CEI44: Network and Hardware Support Lab 1

2019

Lab 1
NETWORK CREATION PLANNING STAGE
SVETLANA DRIVER S11162714

0
CEI44: Network and Hardware Support Lab 1

Contents
Introduction ...................................................................................................................................... 2
Step 1: Evaluation of Client Needs ..................................................................................................... 2
Step 2: Floor Plan Design ................................................................................................................... 3
Step 3: Hardware Evaluation and Recommendation .......................................................................... 5
Desktop: ........................................................................................................................................ 5
Tablet: ........................................................................................................................................... 5
Desktop Accessories (monitor, keyboard and mouse): ................................................................... 5
Printer: .......................................................................................................................................... 6
Networking hardware (port switch and wireless access point): ...................................................... 6
Step 4: Advanced Installation Plan ..................................................................................................... 8
Methodology ................................................................................................................................. 8
Time Frame ................................................................................................................................... 8
Conclusion......................................................................................................................................... 8
Refereces .......................................................................................................................................... 9

1
CEI44: Network and Hardware Support Lab 1

Introduction
This Lab has the aim of applying the basic steps, procedures and planning initiatives required to take
place in order to create a computer network. This assignment follows the scenario below requiring
students to apply skills learnt over the past 6 weeks of this unit with regards to the creation of a
computer network for a client.

“Pacific TAFE wants to make a new lab for their ever growing students. The lab needs to have 20
wired computers and a station for 5 wireless devices. It would also need to have network printer in
the lab.”

Step 1: Evaluation of Client Needs


To begin there are 3 obvious requirements made by the client. The presence of 20 computers
physically wired to the network, 5 wireless devices (as well as stations for said wireless devices) and
the need of a network printer. Further analysis has brought to light the need for the following:

 2x24 port switch is required in order to connect/wire all devices to the same network
 Wireless access point to allow wireless devices to connect to the network
 A computer rack for a computer lab router to enable access to the internet and other
network-network services
 Desktop locks to prevent theft of computer hardware
 The need for an ergonomic layout which allows the easy flow of students in and out of the
lab
 Computer software (OS: Windows 7 or Windows 10) that provide basic functions such as
web surfing for research and Moodle access, basic Microsoft applications i.e. Excel,
PowerPoint, Word, Access and so forth

Further to this some assumptions were made. These include the existing presence of a backend AD
server for authentication, presence of a Core Switch along with the assumption that this particular
project is just to extend a pre-existing network thus creating a new subnet.

2
CEI44: Network and Hardware Support Lab 1

Step 2: Floor Plan Design

3
CEI44: Network and Hardware Support Lab 1

Shown above is a floorplan design for the client’s computer lab. The red line shows the path all
cables and wiring will take to the port switch located in the rack mounted on the east wall.

4
CEI44: Network and Hardware Support Lab 1

Step 3: Hardware Evaluation and Recommendation


Desktop:
VENDOR NAME & BRAND SPECIFICATIONS QUOTATION
Office Works Lenovo Idea Centre 310s A6 Tower Dimensions: 90W x 297D x 344H mm, Max RAM capacity: 16 GB, 64-bit $882.58 FJD
PC Desktop 310S-08ASR computing, installed hard driver capacity: 1TB & installed storage type:
HDD
Harvey Norman Acer Aspire XC-830 Celeron Dimensions: 10 cm x 33 cm x 29.5 cm, Max RAM capacity: 8GB, 64-bit $736.22 FJD
Desktop computing, installed hard drive capacity: 1TB & installed storage type:
HDD
JB Hi-Fi HP 90-0068A 1TB Ryzen 3 Desktop Dimensions:, Max RAM capacity: 16GB, 64-bit computing, installed hard $989.02
Tower drive capacity: 1TB & installed storage type: HDD

Tablet:
VENDOR NAME & BRAND SPECIFICATIONS QUOTATION
Office Works iPad Air 10.5" WiFi 64GB Space Storage: 64GB & dimensions: 174.1W x 250.6D x 6.1H mm $1,164.95 FJD
Grey
Harvey Norman Lenovo Tab P10 10.1-inch Tablet - Storage: 64GB & dimensions: 242mmW x 70mmH x 167mmD $530.73 FJD
Black
JB Hi-Fi Apple iPad Pro 11-inch 64GB Wi-Fi Storage:64GB & dimensions: 9.74 × 7.02 × 0.23 in / 247.6 × 178.5 × $2,142.14 FJD
+ Cellular (Space Grey) 5.9mm

