Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1.18/p Prodhim zall lavatrice m3
Sp + p op 0.44 125 55
Sigurime shoqerore 65% leke 55 0.650 36
Transport rere T/km 8.5 20 170
Transportier 25 m op 0.32 79 25
Shoshe vibruese > 9 m3/ore op 0.03 263 8
Shoshe rrotulluese 4-11 m3/h op 0.06 210 12
Gurthyese 400x600mm op 0.03 578 17
Larese rere > 5 m3 op 0.06 472.5 27
Elektropompe 40 KW op 0.03 310 9
Buldozer S 80/100 op 0.01 4800 53
Ekskavator 0.25 m3 op 0.01 2810 31
Zhavor m3 1.5 331.5 487
Shuma: 91 170 183 487 931 74 93 1098
Page 3
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Shuma: 99 16 207 956.37 1278 102 128 1508
Page 4
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Gelqere e pashuar ton 0.66 10219 6745
Shuma: 887 240.05 6745 7872 630 787 9289
Page 5
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Page 7
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Uje liter 200 0.4 80
Shuma: 348 920 180 2696 4144 332 414 4890
Page 8
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Çimento 32.5 N kg 245 8.3 2034
Uje liter 200 0.4 80
Shuma: 348 920 180 3191 4639 371 464 5474
Page 9
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Zall m3 27 20 540 0.76 931 707
Çimento 42.5 R kg 294 8.7 2558
Uje liter 200 0.4 80
Shuma: 348 880 180 3691 5099 408 510 6017
Page 10
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Rere m3 15 20 300 0.42 736 309
Zall m3 23 20 460 0.63 931 586
Çimento 42.5 R kg 525 8.7 4568
Uje liter 200 0.4 80
Shuma: 348 760 180 5543 6831 546 683 8061
Page 11
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Shuma: 3541 22 95.4 7294 10952 876 1095 12924
Page 13
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Prodhim soleta b/a tip govate
1.49/p 0.069m3/m2, h=30cm, C-16/20 m2
Sp + p op 1.22 185 226
Sigurime shoqerore 16.7% leke 226 0.167 38
Beton C-16/20 m3 0.770 20 15 0.089 5294 471
Kallep inventari m2 1.5 140 210
Avull ton 0.054 450 24
Solar kg 3 87 261
Vinc op 0.05 53 2.65
Vibrator op 0.08 53 4.24
Shuma: 263 15 6.89 966 1252 100 125 1478
Page 14
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Prodhim soleta b/a te
parapergatitura me tulla me vrima
1.52/p h=25cm m2
Sp + p op 2.44 185 451.4
Sigurime shoqerore 16.7% leke 451 0.167 75
Beton C-16/20 m3 1.507 20 30 0.137 5294 725
Kallep inventari m2 1 140 140
Tulla me 6 vrima cope 0.007 20 0.14 24 25 600
Solar kg 0.54 87 47
Vinc op 0.2 53 10.6
Vibrator op 0.17 53 9
Shuma: 527 30 20 1512 2089 167 209 2465
Page 15
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Page 16
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Vibrator 0.27 53 14
Elektro argano 0.27 45 12
Shuma: 639 23 37 689 1388 111 139 1638
Page 18
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Sp + p op 0.09 185 17
Sigurime shoqerore 16.7% leke 16.7 0.167 3
Çimento 32.5 N kg 0.002 20 0.04 1.6 8.1 13
Rere e lare lavatrice m3 0.005 20 0.1 0.003 1743 5
Zall i lare lavatrice 5-10mm m3 0.005 20 0.1 Mak 0.003 931 3
Solar kg 0.01 37 0.3 0.12 87 10
Shuma: 19 0.2 0.3 32 52 4 5 61
Page 19
