Panel System 101

Tata Consulting Engineers Limited 640 Megawatts (AC) of Solar PV Projects-220/33 Kilovolt, 110/33 Kilovolt and 66/11 Kilovolt Substations 232

Tata Consulting Engineers Limited Akwa Ibom Transmission Project Phase II 232

Tata Consulting Engineers Limited Integrated and Comprehensive Stormwater Management Facility for Salem City 262

Tata Power Company Limited Provision of Seasonal Tilt Arrangement for Solar Structure 145

Tebodin Middle East Ltd. FFS & Life Extension Study for Offshore Platform Structures 121

TechnipFMC plc Lifting of Well Jumpers 122

Tianjin Municipal Engineering Design & Research Institute Application of BIM in East Grade-separated Junction Engineering of Yangang, Shenzhen 134

F Tianjin Municipal Engineering Design & Research Institute Construction and Design General Contracting of Retrofit Project at Haiyu East Line Municipal Road 129

Toyo Construction Co., Ltd. BBAJ Tochigi New Factory Project 60

Toyo Construction Co., Ltd. Self-Propelled Multipurpose Working Vessel Construction Project 122

Toyo Engineering India Pvt. Ltd. Global Petrochemical Ethylene Complex 102

Track Access Services Ltd. Track Access Portal – An Online Railway Information System 164

Tractebel Engineering Pvt. Ltd. Chittaurgarh Cement Plant - Rajasthan 102

Traffic Planning and Design, Inc. Yellow Springs Bridge Over Pennsylvania Turnpike 28

Transys Consulting Pvt. Ltd. Structure Options for Proposed Agra Inner Ring Road Phase-II 212
2017 INFRASTRUCTURE YEARBOOK

TRC South Street Substation 233

UCB UCB Environmental Improvement Project 190

Ultragaz S.A. Ultragaz Extrafarma Sustainable Resale 86

 Winner  Finalist  Special Recognition Award Winner


285
Index – Alphabetical by Organization
Organization Name Project Name Page

University of Chile Renovation of the Civic Boulevard in Tierra Amarilla, Project of Renovation of Public Space and Services 60

Vadalkar and Associates Department of Energy Science and Engineering, Centre for Environmental Science and Engineering 61

Volgogradnefteproekt, LLC Conductor Supported Platform of Filanovsky Field 123

Volgogradnefteproekt, LLC Construction Management of Conductor Supported Platform on Filanovsky Field 77

Design of Electro-Technical Solutions and Systems for Control of the Conductor


F Volgogradnefteproekt, LLC 107
Supported Platform of Filanovsky Field

Voyants Solutions Pvt. Ltd. Augmentation of Sewerage Collection and Treatment Scheme 263

Voyants Solutions Pvt. Ltd. Augmentation of Water Supply for Thoothukudi City 262

Detailed Design and Approval for the Roadwork – Four-Laning of Barhi – Hazaribagh Section
Voyants Solutions Pvt. Ltd. 213
of NH-33 Jharkhand on EPC Mode under NHDP – Phase III

Watercare Services Limited The Central Interceptor 154

White Martins Gases Industriais Air-Gas Separation Plant - Ouro Branco, T1600S 103

WHY Inc. ContextCapture for Comms 191

Wood & Grieve Engineers Bushmead 191

F WSP One Blackfriars, London 31

WSP Consultants India Pvt. Ltd. Hallsberg-Stenkumla 165

Xiamen Municipal Pipe Rack Investment Management Co., Ltd. /


Comprehensive Pipe Rack Project in Maluan Bay 134
Xiamen Municipal Engineering Design Institute Co., Ltd.

Yenon-Research and Design Ltd. Highway 65-85 213

Yinchuan Planning Architectural Design and Research Institute Co., Ltd. Upgrading and Reconstruction Project of No. 2 Sewage Treatment Plant 238

Zakum Development Company Managing a Major Offshore Complex Structure: Substructuring Technique 123

Zentech Engineering Co., Ltd. Bahrain LNG Import Terminal 124

Zentech Engineering Co., Ltd. Offshore Wind Turbine Substructure 124

Zentech Engineering Co., Ltd. TUAS Terminal Phase1 Reclamation, Wharf Construction and Dredging 125

Zhongcheng International Marine Engineering Survey & Design Co., Ltd. Qingdao Oriental Movie Metropolis Yacht Wharf Project 125

 Winner  Finalist  Special Recognition Award Winner

286
Index – Project Location by Country
Organization Name Project Name Location Page

ARGENTINA

CH2M HILL Parana Las Palmas Water Treatment Plant Ingeniero Maschwitz, Buenos Aires 243

AUSTRALIA

AECOM Perth Stadium Station Perth, Western Australia 32

AECOM-GHD Joint Venture Level Crossing Removal Project – Technical Advisory Services Melbourne, Victoria 158

Aerometrex Parramatta Light Rail Project Parramatta, New South Wales 170

F AMEC Foster Wheeler Gruyere Project South Dorothy Hills, Western Australia 107

Arcadis Buangor Bypass Buangor, Victoria 198

F Arcadis-WSP/PB Joint Venture Citylink Tulla Widening Melbourne, Victoria 23

Aurecon Zillmere Substation Brisbane, Queensland 228

Lendlease Kingsford Smith Drive Upgrade Brisbane, Queensland 71

Lendlease Engineering VDC - Project Lifecycle Standards, Procedures,


Lendlease Engineering Pty Limited 154
and Workflows to BIM Level 3

NSW DFSI Spatial Services Smart State NSW New South Wales 183

Queensland Rail Railway Signaling Information Modeling Brisbane, Queensland 163

SiteSee Automated Recognition of Antenna on a Cell Tower Brisbane, Queensland 189

Stantec Resource Data Management System (RDMS) 223

Wood & Grieve Engineers Bushmead Perth, Western Australia 191

BAHRAIN

Zentech Engineering Co., Ltd. Bahrain LNG Import Terminal Hidd, Khalifa bin Salman Port 124

BELGIUM

Brussels Regional Public Service, Monuments


Recording of the Archaeological Heritage in Brussels Brussels 172
and Sites Directorate

UCB UCB Environmental Improvement Project Braine-l'Alleud, Walloon Brabant 190

BRAZIL

W AEGEA AEGEA Prolagos Sewerage Master Plan 2041 Região dos Lagos, Rio de Janeiro 240

Daniel Winther Checchia Proposed Case Study of BIM Application in Safety Engineering for Heliports São Paulo 83

F Enorsul – Sanitation Services Optimization of Water Distribution System and Reduction of Losses Olinda, Pernambuco 241

Fagundes-Construção E Mineração Ineração S.A. Feasibility Study – Access Ramp Catal, Goiás 113

GEA Equipamentos e Soluções LTDA Coffee Extract Concentration Plant Cornélio Procópio, Paraná 95

GEA Equipamentos e Soluções S.A. Centrifugal Recovery of Beer Lages, Santa Catarina 96
2017 INFRASTRUCTURE YEARBOOK

Proensi - Projeto e Engenharia de Sistemas Ltda. Almirante Tamandaré Almirante Tamandaré, Paraná 255

RendArk Monnalisa Shop São Paulo - Brazil São Paulo 49

 Winner  Finalist  Special Recognition Award Winner

287
Index – Project Location by Country
Organization Name Project Name Location Page

Sabesp Safe Daily Transfer of 1.1 Trillion Liters of Water São Paulo 257

Sabesp Analysis of Real Losses in Potable Water Distribution Networks São Paulo 257

SANOVA - Soluções para Gestão da Água Water Loss Reduction Study for Rio Vermelho District Water Supply System Florianópolis, Santa Catarina 258

Guaramirim, Schroeder, and Jaragua


SOTEPA Ltda. Adjustments to the Engineering Project for Highway BR-280/SC 212
Do Sul, Santa Catarina

Ultragaz S.A. Ultragaz Extrafarma Sustainable Resale Fortaleza, Ceará 86

White Martins Gases Industriais Air-Gas Separation Plant – Ouro Branco, T1600S Ouro Branco, Minas Gerais 103

BULGARIA

DAVID Holding Company Sofia Municipality Improves Management of Street Lighting Sofia City Province 130

CAMBODIA

W PESTECH International Berhad Automation and Integration of Substation Design Project Kratié and Kampong Cham 226

CANADA

Implementation of a Comprehensive Technical Records and Information


F A Natural Gas Company 149
Management Program Powered by ProjectWise

Alberta Pipe Trades College Alberta Pipe Trades College Construction Academy Edmonton, Alberta 66

City of Montreal Rio Tinto Alcan Planetarium of Montreal Montreal, Quebec 83

EDCO Joint Venture Partnership VivaNext Urban Rapid Bus Transitway Design-Build-Finance York Region, Ontario 151

Hatch Rock Dump Geotech Inspection Sudbury, Ontario 179

CHILE

Renovation of the Civic Boulevard in Tierra Amarilla, Project of Renovation


University of Chile Yellow Earth, Atacama 60
of Public Space and Services

CHINA

Beijing Housing Construction Co., Ltd. First Section of Binhu Embellished Garden Prefabricated Residential Project Hefei, Anhui 66

Beijing Institute of Architectural Design Swimming Pool of Hangzhou Olympic Sports Center Hangzhou, Zhejiang 35

W Beijing Institute of Water Tongzhou Water Works of Beijing South-to-North Water Diversion Project Beijing 236

Application of BIM Strategy on the Meiguan Expressway to Urban Road


W CCCC First Highway Consultants, Co., Ltd. Shenzhen City, Guangdong 194
Design Project

CCCC Water Transportation Planning Design Institute Co., Ltd. Ningbo – Container Terminal Project in Meishan Port Area of Zhoushan Port Ningbo, Zheijiang 35

Changsha Design and Research Institute of Nonferrous 100kt/a Electrolytic Zinc Smelting Project of Huixin Lead-Zinc Smelting Co.,
Huili, Sichuan 92
Metallurgy Co., Ltd. Ltd. of Huili County of Sichuan
China Construction Sixth Engineering Division Corp., Ltd., Tianjin
SR F University of Technology, and Tianjin Tianhe-Cloud Building Sanya New Airport Reclamation Project Sanya, Hainan 17, 65
Engineering Technology Co., Ltd.
China Energy Engineering Group Zhejiang Electric Power
Daishan Convertor Station Zhoushan, Zhejiang 229
Design Institute Co., Ltd.
China Railway Eryuan Engineering Group Co., Ltd.; Yungui
F Application of BIM Strategy for Dali to Ruili Railway Project Baoshan, Yunnan 157
Railway Yunnan Co. Ltd.
China Water Resource Pearl River Planning Surveying Pu'an County, Qianxinan Buyei and Miao
W Wugachong Reservoir Project in Pu'an County of Guizhou Province 136
& Designing Co., Ltd. Autonomous Prefecture, Guizhou

Dongguan Huajian Property Investment Co., Ltd. Kaida Science & Technology Design Center (Phase 1) No. 12 Office Building Dongguan, Guangdong 68

Fantawild Design Institute (Shenzhen) Co., Ltd. Oriental Heritage Ningbo, Zheijiang 39

 Winner  Finalist  Special Recognition Award Winner


288
Index – Project Location by Country
Organization Name Project Name Location Page

Goldwind Science & Technology Co., Ltd. Application of BIM Technology in Hybrid Concrete/Steel Wind Turbine Towers Dezhou, Shandong 222

SR Guangdong Hydropower Planning & Design Institute Guangdong Pearl River Delta Water Resources Allocation Project Guangdong 15, 178

Guangzhou Municipal Engineering Design & Research Institute Chebei Road - Xinjiao East Road Tunnel Project Guanghzou, Guangdong 131

Guizhou Transportation Planning Survey & Design


The Hongshui River Bridge on Huiluo Express, Guizhou Province Luodian, Guizhou 24
Academe Co., Ltd.

Haiwei Spatial Information Technology LLC 3D Reality Modeling of Yangzhou City Yangzhou, Jiangsu 179

The Biomass Combined Heat and Power Project in Pingdu Comprehensive


Hangzhou Bole Computer Technology Co., Ltd. Lishui City, Zhejiang 139
New Area of Qingyuan County

Hebei Third Surveying and Mapping Institute Aided Design for Planning of 2016 Tangshan World Horticultural Exposition Tangshan, Hebei 180

Henan Province Water Conservancy Survey and Design


Water Management Project of South to North Water Diversion Shijiazhuang, Hebei 84
Research Co., Ltd.

