PLTM LUBUK GADANG 2X4 MW

Nov-19

Date Average Average End Time


Count Outage Duration
Canal flow river Flow Time Trip (synchron
Break U1 Number U1 (Hour)
(m3/s) (m3/s) Time)
1 12.88 12.8 1 1 8:53 9:10 0.28
1 2 2:45 3:29 0.73
2 12.26 11.53 1 3 6:45 6:56 0.18
1 4 14:34 14:53 0.32
1 5 4:27 4:42 0.25
3 10.19 9.99 1 6 5:57 6:39 0.70
1 7 7:51 8:58 1.12
1 8 16:51 16:54 0.05
4 11.35 10.99
1 9 17:10 17:24 0.23
5 11.68 11.31 1 10 2:49 3:09 0.33
6 11.17 10.75 0 10 0.00
1 11 3:59 4:19 0.33
1 12 4:25 4:37 0.20
1 13 5:44 6:03 0.32
1 14 6:13 6:27 0.23
7 7.95 7.19
1 15 7:23 7:28 0.08

1 16 16:41 16:46 0.08

1 17 16:50 18:09 1.32

1 18 8:11 8:30 0.32


8 10.87 10.59
1 19 20:23 20:25 0.03
9 11.63 11.1 1 20 9:59 10:14 0.25
1 21 0:00 0:09 0.15
1 22 6:13 6:26 0.22
1 23 9:17 9:29 0.20
10 12:02 11.54 1 24 10:03 10:16 0.22

1 25 10:52 12:07 1.25

1 26 17:17 17:27 0.17

1 27 0:47 1:06 0.32

11 14.61 13.07
1 28 8:00 8:30 0.50

1 29 10:17 10:31 0.23


1 30 9:50 10:08 0.30

1 31 10:28 10:33 0.08


12 14.02 13.29
1 32 10:45 10:51 0.10
1 33 14:59 15:20 0.35
13 13.74 13.02 0 33 0.00

0 33 0.00

1 34 10:38 11:05 0.45


14 11.46 11.47
0 34 0.00
1 35 11:41 11:45 0.07
1 36 14:52 14:55 0.05
1 37 11:10 11:24 0.23
15 14.24 13.63
1 38 20:03 20:27 0.40
1 39 5:49 6:17 0.47
1 40 8:39 8:51 0.20
16 12.04 11.4
1 41 13:57 14:39 0.70
1 42 20:32 21:41 1.15
1 43 7:08 7:20 0.20

17 12.82 12.46 1 44 13:26 13:37 0.18

1 45 13:57 14:14 0.28

18 12.09 11.78 0 45 0.00


1 46 12:03 12:18 0.25
19 12.72 11.74
1 47 23:24 0:00 0.60

0 47 0:00 3:49 3.82

1 48 3:55 4:12 0.28


20 14,03 12.53 1 49 22:09 22:32 0.38

1 50 23:01 23:20 0.32


1 51 23:22 0:00 0.63
21 0 51 0:00 0:10 0.17
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
0 51 0.00
Unit 1
Unit Scheduled/Unsched MW Before MW After
Category of Outage Affected Equipment Type of Fault
Stopped uled outage Trip Trip (max)

Yes Unscheduled Transmission Line Transmission Line GFR 2.59 3.71


Yes Unscheduled Transmission Line Transmission Line GFR 2.85 3.74
Yes Unscheduled Transmission Line Transmission Line OCR 2.9 3.03
Yes Unscheduled Transmission Line Transmission Line GFR 2.8 3.4
Yes Unscheduled Transmission Line Transmission Line GFR 2.53 2.9
Yes Unscheduled Transmission Line Transmission Line GFR 2.79 2.95
Yes Unscheduled Transmission Line Transmission Line GFR 2.48 3.68
Yes Unscheduled Transmission Line Transmission Line GFR 2.75 3
Yes Unscheduled Transmission Line Transmission Line GFR 2.7 3
Yes Unscheduled Transmission Line Transmission Line GFR 2.8 3
No
Yes Unscheduled Transmission Line Transmission Line GFR 2.55 1.48
Yes Unscheduled Transmission Line Transmission Line OCR 1.48 2.26
Yes Unscheduled Transmission Line Transmission Line GFR 2.67 2.55
Yes Unscheduled Transmission Line Transmission Line GFR 2.55 2.24

