Table of Contents
- Face Sheet 1
- Table of Contents 2
1 Scope 3
2 Definitions 3
4 Drafting Requirements 12
5 CADD Standard 14
9 Applicable Documents 29
1 Scope
This standard establishes a uniform means of Computer Aided Design & Drafting (CADD)
standard used, in producing new and modifying existing SEC project engineering drawings
soft/hard copies and submitted by the contractor.
2 Definitions
2.1 Abbreviations and Letter Symbols: These shall be used where physical space prevents
complete spellings as in title blocks and in small drawings. Abbreviations shall only be
used when absolutely necessary and never used when the meaning is to be clear. SEC
standard Abbreviations and Letter Symbols shall be used to maintain consistency within
the SEC documents.
2.2 As-Built Drawing: An Engineering Drawing that has been Prepared/revised to reflect
actual field conditions after the completion of construction. Additions or changes to a
drawing resulting from facility modification shall also be verified as As-Built drawings.
2.4 CADD Standard Manual: The tool that provides a unique method to apply the SEC
CADD ( SECS-Auto) standards manual.
2.8 DCC (Drawing Completion Certificate) A document bearing the names and signatures
of persons authorized, per this procedure, to certify that an Engineering Drawing meets
the applicable SEC Engineering, Design, Drafting and CADD Standards. The DCC
fulfills the approval/certification requirement in lieu of signing the drawing title block.
2.9 DCC Number: A unique number that identifies a specific DCC for the purpose of
cross-referencing the certified DCC and the Engineering Drawings covered by that DCC
and as a log number for the permanent archival of the DCC (Appendix B).
SEEDS-II-00 Date of Issue 2004-10-10 Page No. 3 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)
Transmission Standards & Specifications Department
Transmission Document Management Division
2.10 Design Agency: Refers to any SEC organization or Contractor charged by SEC with
the responsibility of developing and/or modifying of SEC Engineering
Drawings/Documents.
2.11 Drawing Name: File system name of the Engineering Drawing in a standard SEC
format. The name format is used when transferring drawings to or from EDMS
(TSSD/TDMD).
2.13 E&DD (Engineering and Design Division) of E&DD (Engineering and Design
department) refer to the organization that handles engineering, design and procurement
of transmission projects
2.14 EDMS (Enterprises Drawing Management System) Refers to that set of software
installed and well-established application on the SEC-CADD System and SEC-Intranet
which controls the creation, revision, workflow and archival of As-built
Drawings/Documents/Manuals and Specifications/Standards etc. And provides tools to
manage above effectively in a secured and friendly environment.
2.16 Operation & Maintenance Instruction Manuals: The operation and maintenance
instructions manuals should include complete procedure for all equipment installation,
testing, operation, maintenance, repair and overhauling etc. showing all the stages of
work.
2.18 Proponent: Department of SEC organization charged with the overall operation,
maintenance, safety and protection of a SEC facility, equipment or property.
2.21 Standard Drawings: Specially prepared engineering drawings that have been pre-
approved by responsible SEC organization for mandatory application in the design of
SEC facilities when the information they contain applies and is appropriate during
2.23 Title Block: The reserved portion of a drawing containing information about the
drawing projects of Substation/Transmission and Facilities.
2.24 User: The SEC organization, which creates, controls and/or contracts engineering,
procurement and/or construction work to outside contractors is the User. If there is no
separate User organization, the Proponent is the User.
2.25 Vendor drawing: Any document developed by a manufacturer that supports the
technical requirements of material or equipment and received as part of a purchase order
and Turnkey projects.
These are considered to be all the drawings prepared for a specific Turnkey Project whether
they are for the design, construction or for procurement.
3.1.1 All Project Engineering drawings sheets from size A to E will be printed on
matte plastic mylars, 0.08mm (0.003 inch) thick, quality of which shall match
samples obtained from TSSD/TDMD (electronic Files of Boarders will be
provided by SEC).
3.1.2 All Project Engineering drawings shall be prepared in capital letters in English
language with 3x2.5mm letters on A and B size sheets and 2.5x2mm letters on
C, D and E size sheets.
3.1.5 SEC color table & boarder shall be received from TSSD/TDMD with SEC
standard setting.
3.1.6 All Project Engineering drawings save setting shall be as per SEC standard.
An estimated block of drawings numbers for any project (as agreed on by the
Project Manager or Project Engineer and Contractor) shall be obtained by
submitting SEC form no. 15367 (Appendix-K) to TSSD/TDMD, Room 1-
200West, Saudi Electricity Company, Eastern Area Administration Office,
Dammam or SEC Operating Area Offices.
3.3.1 The Drawing Control Sheet shall be prepared listing details of all As-Built
Engineering Drawings required for a particular project, listed by index and
drawing numbers in sequence.
