March 12, 2020, marked the first time we had our on-line class due to the COVD-19 epidemic. It was
required for each of you to start finalizing the SDP, Final B.F. and Form/Massing. Next was the Space
Planning processes which the formation of floorplans to final form takes place. Now as that is on-going,
I will be asking for you to simultaneously start working on the following:
DESIGN PHILOSOPHY*
DESIGN CONCEPT; General and specific*; Planning Concept*; Structural Concepts*; Utilities concepts*
(Lighting, Conveyance, Security, Power Supply; Clean Water Supply; Sanitary System, *Storm Drainage &
Rainwater Collection System)
DESIGN GOALS AND OBJECTIVES*; (IN WHICH IT SHOULD BE SHOWN AT THE END ITS APPLICATION)
CARPARK*
SWIMMING POOL
THE INDICATED ITEMS WITH * ARE THE ONES I AM CONSIDERING FOR MIDTERM EXAM REQIREMENTS
DUE TO NO UPDATE ABOUT DEPARTMENTAL EXAMS. LETS DISCUSS FURTHER ABOUT IT LATER IN TEAMS