Henan Water & Power Engineering Consulting Co., Ltd. Zhengzhou Guanyin Lake Water Diversion and Storage Project Zhengzhou, Henan 180

Hilong Petroleum Marine Engineering Services


Sanya New Airport Artificial Island Project Sanya, Hainan 114
(Shanghai) Co., Ltd.
Hilong Petroleum Marine Engineering Services
Study on Compacting Effect of Drilling Ship Shanghai 115
(Shanghai) Co., Ltd.

W Huadong Engineering Corporation Limited, PowerChina Application of BIM Strategy for Shenzhen Qianhai Municipal Infrastructure Shenzhen City, Guangdong 128

Huaneng Rudong Baxianjiao Offshore Wind Power


Huaneng Rudong 300MW Offshore Wind Farm Rudong, Jiangsu 115
Generation Co., Ltd.

F Hubei Electric Power Survey and Design Institute Macheng Caijiazhai Wind Farm Project Macheng, Hubei 227

Inner Mongolia Electric Power Survey & Design Institute Co., Ltd. Huolinhe Air Cooling System's Steel Structure Platform Holingol City, Inner Mongolia 140

Inner Mongolia Electric Power Survey & Design Institute Co., Ltd. Hohhot Youyouban 220-kilovolt Substation Project Hohhot, Inner Mongolia 230

JSTI Group Xuzhou Yingbin Road Rapid Retrofit Project Xuzhou, Jiangsu 131

W Long Jian Road & Bridge Co., Ltd. Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge Project Heihe City, Heilongjiang Province, China 22

MCC Capital Engineering & Research Incorporation Limited Bridge Construction Project over Hondlon River in Baotou City Beijing 25

Newly Built Comprehensive Gymnasium of Tianjin University


MCC TianGong Group Corporation Limited Tianjin 132
of Finance and Economics
Application of Bentley Technology to Yangjialing Bridge Project
Municipal Engineering Co., Ltd., of CREC Shanghai Group Sanmenxia, Henan 73
of Menghua Railway
Oil Field Jacket Design and Development of ‘Fixed Offshore
W Offshore Oil Engineering Company Limited Tianjin 106
Structure Design Tool’

PowerChina Henan Engineering Corporation Puyang Longfen 2×660 MW Power Plant Project Puyang, Henan 143

F PowerChina Zhongnan Engineering Corporation Limited Digital Delivery of Qiongzhong Pumped Storage Power Station Qiongzhong County, Hainan 137

Shanghai Hangyao Information Technology Co., Ltd. 3D Digital Mapping Project of the Tian Qi Mausoleum and Linzi Tombs Beijing 186

Shanghai Hangyao Information Technology Co., Ltd. Aerial Photography by Unmanned Aerial Vehicles for Shanghai Disney Resort Shanghai 187

Technical Cooperation Agreement for Making 3D Models by UAV Oblique


Shanghai Hangyao Information Technology Co., Ltd. Beijing City, Beijing 187
Aerial Photography in Duoba Region

Shanghai Hangyao Information Technology Co., Ltd. Technical Services for Oblique Aerial Photography of the West Lake Beijing 188
2017 INFRASTRUCTURE YEARBOOK

Application of "Four-in-one" Physical Design Approach for the


Shanghai IFA Technology Harbin, Heilongjiang 188
Protection and Renovation of Historical and Cultural Street Blocks

Shanghai IFA Technology Creating a Virtual Reality System of the Ancient City of Pingyao Pingyao, Shanxi 189

F Shanghai New Jinshan Investment Holding Group Co., Ltd. Xinjiang Water Purification No. 2 Plant and Supporting Pipe Network Project Jinshan District, Shanghai 237

 Winner  Finalist  Special Recognition Award Winner

289
Index – Project Location by Country
Organization Name Project Name Location Page
Shanghai Water Engineering Design & Research
Nanhui Dongtan N1 Reservoir Area Reclamation Project Shanghai 120
Institute Co., Ltd.

Shenzhen Municipal Design & Research Institute Co., Ltd. Shahe West Road Rapid Retrofit Project Shenzen, Guangdong 133

Sichuan Provincial Transport Department Highway Planning,


Interchange Hub Chengdu, Sichuan 211
Survey, Design, and Research Institute
Construction and Design General Contracting of Retrofit Project at Haiyu
F Tianjin Municipal Engineering Design & Research Institute Sanya, Hainan 129
East Line Municipal Road
Application of BIM in East Grade-separated Junction Engineering
Tianjin Municipal Engineering Design & Research Institute Shenzen, Guangdong 134
of Yangang, Shenzhen
Xiamen Municipal Pipe Rack Investment Management Co., Ltd./
Comprehensive Pipe Rack Project in Maluan Bay Xiamen, Fujian 134
Xiamen Municipal Engineering Design Institute Co., Ltd.
Yinchuan Planning Architectural Design and Research Qingtongxia, Ningxia Hui Autonomous
Upgrading and Reconstruction Project of No. 2 Sewage Treatment Plant 238
Institute Co., Ltd. Region
Zhongcheng International Marine Engineering Survey
Qingdao Oriental Movie Metropolis Yacht Wharf Project Qingdao, Shandong 125
& Design Co., Ltd.

COLOMBIA

CNI Ingenieros Consultores SAS/La Rotta Arquitectos Edificio Gerardo Arango – Facultad de Artes Bogota 36

Enord LLC Colombia Mining Sites Survey Bogota 174

Estaco S.A. Armored Transmission Towers Medillin, Antioquia 229

CROATIA

Implementation of GIS Database in Hydraulic Model for Precise


Hidroing d.o.o. Varaždin, Varaždin County 247
Modeling and Accurate Results

CZECH REPUBLIC

SUDOP PRAHA a.s. Reconstruction of Masaryk Station in Prague Prague 164

DENMARK

Architect Group 5 (AG5) Multi-functional Sports Enclosure Elsinore and Hilerød, Sjælland 33

Copenhagen Airport A/S Building Information Modeling in Existing Buildings Copenhagen, Kastrup 36

The Danish Road Directorate Managing Data for the Project Roskilde Fjord Roskilde Fjord, Zealand 151

ECUADOR

Amagua CEM Water Pressure Improvement in Daule-Samborondón Guayaquil, Guayas 242

ETHIOPIA

Morrison Hershfield Limited Kaliti Wastewater Treatment Plant Expansion Akaky Kaliti, Addis Ababa 251

FINLAND

Finnmap Infra Oy Highway 3 Arolampi Interchange Riihimäki 201

Malmi Airport Development Group Helsinki-Malmi Airport Development Project Helsinki, Uusimaa 44

SR Outotec Design for Reliability Project in Counter Current Decantation (CCD) Helsinki, Finland 19, 222

Outotec Modular Flotation cPlant 223

Electrical Design in the Russian-Finnish Project on the Construction


Rosatom State Nuclear Energy Corporation Pyhäjoki, Northern Ostrobotnia 144
of Nuclear Power Plants Hanhikivi-1

FRANCE

GEOFIT 3D Surveying and Modeling of an Electrical Substation Aix-en-Provence 230

290  Winner  Finalist  Special Recognition Award Winner


Index – Project Location by Country
Organization Name Project Name Location Page

GERMANY

3D ScanWorld Energy Factory Knappenrode Knappenrode, Saxony 170

Fontemaggi Srl AMB for interpack Düsseldorf, North Rhine-Westphalia 40

INNIUS GTD GmbH New South Entrance Düsseldorf, North Rhine-Westphalia 153

HONG KONG

W CEDD-AECOM-The Earth Solutions Development of Anderson Road Quarry Site 168

W Leighton Asia Hong Kong Boundary Crossing Facilities, Hong Kong-Zhuhai-Macao Bridge 64

HUNGARY

Ichemad-Profarb Water-based Paints Production Line Bócsa 97

INDIA

Accrete Consulting Engineers Pvt. Ltd. Designing a Road Network for Raya Resort Mysore, Karnataka 196

Strengthening and Widening of Two-Lane National Highway to Two Lanes


Accrete Consulting Engineers Pvt. Ltd. with Paved Shoulder for Manoharpur to Dausa Section of NH-11A Jaispur, Rajasthan 196
(New NH-148)

Almondz Global Infra Consultant Ltd. Four Lanning of Bhavnagar Talaja of NH 8E Bhavnagar, Gujarat 197

Andhra Pradesh Road Development Corporation AP Road Database Management System Vijayawada, Andhra Pradesh 218

Arush Gas Technology Services LLP HFO Mundra Bunkering System Mundra, Gujarat 90

Aryatech Marine & Offshore Services Pvt. Ltd. Installation of New Lifeboat Platform for FRC Boat on Jack-up Rig Delhi 109

Replacement of Existing Compressor and Air Dryer with


Aryatech Marine & Offshore Services Pvt. Ltd. Delhi 110
New Units for Jacket Platform

Avijit Ghosh Abhijit Tea Company Darjeeling, West Bengal 33

Backbone Structural Consultants, Jaipur Hissar Commercial Complex Jaipur, Rajasthan 34

CIDCO of Maharashtra Ltd. Pushpak Nagar Sewerage Scheme Navi Mumbai, Maharashtra 243

CIDCO of Maharashtra Ltd. R/R Vahal Sewerage Network Design Navi Mumbai, Maharashtra 244

Citec Engineering India, Pvt. Ltd. Refinery Project 92

Clove Technologies Pvt. Ltd. 3D BIM Modeling for Nagpur Metro Nagpur, Maharashtra 158

Clove Technologies Pvt. Ltd. 3D Digital Documentation of Heritage Structure Thorur, Warangal, Telangana 173

Clove Technologies Pvt. Ltd. Krishna River Walk Proposal Vijayawada, Andhra Pradesh 173

Alignment Design for Proposed Majlis Park to RK Ashram for Delhi


Delhi Metro Rail Corporation New Delhi, Delhi 159
MRTS Corridor – Phase IV

Design (R&B) Circle Government Colony, Multi-story Two Tower Ahmedabad, Gujarat 38

Design (R&B) Circle Construction of District Court Building Himatnagar, Gujarat 37


2017 INFRASTRUCTURE YEARBOOK

Design (R&B) Circle Construction of Girls Hostel at Government Polytechnic, Ahmedabad Ahmedabad, Gujarat 37

DRA Consultants Ltd. Revamping of Intermittent System to a 24-by-7 Water Supply Ahmedabad, Gujarat 244

Electrosteel Castings Limited Naranghi Oil India Limited Township Project Guwahati, Assam 245

 Winner  Finalist  Special Recognition Award Winner

291
Index – Project Location by Country
Organization Name Project Name Location Page

Engineers India Ltd. AMRUT Bhubaneswar, Odisha 245

EZ Structure Consulting Engineers Colourtex Plant Building Vilayat, Gujarat 95

Facile Maven Pvt. Ltd. Sewerage System Scheme for Six Census Towns Dadra and Nagar Haveli, Union Territory 246

Construction of a Flyover and Underpass at Hero Honda Chowk on Delhi-Gurgaon


Indian Technocrat Limited Gurgaon - Delhi, Haryana 202
Section of Access Controlled Highway on NH-8 in Haryana on EPC Mode
Consultancy Services for the Development of Eastern Road Corridor and City
Infra Support Engineering Consultants Pvt. Ltd., Bengaluru Jamshedpur, Jharkhand 203
Bypass to Enable Decongestion of Jamshedpur

Institute of Engineering and Ocean Technology Relocation of Existing Jacket Platform Western Offshore 116

Structural Integrity Assessment in View of Additional Facilities


Institute of Engineering and Ocean Technology Western Offshore 116
and Damages on a Well Head Platform
Structural Integrity Assessment of an Existing Structure for
Institute of Engineering and Ocean Technology Mumbai-Western Offshore 117
Additional Living Capacity

Ircon International Limited Anji Bridge Construction Reasi, Jammu and Kashmir 160

Karnataka Public Works Department Building Division CMM Court Premises Bangalore, Karnataka 42

KDC Division 4 Kanher Power Station Satara District, Maharashtra 70

Taluka Budargad, Kolhapur District,


Koyna Design Circle Patagon Hydro Electric Project 143
Maharashtra

Kutumbale Consultants & Engineers Pvt. Ltd. Seismic Strengthening of Preheater Building at Purbanchal Cement Guwahati, Assam 43

Larsen & Toubro Construction Mega Lift Irrigation Project - Cluster XII Bhubaneswar, Odisha 71

Larsen & Toubro Construction Bansujara Major Project, Madhya Pradesh Baldeogarh, Madhya Pradesh 249

Larsen & Toubro Construction Tumakuru Continuous Water Supply Scheme Tumakuru, Karnataka 249