SEEDS-II-00 Date of Issue 2004-10-10 Page No. 6 of 29
SEC ENGINEERING DRAWINGS STANDARD (SEEDS-II)
Transmission Standards & Specifications Department
Transmission Document Management Division
3.3.2 The Drawing Control Sheet shall be prepared and submitted in Excel format.
SEC form no. 16758 (Appendix-H)
3.3.3 The first drawing number from the allocated block of drawing numbers shall be
assigned to the Drawing Control Sheet (If only one location).
3.3.4 More then one locations in one project allocated block of drawing numbers can
be break-up as per locations and then assigned the first drawing number from the
break-up block.
3.3.5 The Drawing Control sheet Number shall be mentioned on all drawings sheets in
the reference drawings area.
3.3.6 Drawing Control Sheet shall be prepared separately for each location.
3.3.7 Documents and Manuals required for a particular project shall be mentioned in
the last sheet.
All Project Engineering drawing shall consist of the following elements (in the order
they appear):
JO NO. INDEX PLANT NO. DRAWING NO. SHEET NO. REV. NO.
1234567 P DA123 EA-123456 04 OF 05 00
Second letter following prefix letter indicates the sheet size, as follows:
No sheet sizes differing from these listed shall be used on any Turnkey Project
under any circumstances.
Example-I E A - 123456
A six (6) digit identifying a drawing number shall be assigned from the allocated
block of numbers.
3.4.6.2 Plant numbers are two alpha and three numeric characters in length.
Exception: More than one plant number may be allowed under certain
circumstances.
Example: When the drawing contains interrelated information for more than
one plant: continuation of transmission lines, interface points,
jumpers, tie-in points etc and all such plants fall under the
responsibility of the same operating organization.
3.4.6.4 Drawings requiring more than one Plant Number shall be approved by
TSSD/TDMD.
3.4.6.5 When an Engineering Drawing is typical for more than one plant, then
a separate drawing shall be produced for each plant (Substations,
Transmission lines…..etc.) with other new drawing number.
3.4.6.6 While changing the plant number of an existing drawing, revise the
drawings that involve changing the plant number and plant description
in the title block and state in the revision description CHANGED
PLANT NO. FROM XXXXX TO XXXXX along with As-built
revision, if any.
3.4.7.3 The Index implies, but does not determine, a group of associated types.
Details in the Title block of the drawings should be “Tag Values” instead of plain text.
And in the drawing wherever there is a text, which denotes reference of another
drawing like “Refer Drawing No.” should be used “Tag Values” instead of plain text.
(Appendix-D).
Reference drawings Legend and Notes shall be placed in the area provided above the
title block. Reference drawings listed shall be the necessary minimum engineering
drawings only. Do not include Plant or Index reference of the referred drawings nor
Standard Drawings. (Appendix-D)
3.7 Scale
3.7.1 Graphic Scale, a line scale reference shall be included on both new and existing
drawing just over the title block on scale drawings. The line scale shall be
divided into units of length as determined by the scale of the drawing. Refer to
SECS-Auto for a list of graphic scales symbols.
3.7.2 The SEED files and attached borders are created at 1:1 scale. Do not change the
seed file scale.
3.7.4 For scaled drawings, use the auto-dimensioning command where applicable and
don’t drop it.
3.7.5 Do not scale down drawings, instead, rearrange the drawing or split the drawing
into two drawings.
3.7.6 The setting of all SEC border files are set at (Global Origin) GO=0,0. This GO
is defined at the left bottom corner of the border. No changes are allowed in the
GO setting for all drawing types including scaled drawings.
3.7.7 General drawings shall be made to a scale compatible with any anticipated
reduction of the drawing such that legibility is maintained.
3.7.8 The scale is the ratio of the linear dimension of an element of an object as
represented in the original drawing, to the real linear dimension of the same
element of the object itself.
3.7.9 Drawings may be produced to various scales, dependent upon the nature of the
drawing concerned. An enlargement scale is where the ratio is greater than 1 : 1.
Full size is indicated by 1 : 1 enlargement by X : 1 and reduction by 1 : X
Where it is necessary to use more than one scale on a drawing, each scale shall
be clearly identified.
3.7.10 he scale chosen for a drawing depends on the size of the drawing sheet and the
size of the object to be depicted. The scale shall be large enough to permit easy
and clear interpretation. Details that are too small for clear dimensioning in the
main view(s) shall be shown in a separate view to a larger scale.
4 Drafting Requirements
4.1 All existing drawings (raster files) shall be revised and redrawn in an electronic format
utilizing Microstation (J or V8 or latest version) ONLY, if required for new project
with higher revision.
4.2 Existing Drawing Control Sheet shall be retyped and submitted in Excel format. SEC
form no. 16758 (Appendix-H) if required for new project With the next higher revision.
4.3 Existing drawings shall be utilized for any modification of a facility. Creation of new
drawings to indicate a change in an existing facility will not be accepted. If, however,
this is unavoidable for some reason such as being too crowded or major revision
changes, then a new sheet shall be added to the existing drawing.