Yes Scheduled Transmission Line Transmission Line Under Voltage 2.74 2.9

Yes Unscheduled Transmission Line Transmission Line Change Over 3.1 3.7

Yes Unscheduled Transmission Line Transmission Line OCR 3.7 5.7

Yes Unscheduled Transmission Line Transmission Line GFR 2.47 2.92


Yes Unscheduled Transmission Line Transmission Line Under Voltage 2.52 2.71
Yes Unscheduled Transmission Line Transmission Line Under Voltage 2.63 2.4
Yes Unscheduled Transmission Line Transmission Line GFR 2.68 2.79
Yes Unscheduled Transmission Line Transmission Line Under Voltage 2.75 3.28
Yes Unscheduled Transmission Line Transmission Line Under Voltage 2.96 3.09
Yes Unscheduled Transmission Line Transmission Line OCR 3.31 2.89
Trash cleaning / Trash cleaning /
Yes Scheduled Reverse Power 1.12 4.01
headpond headpond
Yes Unscheduled Transmission Line Transmission Line GFR 2.02 2.95

Yes Unscheduled Transmission Line Transmission Line GFR 3.55 3.58

Yes Unscheduled Transmission Line Transmission Line Under Frequency 2.9 2.88

Yes Unscheduled Transmission Line Transmission Line Change Over 1.63 3.01
Yes Unscheduled Transmission Line Transmission Line OCR 3.46 3.68

Yes Unscheduled Transmission Line Transmission Line Change Over 3.67 1.01

Yes Unscheduled Transmission Line Transmission Line Change Over 1.01 3.56
Yes Unscheduled Transmission Line Transmission Line OCR 3.8 3.6
No

Yes Unscheduled Transmission Line Transmission Line GFR 2.87 2

Yes Unscheduled Transmission Line Transmission Line OCR 2.36 1.97


Yes Unscheduled Transmission Line Transmission Line Change Over 1.64 3.66
Yes Unscheduled Transmission Line Transmission Line GFR 2.21 2.92
Yes Unscheduled Transmission Line Transmission Line OCR 3.53 2.93
Yes Unscheduled Transmission Line Transmission Line GFR 2.96 3.7
Yes Unscheduled Transmission Line Transmission Line GFR 2.97 3.52
Yes Unscheduled Transmission Line Transmission Line GFR 2.87 3.52
Yes Unscheduled Transmission Line Transmission Line Over Frequency 3.55 3.59
Yes Unscheduled Transmission Line Transmission Line Under Voltage 3.08 2.94
Yes Unscheduled Transmission Line Transmission Line Under Voltage 2.61 2.77
Plant Unscheduled Penstock Pressure
Yes Unscheduled 2.43 3.05
Maintenance Very Low
No
Yes Unscheduled Transmission Line Transmission Line GFR 2.53 2.91
Trash cleaning / Trash cleaning /
Yes Unscheduled 3.59 0
headpond headpond
Trash cleaning / Trash cleaning /
Yes Unscheduled 0 3.67
headpond headpond
Yes Unscheduled Transmission Line Generator 3.72 2.42

Yes Unscheduled Transmission Line Transmission Line Under Voltage 3.84 1.64

Yes Unscheduled Transmission Line Transmission Line Change Over 1.5 2.99
Yes Unscheduled Transmission Line Transmission Line Under Voltage 2.96 0
Yes Unscheduled Transmission Line Transmission Line Under Voltage 0 3.5
Estimated
Explanation/Description
MWh Lost

0.89 Due to Ground Fault Indication at Malako and SKE Incoming feeder
2.42 Due to Ground Fault Indication at Malako and SKE Incoming feeder
0.54 Due to Over Current Indication in Incoming SKE
0.98 Due to Ground Fault Indication from Malako Feeder bring to incoming SKE realese from GH.
0.68   GFR Indication at Feeder Malako.
2.01 Indication GFR di Balun Subtition And recloser Muara Paneh Trip
3.44 Indication GFR di Balun Subtition And recloser Muara Paneh Trip
0.14 Due to Ground Fault indication on Unit. Unknow failure from grid
0.67 Due to Ground Fault indication on Express Feeder Lubuk Gadang in Balun Substation
0.97 Due to Over Current indication in SKE incoming Cubicle.
0.00 Normal Condition
0.67 Due to Ground Fault Indication at Malako Feeder
0.37 Due to Over Current Indication at Malako Feeder
0.83 Due to Ground Fault Indication because the rubber Tree Hit on Line 20kv at malako
0.56 Due to Ground Fault Indication because the monkey hit on Line 20KV at Malako

0.24 Disconecting from Lubuk Gadang Incoming because schedule prepare Tour D Singkarak and SKE Start Isolated

0.28 Stop Isolated and Manuver back to GI Solok


Due to Over Current on Unit because Wind Storm at site and PLN do inspection at 20KV, after inspection trauble
6.19
found is Groot attached on SKE Feeder
0.85 Due to Ground Fault Indication at Malako Feeder bring to SKE Incoming.
0.09 Due to Unknown Indication
0.63 Due to Unknown Indication
0.41 Due to Ground Fault Indication at Malako Feeder
0.65 Due to Unknown Indication
0.60 Due to Unknown Indication
0.67 Due to Unknown Indication from 20KV System, and Overcurrent indication on SKE Substation.