Desktop Accessories (monitor, keyboard and mouse):


VENDOR NAME & BRAND-Monitor SPECIFICATIONS QUOTATION
Office Works BenQ 21.5" LED Monitor GW2270 Resolution: 1920x1080 & contrast ratio: 16:9 $ 289.76 FJD

Harvey Norman Acer 21.5-inch KA220HQ Full HD Resolution: 1920x1080 & contrast ratio: 16:9 $190.71 FJD
TN Monitor
JB Hi-Fi LG 22MP58VQ 21.5" Full HD IPS Resolution: FHD 1920x1080 & contrast ratio: 1000:1 $ 264.63 FJD
LED Monitor

5
CEI44: Network and Hardware Support Lab 1

VENDOR NAME & BRAND-Keyboard & SPECIFICATIONS QUOTATION


Mouse Combo
Office Works Logitech Wireless Keyboard and Range: 10M & dimensions: 191W x 521D x 4H mm $85.74 FJD
Mouse Combo MK345
Harvey Norman Microsoft Wired Keyboard and Wired, dimensions: Keyboard: 45.6 cm x 16 cm x 4.27 cm¦ Mouse: 5.79 $56.18 FJD
Mouse cm x 11.3 cm x 3.92 cm
JB Hi-Fi Logitech Desktop MK120 Wired Wired, dimensions: 30 x 90 x 185 mm $35.48 FJD
Keyboard and Mouse Combo

Printer:
VENDOR NAME & BRAND SPECIFICATIONS QUOTATION
Office Works Epson Work Force Wireless Inkjet Prints, copy, scan, fax, inkjet multifunction printer, dimensions: 391W x $146.36 FJD
MFC Printer WF-2630 375D x 221H mm, wireless & wired connection compatible.
Harvey Norman Epson Work Force WF-3725 Prints, copy, scan, fax, inkjet printer, dimensions: 425mmW x 378mmD x $ 322.28 FJD
Multifunction Printer 249mmH, wireless &wired connection compatible
JB Hi-Fi Epson Work Force Pro WF-3725 Prints, copy, scan, fax, wireless & wired connection compatible $ 220.28 FJD
All-in-One Printer

Networking hardware (port switch and wireless access point):


VENDOR NAME & BRAND-Port Switch SPECIFICATIONS QUOTATION
Office Works D-Link 24 Port Unmanaged Gigabit Dimensions: 280W x 180D x 44H mm $334.11 FJD
Switch DGS-1024D
Harvey Norman D-Link 24-Port Gigabit EasySmart Dimensions: 280mmW x 180mmD x 440mmH $325.16 FJD
Switch
JB Hi-Fi D-Link 24-Port Gigabit Unmanaged Dimensions: 280mmW x 180mmD x 440mmH $294.19 FJD
Switch (Metal Housing)
VENDOR NAME & BRAND-Wireless Access SPECIFICATIONS QUOTATION
Point
Office Works D-Link AC1200 PoE Dual-Band Data rates: 1200Mbps, frequency band: 5GHz & dimensions: $691.87 FJD
Access Point DWL-6610AP 265W x 112D x 238H mm

6
CEI44: Network and Hardware Support Lab 1

Harvey Norman Netgear ProSAFE WAC720 Dual Data rates: 300Mbps, frequency band:2.4,5 GHz & dimensions: 197mmW $1003.80 FJD
Band Wireless-AC Access Point x 197mmD x 40mmH
JB Hi-Fi D-Link DAP-2610 AC1300 Wave 2 Data rates: 900Mbps, frequency band: 5GHz & dimensions: 6.54 x 6.54 x $412.46 FJD
Dual Band PoE Access Point 1.1 in

Each piece of purchased hardware was chosen based on durability, price and feasibility. The prices listed in the quotation section include do not include the
shipping fee. Each chosen piece of hardware is shown in the tables above as highlighted in yellow.

