NOTES

1. THE CONTRACTOR MUST PROVIDE, INSTALL AND COMMISSION ALL NEW EQUIPMENT / MATERIALS BASED ON: PLANS AND
DOCUMENTS.

2. HE SHOWN SIZES OF DUCTS REFER TO THE EXTERNAL MEASURES, AND ALREADY INCLUDES INSULATION.
S.F-35 3. SEE PICTURES OF EQUIPMENT AND DETAILS FOR THE SPECIFICATION OF HVAC EQUIPMENT. CONSULT TECHNICAL DATA SHEETS
690 L/S OF EQUIPMENT FOR ADDITIONAL ACCESSORIES NOT INDICATED IN CEDULES.

4. THE LOCATIONS OF THE ACCESS PANELS ON THE CEILING AND WALLS MUST BE PROVIDED AND COORDINATED
MAINTENANCE AND SERVICE TO THE COMPUTERS, VAVS, EQUIPMENT ETC. WITH OTHER CONTRACTORS.

5. ONLY AIR INJECTION DUCTS FOR AIR CONDITIONING SYSTEMS SHOULD HAVE INSULATION

D THERMAL TYPE DUCT-LINER 3/4 "ESP, WHICH MEETS THE REQUIREMENTS OF ASHRAE 90.1.
FIXING ELEMENTS RECOMMENDED BY THE MANUFACTURER. AIR RETURN DUCTS WILL NOT CARRY INSULATION
THERMAL. THE REFRIGERANT PIPE SHOULD HAVE THERMAL INSULATION BASED ON THE REQUIREMENTS OF ASHRAE 90.1.

6. THE CONTRACTOR SHALL COORDINATE THE FINAL LOCATIONS OF THE GRILLS AND DIFFUSERS IN FIELD WITH THE
OTHER SUBCONTRACTORS.

7. THE CONTRACTOR SHALL PROVIDE THE NECESSARY SUPPORTS FOR ALL EQUIPMENT, DUCTS, PIPES ETC.

8. THE CONTRACTOR SHOULD CLEAN, PRESSURE OF THE SYSTEMS OF


AIR DISTRIBUTION.

9. THE CONTRACTOR SHOULD PROVIDE LABELS FOR THE EQUIPMENT, FOR EXAMPLE: "VI-01" ETC.

10. IN GENERAL THE DUCTS SHOULD BE BUILT OF GALVANIZED STEEL BASED ON THE STANDARDS OF SMACNA
(SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION, INC.)

11. FOR THE INSTALLATION OF EQUIPMENT AND GRILLS, IT SHOULD BE PROCEDURED ACCORDING TO THE MANUFACTURER'S INDICATIONS.

12. POWER SUPPLIES AND ELECTRICAL DEVICES FOR THE STARTING AND PROTECTION OF EQUIPMENT WILL BE
PROVIDED BY OTHERS.

13. THE EQUIPMENT SHALL COMPLY WITH THE CHARACTERISTICS AND SPECIFICATIONS INDICATED BY THE PLANS AND
CORRESPONDING DOCUMENTS. UNLESS OTHERWISE IS INDICATED, THE LOCATION SHOWN ON PLANES IS
APPROXIMATE, SINCE THE FINAL LOCATION WILL BE ADJUSTED IN FIELD, TAKING INTO ACCOUNT THE FACILITIES OF
STRUCTURES FOR SUPPORT AND OTHER PREPARATIONS RELATED TO SUCH EQUIPMENT. THE MARKS OF THE TEAMS,
DEVICES, MATERIALS AND ACCESSORIES, MAY BE REPLACED ONLY WITH THE OWNER'S AUTHORIZATION. IN
CASE OF SUBSTITUTION, IT IS THE RESPONSIBILITY OF THE ONE WHO SUPPLIES (CONTRACTOR) THAT THE OPERATION IN
GENERAL (EFFICIENCIES, SOUND LEVELS, ETC.) EQUAL TO THE EQUIPMENT SPECIFIED IN THE PROJECT, AS WELL AS
THE DIFFERENCES THAT COULD EXIST IN TERMS OF DIMENSIONS, MECHANICAL SPECIFICATIONS AND QUALITY. AS WELL
YOU WILL BE RESPONSIBLE FOR THE IMPLICATIONS THAT THIS HAS ON THE OPERATION OF THE SYSTEM.

