Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Prepared By
Reviewed By
Approved By
Page 2 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
TABLE OF CONTENTS
INSTALLATION QUALIFICATION
1.0 OBJECTIVE……………………………………………………………………..4
2.0 SCOPE……………………………………………………………………………4
3.0 RESPONSIBILTY……………………………………………………………….4
4.0 TRAINING DETAILS..........................................................................................5
5.0 SYSTEM DESCRIPTION………………………………………………………6
6.0 INSTALLATION VERIFICATION OF MAJOR COMPONENTS…………7
7.0 INSTRUMENT INBUILT CALIBRATION…………………………………..14
8.0 LIST OF ATTACHMENTS…………………………………………………….19
9.0 DEVIATION(S) IF ANY…………………………………………………………20
10. SUMMARY AND CONCLUSION……………………………………………..21
OPERATIONAL QUALIFICATION
1.0 OBJECTIVE……………………………………………………………………..22
2.0 SCOPE……………………………………………………………………………22
3.0 RESPONSIBILTY……………………………………………………………….22
4.0 GENERAL VERIFICATION..............................................................................23
5.0 IDENTIFICATION OF PROCEDURES………………………………………25
6.0 QRA COMPLIANCE VERIFICATION………………………………………26
7.0 LIST OF ATTACHMENTS…………………………………………………….27
8.0 DEVIATION(S) IF ANY………………………………………………………...28
9.0 SUMMARY AND CONCLUSION……………………………………………...29
Page 3 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
INSTALLATION QUALIFICATION
1.0 OBJECTIVE:
To establish documented evidence that all parts of Compressed Air Distribution System and its
accessories are installed as per manufacturer’s recommendation, design specification at Central
Warehouse of Dr. Reddy’s Laboratories Ltd., Formulations Unit 11.
2.0 SCOPE:
This IQ is applicable for installation qualification and its associated activities for the
qualification of the subject equipment/Components.
3.0 RESPONSIBILITY:
Page 4 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
1.
2.
3.
4.
5.
6.
7.
8.
9.
Page 5 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Compressed air distribution system is designed to distribute the compressed air with required
pressure to the Central Warehouse at Dr Reddy’s Laboratories Ltd, FTO-11 Located at
Pydibheemavaram.
Compressed air (CA) receiver for Non Onco expansion (Block-A) is located at service floor of
Non Onco block and connected to Existing Air Compressors. Compressed air pressure is
maintained through air compressor (Air-cooled Air compressor (522 CFM) and Water-cooled
Air Compressor (530CFM) of existing make & capacity which is connected to Dryer-1 and
Dryer-2, the dryer output air is connected to two receiver tanks. One is in the utilities and another
in service floor. After the utility block receiver tank, this compressed air distribution system is
tapped for Central Warehouse. CA can be used for operation of instruments and can also be
connected/used for process with addition of Air filter regulator (AFR) & 0.2µ filter. CA SS304
(25NB) Pipeline is laid from utility block to false ceiling. In between Ball Valves, Pressure
Gauges, Filter Housing & Air Filters (5µ, 1µ, 0.2µ) is installed. SS316 L OD EP tubes to be
considered for inside the clean room. Inside the clean room Ball Valves, Filters Housing, Air
Filters (0.2µ), Pressure Gauges & Air Filter Regulator is installed.
For Compressed Air Distribution System, following rooms/user points will be considered for
qualification as per approved Facility design qualification for Central Warehouse.
Page 6 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Shubhalaxmi
1 Make Metals & Tubes
PVT.LTD.
2 Grade SS 304
3 Size 25 NB
2 Grade SS 316 L
Page 7 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
3 Size 25.4 NB
Verification of Valves:
2 Size 25 NB
To be
3 Quantity Verified at
Site
Ball Valve
1 Make L&T
2 Size 15 NB
To be
3 Quantity Verified at
Site
Ball Valve
1 Make GAMU
2 Size 25 NB
Quantity To be
3
Verified at
Page 8 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Ball Valve
2 Size 25 NB
To be
3 Quantity Verified at
Site
1 Make FESTO
2 Series D
4 Quantity 4 Nos.
Verification Housing:
Page 9 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Verification
Sr. Component Done By
Specifications Observations Methodolog
No. s (Sign & Date)
y
Housing Details
DOMNICK
1 Make
HUNTER
2 MOC SS 316L
ZVAF-01K-
3 Model
BTEPD
1.
Sr. No. & To be Verified
4
Location at Site
2.
Verification
Sr. Component Done By
Specifications Observations Methodolog
No. s (Sign & Date)
y
3.
4.
Housing Details
1 Make PARKER
2 MOC SS 316L
ZVA-01K-
3 Model
BFE
4 Qty 3 Nos.
Verification of Filters:
Page 10 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Verification
Sr. Component Done By
Specifications Observations Methodolog
No. s (Sign & Date)
y
Filter Details (0.2µ)
1 Make Parker
2 Rating 0.2µ
3 Model ZHFT/KC
4 Qty. 5 Nos.
1 Make Parker
2 Rating 1µ
ZCPPK-
3 Model
1.0C
Verification
Sr. Component Done By
Specifications Observations Methodolog
No. s (Sign & Date)
y
4 Qty. 1 No.
1 Make Parker
2 Rating 5µ
ZCPPK-
3 Model
005C
4 Qty. 1 No.
Page 11 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Verification
Sr. Component Done By
Specifications Observations Methodolog
No. s (Sign & Date)
y
Pressure Gauge
1 Make ITEC
2 Range 0 to 10 Bar
3 Qty. 4 Nos.
1.