3.21 Stop normal due total cleaning intake and head pond filter

0.41 Due to Ground Fault indication at Malako Feeder

1.13 Due to Ground Fault indication at Malako Feeder

1.45 Due to Under Frequency indication on unit because recloser of Feeder 8 Alahan Panjang is trip.

0.54 manuver from GI Sei penuh to Sistem GI Solok


1.07 Indication no view from lubuk gadang and Balun subtition,to SKE relay Over Curren
Manuver from Gi Solok to ISOLATED MODE Because there are line JOB Expres Lubuk gadang in Blok 0
0.20
Suprem energi(Revecation pole)
0.23 To Line job Expres lubuk gadang finish,to ske stop Isolated Mode and manuver to GI Solok sistem
1.30 Due to Unknown Indication
0.00 Normal Condition

0.00

1.10 Due to GFR indication di Balun Subtition And LBS Muara Labuh Trip. Unit OFF
0.00
0.14 Due to over current indication And recloserLubuk malako Trip
0.13 Stop Isolated and Manuver back to GI Solok
0.60 Due to Ground Fault Indication at Muara labuh Feeder
1.29 Due to Ground Fault Indication at SKE Incoming feeder
1.55 Due to Ground Fault Indication at Malako Feeder
0.65 Due to Ground Fault Indication at Malako Feeder
2.24 Due to Ground Fault Indication at Coupling (II) and Balun Express
4.11 Due to Loss the Transformer Jumpers at Rimbo Datar Area
0.60 Due to Under Voltage Indication in Unit, and Not Indication At Lubuk Gadang Substation
0.49 Due to Underexictation Relay in Unit

0.78 Normal Stop because the Penstock Pressure Very Low

0.00 Normal Condition


0.68 Due to Ground Fault Indication at Malako Feeder

1.08 Normal Stop because the Penstock Pressure Very Low

7.00 Normal Stop because the Penstock Pressure Very Low

0.87 Due to there are sparks on the brake of generator unit 1


1.05 due to under voltage, there is collapse pole at expreess feeder balun, SKE requested for operate at isolated mode

0.71 due to chenge over from isolated mode to sungai penuh. Request by PLN
0.94 due to ground fault at Kerisik Tuo Substation
0.29 due to ground fault at Kerisik Tuo Substation
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
End Time
Count Outage Duration Unit Scheduled/Unsched
Time Trip (synchron Category of Outage
Break U2 Number U2 (hours) stopped uled outage
Time)
1 1 8:53 9:04 0.18 Yes Unscheduled Transmission Line
1 2 2:45 3:34 0.82 Yes Unscheduled Transmission Line
1 3 6:45 6:56 0.18 Yes Unscheduled Transmission Line
1 4 14:34 14:45 0.18 Yes Unscheduled Transmission Line
1 5 4:27 4:41 0.23 Yes Unscheduled Transmission Line
1 6 5:57 6:38 0.68 Yes Unscheduled Transmission Line
1 7 7:51 9:03 1.20 Yes Unscheduled Transmission Line
1 8 16:51 17:01 0.17 Yes Unscheduled Transmission Line
1 9 17:10 17:16 0.10 Yes Unscheduled Transmission Line
1 10 2:49 3:02 0.22 Yes Unscheduled Transmission Line
0 10 0.00 No
1 11 3:59 4:20 0.35 Yes Unscheduled Transmission Line
1 12 4:25 4:32 0.12 Yes Unscheduled Transmission Line
1 13 5:44 6:04 0.33 Yes Unscheduled Transmission Line
1 14 6:13 6:31 0.30 Yes Unscheduled Transmission Line