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Mirembajtje kallepi 10% m2 mak vibrator 0.01 53 0.53 12.16 2% 0.2
Solar kg mak d/hekur 0.01 210 1.26 0.1 87 8.7
Shuma: 73 3.2 2.426 119 198 16 20 234
Page 20
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Sigurime shoqerore 16.7% leke 5.55 0.167 1
Hekur betoni kg 0.005 20 0.1 1.03 78 80.34
Prerje e drejtim hekuri makin op 0.002 63 0.1008
Kthim hekuri op 0.004 63 0.252
Hekur betoni per zgjatim kg Elektro argano 0.001 45 0.0585 0.004 78 0.3
Vinc op 0,0005 74 2.5
Shuma: 6.5 0.1 2.91 81 90 7 9 106
Pergatitje konstruksione
1.99/p metalike te perbera ton
Sp + p op 85 185 15725
Sigurime shoqerore 16.7% leke 15725 0.167 2626 Gazogjen
Hekur profil e shirit kg 5.15 20 103 1.5 72 108 810 80 64800
Llamarine e zeze kg Tranxhe elektrike 1.5 210 315 220 75 16500
Karbit kg Saldatrice 15 74 1110 1 183 183
Elektroda kg Trapano elektrik 1.5 95 142.5 10 180 1800
Oksigjen op Vinc ure 3,0 53 150 10 122 1220
Shuma: 18351 103 1825.5 84503 104783 8383 10478 123643
Pergatitje konstruksione
1.100/p metalike te thjeshta ton
Sp + p op 80 185 14800
Sigurime shoqerore 16.7% leke 14800 0.167 2472 Gazogjen
Hekur profil e shirit kg 5.15 20 103 1.5 72 108 910 80 72800
Llamarine e zeze kg Tranxhe elektrike 1 210 210 120 75 9000
Kthim hekuri op Saldatrice 5 74 370 1.5 183 274.5 karbit
Elektroda kg Trapano elektrik 2 95 190 4.0 180 720
Vinc op Vinc ure 2.0 53 100 15 122 1830 oksigjen
Page 21
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Shuma: 17272 103 978 84625 102977 8238 10298 121513
Page 22
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Oksigjen liter 15 122 1830
Saldatrice elektrike op 9.5 74 703
Gazogjen op 3 80 240
Tranxhe elektrike op 2 210 420
Autovinc op 0.2 3100 620
Vinc ure op 1.5 53 79.5
Shuma: 19646 408 2062.5 82885 105001 8400 10500 123902
Page 24
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Sp + p op 2.07 185 383
Sigurime shoqerore 16.7% leke 383 0.167 64
Çimento 32.5 N ton 0.1 20 2 16 8.1 130
Granil m3 0.24 20 4.8 0.03 1351 41
Lavigatrice op 0.75 84 63
Kallep m2 0.15 60 9
Hekur betoni Ø 3 - 5 mm kg 1.5 95 143
Shuma: 447 7 63 322 838 67 84 989
Page 25
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Kallep inventari m2 0.25 140 35
Solar kg 0.32 87 28
Shuma: 128 13 343 485 39 49 572
Page 26
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Kallep inventar m2 2.16 305 658.8
Mirembajtje kallepi 10% 658.8 10% 65.9
Solar kg 0.33 87 28.7
Betonjere op 0.03 174 5.22
Vinc op 0.02 53 1.06
Shuma: 172.72 39 6 999 1217 97 122 1436
Page 27
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Kallep inventar m2 4.14 305 1262.7
Mirembajtje kallepi 10% 1263 10% 126.3
Solar kg 0.62 87 53.9
Betonjere op 0.08 174 13.92
Vinc op 0.02 53 1.166
Shuma: 384 100 15 2088 2587 207 259 3052
Page 28
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Kallep inventar m2 2.82 305 860.1
Mirembajtje kallepi 10% 860.1 10% 86.0
Solar kg 0.42 87 36.5
Betonjere op 0.04 174 6.264
Vinc op 0.02 53 1.06
Shuma: 313 78 7 1446 1844 148 184 2176
Page 29