4.4 New drawings that are created as a continuation of an existing design are considered as
continuation drawings of that design bearing the next sequential (numeric) sheet number
of that drawing set.
4.5 When revising an existing drawing, the incorrect information on the title block including
substation/transmission/facilities description and drawing type shall be corrected or
completed.
4.6 Revision diamonds 01 shall be placed in the drawing area in such a way as to make it
possible to locate revisions quickly.
4.7 Old revision diamonds, clouds and related notes shall be removed from the drawing.
4.8 If a drawing is completely redrawn, the words Completely redrawn and incorporated
revisions (indicate the revision number incorporated) shall be entered in the description
column in the revision area above the title block.
4.9 When revising some pages of bulk drawings that have a single electronic file of the
complete set such as scope of work, the revision block of only first sheet shall indicate
the changes and revision number change. Complete set shall be submitted.
4.10 The standard north arrow symbol shall be drawn in a prominent place in the upper left
region of the drawing for all plan view drawings. It shall be drawn pointing upward, or
if unavoidable, pointing left, but shall never point right or down.
4.11 Information covered by Standard Drawings, elaborated details, unnecessary views, and
repetitions, which add no value to the drawings, shall be omitted.
4.12 non-essential items from design, which add nothing to the accuracy, completeness and
clarity of the drawing, shall be eliminated.
4.13 Any shading element is not allowed on drawings. Hatching may be used as an
alternative to shading. (Minimum 2mm distance is required between hatching lines).
4.14 Revisions on drawings may be encircled or clouded on the prescribed layer for easy
identification of the revised portion during certification and review cycle. However, for
100% As-Built drawings, all revision encirclement or clouding shall be either removed
or the level turned off prior to submitting the drawings to TSSD/TDMD.
4.15 The letter O and I shall not be used for identification symbols on the drawings, as they
are often confused with Zero and One.
4.17 Contractor should not use their company’s LOGO in the SEC Engineering drawings and
in drawing control sheet. They should use the reserve place in the title block.
(Appendix-D)
4.18 Contractor can be a place manufacturer drawing number or vendor drawing number in
left side lower corner. (Appendix-D)
5. CADD Standards
5.1 General
SEC CADD standards and SECS-Auto are custom programs based on MicroStation and
were developed to assure consistency between drawings. SECS-Auto contains
collections of seed files, cell libraries, border files, levels, and line weights, font, and
line codes, MDL routines.
5.2 Requirements
To ensure maximum productivity from the SEC CADD systems, the CADD standards
parameters shall be followed.
5.2.1 All drawing files shall be created from a SEC product seed file.
5.2.2 Do not override or change the product seed file setups. Do not change the
working units.
5.2.3 SEC forms (borders) shall be referenced only. Do not include forms as part of
the design file. A border shall remain with the CADD drawing.
5.2.4 Do not drop or change Standard Cells. TSSD/TDMD prior approval is required
for any additional cell.
5.2.5 All elements in schematic type drawings (non-scale) shall be placed with
grid/unit lock set to ON position.
5.2.6 File design to display the drawing such as that view 1 (maximized) showing the
title block with data fields turned OFF position.
5.2.7 Always attach the latest border on Auto-SECS whenever revising or creating
new drawings.
All Engineering Drawings developed (if new) and/or revised (if existing) by SEC organizations,
or by other Contractors/Design agency for SEC, shall be developed or revised by means of SEC
approved electronic software and formats as specified in the SEC CADD Standards Manual.
The final acceptance certificate will not be issued until the TSSD/TDMD (EDMS
Administrator) must certifies all final soft copy submittal for suitability of drawings/documents
files format as compatible and acceptable for uploading in EDMS.
6.4 Approval/Certification
6.4.1 All SEC Engineering Drawings shall be approved, certified and dated as
required, herein, by means of completing a Drawing Completion Certificate
(DCC) and the Approval/Certification (Appendix-E). Uncertified drawings will
not be accepted for inclusion into the corporate drawing system.
6.4.2 One single project has one DCC. Engineering Discipline(s) (e.g. Electrical,
Instrumentation, Communication, Piping, Mechanical, Structural, Architectural,
Civil, etc.) Have one DCC and submittal. No more than one project shall be
covered by one DCC.
6.4.3 A Design Agency and the SEC responsible organizations shall approve/certify a
DCC as follows:
6.4.3.4 The full names of all the signatories, and dates, shall appear where
applicable in the title block of each drawing, as required, as well as
on the DCC. Drawn By and Checked By shall also be completed in
each drawing title block.
6.4.3.5 For revised drawings, the initials of the signatories shall appear where
applicable in the revision block of the drawing.
6.4.4 At the signing of the DCC and after affixing the Revision Approval/Certification
information, each relevant drawing electronic file shall be managed to prevent
subsequent modification until each of these files is transferred into a CD for final
submittal.