Development and Two-Lane Upgrade with Paved Shoulder of


Larsen & Toubro Limited Bijapur-Gulbarga-Homnabad, Karnataka 204
Bijapur-Homnabad Section of NH-50 from Km 195 to Km 415
Geotechnical Investigation of Railway Track for Dedicated Freight Corridor Ahmedabad, Mehsana, Palanpur,
M. K. Soil Testing Laboratory 84
Corporation of India Siddhpur, and Balaram, Gujarat

Maharashtra Metro Rail Corporation Limited Nagpur Metro Nagpur, Maharashtra 162

Maharashtra Metro Rail Corporation Limited Nagpur Metro Nagpur, Maharashtra 218

Mallikarjun Associates Bangalore REVA Grand Staircase Bangalore, Karnataka 72

Sewer Network Design with House Connections, Sewage Treatment


Multi Media Consultants Pvt. Ltd. Tonk, Rajasthan 251
Plants, and Allied Works

Municipal Corporation of Greater Mumbai Improvement in Supply at 2nd October Colony, Jerbai Wadia Marg Mumbai, Maharashtra 252

Municipal Corporation of Greater Mumbai Improvement of Water Supply Along P.L. Lokhande Marg, Chembur Mumbai, Maharashtra 252

Improvement of Water Supply at Worli Koliwada Locality


Municipal Corporation of Greater Mumbai Mumbai, Maharashtra 253
in G/South Ward, Mumbai

Nagesh Consultants Coleroon River Bridge Srirangam, Tamil Nadu 25

Nagesh Consultants Meditation Hall Tirupati, Andhra Pradesh 45

Distribution Network Installation, Leakage Prevention,


NJS Engineers India Pvt. Ltd. Agra, Uttar Pradesh 254
and Rehabilitation at PCM Area

NJS Engineers India Pvt. Ltd. Guwahati Water Supply Project Guwahati, Assam 253

W NJS Engineers India Pvt. Ltd. JICA Assisted Ganga Action Plan II Varanasi, Uttar Pradesh 80

Pankaj Associates & Consultant Engineers Kolar Gravity Feeder Main Bhopal, Madhya Pradesh 254

Pankaj Tiwari AMRUT Sewer Network Datia, Madhya Pradesh 255

 Winner  Finalist  Special Recognition Award Winner


292
Index – Project Location by Country
Organization Name Project Name Location Page

PPS Tech LLP Alstom Bharat Forge Power Ltd. Mundra Special Economic Zone, Gujarat 47

Precision Precast Solutions Pvt. Ltd. The North Country Mall Mohali, Punjab 48

Preparation of a Feasibility Study and Detailed Project Report of Access


Primove Infrastructure Development Consultants Pvt. Ltd. Nagpur, Maharashtra 206
Controlled Nagpur-Mumbai Super Communication Expressway
Construction of ROB on Dungri Link Road Mumbai Delhi Route
R&B Design Circle Dungri, Gujarat 26
of Western Railway in Valsad District

Reliance Engineering Group DTA HNUU Platform Revamp Jamnagar, Gujarat 100

ReNew Power PV Mounting Structure to Cover Carports at Delhi Metro Stations New Delhi, Delhi 85

RITES Limited Preparing a Detailed Project Report for Rail/Road Connectivity Kanyakumari, Tamil Nadu 209

Preparation of Detailed Project Report for Construction


RITES Limited Korba, Chhattisgarh 209
of a Bridge across Hasdeo River

Roark Consulting Engineers LLP Jai Prakash Narayan International Convention Center Lucknow, Uttar Pradesh 50

RODIC Consultants Pvt. Ltd. SH-101, NH-23/32 Gaya/Dhanbad-Ranchi, Bihar/Jharkhand 210

Rural Water Supply and Sanitation Tandur 52 Kilometers Hyderabad, Telanagana 256

Feasibility Report, Preliminary Design for Alternative Highway


SA Infrastructure Consultants Pvt. Ltd. Gangtok, Sikkim and West Bengal 210
to Gangtok in the State of Sikkim
Feasibility Study and Detailed Project Report for Proposed High
Saanvi Infrastructure Pvt. Ltd. Dumka, Jharkhand 26
Level Bridge Near Kumrabad

Saunrachana Strucon Pvt. Ltd. Amul Cattle Feed Plant Kapadvanj, Gujarat 51

Saunrachana Strucon Pvt. Ltd. Cattle Feed Plant at Sumul Dairy Surat, Gujarat 52

Saunrachana Strucon Pvt. Ltd. Combined Water Supply Scheme to Vellore Corporation Package-1 Vellore, Tamil Nadu 238

Saunrachana Strucon Pvt. Ltd. SRFDCL House at Sabarmati Riverfront Ahmedabad, Gujarat 52

Scon Pvt. Ltd. Structural Designs Basis Report of Ashiana Anantara Jamshedpur, Jharkhand 53

Shah Technical Consultants Pvt. Ltd. RUIDP PH-III (Smart Check - Monitoring Application) Multiple Locations, Rajasthan 259

Shree Prefab Steel Pvt. Ltd. Mother Dairy Plant Building Gandhinagar, Gujarat 53

Shree Prefab Steel Pvt. Ltd. Process House Building of Nandan Denim Limited Ahmedabad, Gujarat 54

Shree Prefab Steel Pvt. Ltd. Show Room Building Rajkot, Gujarat 54

SID Consultants Hydro Power Plants on Miyagam Branch Narmada Canal, Vadodara Vadodara, Gujarat 144

Silicon Engineering Consultants Pvt. Ltd. BRTS – Chhattisgarh (Workshop, Control Building, and Bus Shelters) Raipur, Chhattisgarh 55

Silicon Engineering Consultants Pvt. Ltd. Educational Hub at Diu Diu, Daman and Diu, Gujarat 55

Simon India Ltd. 50,000 MTPY Caprolactam Quality Project Vadodara, Gujarat 101

Skeleton Consultant Pvt. Ltd. ICSS Complex at SGPC, Gurdwara Rakab Ganj Sahib New Delhi, Delhi 57

Skeleton Consultant Pvt. Ltd. Sri Sathya Sai Sanjeevani Hospital Ballabhgarh, Haryana 57

Skematic Consultants Library Building for NIT Agartala Agartala, Tripura 58


2017 INFRASTRUCTURE YEARBOOK

Smith Structures India Pvt. Ltd. Industrial Complex at Ditasan Ahmedabad, Gujarat 58

Detailed Design of Water Supply Distribution Network in the


Srijan Ecological Upliftment Kolkata, West Bengal 260
District of North 24 Parganas and South 24 Parganas

State Urban Development Authority Ambikapur Water Supply Ambikapur, Chhattisgarh 260

 Winner  Finalist  Special Recognition Award Winner


293
Index – Project Location by Country
Organization Name Project Name Location Page

State Urban Development Authority Durg Water Supply Durg, Chhattisgarh 261

State Urban Development Authority Raipur Water Supply Raipur, Chhattisgarh 261

Structcon Designs Pvt. Ltd. Approaches around Mumbai Airport Mumbai, Maharashtra 27

Strukad Consultant Construction of Railway ROB on Karjan Bypass Road Karjan, Gujarat 27

Sunil Mutalik & Associates Vallonia Pune, Maharashtra 59

Survey of India Advancement in Map Printing Dehradun, Uttarakhand 133

640 Megawatts (AC) of Solar PV Projects-220/33 Kilovolt, Chamarajanagar, Rajeshwar,


Tata Consulting Engineers Limited 232
110/33 Kilovolt, and 66/11 Kilovolt Substations Channapatna; Karnataka
Integrated and Comprehensive Stormwater Management
Tata Consulting Engineers Limited Salem, Tamil Nadu 262
Facility for Salem City

Tata Power Company Limited Provision of Seasonal Tilt Arrangement for Solar Structure Mumbai, Maharashtra 145

Tractebel Engineering Pvt. Ltd. Chittaurgarh Cement Plant - Rajasthan Chittaurgarh, Rajasthan 102

Transys Consulting Pvt. Ltd. Structure Options for Proposed Agra Inner Ring Road Phase-II Agra, Uttar Pradesh 212

Department of Energy Science and Engineering, Centre for Environmental


Vadalkar and Associates Mumbai, Maharashtra 61
Science and Engineering
Detailed Design and Approval for the Roadwork – Four-Laning of Barhi –
Voyants Solutions Pvt. Ltd. Hazaribagh Section of NH-33 Jharkhand on EPC Mode under Barhi and Hazaribagh, Jharkhand 213
NHDP – Phase III

INDONESIA

PT. Hutama Karya Trans-Sumatra Toll Road Medan, North Sumatra 207

PT. Link Net Tbk Link Net FTTH Expansion Jakarta 231

PT. PAM Lyonnaise Jaya Using WaterGEMS to Reduce Water Loss West Jakarta 256

PT. Shinryo Indonesia Aeon Mall - Jakarta Garden City Jakarta Utara, Jakarta 73

PT. Taikisha Indonesia Engineering Yamaha Manufacturing Indonesia Bekasi, Jawa Barat 74

PT. Wijaya Karya (Persero) Tbk Balikpapan-Samarinda Toll Road Project, Sections 2, 3, and 4 Balikpapan, East Kalimantan 207

PT. Wijaya Karya (Persero) Tbk Rehabilitation of School Building Package 1 Jakarta, Indonesia 48

IRAN

MCC Capital Engineering & Research Incorporation Limited Newly Built Ardakan Electric Furnace Ardakan 99

ISRAEL

Yenon-Research and Design Ltd. Highway 65-85 Ami’ad 213

ITALY

BM Engineering S.r.l Revamping ABS Steelworks Buttrio, Udine 171

Cad Connect Architectural Project Milan 67

Italferr Itinerary Naples Apice, Benevento and Avellino 161

Lineacurva Keydi Lamps Casale Monferrato 98

Plotini Allestimenti City after the City Milan 46

 Winner  Finalist  Special Recognition Award Winner

294
Index – Project Location by Country
Organization Name Project Name Location Page

RendArk TUUM Store Assisi Assisi, Perugia 49

SR SEIKEY Enterprise Drone Solutions Cell Tower Inspections 4G and 5G Caronno Pertusella, Varese 18, 186

Stemas 02PLDF Filmatrice Doppia Motta di Livenza, Treviso 59

JAPAN

Kokusai Kogyo Co., Ltd. 3D Map Project for Areas Prone to Sediment Disaster Shizuoka Prefecture 153

Neutral Design Co., Ltd. Seismic Diagnosis and Reinforced Design Saitama Prefecture 85

RISE Structural Design, Inc. Piping Stress Analysis at Methanol Production Plant 100

Rikuzentakata-shi Reconstruction Project – 3D Modeling Using


TAC Engineering Co., Ltd., Rikuzentakata Shimizu Joint Venture Rikuzentakata, Iwate 190
Fixed-wing UAV

Takahashi Architect Twin Pointed Roof House Dazaifu, Fukuoka Prefecture 76

Toyo Construction Co., Ltd. BBAJ Tochigi New Factory Project Tochigi-shi, Tochigi Prefecture 60

Toyo Construction Co., Ltd. Self-Propelled Multipurpose Working Vessel Construction Project Tokyo 122

KAZAKHSTAN

AAEngineering Group EPC + Operations in Gold Mining Almaty 108

Bystrinsky Ore Mining and Processing Plant—Dressing Works for Processing


Kazgiprotsvetmet Ltd. Bystrinskoye Field, Zabaykalsky Krai 118
and Dressing Gold, Iron, and Copper Ores

F North Caspian Operating Company N.V. Managing Corrosion and Inspection with Bentley APM in the Kashagan Project Atyrau Region, Caspian Sea 221

KUWAIT

Dongyang P&F Co., Ltd. KNPC Clean Fuels Project Coke Handling System 112

Korea Heat Exchanger Al-Zour New Refinery 97

Tamco Switchgear (Malaysia) Sdn. Bhd. Integrated Systems of a Switchgear with Control Relay Panel System Al Ahmadi 101

LATVIA

PLH Architects Rail Baltica Riga 162

LITHUANIA

Energotechnika Engineering Sp. z o.o. Waste Incineration Plant Wilno 138

MALAWI

F COBA – Engineering and Environmental Consultants Kholombidzo Hydroelectric Power Plant District of Blantyre 137

MALAYSIA

Bina Puri Sdn. Bhd. Sabah State Administrative Centre Kota Kinabalu, Sabah 67

ETD Transmission & Distribution Sdn. Bhd. Supply of Control and Protection Panels for Landfill Renewable Energy System Bukit Tagar, Perak 139

KLCC Projeks Sdn. Bhd. Mövenpick Spa & Resort Kuala Terengganu, Terengganu 43
2017 INFRASTRUCTURE YEARBOOK

