Professional Documents
Culture Documents
Nov-19
11 14.61 13.07
1 28 8:00 8:30 0.50
0 33 0.00
Yes Scheduled Transmission Line Transmission Line Under Voltage 2.74 2.9
Yes Unscheduled Transmission Line Transmission Line Change Over 3.1 3.7
Yes Unscheduled Transmission Line Transmission Line Under Frequency 2.9 2.88
Yes Unscheduled Transmission Line Transmission Line Change Over 1.63 3.01
Yes Unscheduled Transmission Line Transmission Line OCR 3.46 3.68
Yes Unscheduled Transmission Line Transmission Line Change Over 3.67 1.01
Yes Unscheduled Transmission Line Transmission Line Change Over 1.01 3.56
Yes Unscheduled Transmission Line Transmission Line OCR 3.8 3.6
No
Yes Unscheduled Transmission Line Transmission Line Under Voltage 3.84 1.64
Yes Unscheduled Transmission Line Transmission Line Change Over 1.5 2.99
Yes Unscheduled Transmission Line Transmission Line Under Voltage 2.96 0
Yes Unscheduled Transmission Line Transmission Line Under Voltage 0 3.5
Estimated
Explanation/Description
MWh Lost
0.89 Due to Ground Fault Indication at Malako and SKE Incoming feeder
2.42 Due to Ground Fault Indication at Malako and SKE Incoming feeder
0.54 Due to Over Current Indication in Incoming SKE
0.98 Due to Ground Fault Indication from Malako Feeder bring to incoming SKE realese from GH.
0.68 GFR Indication at Feeder Malako.
2.01 Indication GFR di Balun Subtition And recloser Muara Paneh Trip
3.44 Indication GFR di Balun Subtition And recloser Muara Paneh Trip
0.14 Due to Ground Fault indication on Unit. Unknow failure from grid
0.67 Due to Ground Fault indication on Express Feeder Lubuk Gadang in Balun Substation
0.97 Due to Over Current indication in SKE incoming Cubicle.
0.00 Normal Condition
0.67 Due to Ground Fault Indication at Malako Feeder
0.37 Due to Over Current Indication at Malako Feeder
0.83 Due to Ground Fault Indication because the rubber Tree Hit on Line 20kv at malako
0.56 Due to Ground Fault Indication because the monkey hit on Line 20KV at Malako
0.24 Disconecting from Lubuk Gadang Incoming because schedule prepare Tour D Singkarak and SKE Start Isolated
3.21 Stop normal due total cleaning intake and head pond filter
1.45 Due to Under Frequency indication on unit because recloser of Feeder 8 Alahan Panjang is trip.
0.00
1.10 Due to GFR indication di Balun Subtition And LBS Muara Labuh Trip. Unit OFF
0.00
0.14 Due to over current indication And recloserLubuk malako Trip
0.13 Stop Isolated and Manuver back to GI Solok
0.60 Due to Ground Fault Indication at Muara labuh Feeder
1.29 Due to Ground Fault Indication at SKE Incoming feeder
1.55 Due to Ground Fault Indication at Malako Feeder
0.65 Due to Ground Fault Indication at Malako Feeder
2.24 Due to Ground Fault Indication at Coupling (II) and Balun Express
4.11 Due to Loss the Transformer Jumpers at Rimbo Datar Area
0.60 Due to Under Voltage Indication in Unit, and Not Indication At Lubuk Gadang Substation
0.49 Due to Underexictation Relay in Unit
0.71 due to chenge over from isolated mode to sungai penuh. Request by PLN
0.94 due to ground fault at Kerisik Tuo Substation
0.29 due to ground fault at Kerisik Tuo Substation
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
End Time
Count Outage Duration Unit Scheduled/Unsched
Time Trip (synchron Category of Outage
Break U2 Number U2 (hours) stopped uled outage
Time)
1 1 8:53 9:04 0.18 Yes Unscheduled Transmission Line
1 2 2:45 3:34 0.82 Yes Unscheduled Transmission Line
1 3 6:45 6:56 0.18 Yes Unscheduled Transmission Line
1 4 14:34 14:45 0.18 Yes Unscheduled Transmission Line
1 5 4:27 4:41 0.23 Yes Unscheduled Transmission Line
1 6 5:57 6:38 0.68 Yes Unscheduled Transmission Line
1 7 7:51 9:03 1.20 Yes Unscheduled Transmission Line
1 8 16:51 17:01 0.17 Yes Unscheduled Transmission Line
1 9 17:10 17:16 0.10 Yes Unscheduled Transmission Line
1 10 2:49 3:02 0.22 Yes Unscheduled Transmission Line
0 10 0.00 No
1 11 3:59 4:20 0.35 Yes Unscheduled Transmission Line
1 12 4:25 4:32 0.12 Yes Unscheduled Transmission Line
1 13 5:44 6:04 0.33 Yes Unscheduled Transmission Line
1 14 6:13 6:31 0.30 Yes Unscheduled Transmission Line
0 15 0.00
0 15 0.00
0 27 0.00
0 40 0.00 No
0 40 0.00 No
1 41 12:03 12:19 0.27 Yes Unscheduled Transmission Line
0 42 0.00
0.00
0.00
0.00
0.00
0.00
Transmission Line GFR 2.52 2.68 0.69
Trash cleaning /
3.46 0 0.12
headpond
Trash cleaning /
0 3.72 7.13
headpond
0.00
Disconecting from Lubuk Gadang Incoming because schedule prepare Tour D Singkarak
Stop normal due total cleaning intake and head pond filter
Due to Under Frequency indication on unit because recloser of Feeder 8 Alahan Panjang is trip.
To Line job Expres lubuk gadang finish,to ske stop Isolated Mode and manuver to GI Solok sistem
Due to Unknown Indication
Normal Condition
Due to GFR indication And LBS Muara Labuh Trip.Unit Isolated Mode
Due to Over frequency on Unit
Normal Condition
Due to Ground Fault Indication at Malako Feeder
due to under voltage, there is collapse pole at expreess feeder balun, SKE requested for operate at isolated mode
SCADA
Penstock Pressure Very Low