6.4.5 Approval levels for design changes made to previously certified Engineering
Drawings are the same as for new drawings.
6.4.6 Each revision shall be individually approved and certified. Revisions to Key
drawings shall be reviewed and initialed by the Construction Agency, Operations
and Others (if initially involved).
6.4.7 The signatures in the SEC Review for Drawings block of the DCC are
indicative of the reviewer’s familiarity with the contents of the drawings and
agreement with the design in principle. The signatures do not relieve the Design
Agency of its full responsibility for compliance with all relevant project scope,
standards, procedures, specifications, codes, contract documents, etc.
6.4.8 After the signing of the DCC, each drawing shall indicate that it is covered by
the DCC for approval/certification requirements by completing the
Approval/Certification information. The Design Agency shall include in the
block the following:
6.4.8.1 The Drawing Completion Certificate number assigned per Item 6.7.
6.4.8.2 The revision number of the drawing being certified. New drawings
issued for construction shall bear the revision number 00.
6.5 Submittal
All SEC new, revised, canceled and canceled/superseded Engineering Drawings shall be
submitted to the corporate engineering drawing management system (EDMS) for
permanent retention and management.
6.5.1 Deliverables
EA123456.0001.0000
Excel: EE123456X.0001.0000
Word: EE123456W.0001.0000
Acrobat: EE123456P.0001.0000
6.5.4 Media
6.5.4.3 Media shall be enclosed in suitable Manila envelopes. The Form No.
15057 (Appendix-F). shall be attached to the outside of the envelope.
6.5.5 The Interactive Submittal will remain available as an alternative to the submittal
described herein. (For Interactive Submittal deliverables, see Item 6.5.1.2).
6.5.7.3 The SEC Project Manager or a delegate shall sign the Engineering
Drawing Submittal Form No. 15057 (Appendix-F).
6.5.7.8 When the drawings are accepted for inclusion into the EDMS,
TSSD/TDMD shall confirm such by forwarding a signed copy of the
DCC to the SEC person responsible for signing the initial submittal.
Until such confirmation is received, the TSSD/TDMD responsible for
the development of the drawings shall maintain a temporary backup
of all the submitted drawings. When confirmed as accepted, the
backups shall be deleted unless deemed justified to maintain longer.
6.5.7.9 Any drawing found not in compliance to the SEC CADD Standards
Manual and SEEDS-II will be returned to the SEC Project manager
or Contractor/Design Agency for correction. After correction, the
drawings shall be re-submitted under a new drawing submittal.
6.6.2 When an existing drawing is requested for revision, then the requester shall
allow for the Approval/Certification of the new revision by removing the
previous Approval/Certification information When possible, this task may be
carried out by TSSD/TDMD prior to releasing the drawing to the requester.
Example
E – 123456
All As built Drawings are to be sent to TDMD to safe keep and archive in the
EDMS system.
7.1.2 Purchase of all required drawings sheets (Size A to E) per samples obtained
from TSSD/TDMD.
7.1.3 Provide correction work of any drawings required by CTAP or DTAP and
TSSD/TDMD.
7.1.5 Make sure that only the latest SEC Engineering Drawing borders used for new as
well as for revised drawings.
7.1.6 Five (5) sets of As-Built engineering drawings, manuals and other documents
related with project shall be submitted to CTAP or DTAP for SEC record.
7.1.8 Contractor should produce and submit the Mylar prints from the final as-built
drawings CD, which is provided by the TDMD/EDCU.
7.2.1 SEC Project Manager/Engineer is the authority to certify for filing final project
drawings and submits to TSSD/TDMD
7.2.3 In case of any misassignment of drawing numbers, poor quality drawings, the
Project Manager/Engineer will inform the Contractor to correct all documents.
7.2.4 Upon the project construction completion, the Project Manager/ Engineer shall
assure that good quality set of originals of as-built Engineering drawings are sent
to TSSD/TDMD before signing the Technical Completion Certificate (TCC). All
Vendor’s operations/maintenance manuals, performance curves, etc. and other
7.2.5 SEC Project Manager/Engineer shall request the contractor to pay the amount for
microfilming the project drawings to treasury department.
7.2.6 Verify that the submittal package is complete and that it has been prepared in
accordance with the submittal requirements as per item 6.5
b) Archive all original submittal documents and electronic files for future
reference.
7.4.2 Prepare the engineering drawings using the latest version of SEC CADD
Standards Manual or other as provided by the Transmission Document
Management Division (TDMD).
7.4.3 Prepare and submit all engineering drawings in accordance with SEC CADD
Standards Manual and chapter-3.
7.4.4 Ensure to fill the box beneath the title block to indicate the file format type i.e.
VECTOR, EXCEL or WORD or PDF.
7.4.5 Ensure that every new drawing is prepared using the latest version of the border
from the CADD Standards Manual.
7.4.6 Ensure that each existing drawing is revised/redrawn electronically and carried
the higher version of the existing border that includes Approval/Certification
Information While revising an existing drawing the old border can be replaced
to the latest version.