W Mass Rapid Transit Corporation Sdn. Bhd. Klang Valley Mass Rapid Transit Project - Sungai Buloh-Serdang-Putrajaya Line Kuala Lumpur 156

Minconsult Sdn. Bhd. Network Analysis for a Medium-size Town Pahang 250

MMC Gamuda KVMRT Sdn. Bhd. and AECOM Perunding Sdn. Bhd. MRT Sungai Buloh-Serdang-Putrajaya Line Kuala Lumpur 183

 Winner  Finalist  Special Recognition Award Winner


295
Index – Project Location by Country
Organization Name Project Name Location Page

Reveron Consulting Project Information Management System Kuching, Sarawak 208

Sabah Lands and Surveys Department 3D Modeling for New Trail Selection of Post-Quake Mt. Kinabalu Ranau, Sabah 184

Sabah Lands and Surveys Department Sabah 3D Subsidiary Title Information System Kota Kinabalu, Sabah 185

W SATRIA Technologies Sdn. Bhd. Sustainable Solutions for Control and Protection Systems Klang, Selangor 88

Toyo Engineering India Pvt. Ltd. Global Petrochemical Ethylene Complex 102

MEXICO

Diplamar Servicios de Ingeniería S.A. de C.V. Finite Element Analysis for an Offshore Platform Tampico, Tamaulipas 112

GeoMarine Ingeniería Full Review of FPSO Pump Hosting for Maintenance Ciudad del Carmen, Campeche 113

Grupo Especializado en Obras Marinas S.A. de C.V. Structural Evaluation of Process Pipelines Campeche 114

WHY Inc. ContextCapture for Comms Mexico City 191

NAMIBIA

iSpatial Global Systems Namibia Elisenheim GIS Windhoek, Khomas 70

NEW ZEALAND

Watercare Services Limited The Central Interceptor Auckland 154

NIGERIA

Sanni, Ojo & Partners Church Auditorium Port-Harcourt, Rivers State 50

Sanni, Ojo & Partners Multi-story Office Building Abeokuta, Ogun State 51

Tata Consulting Engineers Limited Akwa Ibom Transmission Project Phase II Odiok Itam, Akwa Ibom 232

NORWAY

Herøya Industripark AS Herøya Industrial Park Porsgrunn, Telemark 152

SNC-Lavalin UK Ltd. Johan Sverdrup LQ Jacket Norwegian Sector, North Sea 121

TechnipFMC plc Lifting of Well Jumpers Kongsberg 122

OMAN

Khazzan Field, Block 61,


W BP Khazzan Central Information Store 220
Ad Dhahirah Governorate

PAKISTAN

China Water Resources Beifang Investigation,


Pakistan Kohala Hydropower Station 150
Design and Research Co., Ltd.

PANAMA

Cable Onda Cable Onda Network Documentation in Panama 228

PERU

Ingeniería Sísmica S.A.C. INEN Building Extension Lima 152

PHILIPPINES

F Manila Water Company, Inc. Manila Water Natural Calamity Risk Resiliency and Mitigation Masterplan Manila, National Capital Region, Rizal 241

 Winner  Finalist  Special Recognition Award Winner


296
Index – Project Location by Country
Organization Name Project Name Location Page

Manila Water Company, Inc. Hinulugang Taktak Sewerage System Project Hinulugang Taktak, Antipolo City, Rizal 250

POLAND

T.T.U. Urbanowicz Sp. z o.o Project Installation of Atmospheric Distillation in Group Lotos Gdansk 91

Plast Install SKB Sp. z o.o. Installation of Flue Gas Desulfurization in Power Plant Police 91

ZRE Katowice S.A. Power Station EDF Ward in Rybnik Rybnik, Silesia Province 138

CS Softdesk Natural Gas Compressor Station at PGNiG Gas Field Zuchlów Stara Góra 93

Metal Projekt Krakow Power Plant Modernization Gdansk, Pomorskie 72

QATAR

QDVC New Orbital Highway 2 Doha 208

Simon India Ltd. Caustic Soda Project - KLJQ Doha 74

ROMANIA

IPIP – Engineering and Design Institute for Oil Refineries Technical Evaluation of the 130-H1, H2, H3 Heaters from
Ploiesti, Prahova 141
and Petrochemical Plants Part of Kraftanlagen Group 130 RC2-Platforming Unit at Petrobrazi Refinery

RUSSIA

DI Soyuzhimpromproekt FSBEI HPE KSTU Isoprene Production Nizhnekamsk, Republic of Tatarstan 93

DI Soyuzhimpromproekt FSBEI HPE KSTU Water Block No. 3 with Cooling Towers BMG-2000 at OJSC TANECO Nizhnekamsk, Republic of Tatarstan 94

Expert Engineering Company Reconstruction of the Administrative Complex Moscow 175

Bentley ProjectWise System for Digital Reviewing and Processing


GKU CODD Moscow 130
Traffic Management Projects
Management of Engineering Data for the Operation of the Facilities
JSC Kovdorsky GOK, Eurochem Kovdor, Murmansk 182
of JSC Kovdorsky GOK
Addition of the Second Experimental Section of Achimov Deposits Urengoy, Yamalo-Nenets
LLC TyumenNIIginprogaz 98
of the Urengoy Oil and Gas Field for Full Development Autonomous Okrug, Russia
Creating Multi-discipline Support Systems and Cable Support Systems to
OOO Oglaend System Caspian Sea, Astrakhan Region 99
Implement Design Solutions in the Development of Vladimir Filanovsky Field
Tyumen Region, Yamal-Nenets
F PJSC Giprotyumenneftegaz Central Production Facility, Novoportovskoye Field 89
Autonomous District

PLS snc di Paolo & Loretta Segato Camera 2 Moscow 47

Samara Utility Systems LLC The Search for Unaccounted Losses in a Zone of the
​​ B-55 Waterway Samara, Samara Oblast 258

State Unitary Enterprise MosgortransNIIproject Program for the Overhaul of Tramways in the City of Moscow, 2017-2019 Moscow 163

Construction Management of Conductor Supported


Volgogradnefteproekt, LLC Volgograd, Volgograd Oblast 77
Platform on Filanovsky Field
Design of Electro-Technical Solutions and Systems for Control
F Volgogradnefteproekt, LLC Caspian Sea, Astrakhan Region 107
of the Conductor Supported Platform of Filanovsky Field

Volgogradnefteproekt, LLC Conductor Supported Platform of Filanovsky Field Volgograd, Volgograd Oblast 123

SAUDI ARABIA
2017 INFRASTRUCTURE YEARBOOK

Ministry of Municipal and Rural Affairs, Kingdom of Saudi Study to Optimize Reality Modeling and Topographic Data Compilation
Al Bahah, Al Bahah Region 132
Arabia Procedure

Hyundai Heavy Industries Shuqaiq Steam Power Plant Project Jizan, Jizan Region 247

SK E&C Mobile 3D Model Jazan 75

 Winner  Finalist  Special Recognition Award Winner

297
Index – Project Location by Country
Organization Name Project Name Location Page

SINGAPORE

F AAM Group Creating Singapore's National 3D Map Using Mobile Mapping 129

Land Transport Authority C8801 – Kim Chuan Depot Extension 161

Land Transport Authority BIM Model Facility of Buildings of North-South Corridor 203

F Stream Environment Pte. Ltd. (Stream) Automated Waste Collection System for Changi Airport Terminal 4 81

Zentech Engineering Co., Ltd. TUAS Terminal Phase1 Reclamation, Wharf Construction and Dredging Tuas 125

SOMALIA

Infrastructure University Kuala Lumpur (IUKL) Sewerage Reticulation Design Using SewerCAD Mogadishu 248

SOUTH AFRICA

AngloGold Ashanti Project Engineering Services 120 Level - Incline for Atic Rock Handling Carletonville, Gauteng 108

Aurecon South Africa Nekkies Roundabout Knysna, Eden 200

iSpatial Global Systems South Africa Glencore Rock Engineering Solution Witbank, Gauteng 117

iSpatial Global Systems South Africa iGTMS Pretoria, Gauteng 182

SMEC South Africa (Pty) Ltd. Upgrade of National Road N4 Section 5B Belfast-Crossroads, Mpumalanga 211

SOUTH KOREA

Daelim Industrial Co., Ltd. CPMS+ Seoul 68

Damwon Co., Ltd. Comparison of 3D Model Accuracy Based on Drone Photography Seongnam, Gyeonggi-do 174

GeoINT Analysis of an Area around a Transmission Tower Greater Gwangju Metropolitan Area 177

GeoINT Gyeonggi-do Pottery Museum Virtual Experience Reality Model Gwangju, Gyeonggi-do 178

IAAN Soft Osan Thermal Power Plant Osan, Gyeonggi-do 140

IAAN Soft Transmitter and Receiver Aging Management Seoul 181

IAAN Soft View the Location Information of Samsung Electronics Facilities Giheung, Gyeonggi-do 181

Korea District Heating Engineering 3D Pipe Supports for Power Plant Osan, Gyeonggi-do 141

Korea District Heating Engineering Construction of the Seokmun Combined Heat and Power Plant Osan, Gyeonggi-do 142

Korea District Heating Engineering Osan Combined Heat and Power Plant Construction Osan, Gyeonggi-do 142

Sangji University Research Project Consisting of Realistic Modeling Video Production Yongin, Gyeonggi-do 185

SK E&C SK A Project Greater Ulsan Metropolitan Area 75

Taesung SNI The Second Namhae Bridge-Suspension Bridge Model Namhae-gun, Gyeongsangnam-do 76

Zentech Engineering Co., Ltd. Offshore Wind Turbine Substructure Seoul 124

SPAIN

Arup Sector C-14 Málaga 82

 Winner  Finalist  Special Recognition Award Winner

298
Index – Project Location by Country
Organization Name Project Name Location Page

SWEDEN

Road Design and Inter-disciplinary Coordination of the E10


F AECOM Gällivare kommun, Norrbottens län 195
Avvakko-Lappeasuando Project

WSP Consultants India Pvt. Ltd. Hallsberg-Stenkumla Hallsberg 165

SWITZERLAND

Burken Ltd. 3D Inventory (UFA AG) Herzogenbuchsee, Bern 90

La Bottega del Legno Snc Old Wood Interiors St. Moritz/Silvaplana, Graubünden 44

F Raymond Vogel Landschaften AG New Landscape for the New Hydropower Plant in Hagneck Hagneck, Bern 81

TAIWAN

BES Engineering Corporation Photomesh and BIM for House Selling Taipei 171

F CPC Corporation, Taiwan Talin No. 12 Topping Unit Project Kaohsiung 89

FlyingJoy VR FlyingJoy VR Formosa Taipei 176

National Center for Research on Earthquake Engineering Using ContextCapture for 3D Model Analysis of Structural Collapse in Earthquake Taipei 45

National Taipei University of Technology Ancient Folk Culture Village Kinmen, Fukin 46

RealWorld Engineering Consultants Smart City of New Taipei City New Taipei City, Taipei 184

Sinotech Engineering Consultants, Ltd. TPC Offshore Power Generation Project Phase 1 Taipei City 120

THAILAND

Daewoo Shipbuilding & Marine Engineering Co., Ltd. Block B12/27 in Ubon Field Gulf of Thailand 111

Etpro Sumit Designs Co., Ltd. Hua Hin Condominium Hua Hin, Prachuap Khiri Khan 38

Etpro Sumit Designs Co., Ltd. Kasetsart Univeristy - Si Racha Campus Si Racha, Chonburi 39

Etpro Sumit Designs Co., Ltd. Wellgrow Plant Chachongsao Province 94

REI Software Co., Ltd. CH3 Broadcast Communication Tower Khorat, Nakhon Ratchasima 231

UNITED ARAB EMIRATES

AECOM Detailed Design of DS-158 Project – Main Transmission Pipelines Jebel Ali, Dubai 242

Al Shaffar Steel Engineering (ASSENT) Mohammed Bin Rashid Library Dubai 32

Aryatech Engineering Consultants FZE Shale Shaker Platform Modification on Jack-up Rig Dubai 109

Aryatech Marine & Offshore Services Pvt. Ltd. Stability Analysis of Jack-Up Rig Using MOSES Ras al-Khaimah 110

Configuration Management and Collaborative Information


Dubai Roads and Transport Authority Dubai 159
Management for Dubai Rail Networks

Dubai Roads and Transport Authority Route 2020 Dubai 160

Federal Electricity & Water Authority Transmission & Distribution Network Wadi Shaam, Ras al-Khaimah 246
2017 INFRASTRUCTURE YEARBOOK