7
CEI44: Network and Hardware Support Lab 1

Step 4: Advanced Installation Plan


Methodology
Before proceeding with this project, approval from management needs to be obtained. After the
project has been approved then implementation will begin. To increase efficiency a number of tasks
will run in parallel, these are: cabling, subnet configuration and computer software test deployment

With regards to the computer software test deployment two computer desktops will be set up to
test software deployment.

Once the software deployment has proven successful during the test that deployment process will
be used to install software on the remaining desktops after cabling and hardware have been
installed/setup.

Once everything has been installed and configured the computer lab will be opened for use.

Time Frame
Once purchasing and shipping has been completed then the minimal timeframe should be 7-12 days.
Planning, subnet configuration and software test deployment will be completed before (at least 2
weeks in advanced) the installation of cabling and hardware.

Conclusion
In conclusion this assignment thoroughly covers and explains the client’s needs, the floorplan, the
purchasing of hardware and the advanced installation plan of this project requested upon by the
client.

All decisions made were done so while keeping feasibility and efficiency in mind.

8
CEI44: Network and Hardware Support Lab 1

Refereces
Harvey Norman, 2019. D-Link 24-Port Gigabit EasySmart Switch. [Online]
Available at: https://www.harveynorman.com.au/d-link-24-port-gigabit-easysmart-switch.html
[Accessed 20th August 2019].

Harvey Norman, 2019. Harvey Norman. [Online]


Available at: https://www.harveynorman.com.au/acer-21-5-inch-ka220hq-full-hd-tn-monitor.html
[Accessed 20th August 2019].

Harvey Norman, 2019. Microsoft Wired Keyboard and Mouse. [Online]


Available at: https://www.harveynorman.com.au/microsoft-wired-keyboard-and-mouse.html
[Accessed 20th August 2019].

Harvey Norman, 2019. Netgear ProSAFE WAC720 Dual Band Wireless-AC Access Point. [Online]
Available at: https://www.harveynorman.com.au/netgear-prosafe-wac720-dual-band-wireless-ac-
access-point.html
[Accessed 20th August 2019].

JB Hi-Fi, 2019. LG 22MP58VQ 21.5" Full HD IPS LED Monitor. [Online]


Available at: https://www.jbhifi.com.au/computers-tablets/monitors/lg/lg-22mp58vq-21-5-full-hd-
ips-led-monitor/945794/
[Accessed 20th August 2019].

JB Hi-Fi, 2019. Logitech Desktop MK120 Wired Keyboard and Mouse Combo. [Online]
Available at: https://www.jbhifi.com.au/computers-tablets/accessories/logitech/logitech-desktop-
mk120-wired-keyboard-and-mouse-combo/452615/
[Accessed 20th August 2019].

JBH-Fi, 2019. D-Link DAP-2610 AC1300 Wave 2 Dual Band PoE Access Point. [Online]
Available at: https://www.jbhifi.com.au/computers-tablets/networking/d-link/d-link-dap-2610-
ac1300-wave-2-dual-band-poe-access-point/469608/
[Accessed 20th August 2019].

JBHi-Fi, 2019. D-Link 24-Port Gigabit Unmanaged Switch (Metal Housing). [Online]
Available at: https://www.jbhifi.com.au/computers-tablets/networking/d-link/d-link-24-port-gigabit-
unmanaged-switch-metal-housing/469605/
[Accessed 20th August 2019].

Office Works, 2019. D-Link 24 Port Unmanaged Gigabit Switch DGS-1024D. [Online]
Available at: https://www.officeworks.com.au/shop/officeworks/p/d-link-24-port-unmanaged-
gigabit-switch-dgs-1024d-dlgs1024d
[Accessed 20th August 2019].

Office Works, 2019. D-Link AC1200 PoE Dual-Band Access Point DWL-6610AP`. [Online]
Available at: https://www.officeworks.com.au/shop/officeworks/p/d-link-ac1200-poe-dual-band-
access-point-dwl-6610ap-dldwl6610a#features
[Accessed 20th August 2019].

Office Works, 2019. Office Works. [Online]


Available at: https://www.officeworks.com.au/shop/officeworks/p/logitech-wireless-keyboard-and-
mouse-combo-mk345-inlogmk345#specifications
[Accessed 20th August 2019].

9
CEI44: Network and Hardware Support Lab 1