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Ngjites GNS-2 (tutkall) kg 0.36 1015 365.4
Inglizina T 10/12 cope 2.65 508 1346.2
Mentesha 50x52cm cope 1.27 1050 1333.5
Vida druri cope 18.7 10 187.0
Spanjoleta cope 0.64 254 162.6
Shufra spanjoletash cift 0.64 110 70.4
Kraheza cope 0.64 270 172.8
Bilbile cope 0.64 180 115.2
Gozhde kg 0.2 90 18.0
Vaj lini kg 0.11 203 22.3
Oketi cope 1.28 142 181.8
Zumpara m 0.12 150 18.0
Klorur amoni kg 0.004 140 0.6
Grasese elektrike op 0.35 180 63
Cirkular op 0.33 140 46.2
Sharre shirit op 0.42 137 57.54
Plan op 0.38 126 47.88
Sumpatriqe op 0.32 150 48
Trapon elektrik op 0.24 95 22.8
Shuma: 1274 40 285 6346 7945 636 794 9375
Page 30
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Klorur amoni kg 0.004 140 0.6
Grasese elektrike op 0.35 180 63
Cirkular op 0.33 140 46.2
Sharre shirit op 0.42 137 57.54
Plan op 0.38 126 47.88
Sumpatriqe op 0.32 150 48
Trapon elektrik op 0.24 95 22.8
Shuma: 1468 48 285 5824 7626 610 763 8998
Page 31
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Sp + p op 8.3 185 1535.5 3.75 20 75
Sigurime shoqerore 16.7% leke 1536 0.167 256
Energji elektrike kw 3 10 30.0
Lende e holle pishe e stazh
(Vendi) m3 0.011 28420 312.6
Lende e trashe pishe e stazh
(Vendi) m3 0.044 28420 1250.5
Ngjites GNS-2 (tutkall) kg 0.4 1015 406.0
Inglizina T 10/12 cope 2.65 508 1346.2
Mentesha 50x52cm cope 1.27 280 355.6
Vida druri cope 18.7 10 187.0
Spanjoleta cope 0.64 254 162.6
Shufra spanjoletash cift 0.64 110 70.4
Kraheza cope 0.64 270 172.8
Bilbile cope 0.64 180 115.2
Gozhde kg 0.2 90 18.0
Vaj lini kg 0.12 203 24.4
Oketi cope 1.28 142 181.8
Zumpara m 0.12 150 18.0
Klorur amoni kg 0.002 140 0.3
Grasese elektrike op 0.42 180 75.6
Cirkular op 0.41 140 57.4
Sharre shirit op 0.5 137 68.5
Plan op 0.45 126 56.7
Sumpatriqe op 0.38 150 57
Trapon elektrik op 0.29 95 27.55
Shuma: 1792 75 343 4651 6861 549 686 8096
Page 32
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Gozhde kg 0.02 90 1.8
Vaj lini kg 0.04 203 8.1
Zumpara m 0.09 150 13.5
Klorur amoni kg 0.003 140 0.4
Brava cope
Shula cope 0.3 125 37.5
Grasese elektrike op 0.35 180 63
Cirkular op 0.33 140 46.2
Sharre shirit op 0.42 137 57.54
Plan op 0.38 126 47.88
Sumpatriqe op 0.33 150 48.75
Trapon elektrik op 0.24 95 22.8
Shuma: 1166 50 286 3081 4583 367 458 5408
Page 33
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Lende e trashe pishe e
stazh(material Vendi) m3 0.062 28420 1762.0
Ngjites GNS-2 (tutkall) kg 0.34 1015 345.1
Inglizina T 12/14 cope 1.2 508 609.6
Gozhde kg 0.1 90 9.0
Brava cope 0.58 1000 580.0
Vida druri cope 7 10 70.0
Vaj lini kg 0.14 203 28.4
Zumpara m 0.24 150 36.0
Klorur amoni kg 0.003 140 0.4
Grasese elektrike op 0.42 180 76
Cirkular op 0.41 140 57
Sharre shirit op 0.5 137 69
Plan op 0.45 126 57
Sumpatriqe op 0.38 150 57
Trapon elektrik op 0.29 95 28
Shuma: 1619 25 343 4521 6508 521 651 7680
Page 34
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Çimento e bardhe 42.5 R kg 0.02 20 0.4 4 12 48.0
Rere e lare m3 0.14 20 2.8 0.015 1743 26.1
Granil guri i thyer 1-2-3mm m3 0.06 20 1.2 0.008 1351 10.8
