You are on page 1of 1

Cement Planning & Engineering Department

CEMENT SQUEEZE PROGRAM

GENERAL: CEMENT SQUEEZE DATE : 13/Oct/ 2019


RIG : NDC 114 WELL NO : 020 LOCATION : Aghar

WELL GEOMETRY:
CSG / LINER Inch Prev. CSG : 7 Inch @ 3967 m
Plug Length : m Hole Size Inch BHSP : PSI
BHST: 206 F BHCT: 162 F

DRILLING FLUID:
MUD TYPE : WBM MUD WT : 85-103 PCF
PV: 13 CP YP : 17 LBF/100FT2

MAIN CEMENT SLURRY:


VOLUME: 60 BBL BOTTOM: 3847 m TOP m
WT: 118 PCF YIELD 1.365 CUFT/SK SOLUTION 35.8 BBL
CEMENT TYPE : G Delijan NO OF SACKS : 247 (110 LBS. / SACK )

ADDITIVE:
ITEM NAME LBS. LBS. / SK LBS. / BBL
1 PK-FL8 (F.L.Controller) 122.1 0.495 3.605
2 O-CFR8 (Dispersant) 40.7 0.165 1.202
3 O-R12 (H.T. Retarder) 19 0.077 0.561
4 PK-Gas7 (Anti Gas Migration) 61.7 gal 0.25 gal/sk 1.822 gal/bbl
5 TA-47 (Anti Foam) 3.7 gal 0.015 gal/sk

SOLUTION FOR MAIN SLURRY : Fresh Water 60 BBL


( PREPARED AT RIG SITE )
ITEM NAME LBS. LBS. / BBL
1 PK-FL8 (F.L.Controller) 216.3 3.605
2 O-CFR8 (Dispersant) 72.1 1.202
3 O-R12 (H.T. Retarder) 33.6 0.561
4 PK-Gas7 (Anti Gas Migration) 109.3 gal 1.822 gal/bbl
5 TA-47 (Anti Foam) 6.5 gal

SPACER: 10 bbl Salt Saturated Water as Spacer Ahead.


REMARK :
MAX PUMPING TIME : 120 MIN
MIN DISPLACEMENT RATE: 2-5 BBL/MIN

NOTE 1: THE ABOVE CEMENT PROGRAM WILL BE CHANGED ACCORDING TO NEW WELL
CONDITION SUCH AS DEPTH AND TEMPERATURE.
NOTE 2: THE VOLUME OF DISPLACEMENT SHOULD BE CALCULATED IN RIG SITE BY COMPANY
MAN AND TO ALL THE EXECUTIVE GROUPS TO BE ANNOUNCED.

PREPARED BY: M. HAYATDAVOODI CEMENT ENGINEER SIGNATURE:


APPROVED BY: M. BEIRANVAND CEMENT ENG. HEAD SIGNATURE:

You might also like