7.4.7 Request engineering drawing numbers and other engineering data as described in
SEC CADD Standards Manual to use with project detail design drawings.
7.4.8 Request existing As-built drawings and revise these per requirement of the
project.
7.4.9 Return all unused data and drawing numbers to SEC at the completion of the
project.
Any SEC Engineering Drawing or Vendor drawing and/or electronic database(s) bearing
information related to a SEC facility, equipment or property disseminated in any format
(including non-SEC formats) and media including, and not limited to, paper; mylar;
microfilm; microfiche; sepia; photographs; electronic files on magnetic tapes, cartridges,
diskettes, spools, hard disks, optical disks, compact disks, or other electronic storage
devices, produced by SEC, or by an organization under contract to SEC. Engineering
Drawing Data, which includes information that could lead to making a SEC facility,
equipment or property vulnerable to sabotage and/or intentional damage, shall be
classified as CONFIDENTIAL or RESTRICTED per GI-XXXX, Classification of
Sensitive Documents. Examples are key and emergency drawings, as specified by the
Proponent, Security Fences and Shelters drawings of Plant No. W95 Herein after, all
Engineering and Vendor Drawings and electronic databases covered by this definition
are referred to in 8.2.1 shall be considered the sole property of SEC.
8.1 Instructions
8.1.1.2 The User shall ensure that only the needed amount of original and
duplicate original Engineering Drawing Data, to efficiently perform the
specified work, shall be transferred out of SEC to the Contractor.
8.1.1.3 The User and the Contractor shall restrict the number of copies,
duplicate reproducible, and reference prints made of Engineering
Drawing Data on the basis of need-to-know only. Shredding beyond
recognition immediately when no longer required shall destroy all such
documents.
8.1.1.4 The Contractor is responsible for the safety, security and confidentiality
of all Engineering Drawing Data the Contractor generates in the course
of performing work under a contract with SEC. This includes all data
generated, including the manner in which such Engineering Drawing
Data are put into hard copy form such as printing and / or plotting of
drawings. Work will be done in the same secured environment as
where the computer workstations are located.
8.1.2 Transmittals
during the time such Engineering Data is outside the secured area, it
shall be kept in locked cabinets during non-working hours. All visitors
shall be escorted.
8.1.3.2 User shall designate a custodian to receive the original and duplicate
original drawings and to assume responsibility for their safety, security
and confidentiality. The custodian shall be responsible for limiting and
logging the access to these original and duplicate original drawings on
a need-to-know basis and advising other personnel on the security
procedures. This custodian and designated alternate(s) shall be
responsible for tracking all Engineering Drawings/Documents Data
requested by, or in the custody of, the Contractor.
8.1.3.5 The Contractor shall obtain the User's written permission prior to
transferring Engineering Drawings/Documents Data to any third party.
The Contractor shall ensure that the third party agrees in writing to
comply with this procedure.
8.1.3.6 The Contractor shall return all originals, and duplicate originals of,
Engineering Drawings/Documents Data to the User immediately, upon
completion of work or when they are no longer needed.
8.1.5.1 Daily and weekly back-ups are required for all electronic Engineering
Drawings/Documents Data files. Weekly back-up files shall be stored
in off-site fireproof safe(s) approved by the User and shall be kept for
the duration of the job until three (3) months after the submittal of all
the Engineering Drawings/Documents Data to the User after which all
back-ups shall be destroyed by means of mechanical shredding
equipment when approved by the User.
8.2 Responsibilities
8.2.1 Proponents
8.2.2 Users
8.2.2.1 The Users shall review and approve of the Contractors' security
procedures to ensure they meet the minimum requirements of this
procedure prior to releasing any Engineering Drawings/Documents
Data to the Contractors.
8.2.2.5 The Users shall review the Contractors' utilization of the Engineering
Drawings/Documents Data and drawing numbers, in the Contractors'
custody, at each project review phase and perform final counts prior to
signing each Final Release Receipt Agreement (FRRA).
8.3 Non-Compliance
In the event of Mishandling by the Contractor, or his personnel, of any SEC Engineering
Drawings/Documents Data, in the custody of the Contractor, the User, jointly with the
Proponent, shall investigate the matter and bring their findings to the attention of the
SEC contract proponent who may take appropriate action.
9 Applicable Documents
TSSD/TDMD Acknowledgement
Acknowledge Receipt Appendix-E (Item-6.5.7.6)
Assign Control Number Appendix-E (Item-6.5.7.6)
TSSD/TDMD Approval/Verification
Review for Compliance
Approval/Certification (Item-6.4)
Fill Approval/Certification Information in all Drawings (Item-6.3)
Signature on Appendix-E (Item-6.4.1)
Prepare the Electronic Drawing File Appendix-G (Item-6.5.2)
Signnature on DCC Appendix-B (Item-6.4.3)
DCC No.
