Cycle 1 2 3 4 5 6 7 8
Green 01:19.03 01:21.12 01:20.15 01:20.19 01:20.32 01:44.51 01:20.00 01:20.02
Time
(Green-
Amber)
Cycle 01:22.14 01:24.44 01:24.22 01:23.45 01:24.28 01:49.12 01:25.07 01:24.15
Time
(Green-
Amber-
Red)
Cycle 9 10 11 12 13 14 15
Green 01:07.30 00:46.23 00:53.32 00:47.51 01:20.15 01:20.50 01:20.17
Time
(Green-
Amber)
Cycle 01:11.14 00:49.24 00:57.15 00:51.18 01:33.39 01:24.31 01:23.53
Time
(Green-
Amber-
Red)
Cycle T4 N Tn Average Saturati Start Up Effectiv Lane
(s) (s) Headwa on Flow Delay e Green Capacit
y (veh/hr) (s) (s) y
(s)
1 00:01.4 18 00:12.1 0.77 4675.32 -1.68 80.71 2311.98
0 7
2 00:02.0 21 00:03.1 0.06 60000.0 1.77 60.35 42882.5
1 0 0 2
3 00:03.1 10 00:16.1 2.18 1651.38 -5.62 85.77 1681.77
0 7
4 00:01.3 13 00:12.1 1.20 3000.00 -3.42 83.61 3005.75
8 8
5 00:02.2 9 00:05.3 0.62 5806.45 -0.26 80.58 5551.54
2 3
6 00:10.0 10 00:15.2 0.87 4137.93 6.60 97.91 3715.11
8 9
7 00:02.1 20 00:14.2 0.76 4736.84 -0.92 80.92 4505.76
2 8
8 00:01.3 11 00:04.4 0.44 8181.82 -0.40 80.42 7819.16
6 7
9 00:03.3 9 00:04.2 0.17 21176.4 2.69 64.61 19232.6
7 0 7 6
10 00:03.2 8 00:20.2 4.25 847.06 -13.74 59.97 1031.64
6 6
11 00:02.5 8 00:18.3 3.97 906.80 -13.36 66.68 1058.01
2 9
12 00:01.5 9 00:10.3 1.75 2057.14 -5.41 52.92 2127.08
9 2
13 00:02.0 13 00:30.1 3.13 1150.16 -10.51 90.66 1116.51
1 8
14 00:04.4 21 00:09.3 0.29 12413.7 3.29 77.21 11368.3
5 1 9 9
15 00:03.1 17 00:12.5 0.72 5000.00 0.31 79.86 4780.32
9 2
Averag 13 1.41 9049.41 -2.71 76.15 7479.21
e
Sample Calculation:
1. Average Headway
Average Headway,h = (Tn-T4)/ (N-4)
Average Headway = (21.34-01.40)/ (17-4)
= 1.53 s
2. Saturation Flow
Saturation Flow, S = 3600/ Average Headway
Saturation Flow = 3600/ 1.53
= 2352.94 veh/hr
3. Start-up Delay
Start-up Delay = T4-4 (Average Headway)
Start-up Delay = 01.40-4(1.53)
= -4.72 s
4. Effective Green Capacity
Effective Green = Green Time- Startup Delay + Clerance Interval
Effective Green = 79.03 - (-1.68)
= 80.71 s
5. Lane Capacity
Lane Capacity = (Effective Green Capacity/ Cycle Length) x Saturation Flow
Lane Capacity = (80.71/82.14) x 2352.94
= 2311.98