Professional Documents
Culture Documents
01 TRAIN EXO04 - CompareBoM
01 TRAIN EXO04 - CompareBoM
1. DESCRIPTION
Process:
Maintenance processing
Sub-process:
Compare Bills of Material and identify where a material is used (“where used” list)
2. OBJECTIVES
- Compare Bills of Material and identify where a material is used (“where used” list)
3. SCENARIO
Compare Bills of Material and identify where a material is used (“where used”
list)
Two equipments have been installed in plant XXX to optimise the costs,
compare the BOMs of these two assemblies.
Search for the “where used” list of one of the materials used in both BOMs.
Exercise 2: “where used” list of one of the materials common to both BOMs
Exercise 2: “where used” list of one of the materials common to both BOMs
1. In which BOM (give an example) is the used quantity equal to 2 pieces?
5. EXERCISE SOLUTION
Exercise 2: “where used” list of one of the materials common to both BOMs
1. In which BOM (give an example) is the used quantity equal to 2 pieces?