Oiltech Engineering (India) Pvt. Ltd. FPSO Cyrus Offshore 119

Sharjah Electricity and Water Authority SEWA Water 2030 Sharjah 259

 Winner  Finalist  Special Recognition Award Winner

299
Index – Project Location by Country
Organization Name Project Name Location Page

Tebodin Middle East Ltd. FFS & Life Extension Study for Offshore Platform Structures Abu Dhabi 121

Zakum Development Company Managing a Major Offshore Complex Structure: Substructuring Technique Abu Dhabi 123

UNITED KINGDOM

A14 Integrated Delivery Team A14 Huntingdon to Cambridge Improvement Scheme Cambridge, Cambridgeshire 82

Arup A120 Bypass (Little Hadham) and Flood Alleviation Scheme Little Hadham, Hertfordshire 199

ASV Global C-Worker 7 Portchester, Hampshire 111

F CH2M Fairhurst JV A9 Dualling - Glen Garry to Dalraddy Dalwhinnie, Highlands 195

W Highways England Network Occupancy Management System (NOMS) – Strategic Road Network England 216

John McAslan + Partners The Burrell Collection Glasgow, Scotland 40

Mott MacDonald and the Costain, VINCI Construction


W East Section of the Thames Tideway Tunnel London, England 148
Grands Projets, Bachy Soletanche Joint Venture

Mott MacDonald Sweco A96 Hardmuir to Fochabers Elgin, Moray 205

F MWH Ltd. (operating in CiM6 alliance) Netheridge STW Gloucester, England 237

SimpsonHaugh Library Walk Manchester, Lancashire, England 56

Track Access Services Ltd. Track Access Portal – An Online Railway Information System 164

F WSP One Blackfriars, London London, England 31

UNITED STATES

F AECOM Pearl Harbor Memorial Bridge New Haven, Connecticut 23

F AES Indianapolis Power & Light Company T&D Implementation of Asset Risk at Indianapolis Power & Light Indianapolis, Indiana 221

Alabama Department of Transportation Roundabout Bibb County Centreville, Alabama 197

AlmassTronics Canopy of a Metro Station New York, New York 150

Arcadis State Road 9B Construction Jacksonville, Florida 198

Atkins Project Neon Las Vegas, Nevada 199

AVI P.C. West Belt Loop Road Casper, Wyoming 200

Baldridge & Associates Structural Engineering, Inc. (BASE) The Ritz-Carlton Residences Waikiki Beach, Phase 1 Honolulu, Hawaii 34

CEDARVILLE Engineering Group, LLC Eastern State Penitentiary Historic Site Infrastructure Characterization Philadelphia, Pennsylvania 172

Enord LLC Spanish River Miami, Florida 69

Eye-bot Aerial Solutions Springdale Monopole Springdale, Pennsylvania 175

Flightline Geographics LLC Ethanol Processing Plant Liberal, Kansas 176

Foth Infrastructure & Environment, LLC Mobile LiDAR and sUAS Case Study Des Moines, Iowa 177

F Ghafari Associates, LLC General Motors Productivity Improvement Program Various Locations, Michigan 149

SR HNTB Corporation I-94 Modernization Project Detroit, Michigan 16, 201

Horrocks Engineers Cul De Sac Canyon Passing Lane, Phase 2 and Lapwai Creek Bridge Replacement Winchester, Idaho 202

 Winner  Finalist  Special Recognition Award Winner


300
Index – Project Location by Country
Organization Name Project Name Location Page
Burbank to Los Angeles to
F Jacobs/Zephyr UAS Mapping 42 Miles of California High Speed Rail Corridor Utilizing UAVs 157
Anaheim, California

F JMC2 Heaven Sent Simi Valley, California 65

John Portman & Associates 615 South College Charlotte, North Carolina 41

John Portman & Associates Hotel Indigo at 230 Peachtree Street Atlanta, Georgia 41

John Portman & Associates Union Tower West Denver, Colorado 42

Keystone Engineering WOG Coelacanth Fabrication Ingleside, Texas 118

Maricopa Department of Transportation Vulture Mine Recreational Areas Wickenburg, Arizona 204

W Morphosis The Bloomberg Center New York, New York 30

NJDOT / Public Private Partnership of a Bentley-Hosted SUPERLOAD


F New Jersey Department of Transportation Trenton, New Jersey 217
System for Oversize / Overweight Vehicle Permitting and Routing

NTT Data/Texas Department of Transportation TxDOT SH-358 Corpus Christi, Texas 205

Operations EOS DOT LiDAR Whitestown, Indiana 206

SR F Oregon Department of Transportation TransInfo – A Connected Data Environment for Transportation Salem, Oregon 14, 217

F Pacific Gas & Electric Company Reality Modeling in Bentley Substation San Francisco, California 227

Pennsylvania State University,


F Virtual Penn State Campus University Park, Pennsylvania 169
Department of Architectural Engineering

F The Sanborn Map Company, Inc. Sanborn3D HD Maps for Autonomous Driving: Santa Clara Santa Clara County, California 169

F Shalom Baranes Associates Cannon House Office Building Renewal Washington, District of Columbia 31

SKA Consulting Engineers, Inc. Steven Tanger Center for the Performing Arts Greensboro, North Carolina 56

Charlestown Township, Chester County,


Traffic Planning and Design, Inc. Yellow Springs Bridge Over Pennsylvania Turnpike 28
Pennsylvania

TRC South Street Substation Providence, Rhode Island 233

UZBEKISTAN

Hyundai Engineering Co., Ltd. Construction of CPF Complex and Development of Kandym Group of Fields Bukhara 69

VENEZUELA

Hyundai Engineering RPLC Deep Conversion Project Puerto la Cruz, Anzoátegui State 96

VIETNAM

JVTek Company Vam Cong Cable-Stayed Bridge Can Tho 24

PetroVietnam Marine Shipyard Tam Dao 05 Jack-up Rig Vung Tàu, Bà Ria-Vung Tàu 119

 Winner  Finalist  Special Recognition Award Winner


2017 INFRASTRUCTURE YEARBOOK

301
Index – Alphabetical by Category
Organization Name Project Name Page

BIM ADVANCEMENTS IN BRIDGES

F AECOM Pearl Harbor Memorial Bridge 23

F Arcadis-WSP/PB Joint Venture Citylink Tulla Widening 23

Guizhou Transportation Planning Survey & Design Academe Co., Ltd. The Hongshui River Bridge on Huiluo Express, Guizhou Province 24

JVTek Company Vam Cong Cable-Stayed Bridge 24

W Long Jian Road & Bridge Co., Ltd. Heihe-Blagoveshchensk Heilongjiang River (Amur River) Road Bridge Project 22

MCC Capital Engineering & Research Incorporation Limited Bridge Construction Project over Hondlon River in Baotou City 25

Nagesh Consultants Coleroon River Bridge 25

R&B Design Circle Construction of ROB on Dungri Link Road Mumbai Delhi Route of Western Railway in Valsad District 26

Saanvi Infrastructure Pvt. Ltd. Feasibility Study and Detailed Project Report for Proposed High Level Bridge Near Kumrabad 26

Structcon Designs Pvt. Ltd. Approaches around Mumbai Airport 27

Strukad Consultant Construction of Railway ROB on Karjan Bypass Road 27

Traffic Planning and Design, Inc. Yellow Springs Bridge Over Pennsylvania Turnpike 28

BIM ADVANCEMENTS IN BUILDINGS AND CAMPUSES

AECOM Perth Stadium Station 32

Al Shaffar Steel Engineering (ASSENT) Mohammed Bin Rashid Library 32

Architect Group 5 (AG5) Multi-functional Sports Enclosure 33

Avijit Ghosh Abhijit Tea Company 33

Backbone Structural Consultants, Jaipur Hissar Commercial Complex 34

Baldridge & Associates Structural Engineering, Inc. (BASE) The Ritz-Carlton Residences Waikiki Beach, Phase 1 34

Beijing Institute of Architectural Design Swimming Pool of Hangzhou Olympic Sports Center 35

CCCC Water Transportation Planning Design Institute Co., Ltd. Ningbo – Container Terminal Project in Meishan Port Area of Zhoushan Port 35

CNI Ingenieros Consultores SAS/La Rotta Arquitectos Edificio Gerardo Arango - Facultad de Artes 36

Copenhagen Airport A/S Building Information Modeling in Existing Buildings 36

Design (R&B) Circle Construction of District Court Building 37

Design (R&B) Circle Construction of Girls Hostel at Government Polytechnic, Ahmedabad 37

Design (R&B) Circle Government Colony, Multi-story Two Tower 38

Etpro Sumit Designs Co., Ltd. Hua Hin Condominium 38

Etpro Sumit Designs Co., Ltd. Kasetsart University - Si Racha Campus 39

Fantawild Design Institute (Shenzhen) Co., Ltd. Oriental Heritage 39

Fontemaggi Srl AMB for interpack 40

John McAslan + Partners The Burrell Collection 40

 Winner  Finalist  Special Recognition Award Winner


302
Index – Alphabetical by Category
Organization Name Project Name Page

John Portman & Associates 615 South College 41

John Portman & Associates Hotel Indigo at 230 Peachtree Street 41

John Portman & Associates Union Tower West 42

Karnataka Public Works Department Building Division CMM Court Premises 42

KLCC Projeks Sdn. Bhd. Mövenpick Spa & Resort 43

Kutumbale Consultants & Engineers Pvt. Ltd. Seismic Strengthening of Preheater Building at Purbanchal Cement 43

La Bottega del Legno Snc Old Wood Interiors 44

Malmi Airport Development Group Helsinki-Malmi Airport Development Project 44

W Morphosis The Bloomberg Center 30

Nagesh Consultants Meditation Hall 45

National Center for Research on Earthquake Engineering Using ContextCapture for 3D Model Analysis of Structural Collapse in Earthquake 45

National Taipei University of Technology Ancient Folk Culture Village 46

Plotini Allestimenti City after the City 46

PLS snc Di Paolo & Loretta Segato Camera 2 47

PPS Tech LLP Alstom Bharat Forge Power Ltd. 47

Precision Precast Solutions Pvt. Ltd. The North Country Mall 48

P.T. Wijaya Karya (Persero) Tbk. Rehabilitation of School Building Package 1 48

RendArk Monnalisa Shop São Paulo - Brazil 49

RendArk TUUM Store Assisi 49

Roark Consulting Engineers LLP Jai Prakash Narayan International Convention Center 50

Sanni, Ojo & Partners Church Auditorium 50

Sanni, Ojo & Partners Multi-story Office Building 51

Saunrachana Strucon Pvt. Ltd. Amul Cattle Feed Plant 51

Saunrachana Strucon Pvt. Ltd. Cattle Feed Plant at Sumul Dairy 52

Saunrachana Strucon Pvt. Ltd. SRFDCL House at Sabarmati Riverfront 52

Scon Pvt. Ltd. Structural Designs Basis Report of Ashiana Anantara 53

F Shalom Baranes Associates Cannon House Office Building Renewal 31

Shree Prefab Steel Pvt. Ltd. Mother Dairy Plant Building 53

Shree Prefab Steel Pvt. Ltd. Process House Building of Nandan Denim Limited 54
2017 INFRASTRUCTURE YEARBOOK

Shree Prefab Steel Pvt. Ltd. Show Room Building 54

Silicon Engineering Consultants Pvt. Ltd. BRTS – Chhattisgarh (Workshop, Control Building, and Bus Shelters) 55

Silicon Engineering Consultants Pvt. Ltd. Educational Hub at Diu 55

 Winner  Finalist  Special Recognition Award Winner


303
Index – Alphabetical by Category
Organization Name Project Name Page

SimpsonHaugh Library Walk 56

SKA Consulting Engineers, Inc. Steven Tanger Center for the Performing Arts 56

Skeleton Consultant Pvt. Ltd. ICSS Complex at SGPC, Gurdwara Rakab Ganj Sahib 57

Skeleton Consultant Pvt. Ltd. Sri Sathya Sai Sanjeevani Hospital 57

Skematic Consultants Library Building for NIT Agartala 58

Smith Structures India Pvt. Ltd. Industrial Complex at Ditasan 58

Stemas 02PLDF Fimatrice Doppia 59

Sunil Mutalik & Associates Vallonia 59

Toyo Construction Co., Ltd. BBAJ Tochigi New Factory Project 60

University of Chile Renovation of the Civic Boulevard in Tierra Amarilla, Project of Renovation of Public Space and Services 60

Vadalkar and Associates Department of Energy Science and Engineering, Centre for Environmental Science and Engineering 61

F WSP One Blackfriars, London 31

BIM ADVANCEMENTS IN CONSTRUCTION

Alberta Pipe Trades College Alberta Pipe Trades College Construction Academy 66

Beijing Housing Construction Co., Ltd. First Section of Binhu Embellished Garden Prefabricated Residential Project 66

Bina Puri Sdn. Bhd. Sabah State Administrative Centre 67

Cad Connect Architectural Project 67

China Construction Sixth Engineering Division Corp., Ltd.,


SR F Tianjin University of Technology, and Tianjin Tianhe-Cloud Building Sanya New Airport Reclamation Project 17, 65
Engineering Technology Co., Ltd.