2.
To be Verified
4 Sr.No.
at Site
3.
4.
Pressure Gauge
1 Make SHREEJI
Verification
Sr. Component Done By
Specifications Observations Methodolog
No. s (Sign & Date)
y
0 to 10
2 Range
KG/CM²
3 Qty. 3 Nos.
1.
To be Verified
4 Sr. No. 2.
at Site
3.
Pressure Gauge
Page 12 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Verification
Sr. Component Done By
Specifications Observations Methodolog
No. s (Sign & Date)
y
Pressure Gauge
1 Make ITEC
1 Make Baumer
0 to 10
2 Range
KG/CM²
3 Qty. 3 Nos.
1.
To be Verified
4 Sr.No. 2.
at Site
3.
Pressure Gauge
1 Make Arbuda
2 Range 0 to 10 Bar
3 Qty. 4 Nos.
1.
To be Verified
4 Sr.No. 2.
at Site
3.
Verification
Sr. Component Done By
Specifications Observations Methodolog
No. s (Sign & Date)
y
4.
Pressure Gauge
Page 13 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Verification
Sr. Component Done By
Specifications Observations Methodolog
No. s (Sign & Date)
y
Pressure Gauge
1 Make ITEC
1 Make FESTO
2 Range 0 to 16 Bar
3 Qty. 4 Nos.
Checked By:
(Sign & Date)
Page 14 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Instructions:
☛ Instrument criticality assessment shall be done based on following questions.
1. Does the instrument have direct impact on the quality of product i.e., it controls or
monitors the CQA/CPP?
2. Does the instrument have impact on the process or system performance in terms of
control and functionality?
3. Is the instrument data documented in quality records?
4. Is the instrument related to any of the safety application?
If the answer is ‘Yes’ to all or any one of the above questions, then the instrument shall be
categorized as ‘Critical Instrument’.
List out the measuring instruments provided on the equipment / system / instrument and classify
them as Critical, Non-Critical and Indicative as per DRL SOP: ________________________.
Page 15 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air Distribution System
Page 16 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air Distribution System
Provide
applicable Critical (C ) / Manufacturer’s
S. Instrument Used to Instrume ID Code
question no Non-Critical (NC) Make Sr. No. (if
No. Description measure nt Range No.
( 1 to 4) or and Indicative (I ) /Periodicity available)
NA
Page 17 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air Distribution System
Carryout the calibration of critical / non critical /Indicative instrument(s) and record the details in the format given below:
Details of the Standard
ID Code/ Calibratio
Instrument Calibratio Calibration Instrument used for calibration
Control n
description n Due On report No. Calibration due
No. Done On Name/ID No. Calibrated on
on
Page 18 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air Distribution System
Calibration due
No. Done On Name/ID No. Calibrated on
on
Remarks:
Date: Date:
Page 19 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
No of
S. No. Attachment Description Attachment no
pages
Page 20 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Page 21 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Page 22 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
OPERATIONAL QUALIFICATION
1.0 OBJECTIVE:
To verify that the system consistently operates within a specified set of parameters under
normal operating conditions and/or range of intended use.
To assure that the system operation is adequate to support the process for which the
system is intended.
To ensure the completeness and adequacy of Standard Operating Procedures / Preventive
maintenance Procedures.
2.0 SCOPE:
This OQ is applicable for operational qualification and its associated activities for the
qualification of the subject equipment / Components.
During Operational qualification, following shall be considered under general and Functional
verification but not limited to:
Pneumatic Test for Piping
3.0 RESPONSIBILITIES:
Sr.
Organization Responsibility
No.
2.1.1 Preparation of OQ protocol
2.1.2 Execution of OQ protocol
M/s. SCON PROJECTS
1
PVT.LTD 2.1.3 Providing all necessary documents for completing OQ
protocol execution
Page 23 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Page 24 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
the defective work shall be corrected immediately by replacing defective parts with
new joints and materials.
After the correction is made the pressure test shall be repeated for the piping
network.
After the successful completion of pressure testing all temporary fittings and gauges
to be removed and pipe ends shall be plugged with dummy.
Test Result enclosed with document.
Acceptance Criteria:
No leakage or pressure drop shall be observed.
Page 25 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Page 26 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Reviewed By:
(Sign & Date)
Page 27 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
No of
S. No. Attachment Description Attachment no
pages
Page 28 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Page 29 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Page 30 of 31
Client: M/s. Dr. REDDY’S LABORATORIES LTD.
Title: Addendum of Installation & Operational Qualification Protocol for Compressed Air
Distribution System
Prepared By
Reviewed By
Approved By
Page 31 of 31