You are on page 1of 2

College Education Development Project (CEDP)

IDG Sub-Project
Name and Address of College

Technical Specification for


Supplying of -------------- (Package No: G-09)

Ite Name of Goods or Technical description, Specification and Standard Specification


m Related Services Required offered
No.
1 Type Wall Mountain spilt type air conditioner
2 Brand To be mentioned by the bidder
3 Model To be mentioned by the bidder
4 Country of origin To be mentioned by the bidder
5 Country of To be mentioned by the bidder
Manufacturing
6 Cooling Capacity Minimum 24000 BTU/hr
7 Main features EER (Cooling): Min. 2.50 w/w
Air circulation: 1200 m3/hour (minimum)
Moisture removal capacity : 2.00 liter/hr. (min.)
Cooling Input Power : Max. 2.70 kw
Noise level (Indoor/Outdoor) : Max. 50/60 dB(A)
8 General features Remote controlled fully automatic Multi way air flow with
auto air swing, auto restart, on-off timers and digital
temperature control system

9 Energy saving Non-Inverter


9 Operating Temperature 18 to 30 Deg. CDB
10 Compressor Compressor: Reciprocating/Scroll Type
Refrigerant: CFC free nontoxic type
11 Filters Easy clean air filter
Anti-fungus or bacteria filter
12 Refrigerant R410A
13 Power Source (V/Ø/Hz) 220-240/1/50
14 Net Dimensions Indoor Unit: To be mentioned by the bidder
Outdoor Unit: To be mentioned by the bidder
15 Warranty Minimum 2 (two) years on compressor and spare parts with
free service

/conversion/tmp/scratch/512345608.docx
Ite Name of Goods or Technical description, Specification and Standard Specification
m Related Services Required offered
No.
16 Other documents to be a. Current Production Certificate of the model offered;
submitted with tender b. Distributorship certificate;
c. Manufacturer's Authorization letter;
d. Original Catalogue/Brochure/ User's manual;
e. Service centers of the offered brand (district or division
wise list);
f. Certificate assuring 5 years spare parts availability from
local agent;
17 Installation and The supplier shall supply and install each unit with
commissioning necessary accessories at the selected offices. Copper tube
with insulation and tapping up to 20 ft on an average
distance shall be provided by the supplier. After installation,
the supplier shall demonstrate operation system and perform
a test run for at least 2 hours.

(-----------------------------------) (-----------------------------------)
Member - Official Cost Estimate Member Secretary- Official Cost Estimate
Committee Committee

(-----------------------------------)

Convener - Official Cost Estimate


Committee

/conversion/tmp/scratch/512345608.docx