[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
The manufacturers for the items of plant listed in Table A-1 below should be ISO 9001-2000
and ISO 14001-2004 and OHSAS 18001: 1999 certified and must submit such certificate
which is valid to date and should also submit their first issued certificate. The ISO certificate
must mention the product or service which is being sourced from the manufacturer.
Critical plant/equipment to be supplied under this Contract shall meet the minimum
criteria as set out in Table A-1.
All the equipment of different vendors shall be designed and manufactured in accordance
with the codes and standard specified in the Project Requirement (Section 4) of the tender
document.
If any equipment is designed and manufactured by any other code, then the Bidder shall
submit test certificates from international reputable quality auditor to justify and authenticate
that the material, design and manufacturing quality meets or exceeds the specified codes
and standards. Failure to comply with this requirement will result in rejection of the
subcontractor/vendor.
Bidders shall furnish testimonies/certificates from the end user in support of the minimum
criteria for the following equipment listed hereunder in Table A-1.
TABLE A-1
No. Description of Item Minimum Criteria to be met
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah 1
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah 2
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah 3
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
1
The manufacturers listed are those preferred by the Owner. The Bidder may propose other
manufacturers but such manufacturer must meet the experience requirement as stated in Table A-1.
2
Same note as No.1 above.
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah 4
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah 5
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah 6
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah 7
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah 8
Appendix 1.1
Instructions to Bidder
List of Reputable Manufacturers
[300]MW Gas-Fired Combined Cycle Power Plant Project at Lahad Datu, Sabah 9