Boje cimentito kg 0.201 112 22.5
Energji elektrike kw 1 10 10.0
Te ndryshme 3% 213.2 3% 6.4
Shuma: 394 6 220 619 50 62 730
Page 35
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Boje cimentito kg 0.1 112 11.2
Copa mermeri pllake m2 0.28 20 5.6 0.7 1500 1050.0
Energji elektrike kw 1 10 10.0
Te ndryshme 3% 201.3 3% 6.0
Shuma: 977 15 1257 2249 180 225 2654
Page 36
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Page 37
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Betonjere op 0.39 174 67.86
Vinc op 0.09 53 4.77
Shuma: 1252 128 73 7730 9183 735 918 10836
Page 38
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Mirembajtje kallepi 10% leke 1220 10% 122.0
Gozhde kg 0.02 90 1.8
Solar kg 0.6 87 52.2
Shuma: 2137 245 80.56 6796 9258 741 926 10925
Page 39
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Hekur Ø 6mm kg 2.2 76 167.2
Solar kg 1.8 87 156.6
Avull ton 0.15 450 67.5
Energji elektrike kw 6.5 10 65.0
Shuma: 1403 245 2277 3925 314 392 4631
Prodhim lugje b/a C-37/45
1.53/p parabolik L=5m, T - 150 cope
Sp + p op 7.3 185 1350.5
Sigurime shoqerore 16.7% leke 1351 0.167 226
Beton C-37/45 m3 12.24 20 245 0.23 6831 1571.1
Hekur Ø 4mm kg 6.5 95 617.5
Hekur Ø 6mm kg 2.2 76 167.2
Solar kg 2.2 87 191.4
Avull ton 0.18 450 81.0
Energji elektrike kw 6.5 10 65.0
Shuma: 1576 245 2693 4514 361 451 5327
Page 40
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Shuma: 1835 245 5520 7600 608 760 8968
Page 41
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Page 42
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Solar kg 0.75 87 65.3
Shuma: 1770 245 399 6024 8438 675 844 9957
Page 43
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Mirembajtje kallepi 10% leke 1330 10% 133.0
Gozhde kg 0.05 90 4.5
Solar kg 1.4 87 121.8
Shuma: 3994 245 689 6989 11917 953 1192 14062
Page 46
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Sp + p op 10.5 125 1312.5
Sigurime shoqerore 16.7% leke 1313 0.167 219
Beton C-12/15 m3 12.24 20 245 1.02 4639 4731.7
Vinc op 0.6 53 31.8
Kallep inventar m2 3.4 140 476.0
Mirembajtje kallepi 10% leke 476 10% 47.6
Solar kg 0.51 87 44.4
Shuma: 1532 245 32 5300 7108 569 711 8387
Page 50
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Rere e lare m3 0.25 1743 427
Bitum kg 39.00 80 3120
Briket kg 20.00 90 1800
Solar kg 12.00 87 1044
Dru zjarri kg 2.65 3.1 8
Shuma: 516 184 6895 7595 608 760 8963
Page 51
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Rere e lare m3 0.24 1743 420
Bitum kg 57.50 80 4600
Briket kg 22.00 90 1980
Solar kg 12.00 87 1044
Dru zjarri kg 2.65 3.1 8
Pluhur guri m3 0.09 1523 134
Shuma: 211 184 8577 8972 718 897 10587
Page 52
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Tranxhe e kombinuar op 4 53 212
Tranxhe llamarine 19 mm op 3.3 53 174.9
Tokmak elektrik op 2 63 126
Vinc ure 5 T me manovrator op 2.3 580 1334
Vinc kulle 4-6 T me " op 2 590 1180
Hekur profil kg 885 80 70800
Hekur pllake kg 135 75 10125
Hekur betoni kg 1 80 80
Bullona e dadi deri 20cm kg 1 125 125
Elektroda kg 13 250 3250
