FAHU-ZONE 1
Table of Contents
1.0 APPROVAL SIGNATURES
2.0 OVERVIEW
3.0 OPERATION AND PROCESS DESCRIPTION
4.0 TECHNICAL REQUIREMENT
5.0 SAFETY AND PROTECTION REQUIREMENT
6.0 OTHERS
This document is prepared as a part of project quality management system and shall be approved by following:
Prepared by
Name/ Designation Signature Date
Checked by
Name/ Designation Signature Date
Approved by
Name/ Designation Signature Date
Authurized by
Name/ Designation Signature Date
Company Name and Details
Equipment/item Fresh Air Handling Unit FAHU-ZONE 1
BOQ Ref: 3.2.1
Company logo Project Specification Ref: 2.2.1 Page2/X
Date
Revision
2.0 OVERVIEW
The facility which this item will be installed is an health care isolation unit, upon comletion it shall be in comlince with WHO standards
100% fresh air handling unit, shall provide an extremely rugged, heavy-duty, long-life, and energy efficient. The unit includes Cooling
coil , heating coil and prefilter section aluminum and bag filter, Panels shall be double skin construction with Polyurethane foam/ fiber
glass insulation sandwiched between the inner and outer panels, The floor panels also shall have double wall construction with 25/50
mm thick sandwich type polyurethane foam/ fiber glass insulation for a rigid non-vibrating construction. Internal surfaces of the units
shall be made of wear-resistant materials.
any other not mentioned standerds related to fulfill the main goal of using the equipment .
Note:
1) This URS has been prepared based on our in-house knowledge & understanding for this equipment. It is
possible that certain points might have been overlooked. As a vendor we expect you to go through the
document in depth and give your suggestions separately as an option. However, the base offer shall be as per
the URS. All suggestions and deviations shall be highlighted and summarized separately.
2) Vendor shall provide response as “Yes” or “No” against each specification for the compliance of their offered
equipment in the remarks column.
The equipment will provide 100% fresh filtered air to the zone served in the facility, outdoor air conditions are [32 degre celcius dry
bulb /50%RH in summer and 5 degre celcius dry bulb /20%RH in winter]. Inside air conditions are [24 degre celcius dry bulb /50%RH
in summer and 24 degre celcius dry bulb /30 %RH in winter]. Equipment operation is controlled by Direct Digital Control (DDC) system
which has the ability to measure, regulate, control, and monitor operation of HVAC system. Monitored parameters are: room
temperature, filter differential pressure and pressure/suction fans differential pressure. Ability of the system to be controlled
automatically depends on configuration of regulating components (PLC controller). System program ensures logic for control and
management of mainstream components: fans, actuators and valves according to required (adjusted) parameters. This air has
conditioned parameters according to requested from the operator. Air temperature is regulated by turning on and off by utilization of
three-way electrically actuated valve which enables teperature control. Filter clogging is prevented by installing a differential pressure
switch that sends signal for system shut down in case differential pressure reaches certain level. Air flow control and fan operation
verification is achieved by utilizing pressure sensors installed at fan positions. In case when air flow is below predetermined level
differential pressure sensors send alarm signal for system shutdown.
Company Name and Details
Equipment/item Fresh Air Handling Unit FAHU-ZONE 1
BOQ Ref: 3.2.1
Company logo Project Specification Ref: 2.2.1 Page3/X
Date
Revision
6.0 OTHERS
This Equipment sall be connected and served by Air Cooled Condensing Unit which is prefered to be from the same vendor, all necessary