Daelim Industrial Co., Ltd. CPMS+ 68

Dongguan Huajian Property Investment Co., Ltd. Kaida Science & Technology Design Center (Phase 1) No. 12 Office Building 68

Enord LLC Spanish River 69

Hyundai Engineering Co. Ltd. Construction of CPF Complex and Development of Kandym Group of Fields 69

iSpatial Global Systems Namibia Elisenheim GIS 70

F JMC2 Heaven Sent 65

KDC Division 4 Kanher Power Station 70

Larsen & Toubro Construction Mega Lift Irrigation Project - Cluster XII 71

W Leighton Asia Hong Kong Boundary Crossing Facilities, Hong Kong-Zhuhai-Macao Bridge 64

Lendlease Kingsford Smith Drive Upgrade 71

Mallikarjun Associates Bangalore REVA Grand Staircase 72

Metal Projekt Krakow Power Plant Modernization 72

Municipal Engineering Co., Ltd., of CREC Shanghai Group Application of Bentley Technology to Yangjialing Bridge Project of Menghua Railway 73

PT. Shinryo Indonesia Aeon Mall - Jakarta Garden City 73

304  Winner  Finalist  Special Recognition Award Winner


Index – Alphabetical by Category
Organization Name Project Name Page

PT. Taikisha Indonesia Engineering Yamaha Manufacturing Indonesia 74

Simon India Ltd. Caustic Soda Project - KLJQ 74

SK E&C Mobile 3D Model 75

SK E&C SK A Project 75

Taesung SNI The Second Namhae Bridge-Suspension Bridge Model 76

Takahashi Architect Twin Pointed Roof House 76

Volgogradnefteproekt, LLC Construction Management of Conductor Supported Platform on Filanovsky Field 77

BIM ADVANCEMENTS IN ENVIRONMENTAL ENGINEERING

A14 Integrated Delivery Team A14 Huntingdon to Cambridge Improvement Scheme 82

Arup Sector C-14 82

City of Montreal Rio Tinto Alcan Planetarium of Montreal 83

Daniel Winter Checchia Proposed Case Study of BIM Application in Safety Engineering for Heliports 83

Henan Province Water Conservancy Survey and Design Research Co., Ltd. Water Management Project of South to North Water Division 84

M. K. Soil Testing Laboratory Geotechnical Investigation of Railway Track for Dedicated Freight Corridor Corporation of India 84

Neutral Design Co., Ltd Seismic Diagnosis and Reinforced Design 85

W NJS Engineers India Pvt. Ltd. JICA Assisted Ganga Action Plan II 80

F Raymond Vogel Landschaften AG New Landscape for the New Hydropower Plant in Hagneck 81

ReNew Power PV Mounting Structure to Cover Carports at Delhi Metro Stations 85

F Stream Environment Pte. Ltd. (Stream) Automated Waste Collection System for Changi Airport Terminal 4 81

Ultragaz S.A. Ultragaz Extrafarma Sustainable Resale 86

BIM ADVANCEMENTS IN MANUFACTURING

Arush Gas Technology Services LLP HFO Mundra Bunkering System 90

Burken Ltd. 3D Inventory (UFA AG) 90

T.T.U. Urbanowicz Sp. z o.o Project Installation of Atmospheric Distillation in Group Lotos 91

Plast Install SKB Sp. z o.o. Installation of Flue Gas Desulfurization in Power Plant 91

Changsha Design and Research Institute of Nonferrous Metallurgy Co., Ltd. 100kt/a Electrolytic Zinc Smelting Project of Huixin Lead-Zinc Smelting Co., Ltd. of Huili County of Sichuan 92

Citec Engineering India, Pvt. Ltd. Refinery Project 92

F CPC Corporation, Taiwan Talin No. 12 Topping Unit Project 89

CS Softdesk Natural Gas Compressor Station at PGNiG Gas Field Zuchlów 93


2017 INFRASTRUCTURE YEARBOOK

DI Soyuzhimpromproekt FSBEI HPE KSTU Isoprene Production 93

DI Soyuzhimpromproekt FSBEI HPE KSTU Water Block No. 3 with Cooling Towers BMG-2000 at OJSC TANECO 94

Etpro Sumit Designs Co., Ltd. Wellgrow Plant 94

 Winner  Finalist  Special Recognition Award Winner


305
Index – Alphabetical by Category
Organization Name Project Name Page

EZ Structure Consulting Engineers Colourtex Plant Building 95

GEA Equipamentos e Soluções LTDA Coffee Extract Concentration Plant 95

GEA Equipamentos e Soluções S.A. Centrifugal Recovery of Beer 96

Hyundai Engineering RPLC Deep Conversion Project 96

Ichemad-Profarb Water-based Paints Production Line 97

Korea Heat Exchanger Al-Zour New Refinery 97

Lineacurva Keydi Lamps 98

Addition of the Second Experimental Section of Achimov Deposits of the Urengoy Oil
LLC TyumenNIIginprogaz 98
and Gas Field for Full Development

MCC Capital Engineering & Research Incorporation Limited Newly Built Ardakan Electric Furnace 99

Creating Multi-discipline Support Systems and Cable Support Systems to Implement Design
OOO Oglaend System 99
Solutions in the Development of Vladimir Filanovsky Field

F PJSC Giprotyumenneftegaz Central Production Facility, Novoportovskoye Field 89

Reliance Engineering Group DTA HNUU Platform Revamp 100

RISE Structural Design, Inc. Piping Stress Analysis at Methanol Production Plant 100

W SATRIA Technologies Sdn. Bhd. Sustainable Solutions for Control and Protection Systems 88

Simon India Ltd. 50,000 MTPY Caprolactam Quality Project 101

Tamco Switchgear (Malaysia) Sdn. Bhd. Integrated Systems of a Switchgear with Control Relay Panel System 101

Toyo Engineering India Pvt. Ltd. Global Petrochemical Ethylene Complex 102

Tractebel Engineering Pvt. Ltd. Chittaurgarh Cement Plant - Rajasthan 102

White Martins Gases Industriais Air-Gas Separation Plant – Ouro Branco, T1600S 103

BIM ADVANCEMENTS IN MINING AND OFFSHORE ENGINEERING

AAEngineering Group EPC + Operations in Gold Mining 108

F AMEC Foster Wheeler Gruyere Project 107

AngloGold Ashanti Project Engineering Services 120 Level - Incline for Atic Rock Handling 108

Aryatech Engineering Consultants FZE Shale Shaker Platform Modification on Jack-up Rig 109

Aryatech Marine & Offshore Services Pvt. Ltd. Installation of New Lifeboat Platform for FRC Boat on Jack-up Rig 109

Aryatech Marine & Offshore Services Pvt. Ltd. Replacement of Existing Compressor and Air Dryer with New Units for Jacket Platform 110

Aryatech Marine & Offshore Services Pvt. Ltd. Stability Analysis of Jack-up Rig Using MOSES 110

ASV Global C-Worker 7 111

Daewoo Shipbuilding & Marine Engineering Co., Ltd. Block B12/27 in Ubon Field 111

Diplamar Servicios de Ingeniería S.A. de C.V. Finite Element Analysis for an Offshore Platform 112

Dongyang P&F Co., Ltd. KNPC Clean Fuels Project Coke Handling System 112

Fagundes-Construção E Mineração Ineração S.A. Feasibility Study – Access Ramp 113

 Winner  Finalist  Special Recognition Award Winner


306
Index – Alphabetical by Category
Organization Name Project Name Page

GeoMarine Ingeniería Full Review of FPSO Pump Hosting for Maintenance 113

Grupo Especializado en Obras Marinas S.A. de C.V. Structural Evaluation of Process Pipelines 114

Hilong Petroleum Marine Engineering Services (Shanghai) Co., Ltd. Sanya New Airport Artificial Island Project 114

Hilong Petroleum Marine Engineering Services (Shanghai) Co., Ltd. Study on Compacting Effect of Drilling Ship 115

Huaneng Rudong Baxianjiao Offshore Wind Power Generation Co., Ltd. Huaneng Rudong 300MW Offshore Wind Farm 115

Institute of Engineering and Ocean Technology Relocation of Existing Jacket Platform 116

Institute of Engineering and Ocean Technology Structural Integrity Assessment in View of Additional Facilities and Damages on a Well Head Platform 116

Institute of Engineering and Ocean Technology Structural Integrity Assessment of an Existing Structure for Additional Living Capacity 117

iSpatial Global Systems South Africa Glencore Rock Engineering Solution 117

Bystrinsky Ore Mining and Processing Plant—Dressing Works for Processing


Kazgiprotsvetmet Ltd. 118
and Dressing Gold, Iron, and Copper Ores

Keystone Engineering WOG Coelacanth Fabrication 118

W Offshore Oil Engineering Company Limited Oil Field Jacket Design and Development of ‘Fixed Offshore Structure Design Tool’ 106

Oiltech Engineering (India) Pvt. Ltd. FPSO Cyrus 119

PetroVietnam Marine Shipyard Tam Dao 05 Jack-up Rig 119

Shanghai Water Engineering Design & Research Institute Co., Ltd. Nanhui Dongtan N1 Reservoir Area Reclamation Project 120

Sinotech Engineering Consultants, Ltd. TPC Offshore Power Generation Project Phase 1 120

SNC-Lavalin UK Ltd. Johan Sverdrup LQ Jacket 121

Tebodin Middle East Ltd. FFS & Life Extension Study for Offshore Platform Structures 121

TechnipFMC plc Lifting of Well Jumpers 122

Toyo Construction Co., Ltd. Self-Propelled Multipurpose Working Vessel Construction Project 122

Design of Electro-Technical Solutions and Systems for the Conductor Supported


F Volgogradnefteproekt, LLC 107
Platform of Filanovsky Field

Volgogradnefteproekt, LLC Conductor Supported Platform of Filanovsky Field 123

Zakum Development Company Managing a Major Offshore Complex Structure: Substructuring Technique 123

Zentech Engineering Co., Ltd. Bahrain LNG Import Terminal 124

Zentech Engineering Co., Ltd. Offshore Wind Turbine Substructure 124

Zentech Engineering Co., Ltd. TUAS Terminal Phase 1 Reclamation, Wharf Construction and Dredging 125

Zhongcheng International Marine Engineering Survey & Design Co., Ltd. Qingdao Oriental Movie Metropolis Yacht Wharf Project 125

BIM ADVANCEMENTS IN MUNICIPAL OPERATIONS

F AAM Group Creating Singapore's National 3D Map Using Mobile Mapping 129
2017 INFRASTRUCTURE YEARBOOK

DAVID Holding Company Sofia Municipality Improves Management of Street Lighting 130

GKU CODD Bentley ProjectWise System for Digital Reviewing and Processing Traffic Management Projects 130

Guangzhou Municipal Engineering Design & Research Institute Chebei Road - Xinjiao East Road Tunnel Project 131

 Winner  Finalist  Special Recognition Award Winner


307
Index – Alphabetical by Category
Organization Name Project Name Page

W Huadong Engineering Corporation Limited, PowerChina Application of BIM Strategy for Shenzhen Qianhai Municipal Infrastructure 128

JSTI Group Xuzhou Yingbin Road Rapid Retrofit Project 131

MCC TianGong Group Corporation Limited Newly Built Comprehensive Gymnasium of Tianjin University of Finance and Economics 132

Ministry of Municipal and Rural Affairs, Kingdom of Saudi Arabia Study to Optimize Reality Modeling and Topographic Data Compilation Procedure 132

Shenzhen Municipal Design & Research Institute Co., Ltd. Shahe West Road Rapid Retrofit Project 133

Survey of India Advancement in Map Printing 133

Tianjin Municipal Engineering Design & Research Institute Application of BIM in East Grade-separated Junction Engineering of Yangang, Shenzhen 134

F Tianjin Municipal Engineering Design & Research Institute Construction and Design General Contracting of Retrofit Project at Haiyu East Line Municipal Road 129

Xiamen Municipal Pipe Rack Investment Management Co., Ltd./


Comprehensive Pipe Rack Project in Maluan Bay 134
Xiamen Municipal Engineering Design Institute Co., Ltd.