This is to certify that the drawing (New and Revised) listed in the
following pages, carried out under the Job Number indicated in this Contract No.
certificate (and on the drawings), hereby, have been prepared in
accordance with the applicable SEC Engineering, Design, Drafting Job Order No.
and cadd Standards, Procedures and Practices specific to the project Dwg. Control Sheet No.
described below per itsScope of Work excep what has (have) been
waived to satisfy all the Engineering Drawing approval/certification Discipline
requiements as set SEEDS-II, Chapter-6.
TSSD/TDMD Control No.
Project Title
Location (s)
Contractor Name
CERTIFICATION
Design Agency Certification
Discipline Engineer
Name Signature Date
Project Engineer
Name Signature Date
Certified by (SEC)
(Project Manager/Engineering) Name Signature Date
SEC Review for Key Drawings
Operating Department
(Key Drawings) Name Signature Date
Engineering Department
(Key Drawings) Name Signature Date
Others
Department Name Signature Date
NOTES:
1 TDMD shall attach a hardcopy print of the Electronic Drawing official count generated per 6.5.7.5
2 Refer chaprer-6 for Certification and Submittal of Drawings Electronically.
3 Attach copies of all TSSD/TDMD approved waiver requests.
Verified By
Name Signature Date
APPENDIX-C
FILES FORMAT FOR NEW ELECTRONIC اﻟﺸﺮآﺔ اﻟﺴﻌﻮدﻳﺔ ﻟﻠﻜﻬﺮﺑﺎء
DRAWINGS/DOCUMENTS Saudi Electricity Company
SEC-xxxxx (2004/10)
Drawing
Drawing/Document Type File Format Requirements
Size
Notes:-
1. Drawings format and size shall be as per the table above.
2. All Project Documents shall be submitted for archival into SEC corporate drawing system. The Project
Documents include, but not necessarily limited to, the following: Material take-off sheets, Construction
Specifications, Operating Specifications/Instructions, Painting Specifications, Inspection Records, Equipment
Lists, Construction Schedules, Construction Bar Charts, Calculations Sheets, Meter Reading Tables,
Reports, Studies, Charts, Operation & Maintenance Manuals, Equipment Manuals, Design Criteria, Sketches,
Requisitions, Quotations, Spare Part Lists, Performance/Calibration Curves, Purchase Orders, Installation
Witness Reports, Name Plates, etc.
...\FORMS\APPENDIX-D.00.dgn 10/12/2004 01:20:13 PM
...\FORMS\APPENDIX-E.00.dgn 10/12/2004 01:32:52 PM
APPENDIX-F
اﻟﺸﺮآﺔ اﻟﺴﻌﻮدﻳﺔ ﻟﻠﻜﻬﺮﺑﺎء
ENGINEERING DRAWING SUBMITTAL Saudi Electricity Company
SEC-15057 (2004/10)
Project Title
Others Cancelled
SUBMITTED BY CONSULTANT/CONTRACTOR
Date
Signature Date
RECEIVED BY NOTES
Name
Signature Date
APPENDIX-G
DETAIL-2
INDEX - P
INDEX - Q
PROJECT COMPLETION DATE PLANT NO. INDEX DRAWING NO. SHEET NO. REV. NO.
AS BUILT
COMPANY NAME 2002-04-10 DA123 KE-123456
BY X 01 OF 01 00
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
DMS EXCEL
APPENDIX-J
اﻟﺸﺮآﺔ اﻟﺴﻌﻮدﻳﺔ ﻟﻠﻜﻬﺮﺑﺎء
ORIGINAL DRAWINGS / DIGITAL FILES REQUEST Saudi Electricity Company
SEC-15345 (2004/10)
PROJECT MANAGER / ENGINEER BADGE NO. TELEPHONE NO. TSSD/TDMD CONTROL NO.
PROJECT TITLE
PROJECT
DESCRIPTION
CONTRACT NO. JOB ORDER NO.