Karbit kg 1 183 183
Oksigjen liter 12 122 1464
Shuma: 14681 102 4909.9 86027 105720 8458 10572 124749
Page 53
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Bazamente b/a per shtylla
97-98 metalike T L m3
Sp + p op 12 185 2220
Sigurime shoqerore 16.7% leke 2220 0.167 371
Beton C - 16/20 m3 12.24 20 245 1.02 4923 5022
Vinc cjap 5 ton op 0.8 270 216
Vibrator thellesie op 0.7 53 37.1
Kallep inventar m2 7 140 980
Solar kg 1.5 87 131
Skele inventar m2 2 130 260
Shuma: 2591 245 253.1 6392 9481 758 948 11188
Page 54
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Elektroda kg 20 180 3600
Karbit kg 1 183 183
Oksigjen liter 10 122 1220
Shuma: 19646 102 5262.5 85583 110594 8848 11059 130501
Page 55
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Hekur betoni kg 21 80 1680
Elektroda kg 20 180 3600
Karbit kg 1 183 183
Oksigjen liter 10 122 1220
Shuma: 14249 102 3535 86273 104159 8333 10416 122908
Page 56
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Vinc kulle 4-6 T me " op 1.5 590 885
Hekur profil kg 900 80 72000
Hekur pllake kg 118 75 8850
Hekur betoni kg 3 80 240
Bulona e dadi kg 0.5 125 62.5
Elektroda kg 14 180 2520
Karbit kg 1 183 183
Oksigjen liter 10 122 1220
Shuma: 43827 102 3527.4 85076 132532 10603 13253 156387
Page 57
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Hekur profil kg 815 80 65200
Hekur pllake kg 205 75 15375
Elektroda kg 21 180 3780
Karbit kg 1 183 183
Oksigjen liter 10 122 1220
Shuma: 30657 102 9566 85758 126083 10087 12608 148778
Page 58
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Transport te ndryshme ton 10.2 20 204
Forxhe kovaci op 1.02 68 69.36
Eshke kovaci kg 50 91 4550
Hekur betoni Ø ton 0.83 80000 66400
Hekur per pykat (llamarine) ton 0.19 75000 14250
Shuma: 28066 204 69.36 85200 113540 9083 11354 133977
Prodhim asfaltobetoni me
ngjyre, "Fab" 8-10T/ore,granil e
1.91/2p rere guri ton
Sp + p op 1.25 185 231
Shtese mbi page 65% leke 231 0.167 39
Fabrike asfaltobetoni 8-10T/h op 0.11 640 71
Kazan 10000l op 0.22 74 16
Ushqyes mekanik op 0.22 126 28
Transportier L-10m op 0.22 79 18
Elektropompe tymthithese 10kw op 0.11 64 7
Ekskavator ne ekonomi 0.25 op 0.07 2810 188
Granil nga guri i thyer m3 0.29 1100 319
Rere guri m3 0.24 1523 367
Bitum kg 57.50 80 4600
Briket kg 22.00 90 1980
Boje cimentito ( ngjyra ) kg 25.00 110 2750
Pluhur guri m3 0.09 1523 136
Shuma: 270 328 10152 10750 860 1075 12685
Shenime teknike:
1. Në analizat teknike betonet nuk janë paraqitur sipas markave, por sipas klasave, bazuar sipas standartit
Page 59
Nr. PUNTORI TRANSPORT MAKINERI MATERIAL Shp Fitim
EMERTIMI Njesia op çmimi Vlefta T/km çmimi Vlefta o.p çmimi Vlefta Sasia çmimi Vlefta Shuma pl TOTALI
Analize 8% 10%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Shqiptar dhe Europian, SSH-EN 206.
2. Çimentoja është paraqitur sipas klasave bazuar në standartet shqiptare dhe europiane SSH-EN 197-1.
3. Në analizat teknike Sigurimet shoqërore, që paguhen nga punëdhënësi, janë marrë 16.7%
në zbatim të VKM Nr.414, datë 27.06.2012.
Page 60