C
14. UNLESS OTHERWISE INDICATED, THE MANUFACTURING, INSTALLATION AND TESTING OF MATERIALS AND EQUIPMENT SHALL BE
ADDING TO THE STANDARDS AND METHODS RECOMMENDED BY THE FOLLOWING ASSOCIATIONS:
AIR CONDITIONING AND REFRIGERATION INSTITUTE (ARI)
L.V. AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR CONDITIONING ENGINEERS (ASHRAE).
30"X26" SHEET METAL AND AIR CONDITIONING CONTRACTOR'S NATIONAL ASSOCIATION (SMACNA)

15.THE CONTRACTOR MUST DELIVER THE FOLLOWING DOCUMENTS:


MANUAL OF OPERATION AND MAINTENANCE OF ALL THE EQUIPMENT THAT COMPOSE THE SYSTEM (IOM MANUALS)
PLANOS ASBUILT
WARRANTY LETTERS
START UP REPORTS OF ALL HVAC EQUIPMENT.
REPORTS OF BALANCES, TESTS AND ADJUSTMENTS OF ALL HVAC SYSTEMS.

16. THE SOPORTERY OF THE UNITS PACKAGE WILL BE BASED ON CONCRETE PLATFORMS (BY OTHERS).

17. THE SOPORTERY OF THE HVAC DUCTS SHOULD BE OF GALVANIZED PLATE TAPES AND UNICANAL PENDANTS
OF 4X4 OR ANGLE OF FAITH 1 41"x 16
3
ESP. WITH THREADED ROD, ANCHORED TO THE SLAB OR TO THE STRUCTURE AS INDICATED IN THE
DETAILED PLANS

18. THE UNION OF THE HVAC DUCTS SHOULD BE SEALED WITH GRAY COLOR TO ENSURE THAT THEY DO NOT EXIST
AIR LEAKS

19. THE FLEXIBLE DUCT SHOULD BE A MADE OF TWO REINFORCED POLYSTYRENE LAYERS
WITH STEEL WIRE, WITH INSULATED 1 1/4 "THICKNESS AND METALIZED STEAM BARRIER.

20. THE REFRIGERATION PIPELINE WILL BE OF COPPER TYPE "L" RIGID.

NOMENCLATURE
UMA AIR HANDING UNIT
SF SUPPLY FAN
EF EXHAUST FAN

SECTION C-C RI
DI
RG
SUPPLY GRILLE
SUPPLY DIFFUSER
GRAVITY GRILLE
RR RETURN GRILLE
CCF FIRE DAMPER

SIMBOLOGY
ELEVATION (m)

DOOR / WALL TRANSFER GRILLE


T THERMOSTAT

S.F-35 VERTICAL SUPPLY DUCT

690 L/S
VERTICAL RETURN DUCT

L.V. ROUND GRILLE


VERTICAL EXHAUST DUCT
30"X26"
IN LINE SUPPLY FAN WITH FILTER RACK

SUPPLY GRILLE

WALL MOUNTED AXIAL EXHAUST FAN

RETURN GRILLE

ROOF MOUNTED DOWNBLAST EXHAUST FAN


DIFUSOR DE RETORNO.

FLEX DUCT

0 29.06.2018 LILIANA RAGA MARCO ROBLES


Revision Modification Contents Date Made by Checked by

Customer Doc No.

V1.6
Project Sub Supplier

Sub Supplier Doc.No.

Plant Date Name


FLUID AND UTILITY FACILITY
Made by
27.06.2018 LILIANA RAGA
Area Checked by
WTP SLURRY TREATMENT 28.06.2018 MARCO ROBLES
Approved by

Equipment Material

Mass (kg)

Subgroup Security Level

Status

Drawing Name Document Type

WTP SLURRY TREATMENT VENTILATION


Material No. Version Scale Size

Sheet No. of Sheets

Drwg. No. PLM-ID Revision

C.7WY0.IH.74.86.1.UAG/EIZ100 0
-