1 15 7:23 18:07 10.73 Yes Scheduled Transmission Line

0 15 0.00

0 15 0.00

1 16 8:11 8:26 0.25 Yes Unscheduled Transmission Line


1 17 20:23 20:27 0.07 Yes Unscheduled Transmission Line
1 18 9:59 10:16 0.28 Yes Unscheduled Transmission Line
1 19 0:00 0:10 0.17 Yes Unscheduled Transmission Line
1 20 6:13 6:27 0.23 Yes Unscheduled Transmission Line
1 21 9:17 9:34 0.28 Yes Unscheduled Transmission Line
1 22 10:03 10:15 0.20 Yes Unscheduled Transmission Line
Trash cleaning /
1 23 11:04 12:09 1.08 Yes Scheduled
headpond
0 23 0.00

1 24 0:47 1:06 0.32 Yes Unscheduled Transmission Line

1 25 8:00 8:29 0.48 Yes Unscheduled Transmission Line

1 26 10:17 10:31 0.23 Yes Unscheduled Transmission Line


1 27 9:50 10:08 0.30 Yes Unscheduled Transmission Line

0 27 0.00

1 28 10:28 10:57 0.48 Yes Unscheduled Transmission Line


1 29 14:59 15:26 0.45 Yes Unscheduled Transmission Line
0 29 0.00 No

1 30 10:12 10:24 0.20 Yes Scheduled Transmission Line

1 31 10:38 10:44 0.10 Yes Unscheduled Transmission Line


1 32 11:02 15:01 3.98 Yes Unscheduled Transmission Line
0 32 0.00
0 32 0.00
1 33 11:10 11:25 0.25 Yes Unscheduled Transmission Line
1 34 20:03 20:27 0.40 Yes Unscheduled Transmission Line
1 35 5:49 6:18 0.48 Yes Unscheduled Transmission Line
1 36 8:39 8:52 0.22 Yes Unscheduled Transmission Line
1 37 13:57 14:40 0.72 Yes Unscheduled Transmission Line
1 38 20:32 21:14 0.70 Yes Unscheduled Transmission Line
1 39 7:08 7:21 0.22 Yes Unscheduled Transmission Line
1 40 13:26 13:30 0.07 Yes Unscheduled Transmission Line

0 40 0.00 No

0 40 0.00 No
1 41 12:03 12:19 0.27 Yes Unscheduled Transmission Line

1 42 23:56 0:00 0.07 Yes Unscheduled Trash cleaning / headpond

0:00 3:50 3.83 Yes Unscheduled Trash cleaning / headpond

0 42 0.00

1 43 22:09 23:11 1.03 Yes Unscheduled Transmission Line

1 44 23:22 0:00 0.63 Yes Unscheduled Transmission Line


1 45 0:00 0:09 0.15 Yes Unscheduled Transmission Line
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
0 45 0.00
Unit 2
MW Before MW After Estimated
Affected Equipment Type of Fault
Trip Trip (Max) MWh Lost

Transmission Line GFR 2.44 3.69 0.56


Transmission Line GFR 2.95 3.75 2.74
Transmission Line OCR 3.52 3.95 0.68
Transmission Line GFR 2.7 4 0.61
Transmission Line GFR 2.53 2.9 0.63
Transmission Line GFR 2.79 2.95 1.96
Transmission Line GFR 2.48 3.68 3.70
Transmission Line GFR 2.65 2.9 0.46
Transmission Line GFR 2.7 2.8 0.28
Transmission Line GFR 2.6 2.8 0.59
0.00
Transmission Line GFR 2.43 1.51 0.69
Transmission Line OCR 1.51 2.32 0.22
Transmission Line GFR 2.46 2.24 0.78
Transmission Line GFR 2.19 2.34 0.68

Transmission Line Under Voltage 2.72 14.60

0.00

0.00

Transmission Line GFR 2.31 2.76 0.63


Transmission Line Under Voltage 2.51 2.64 0.17
Transmission Line Under Voltage 2.51 2.71 0.74
Transmission Line GFR 2.69 2.99 0.47
Transmission Line Under Voltage 3.04 3.32 0.74
Transmission Line Under Voltage 2.87 2.75 0.80
Transmission Line OCR 3.26 2.98 0.62
Trash cleaning /
Reverse Power 2.25 3.81 3.28
headpond
0.00

Transmission Line GFR 2.99 3.36 1.01

Transmission Line Under Frequency 3.33 3.02 1.53

Transmission Line Change Over 1.2 3.1 0.50


Transmission Line OCR 3.33 3.14 0.97

0.00

Transmission Line Change Over 1.42 3.56 1.20


Transmission Line OCR 3.2 3.12 1.42
0.00

Transmission Line 1.96 2.53 0.45

Transmission Line GFR 2.52 2.45 0.25


Transmission Line Over Frequency 2.44 2.21 9.26
0.00
0.00
Transmission Line GFR 2.16 2.6 0.60
Transmission Line OCR 2.88 3.42 1.26
Transmission Line GFR 3.57 3.73 1.76
Transmission Line GFR 3.08 3.41 0.70
Transmission Line GFR 2.76 3 2.06
Transmission Line Over Frequency 3.44 3.61 2.47
Transmission Line Under Voltage 3.28 3.47 0.73
Transmission Line Under Voltage 2.48 3.14 0.19