BIM ADVANCEMENTS IN POWER GENERATION

ZRE Katowice S.A. Power Station EDF Ward in Rybnik 138

W China Water Resource Pearl River Planning Surveying & Designing Co., Ltd. Wugachong Reservoir Project in Pu'an County of Guizhou Province 136

F COBA – Engineering and Environmental Consultants Kholombidzo Hydroelectric Power Plant 137

Energotechnika Engineering Sp. z o.o. Waste Incineration Plant 138

ETD Transmission & Distribution Sdn. Bhd. Supply of Control and Protection Panels for Landfill Renewable Energy System 139

Hangzhou Bole Computer Technology Co., Ltd. The Biomass Combined Heat and Power Project in Pingdu Comprehensive New Area of Qingyuan County 139

IAAN Soft Osan Thermal Power Plant 140

Inner Mongolia Electric Power Survey & Design Institute Co., Ltd. Huolinhe Air Cooling System's Steel Structure Platform 140

IPIP – Engineering and Design Institute for Oil Refineries


Technical Evaluation of the 130-H1, H2, H3 Heaters from 130 RC2- Platforming Unit at Petrobrazi Refinery 141
and Petrochemical Plants Part of Kraftanlagen Group

Korea District Heating Engineering 3D Pipe Supports for Power Plant 141

Korea District Heating Engineering Construction of the Seokmun Combined Heat & Power Plant 142

Korea District Heating Engineering Osan Combined Heat and Power Plant Construction 142

Koyna Design Circle Patagon Hydro Electric Project 143

PowerChina Henan Engineering Corporation Puyang Longfen 2×660 MW Power Plant Project 143

F PowerChina Zhongnan Engineering Corporation Limited Digital Delivery of Qiongzhong Pumped Storage Power Station 137

Rosatom State Nuclear Energy Corporation Electrical Design in the Russian-Finnish Project on the Construction of Nuclear Power Plants Hanhikivi-1 144

SID Consultants Hydro Power Plants on Miyagam Branch Narmada Canal, Vadodara 144

Tata Power Company Limited Provision of Seasonal Tilt Arrangement for Solar Structure 145

BIM ADVANCEMENTS IN PROJECT DELIVERY

AlmassTronics Canopy of a Metro Station 150

China Water Resources Beifang Investigation, Design and


Pakistan Kohala Hydropower Station 150
Research Co., Ltd.

The Danish Road Directorate Managing Data for the Project Roskilde Fjord 151

 Winner  Finalist  Special Recognition Award Winner


308
Index – Alphabetical by Category
Organization Name Project Name Page

EDCO Joint Venture Partnership VivaNext Urban Rapid Bus Transitway Design-Build-Finance 151

F Ghafari Associates, LLC General Motors Productivity Improvement Program 149

Herøya Industripark AS Herøya Industrial Park 152

Ingeniería Sísmica S.A.C. INEN Building Extension 152

INNIUS GTD GmbH New South Entrance 153

Kokusai Kogyo Co., Ltd. 3D Map Project for Areas Prone to Sediment Disaster 153

Lendlease Engineering Pty Limited Lendlease Engineering VDC - Project Lifecycle Standards, Procedures and Workflows to BIM Level 3 154

Mott MacDonald and the Costain, VINCI Construction Grands Projets,


W East Section of the Thames Tideway Tunnel 148
Bachy Soletanche Joint Venture
Implementation of a Comprehensive Technical Records and Information Management Program
F A Natural Gas Company 149
Powered by ProjectWise

Watercare Services Limited The Central Interceptor 154

BIM ADVANCEMENTS IN RAIL AND TRANSIT

AECOM-GHD Joint Venture Level Crossing Removal Project – Technical Advisory Services 158

China Railway Eryuan Engineering Group Co., Ltd.; Yungui Railway


F Application of BIM Strategy for Dali to Ruili Railway Project 157
Yunnan Co. Ltd.

Clove Technologies Pvt. Ltd. 3D BIM Modeling for Nagpur Metro 158

Delhi Metro Rail Corporation Alignment Design for Proposed Majlis Park to RK Ashram for Delhi MRTS Corridor – Phase IV 159

Dubai Roads and Transport Authority Configuration Management and Collaborative Information Management for Dubai Rail Networks 159

Dubai Roads and Transport Authority Route 2020 160

Ircon International Limited Anji Bridge Construction 160

Italferr Itinerary Naples 161

F Jacobs/Zephyr UAS Mapping 42 Miles of California High Speed Rail Corridor Utilizing UAVs 157

Land Transport Authority C8801 – Kim Chuan Depot Extension 161

Maharashtra Metro Rail Corporation Limited Nagpur Metro 162

W Mass Rapid Transit Corporation Sdn. Bhd. Klang Valley Mass Rapid Transit Project - Sungai Buloh-Serdang-Putrajaya Line 156

PLH Architects Rail Baltica 162

Queensland Rail Railway Signaling Information Modeling 163

State Unitary Enterprise MosgortransNIIproject Program for the Overhaul of Tramways in the City of Moscow, 2017-2019 163

SUDOP PRAHA a.s. Reconstruction of Masaryk Station in Prague 164

Track Access Services Ltd. Track Access Portal – An Online Railway Information System 164

WSP Consultants India Pvt. Ltd. Hallsberg-Stenkumla 165


2017 INFRASTRUCTURE YEARBOOK

BIM ADVANCEMENTS IN REALITY MODELING

3D ScanWorld Energy Factory Knappenrode 170

Aerometrex Parramatta Light Rail Project 170

 Winner  Finalist  Special Recognition Award Winner


309
Index – Alphabetical by Category
Organization Name Project Name Page

BES Engineering Corporation Photomesh and BIM for House Selling 171

BM Engineering S.r.l Revamping ABS Steelworks 171

Brussels Regional Public Service, Monuments and Sites Directorate Recording of the Archaeological Heritage in Brussels 172

CEDARVILLE Engineering Group, LLC Eastern State Penitentiary Historic Site Infrastructure Characterization 172

W CEDD-AECOM-The Earth Solutions Development of Anderson Road Quarry Site 168

Clove Technologies Pvt. Ltd. 3D Digital Documentation of Heritage Structure 173

Clove Technologies Pvt. Ltd. Krishna River Walk Proposal 173

Damwon Co., Ltd. Comparison of 3D Model Accuracy Based on Drone Photography 174

Enord LLC Colombia Mining Sites Survey 174

Expert Engineering Company Reconstruction of the Administrative Complex 175

Eye-bot Aerial Solutions Springdale Monopole 175

Flightline Geographics LLC Ethanol Processing Plant 176

FlyingJoy VR FlyingJoy VR Formosa 176

Foth Infrastructure & Environment, LLC Mobile LiDAR and sUAS Case Study 177

GeoINT Analysis of an Area around a Transmission Tower 177

GeoINT Gyeonggi-do Pottery Museum Virtual Experience Reality Model 178

SR Guangdong Hydropower Planning & Design Institute Guangdong Pearl River Delta Water Resources Allocation Project 15, 178

Haiwei Spatial Information Technology LLC 3D Reality Modeling of Yangzhou City 179

Hatch Rock Dump Geotech Inspection 179

Hebei Third Surveying and Mapping Institute Aided Design for Planning of 2016 Tangshan World Horticultural Exposition 180

Henan Water & Power Engineering Consulting Co., Ltd. Zhengzhou Guanyin Lake Water Diversion and Storage Project 180

IAAN Soft Transmitter and Receiver Aging Management 181

IAAN Soft View the Location Information of Samsung Electronics Facilities 181

iSpatial Global Systems South Africa iGTMS 182

JSC Kovdorsky GOK, Eurochem Management of Engineering Data for the Operation of the Facilities of JSC Kovdorsky GOK 182

MMC Gamuda KVMRT Sdn. Bhd. and AECOM Perunding Sdn. Bhd. MRT Sungai Buloh-Serdang-Putrajaya Line 183

NSW DFSI Spatial Services Smart State NSW 183

F Pennsylvania State University, Department of Architectural Engineering Virtual Penn State Campus 169

RealWorld Engineering Consultants Smart City of New Taipei City 184

Sabah Lands and Surveys Department 3D Modeling for New Trail Selection of Post-Quake Mount Kinabalu 184

Sabah Lands and Surveys Department Sabah 3D Subsidiary Title Information System 185

F Sanborn Map Company, Inc. Sanborn3D HD Maps for Autonomous Driving: Santa Clara 169

 Winner  Finalist  Special Recognition Award Winner


310
Index – Alphabetical by Category
Organization Name Project Name Page

Sangji University Research Project Consisting of Realistic Modeling Video Production 185

SR SEIKEY Enterprise Drone Solutions Cell Tower Inspections 4G and 5G 18, 186

Shanghai Hangyao Information Technology Co., Ltd. 3D Digital Mapping Project of the Tian Qi Mausoleum and Linzi Tombs 186

Shanghai Hangyao Information Technology Co., Ltd. Aerial Photography by Unmanned Aerial Vehicles for Shanghai Disney Resort 187

Shanghai Hangyao Information Technology Co., Ltd. Technical Cooperation Agreement for Making 3D Models by UAV Oblique Aerial Photography in Duoba Region 187

Shanghai Hangyao Information Technology Co., Ltd. Technical Services for Oblique Aerial Photography of the West Lake 188

Application of "Four-in-one" Physical Design Approach for the Protection and Renovation
Shanghai IFA Technology 188
of Historical and Cultural Street Blocks

Shanghai IFA Technology Creating a Virtual Reality System of the Ancient City of Pingyao 189

SiteSee Automated Recognition of Antenna on a Cell Tower 189

TAC Engineering Co., Ltd., Rikuzentakata Shimizu Joint Venture Rikuzentakata-shi Reconstruction Project – 3D Modeling Using Fixed-wing UAV 190

UCB UCB Environmental Improvement Project 190

WHY Inc. ContextCapture for Comms 191

Wood & Grieve Engineers Bushmead 191

BIM ADVANCEMENTS IN ROADS

Accrete Consulting Engineers Pvt. Ltd. Designing a Road Network for Raya Resort 196

Strengthening and Widening of Two-Lane National Highway to Two Lanes with Paved Shoulder
Accrete Consulting Engineers Pvt. Ltd. 196
for Manoharpur to Dausa Section of NH-11A (New NH-148)

F AECOM Road Design and Inter-disciplinary Coordination of the E10 Avvakko-Lappeasuando Project 195

Alabama Department of Transportation Roundabout Bibb County 197

Almondz Global Infra Consultant Ltd. Four Lanning of Bhavnagar Talaja of NH 8E 197

Arcadis Buangor Bypass 198

Arcadis State Road 9B Construction 198

Arup A120 Bypass (Little Hadham) and Flood Alleviation Scheme 199

Atkins Project Neon 199

Aurecon South Africa Nekkies Roundabout 200

AVI P.C. West Belt Loop Road 200

W CCCC First Highway Consultants Co., Ltd. Application of BIM Strategy on the Meiguan Expressway to Urban Road Design Project 194

F CH2M Fairhurst JV A9 Dualling - Glen Garry to Dalraddy 195

Finnmap Infra Oy Highway 3 Arolampi Interchange 201

SR HNTB Corporation I-94 Modernization Project 16, 201


2017 INFRASTRUCTURE YEARBOOK

Horrocks Engineers Cul De Sac Canyon Passing Lane, Phase 2 and Lapwai Creek Bridge Replacement 202

Construction of a Flyover and Underpass at Hero Honda Chowk on Delhi-Gurgaon Section


Indian Technocrat Limited 202
of Access Controlled Highway on NH-8 in Haryana on EPC Mode
Consultancy Services for the Development of Eastern Road Corridor and City Bypass to Enable
Infra Support Engineering Consultants Pvt. Ltd., Bengaluru 203
Decongestion of Jamshedpur
 Winner  Finalist  Special Recognition Award Winner
311
Index – Alphabetical by Category
Organization Name Project Name Page

Land Transport Authority BIM Model Facility of Buildings of North-South Corridor 203

Development and Two-Lane Upgrade with Paved Shoulder of Bijapur-Homnabad Section of NH-50
Larsen & Toubro Limited 204
from Km 195 to Km 415

