FLNG Challenges
Moving from Concept to Reality with Technip’s Unique
Combination of Expertise
Industry experience in large FPSO’s
Open sea transfer of LNG made
possible
Issues with processing on moving
platforms are understood
Onshore LNG Plants
Many FLNG Projects at Conceptual,
FEED stage
Technological breakthrough for the Offshore Floating Facilities
energy industry
- The Prelude facility will be 488m long, 74m wide, with a weight
around 600,000 tons
- It will stay moored in water 250m deep for 25 years
- Completion in 2017, with a production of 3.6 MTPA of LNG
- It will create 1000 jobs
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
3 This document is digitally watermarked.
Project Background
Strong need to find a material to
protect carbon steel from damage
during cryogenic spillage.
No international test method
No Cryogenic spillage rating for
materials
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
5 This document is digitally watermarked.
JIP on Cryogenic Spillage (Start Nov 2012)
6 months on testing 9 technologies under spillage condition and vapor
International participants
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
6 This document is digitally watermarked.
JIP break down
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
7 This document is digitally watermarked.
Technip Proof Test
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
8 This document is digitally watermarked.
Cybernetix test facility
CDG Airport
45min
55 km
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
9 Footer can be customized
This document is digitally watermarked.
Internal Test Protocol
Technip Proof Test (TPT)
Sample exposed during 120
min at -190°C (LN2)
3cm of LN2 permanently in
the pool
Monitored the back face
temperature
PASS/FAIL test
Pass physical integrity (ISO
4628-4)
No drop of temperature
under -40°C in average for
rating
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
Technip Proof Test
LIN
outlet
Sample pool
condition LIN
TC
inlet
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
Technip Proof Test Results
6 Months of Testing
30 samples tested
21 Tons of LN2 used
Lost of
sample
integrity
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
16 This document is digitally watermarked.
October 2016
ISO TC67/SC9/JWG3
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
Statuts 20088
3 different Parts :
Part 1 Pool Phase ISO 20088-1: 2016
(Publication in 15/9/16)
Part 2 Vapor Phase Publication in Q4 2018
Part 3 Jet Phase Publication in DIS in
progress target publication end of 2017
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
TC67/SC9/JWG3
Jan
Mature Document Document ready No Document 2014
Jan
Draft International Standard (DIS)
5 month 2016
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
ISO 20088-1 Pool condition
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
20 This document is digitally watermarked.
TEST BENCH IMPLANTATION MAP
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd. 21
This document is digitally watermarked.
TEST BENCH DESIGN
- Retention basin
- Steel S235 table + thermal
insulation
- Sample + thermal insulation
- Thermal insulation hood
- Spillage tank + its gantry
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd. 22
This document is digitally watermarked.
Test Bench
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
SAMPLE INSTRUMENTATION
Temperature
instrumentation
on the
underside of the
sample
Sample backface
Cross-section view
along the central
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
beam
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd. 24
This document is digitally watermarked.
SAMPLE INSTRUMENTATION
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd. 25
This document is digitally watermarked.
SAFETY
THERMAL
BURNING
- Very low temperatures clothes (1h at - Personal and portative O2 rate detectors
-66°C) - Fixed O2 rate detectors inside the technical hall +
- Cryogenic gloves alarm
- Protective visors - SCBA
- Test protocol minimizing proximity to - SCBA trainings
LN2 - Emergency small SCBA for 10-15 minutes rescue
- Test zone delimitation and safety - External N2 vapour ducts
markings - Test protocol taking account of the asphyxia risk
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd. 26
This document is digitally watermarked.
Round Robin
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
29 This document is digitally watermarked.
Future ISO 20088-2
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
30 This document is digitally watermarked.
ISO Standard PT2 – LN2 Vapor
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
ISO Standard PT2 – LN2 Vapor
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
ISO Standard PT2 – LN2 Vapor
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
Thermocouples localization
1 20 13 19 2
23
3 14 4
5 6 15 7 8
9 16 10
24
17
11 22 18 21 12
Insulation Sample
Thermocouple locations
(RED –
Licensed for the exclusive use of NATIONAL COMPOSITES Surface
CENTRE TC)
downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.(KSC Vapor Testing, Sept 2016)
ISO Standard PT2 – LN2 Vapor
ISO 20088 PT2, Vapor, Sample 1, Test 5, Sept 15, 2016
50
0
Temperature (Deg C)
-50
. Nozzle
1.5m from sample (horizontal)
-100 1.165m from ground (vertical)
. TCs 19-24
[1-2 mm from surface - parallel]
. LN2 delivery pressure
[25 psig/1.72 barg]
-150 . VJ Supply Line
. Insulation under sample & stand
. Canopy (back attached)
. No tunnel
-200
0 10 20 30 40 50 60 70 80 90 100
Test Time (Minutes)
TC 1 TC 2 TC 3 TC 4 TC 5 TC 6 TC 7 TC 8 TC 9
TC 10 TC 11 TC 12 TC 13 TC 14 TC 15 TC 16 TC 17 TC 18
TC 19 TC 20 TC 21 TC 22 TC 23 TC 24 START STOP
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.
DIS ISO 20088-3
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
36 This document is digitally watermarked.
ISO 20088-3 Test Condition
1’’Nozzle Diameter
4.5kg.s-1
Set-up ready Distance to target
50cm
100cm
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
37 This document is digitally watermarked.
Example of jet exposure
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
38 This document is digitally watermarked.
Conclusions
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
39 This document is digitally watermarked.
Conclusions
Licensed for the exclusive use of NATIONAL COMPOSITES CENTRE downloaded on 22/12/2016 at 15:38:12. Must not be reproduced,
www.technip.com
forwarded or distributed except in accordance with NATIONAL COMPOSITES CENTRE's agreement with Applied Market Information Ltd.
This document is digitally watermarked.