Project Name: Construction Work of Dhamar Hospital Center - Ma'abar District -Dhamar Governorate
Bidder to complete
No. Item Description ☐ Yes ☐ No
Important Note: This technical questionaire is not a binding document, which means, this dcoumnt includes selective specifications to be considerd as m
criteria for comptetion purposes only. Complying to theses specifications in this document shows bidder understnading of the project scope and quality
does not mean that the submitted material will be necessarliy apporved on site level. Therefore, the selected bidder(s) shall submit complete material s
implementation phase for the supervision engineer to study and review the full compliance to the projects specifications docuemnts and approves acco
1. Distribution Boards
Manufacturer
Indicating Lamps/ Origin / Brand (on/off) and trip indications
for incomers
1
Galvanized sheet steel cabinet, 1.2 mm thinkness
2. L.V CABLES & CABLE WAY
Manufacturer
Bidder / Origin
shall provide / Brand
data sheet (4x95 mm2 CU/XLPE/LSOH + 1x50 mm2 PVC/ECC)
2
FIRE RATED
3. LIGHTING SYSTEM
3 Manufacturer
Life / Origin
time at least / Model
50,000@LM80
3.1 Life
Warranty
time atshall be50,000@LM80
least 5 years
3.2 Warranty shall be 5 years
4. FIRE ALARM SYSTEM:
Manufacturer
NFPA 72/BS5839 / Origin / Brand
and NFPA 70/BS7671 complaince
4
UL listed or LPCB approved.
5. UNINTERRUPTIBLE POWER SUPPLY (UPS)
Manufacturer
of the UPS / Origin / Brand
5.1
The UPS shall be forced-air cooled by internally mounted fans
1.4.1 a AHU-01
Manufacturer / Assembler/ Origin / Model
AHU-01
- Calculated Total Cooling Capacity: 10.70 kW.
- Calculated Sensible Cooling Capacity: 8.10 kW.
- Supply Air Flow: 710 L/s.
- External Minimum Static Pressure: Min 650 Pa.
- Filter: MERV 7, MERV 14.
- Variable speed fan motor.
1.4.1 b AHU-02
Manufacturer / Assembler/ Origin/ Model
AHU-02
- Calculated Total Cooling Capacity: 11.50 kW.
- Calculated Sensible Cooling Capacity: 8.20 kW.
- Supply Air Flow: 690 L/s.
- External Minimum Static Pressure: Min 650 Pa.
- Filter: MERV 7, MERV 14.
- Variable speed fan motor.
1.4.1 c AHU-03
Manufacturer / Assembler/ Origin/ Model
AHU-03
- Calculated Total Cooling Capacity: 11.60 kW.
- Calculated Sensible Cooling Capacity: 8.20 kW.
- Supply Air Flow: 700 L/s.
- External Minimum Static Pressure: Min 650 Pa.
- Filter: MERV 7, MERV 14.
- Variable speed fan motor.
1.4.1 d AHU-04
Manufacturer / Assembler/ Origin/ Model
AHU-04
- Calculated Total Cooling Capacity: 12.70 kW.
- Calculated Sensible Cooling Capacity: 9.20 kW.
- Supply Air Flow: 800 L/s.
- External Minimum Static Pressure: Min 650 Pa.
- Filter: MERV 7, MERV 14.
- Variable speed fan motor.
1.4.1 e AHU-05
Manufacturer / Assembler/ Origin/ Model
AHU-05
- Calculated Total Cooling Capacity: 37.20 kW.
- Calculated Sensible Cooling Capacity: 24.90 kW.
- Supply Air Flow: 2140 L/s.
- External Minimum Static Pressure: Min 650 Pa.
- Filter: MERV 7, MERV 14.
- Variable speed fan motor.
1.4.1 f AHU-06
Manufacturer / Assembler/ Origin/ Model
AHU-06
- Calculated Total Cooling Capacity: 28.30 kW.
- Calculated Sensible Cooling Capacity: 12.70 kW.
- Supply Air Flow: 735 L/s.
- External Minimum Static Pressure: Min 300 Pa.
- Filter: MERV 7, MERV 14.
- Variable speed fan motor.
Is quotation compliant?
UNOPS Requirements
Bidder to complete
Delivery Bidder shall deliver and install the goods and complete the works within 180
☐ Yes ☐ No
time calendar day DAP after Contract signature.
Delivery
place and Delivery at Place DAP to Sana'a CITY and Locations mentioned in the RFQ ☐ Yes ☐ No
Incoterms documents
rules
Technical Questionnaire
binding document, which means, this dcoumnt includes selective specifications to be considerd as minimum accpetance
heses specifications in this document shows bidder understnading of the project scope and quality requirements, and
ecessarliy apporved on site level. Therefore, the selected bidder(s) shall submit complete material submittals in the
o study and review the full compliance to the projects specifications docuemnts and approves accordingly.
are in accordance with the required specifications and requirements specified in Section II: Schedule of Requirements
___________________________________________________________________________________________________
__________________________________________________________________________
Details
Bidder to complete
Insert details
Insert details