Maricopa Department of Transportation Vulture Mine Recreational Areas 204

Mott MacDonald Sweco A96 Hardmuir to Fochabers 205

NTT Data/Texas Department of Transportation TxDOT SH-358 205

Operations EOS DOT LiDAR 206

Preparation of a Feasibility Study and Detailed Project Report of Access Controlled Nagpur-Mumbai Super
Primove Infrastructure Development Consultants Pvt. Ltd. 206
Communication Expressway

PT. Hutama Karya Trans-Sumatra Toll Road 207

PT. Wijaya Karya (Persero) Tbk Balikpapan-Samarinda Toll Road Project, Sections 2, 3, and 4 207

QDVC New Orbital Highway 2 208

Reveron Consulting Project Information Management System 208

RITES Limited Preparing a Detailed Project Report for Rail/Road Connectivity 209

RITES Limited Preparation of Detailed Project Report for Construction of a Bridge across Hasdeo River 209

RODIC Consultants Pvt. Ltd. SH-101, NH-23/32 210

SA Infrastructure Consultants Pvt. Ltd. Feasibility Report, Preliminary Design for Alternative Highway to Gangtok in the State of Sikkim 210

Sichuan Provincial Transport Department Highway Planning, Survey,


Interchange Hub 211
Design, and Research Institute

SMEC South Africa (Pty) Ltd. Upgrade of National Road N4 Section 5B 211

SOTEPA Ltda. Adjustments to the Engineering Project for Highway BR-280/SC 212

Transys Consulting Pvt. Ltd. Structure Options for Proposed Agra Inner Ring Road Phase-II 212

Detailed Design and Approval for the Roadwork – Four-Laning of Barhi – Hazaribagh Section
Voyants Solutions Pvt. Ltd. 213
of NH-33 Jharkhand on EPC Mode under NHDP – Phase III

Yenon-Research and Design Ltd. Highway 65-85 213

BIM ADVANCEMENTS IN ROAD AND RAIL ASSET PERFORMANCE

Andhra Pradesh Road Development Corporation AP Road Database Management System (APRMS Project) 218

W Highways England Network Occupancy Management System (NOMS) – Strategic Road Network 216

Maharashtra Metro Rail Corporation Limited Nagpur Metro 218

NJDOT / Public Private Partnership of a Bentley-Hosted SUPERLOAD System


F New Jersey Department of Transportation 217
for Oversize / Overweight Vehicle Permitting and Routing

SR F Oregon Department of Transportation TransInfo – A Connected Data Environment for Transportation 14, 217

BIM ADVANCEMENTS IN UTILITIES AND INDUSTRIAL ASSET PERFORMANCE

F AES Indianapolis Power & Light Company T&D Implementation of Asset Risk at Indianapolis Power & Light 221

W BP Khazzan Central Information Store 220

Goldwind Science & Technology Co., Ltd. Application of BIM Technology in Hybrid Concrete/Steel Wind Turbine Towers 222

F North Caspian Operating Company N.V. Managing Corrosion and Inspection with Bentley APM in the Kashagan Project 221

 Winner  Finalist  Special Recognition Award Winner


312
Index – Alphabetical by Category
Organization Name Project Name Page

SR Outotec Design for Reliability Project in Counter Current Decantation (CCD) 19, 222

Outotec Modular Flotation cPlant 223

Stantec Resource Data Management System (RDMS) 223

BIM ADVANCEMENTS IN UTILITIES TRANSMISSION AND DISTRIBUTION

Aurecon Zillmere Substation 228

Cable Onda Cable Onda Network Documentation in Panama 228

China Energy Engineering Group Zhejiang Electric Power


Daishan Convertor Station 229
Design Institute Co., Ltd.

Estaco S.A. Armored Transmission Towers 229

GEOFIT 3D Surveying and Modeling of an Electrical Substation 230

F Hubei Electric Power Survey and Design Institute Macheng Caijiazhai Wind Farm Project 227

Inner Mongolia Electric Power Survey & Design Institute Co., Ltd. Hohhot Youyouban 220-kilovolt Substation Project 230

PT. Link Net Tbk Link Net FTTH Expansion 231

F Pacific Gas & Electric Company Reality Modeling in Bentley Substation 227

W PESTECH International Berhad Automation and Integration of Substation Design Project 226

REI Software Co., Ltd. CH3 Broadcast Communication Tower 231

Tata Consulting Engineers Limited 640 Megawatts (AC) of Solar PV Projects-220/33 Kilovolt, 110/33 Kilovolt and 66/11 Kilovolt Substations 232

Tata Consulting Engineers Limited Akwa Ibom Transmission Project Phase II 232

TRC South Street Substation 233

BIM ADVANCEMENTS IN WATER AND WASTEWATER PLANTS

W Beijing Institute of Water Tongzhou Water Works of Beijing South-to-North Water Diversion Project 236

F MWH Ltd. (operating in CiM6 alliance) Netheridge STW 237

Saunrachana Strucon Pvt. Ltd. Combined Water Supply Scheme to Vellore Corporation Package-1 238

F Shanghai New Jinshan Investment Holding Group Co., Ltd. Xinjiang Water Purification No. 2 Plant and Supporting Pipe Network Project 237

Yinchuan Planning Architectural Design and Research Institute Co., Ltd. Upgrading and Reconstruction Project of No. 2 Sewage Treatment Plant 238

BIM ADVANCEMENTS IN WATER NETWORKS

AECOM Detailed Design of DS-158 Project – Main Transmission Pipelines 242

W AEGEA AEGEA Prolagos Sewerage Master Plan 2041 240

Amagua CEM Water Pressure Improvement in Daule-Samborondón 242

CH2M HILL Parana Las Palmas Water Treatment Plant 243


2017 INFRASTRUCTURE YEARBOOK

CIDCO of Maharashtra Ltd. Pushpak Nagar Sewerage Scheme 243

CIDCO of Maharashtra Ltd. R/R Vahal Sewerage Network Design 244

DRA Consultants Ltd. Revamping of Intermittent System to 24-by-7 Water Supply 244

 Winner  Finalist  Special Recognition Award Winner


313
Index – Alphabetical by Category
Organization Name Project Name Page

Electrosteel Castings Limited Naranghi Oil India Limited Township Project 245

Engineers India Ltd. AMRUT 245

F Enorsul Sanitation Services Optimization of Water Distribution System and Reduction of Losses 241

Facile Maven Pvt. Ltd. Sewerage System Scheme for Six Census Towns 246

Federal Electricity & Water Authority Transmission & Distribution Network 246

Hidroing d.o.o. Implementation of GIS Database in Hydraulic Model for Precise Modeling and Accurate Results 247

Hyundai Heavy Industries Shuqaiq Steam Power Plant Project 247

Infrastructure University Kuala Lumpur (IUKL) Sewerage Reticulation Design Using SewerCAD 248

Khatib & Alami Bawabat Makkah Infrastructure Design Consultancy 248

Larsen & Toubro Construction Bansujara Major Project, Madhya Pradesh 249

Larsen & Toubro Construction Tumakuru Continuous Water Supply Scheme 249

Manila Water Company, Inc. Hinulugang Taktak Sewerage System Project 250

F Manila Water Company, Inc. Manila Water Natural Calamity Risk Resiliency and Mitigation Masterplan 241

Minconsult Sdn. Bhd. Network Analysis for a Medium-size Town 250

Morrison Hershfield Limited Kaliti Wastewater Treatment Plant Expansion 251

Multi Media Consultants Pvt. Ltd. Sewer Network Design with House Connections, Sewage Treatment Plants, and Allied Works 251

Municipal Corporation of Greater Mumbai Improvement in Supply at 2nd October Colony, Jerbai Wadia Marg 252

Municipal Corporation of Greater Mumbai Improvement of Water Supply Along P.L. Lokhande Marg, Chembur 252

Municipal Corporation of Greater Mumbai Improvement of Water Supply at Worli Koliwada Locality in G/South Ward, Mumbai 253

NJS Engineers India Pvt. Ltd. Guwahati Water Supply Project 253

NJS Engineers India Pvt. Ltd. Distribution Network Installation, Leakage Prevention, and Rehabilitation at PCM Area 254

Pankaj Associates & Consultant Engineers Kolar Gravity Feeder Main 254

Pankaj Tiwari AMRUT Sewer Network 255

Proensi - Projeto e Engenharia de Sistemas Ltda. Almirante Tamandaré 255

PT PAM Lyonnaise Jaya Using WaterGEMS to Reduce Water Loss 256

Rural Water Supply and Sanitation Tandur 52 Kilometers 256

Sabesp Analysis of Real Losses in Potable Water Distribution Networks 257

Sabesp Safe Daily Transfer of 1.1 Trillion Liters of Water 257

Samara Utility Systems LLC The Search for Unaccounted Losses in a Zone of the
​​ B-55 Waterway 258

SANOVA - Soluções para Gestão da Água Water Loss Reduction Study for Rio Vermelho District Water Supply System 258

Shah Technical Consultants Pvt. Ltd. RUIDP PH-III (Smart Check - Monitoring Application) 259

Sharjah Electricity and Water Authority SEWA Water 2030 259

 Winner  Finalist  Special Recognition Award Winner


314
Index – Alphabetical by Category
Organization Name Project Name Page

Srijan Ecological Upliftment Detailed Design of Water Supply Distribution Network in the District of North 24 Parganas and South 24 Parganas 260

State Urban Development Authority Ambikapur Water Supply 260

State Urban Development Authority Durg Water Supply 261

State Urban Development Authority Raipur Water Supply 261

Tata Consulting Engineers Limited Integrated and Comprehensive Stormwater Management Facility for Salem City 262

Voyants Solutions Pvt. Ltd. Augmentation of Water Supply for Thoothukudi City 262

Voyants Solutions Pvt. Ltd. Augmentation of Sewerage Collection and Treatment Scheme 263

 Winner  Finalist  Special Recognition Award Winner

2017 INFRASTRUCTURE YEARBOOK


www.bentley.com

Corporate Headquarters
685 Stockton Drive • Exton, PA 19341 • United States
1-800-BENTLEY (1-800-236-8539) • Outside the United States +1 610-458-5000
ISBN 978-1-934493-50-2

Bentley EMEA Bentley Systems International Limited


2 Park Place • Upper Hatch Street Dublin 2 • D02 NP94 • Ireland
+353 1 436 4600
9 781934 493502

Bentley Asia
Unit 1402-06, Tower 1 • China Central Place, Beijing 100025 • China
+86 10 5929 7000

Bentley
Communities

© 2018 Bentley Systems, Incorporated. The 2017 Infrastructure Yearbook is published by Bentley Systems, Incorporated, 685 Stockton Drive, Exton, PA USA 19341. Bentley, the “B” Bentley logo, Be, AECOsim Building Designer,
AssetWise, AssetWise ALIM, AssetWise Asset Reliability, AutoPipe, AutoPipe Advanced, AutoPipe Vessel, AutoPLANT, AXSYS, Bentley Architecture, Bentley Coax, Bentley Expert Designer Communications, Bentley Fiber,
Bentley Instrumentation and Wiring, Bentley Map, Bentley Navigator, Bentley Open Utilities Designer, Bentley Open Utilities Map, Bentley Raceway and Cable Management, Bentley Substation, Bentley Subsurface Utility
Engineering, CivilStorm, ComplyPro, ContextCapture, ConstructSim, ConstructSim Planner, ConstructSim Work Package Server, Descartes, GenerativeComponents, GEOPAK, Geo Web Publisher, gINT, HAMMER, Integrated
Structural Modeling, LEAP, LEAP Bridge, LumenRT, MAXSURF, MicroStation, MicroStation Power Draft, MineCycle Material Handling, MOSES, MXROAD, OpenBridge, OpenBridge Modeler, OpenPlant, OpenPLANT PID,
OpenRail, OpenRoads, OpenRoads Designer, OpenRoads Concept Station, OpenRoads Navigator, Pointools, PowerCivil, Power GEOPAK, Power InRoads, Power Rail Track, ProConcrete, ProjectWise, ProjectWise Construction
Management, Promis.e, ProSteel, ProStructures, RAM, RAM Concept, RAM Connection, RAM Elements, RM Bridge, RAM Structural System, SACS, SACS Collapse, SectionWizard, SewerCAD, SewerGEMS, SITEOPS, STAAD
Advanced Concrete Design, STAAD Foundation Advanced, STAAD.Pro, StormCAD, Structural Modeler, SUPERLOAD, topoGRAPH, WaterCAD, and WaterGEMS are either registered or unregistered trademarks or service marks
of Bentley Systems, Incorporated, or one of its direct or indirect wholly owned subsidiaries. Google Maps is trademark of Google Inc. Microsoft is a registered trademark of Microsoft Corporation in the United States and/or
other countries. Other brands and product names are trademarks of their respective owners.