CONSULTANT / CONTRACTOR
TO:- FROM:-
DIVISION MANAGER PROJECT MANAGER / ENGINEER
TSSD / TRANSMISSION DOCUMENT MANAGEMENT DIVISION NAME
UPON PROJECT COMPLETION ALL CERTIFIED ORIGINAL DRAWING MUST BE TRANSMITTED WITH DRAWING
IMPORTANT TRANSMITTAL FORM NUMBER 15057 TO TSSD / TRANSMISSION DOCUMENT MANAGEMENT DIVISION
APPENDIX-L ALL DISCIPLINES SYMBOLOGY TABLE-1
LEVEL COLOR WEIGHT DISCIPLINE LEVEL COLOR WEIGHT DISCIPLINE
1 1 2 RESERVED FOR USER 33 33 2 PLUMBING LINES
2 2 2 RESERVED FOR USER 34 34 2 PLUMBING SYMBOLS
3 3 2 RESERVED FOR USER 35 35 1 PLUMBING TEXT
4 4 0 CENTER LINES 36 36 2 SURVEY LINES
5 0 1 DIMENSIONS, GEN. TEXT/CALL-OUT & LEADER LINE 37 37 2 SURVEY SYMBOLS
6 6 2 ARCHITECTURAL LINES 38 38 1 SURVEY TEXT
7 7 2 ARCHITECTURAL SYMBOLS 39 39 2 TELECOMMUNICATION LINES
8 8 1 ARCHITECTURAL TEXT 40 40 2 TELECOMMUNICATION SYMBOLS
9 9 2 CIVIL LINES 41 41 1 TELECOMMUNICATION TEXT
10 10 2 CIVIL SYMBOLS 42 42 2 RESERVED FOR USER
11 11 1 CIVIL TEXT (FONT-5) 43 43 2 RESERVED FOR USER
12 12 2 COMPRESSED AIR LINES 44 44 1 RESERVED FOR USER
13 13 2 COMPRESSED AIR SYMBOLS 45 45 2 RESERVED FOR USER
14 14 1 COMPRESSED AIR TEXT 46 46 2 RESERVED FOR USER
15 15 2 ELECTRICAL ENGINEERING LINES 47 47 1 RESERVED FOR USER
16 16 2 ELECTRICAL ENGINEERING SYMBOLS 48 0 3 TITLE
17 17 1 ELECTRICAL ENGINEERING TEXT 49 5 4 DRAWING NUMBER
18 18 2 FIRE PROTECTION LINES 50 3 0 PLOTTING FENCE POINTS (REFERENCE FILE)
19 19 2 FIRE PROTECTION SYMBOLS 51 51 1 REVISION DIAMOND WITH TEXT
20 20 1 FIRE PROTECTION TEXT 52 0 1 NOTES
21 21 2 HVAC LINES 53 0 1 LEGEND
22 22 2 HVAC SYMBOLS 54 14 1 OUTSIDE BORDER REVISION BLOCK (REF. FILE)
23 23 1 HVAC TEXT 55 55 2 CLOUDS
24 24 2 IRRIGATION LINES 56 56 1 AS BUILTS BLOCK (REFERENCE FILE)
25 25 2 IRRIGATION SYMBOLS 57 57 1 REFERENCE DRAWINGS BLOCK (REFERENCE FILE)
26 26 1 IRRIGATION TEXT 58 0 1 INSIDE BORDER REVISION BLOCK (REF. FILE)
27 27 2 MISCELLANEOUS LINES 59 1 2 TITLE BLOCK (REFERENCE FILE)
28 28 2 MISCELLANEOUS SYMBOLS 60 0 3 INSIDE BORDER LINE UPPER (REFERENCE FILE)
29 29 1 MISCELLANEOUS TEXT 61 0 3 INSIDE BORDER LINE LOWER (REFERENCE FILE)
30 30 2 PIPING LINES 62 0 5 OUTSIDE BORDER LINE (REFERENCE FILE)
31 31 2 PIPING SYMBOLS 63 63 0 SEC-ERB NAME ARRABIC & ENGLISH (REF FILE)
32 32 1 PIPING TEXT
APPENDIX-M ELECTRICAL ONE LINE DIAGRAM SYMBOLOGY TABLE-2
LEVEL COLOR WEIGHT DISCIPLINE LEVEL COLOR WEIGHT DISCIPLINE
1 1 2 POWER CONVERTERS & GENERATORS 33 142 1 127V BUS
2 2 2 TRANSFORMERS 34 142 1 125V BUS
3 3 2 MACHINES 35 142 1 120V BUS
4 4 2 FIRE EQUIPMENT 36 142 1 110V BUS
5 0 1 GENERAL TEXT/CALL-OUT & TEXT LEADER LINE 37 142 1 48V BUS
6 6 2 OPERATING DEVICES 38 142 1 24V BUS
7 7 2 EARTH & FRAME CONNECTION EQUIPMENTIALITY 39 142 1 12V BUS
8 8 2 MISCELLANEOUS SYMBOLS 40 40 1 EOD PLACE TEXT
9 9 2 RESISTORS, CAPACITORS & INDICATORS 41 135 3 69kV + 66kV LINES
10 10 2 WINDINGS INSTRUMENTS 42 136 4 115kV + 132kV LINES
11 11 2 PRIMARY CELL & ACCUMULATIONS 43 137 5 230kV LINES
12 12 2 SWITCHGEARS 44 138 6 380kV LINES
13 13 2 MOTOR STARTERS 45 139 2 13.8kV 11kV LINES
14 14 2 CONTROL GEAR 46 140 1 2.4kV TO 4.6kV LINES
15 15 2 FUSES 47 142 1 12V TO 480V LINES
16 16 2 GAPS & ARRESTORS 48 0 3 TITLE
17 17 2 METERING DEVICES 49 5 4 DRAWING NUMBER
18 18 2 COMMUNICATIONS SYSTEMS 50 3 0 PLOTTING FENCE POINTS (REFERENCE FILE)
