Part 14: Temporary Works and Equipment
14.1.1 Scope
1 This Part specifies the requirements for Temporary Works required in connection with
construction of the Works and temporary plant and equipment required in connection with
aiding the construction of the Works. It does not include overpumping activities in respect of
sewers and drains.
ED
2 Related Parts and Sections are as follows:
Section 2 Quality Assurance and Quality Control
IT
Section 11 Health and Safety
M
3 Occupational Health and Safety concerning temporary works and equipment is covered in
LI
Section 11 Health and Safety
4
ST
Quality Controlling temporary works and equipment’s is covered in Section 2 Quality
Assurance and Quality Control
EA
14.2.1 General
LE
1 Everything used for and in connection with the Temporary Works shall be fit for the purpose,
D
2 The Contractor shall design his Temporary Works to be of adequate strength, stability and
M
suitability.
3 The Contractor shall submit details of any Temporary Works proposed to the Engineer for
M
review before commencing the work. Such details shall include, but not be limited to design
O
calculations and drawings. The submission to the Engineer of any such details shall not
relieve the Contractor of his responsibility for sufficiency of the Temporary Works or of his
C
4 The Contractor is responsible for ensuring that Temporary Works are not in any way
detrimental to existing structures in any way. Particular care shall be taken with scaffolding to
avoid staining or mechanical damage to finishing.
5 The Contractor shall make safe and reinstate all areas affected by Temporary Works.
14.3.1 General
1 The Contractor shall provide and maintain in good condition on the Site all plant, tools and
vehicles necessary for the proper and safe execution of the Works.
2 Temporary equipment shall be fit for the purpose for which it is to be used.
QCS 2014 Section 01: General Page 3
Part 14: Temporary Works and Equipment
3 Temporary equipment shall only be operated by personnel who are trained and qualified.
14.4.1 General
1 Cranes, whether used to construct the Works or provided as part of the permanent Works,
must have a current test certificate.
2 Each sling, shackle or other item of loose lifting tackle, whether used to construct the Works
or provided as part of the permanent Works, must have either a current test certificate.
ED
3 Test certificates must be issued by a competent testing authority approved by the Engineer.
IT
4 The Contractor must have a copy of each test certificate on site available for inspection by
the Engineer.
M
5 The following Standards and Code of Practice shall be complied with and where such
LI
documents are replaced or superseded the Contractor shall comply with the latest version:
(a) ST
Mobile and Tower Cranes: BS 1757, BS 2799 and CP 3010.
(b) Overhead Cranes: BS 466 and BS 5744.
EA
Contractor in an approved form and shall be made available to the Engineer immediately
upon demand. Copies of monthly inspection reports shall be submitted to the Engineer.
O
C
END OF PART
AE