EX.A.F-01 ALL FLOORS 14 ALL FLOORS AXIAL WALL MOUNTED 200 0.0 0.02 230/1/60 ALL THE STANDARD ACESSORIES SHALL BE PROVIDED INCLUDING ANTI-VIBRATION DEVICE
EX.A.F-02 GROUND FLOOR 1 GROUND FLOOR AXIAL WALL MOUNTED 300 0.0 0.03 230/1/60 ALL THE STANDARD ACESSORIES SHALL BE PROVIDED INCLUDING ANTI-VIBRATION DEVICE
EX.A.F-03 ALL FLOORS 4 ALL FLOORS AXIAL WALL MOUNTED 400 0.0 0.04 230/1/60 ALL THE STANDARD ACESSORIES SHALL BE PROVIDED INCLUDING ANTI-VIBRATION DEVICE
EX.A.F-04 GROUND FLOOR 1 GROUND FLOOR AXIAL INLINE 350 0.5 0.15 230/1/60 ALL THE STANDARD ACESSORIES SHALL BE PROVIDED INCLUDING ANTI-VIBRATION DEVICE
** N.B: the contractor should revise the external static pressure of all fans
PRIMARY CHILLED WATER PUMPS according to the final shop drawing and submit it for approval
SERIAL NO. SERVICE QTY LOCATION TYPE AIR CAP. E.S.P REMARKS
F.A.F-01 GROUND FLOOR GROUND FLOOR INLINE 638 1.0 0.27 ALL THE STANDARD ACESSORIES SHALL BE PROVIDED INCLUDING ANTI-VIBRATION DEVICE
1
F.A.F-02 FIRST FLOOR 1 FIRST FLOOR INLINE 794 1.0 0.27 ALL THE STANDARD ACESSORIES SHALL BE PROVIDED INCLUDING ANTI-VIBRATION DEVICE
F.A.F-03 SECOND FLOOR 1 SECOND FLOOR INLINE 1240 1.0 0.27 ALL THE STANDARD ACESSORIES SHALL BE PROVIDED INCLUDING ANTI-VIBRATION DEVICE
F.A.F-04 GROUND FLOOR GROUND FLOOR INLINE 1008 0.5 0.27 ALL THE STANDARD ACESSORIES SHALL BE PROVIDED INCLUDING ANTI-VIBRATION DEVICE
1
** N.B: the contractor should revise the external static pressure of all fans
according to the final shop drawing and submit it for approval