0.00

0.00
Transmission Line GFR 2.52 2.68 0.69
Trash cleaning /
3.46 0 0.12
headpond
Trash cleaning /
0 3.72 7.13
headpond
0.00

Transmission Line Under Voltage 3.72 2.82 3.38

Transmission Line GFR 2.81 0 0.89


Transmission Line GFR 0 2.75 0.21
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Explanation/Description

Due to Ground Fault Indication at Malako and SKE Incoming feeder


Due to Ground Fault Indication at Malako and SKE Incoming feeder
Due to Over Current Indication in Incoming SKE
  Due to Ground Fault Indication from Malako Feeder bring to incoming SKE realese from GH.
  GFR Indication at Feeder Malako.
Indication GFR di Balun Subtition And recloser Muara Paneh Trip
Indication GFR di Balun Subtition And recloser Muara Paneh Trip
Due to Ground Fault indication on Unit. Unknow failure from grid
Due to Ground Fault indication on Express Feeder Lubuk Gadang in Balun Substation
Due to Over Current indication in SKE incoming Cubicle.
Normal Condition
Due to Ground Fault Indication at Malako Feeder
Due to Over Current Indication at Malako Feeder
Due to Ground Fault Indication because the rubber Tree Hit on Line 20kv at malako
Due to Ground Fault Indication because the monkey hit on Line 20KV at Malako

Disconecting from Lubuk Gadang Incoming because schedule prepare Tour D Singkarak

Due to Ground Fault Indication at Malako Feeder bring to SKE Incoming.


Due to Unknown Indication
Due to Unknown Indication
Due to Ground Fault Indication at Malako Feeder
Due to Unknown Indication
Due to Unknown Indication
Due to Unknown Indication from 20KV System, and Overcurrent indication on SKE Substation.

Stop normal due total cleaning intake and head pond filter

Due to Ground Fault indication at Malako Feeder

Due to Under Frequency indication on unit because recloser of Feeder 8 Alahan Panjang is trip.

manuver from GI Sei penuh to Sistem GI Solok


Indication no view from lubuk gadang and Balun subtition,to SKE relay Over Curren

To Line job Expres lubuk gadang finish,to ske stop Isolated Mode and manuver to GI Solok sistem
Due to Unknown Indication
Normal Condition

Temperature sensor installation for 20 kv cubicle .in balun substation

Due to GFR indication And LBS Muara Labuh Trip.Unit Isolated Mode
Due to Over frequency on Unit

Due to Ground Fault Indication at Muara labuh Feeder


Due to Ground Fault Indication at SKE Incoming feeder
Due to Ground Fault Indication at Malako Feeder
Due to Ground Fault Indication at Malako Feeder
Due to Ground Fault Indication at Coupling (II) and Balun Express
Due to Loss the Transformer Jumpers at Rimbo Datar Area
Due to Under Voltage Indication in Unit, and Not Indication At Lubuk Gadang Substation
Due to Underexictation Relay in Unit

Normal Condition
Due to Ground Fault Indication at Malako Feeder

Normal Stop because the Penstock Pressure Very Low

Normal Stop because the Penstock Pressure Very Low

due to under voltage, there is collapse pole at expreess feeder balun, SKE requested for operate at isolated mode

due to ground fault at Kerisik Tuo Substation


due to ground fault at Kerisik Tuo Substation
UnitScheduled/Unscheduled
Stopped Outage
Yes Scheduled
No Unscheduled
Category Outages Affected Equipment Type of Fault

Transmission Line Transmission Line GFR


Trash cleaning / headpond Trash cleaning / headpond OCR
Cofferdam Bearings Under Voltage
Plant Unscheduled Maintenance Generator Over Voltage
Plant Scheduled Maintenance Inlet Valve Under Frequency
Sediment Cleaning / sandtrap Transformer Over Frequency
Turbine Change Over
weir Reverse Power
Speed Governor Overhaul
Tension Regulation/Exictation Others
Cooling System
LV Breakers
HV Breakers

SCADA
Penstock Pressure Very Low

Sediment Cleaning / sandtrap