19 19 2 LAMPS & SIGNALING DEVICES 51 51 1 REVISION DIAMOND WITH TEXT
20 134 1 34.5kV + 33kV LINES 52 0 1 NOTES
21 134 5 34.5kV + 33kV BUS 53 0 1 LEGEND
22 135 6 69kV + 66kV BUS 54 14 1 OUTSIDE BORDER REVISION BLOCK (REF. FILE)
23 136 8 115kV + 132kV BUS 55 55 2 CLOUDS
24 137 10 230kV BUS 56 56 1 AS BUILTS BLOCK (REFERENCE FILE)
25 138 12 380kV BUS 57 57 1 REFERENCE DRAWINGS BLOCK (REFERENCE FILE)
26 139 4 13.8kV + 11kV BUS 58 0 1 INSIDE BORDER REVISION BLOCK (REF. FILE)
27 140 3 4.16kV BUS 59 1 1 TITLE BLOCK (REFERENCE FILE)
28 141 2 2.4kV BUS 60 0 3 INSIDE BORDER LINE UPPER (REFERENCE FILE)
29 142 1 480V BUS 61 0 3 INSIDE BORDER LINE LOWER (REFERENCE FILE)
30 142 1 380V BUS 62 0 5 OUTSIDE BORDER LINE (REFERENCE FILE)
31 142 1 220V BUS 63 63 0 SEC-ERB NAME ARRABIC & ENGLISH (REF FILE)
32 142 1 208kV BUS
CERT'D
APPENDIX-N
INDEX DESCRIPTION
CHK'D
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PLOT PLANS, AREA MAPS, PLAN & PROFILE, FLOW, PIPING & INSTRUMENTS DIAGRAMS,
A SAFETY INSTRUCTION SHEETS, LIST OF MATERIAL AND SCOPE OF WORK.
D DRUMS & VESSELS, KNOCK OUT AND APPURTENANCES, TANKS AND APPURTENANCES.
H PAINT, HARDWARE
COMPRESSORS, INCLUDING GEARS, & HYDRAULIC COUPLINGS, BLOWERS, FANS VACUUM PUMP
K AIR CONDITIONING, REFRIGERATION. TURBINES (PUMP TURBINE DRIVES) AIR DRYERS. *
STEEL FRAMING FOR BUILDINGS, BRIDGES, WALKS, STAIRS, PLATFORM, PIPE SUPPORTS
M AND ANCHORS, PERIMETER FENCING.
REVISIONS
R WOOD STRUCTURES.
DRAWN MISC. SERVICES, SEWERS, ROADS, PAVING AND GRADING, FIRE PROTECTION
BY:- RIZWAN
S EQUIPMENT, HYDROSTATIC TEST DIAGRAMS, FIRE WALLS, FIREPROOFING.
DATE:- 2004-10-06
CHECKED
T COMMUNICATION SYSTEMS AND EQUIPMENTS.
ENG'G. DEPT.
X DRAWING CONTROL SHEET
BY:-
DATE:-
APPROVAL/CERTF.
INFORMATION
NOTE:- * FOR EQUIPMENT NUMBERING SEE SHEET 2 OF 2
DDC NO.
DESCRIPTION STATUS
S. NO. REMARKS
YES NO N/A
1 TITLE BLOCK
1.1 Drawing title is correct & explicit
1.2 Drawing # and revision # is correct
1.3 Plant # is correct
1.4 Job order # is correct
1.5 "Drawn by" initials are filled out correctly
1.6 "Checked by" initials are filled out correctly
1.7 Scale and dates are correct
1.8 Font & text size is correct
1.9 Box beneath the title block filled by "VECTOR/HYBRID"
1.10 Small box beneath the title block filled by "DMS"
2 GENERAL NOTES AND REFERENCE
2.1 Font & text size is correct
2.2 Text is single entity & symbology is correct
2.3 All relevant SEC Std. are listed.
2.4 Drawing control sheet is listed
2.5 All relevant reference drawings are listed.
2.6 Cross reference shown are correct.
3 DRAWING PRESENTATION
3.1 Proper orientation (North)
3.2 Proper section marked (Alphabetically)
3.3 Proper detail marked (Numerically)
3.4 Text is single entity & symbology is correct
3.5 Drawing confirm to the SEC Drafting Manual
3.6 Drawing is professionally presented & is well balanced
3.7 Dimension arrows are correct
3.8 Lines are clear and thickness is correct
4 OTHERS
4.1 File name is as per SEC Std.
4.2 Drawings are restored in proper folders
4.3 Border is reference, Scale is 1:1, Logical name is "bor"
4.4 Omit outside information of border
4.5 Color table is correct
4.6 Working units & view attributes are correct
4.7 Vendor's name and drawing is listed
CHECKED BY:
Name Phone #
Signature Date