Professional Documents
Culture Documents
Road Project Management and Supervision Manual Vol. II Sample Forms and Document - PDF
Road Project Management and Supervision Manual Vol. II Sample Forms and Document - PDF
VOLUME II:
SAMPLE FORMS AND DOCUMENTS
2014
VOLUME II:
SAMPLE FORMS AND DOCUMENTS
SECOND EDITION
SEPTEMBER 2014
FOREWORD………………………………………………………………………. .. i
TABLE OF CONTENTS.................................................................................. ii
ACKNOWLEDGEMENT ................................................................................. vi
Chapter 3 Procurement.............................................................................. 3- 1
3.1 Invitation to Bid ........................................................................................... 3- 1
3.6 Resolution................................................................................................... 3- 7
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents ii
4.4 Resume Order ............................................................................................ 4- 5
Chapter 6 Payments................................................................................... 6- 1
iii Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.1.4 Billing Summary ...................................................................................... 6- 4
6.1.5 Request for the Release of 15% Advance Payment ............................... 6- 5
6.1.6 Required Certification for Processing of Payments................................. 6- 6
6.1.7 List of Minimum Required Equipment ..................................................... 6- 7
6.1.8 Checklist of Supporting Document.......................................................... 6- 8
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents iv
Chapter 7 Project Completion and Acceptance ........................................... 7- 1
v Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
ACKNOWLEDGEMENT
JICA-TCP II would like to thank the TWG members and the regional project managers for
their patience, guidance, words of encouragement and useful critiques which really helped us
a lot in accomplishing this undertaking.
TWG Members:
Dr. Judy F. SESE, Chairperson, OIC-Director, Bureau of Research and Standards
Ms. Carolina S. CANUEL, Fmr. Vice Chairperson, Fmr. Div. Chief, DPD, P/S
Mr. Adriano M. DOROY, Asst. Director, Bureau of Design
Mr. Aristarco M. DOROY, OIC-Asst. Director, Bureau of Construction
Ms. Edna F. MEÑEZ, OIC-DE, Negros Occidental 4th DEO, DPWH-Region VII
Mr. Felipe S. RAMOS, Fmr. Chief, Technical Services and Evaluation Div., BRS
Mr. Nestor B. CAOILE, OIC-Division Chief, Materials Testing Division, BRS
Thank you also to the CWG Members for their efforts and collaborations.
CWG Members:
Mr. Elmer R. FIGUEROA, Engr. III, BOC
Mr. Ernante S. ANTONIO, Engr. III, BOM
Ms. Carina B. DIAZ, Engr. III, BOD
Ms. Nenita R. VALENCIA, Former Engr. III, BRS
Mr. Vicente R. VALLE, JR., Engr. IV, DPWH-Region VII
Ms. Aurora M. LACASANDILE, Engr. III, CD, DPWH-Region XI
Finally, we wish to thank our Expert, Mr. Ryoichi Yamasaki, Co-Team Leader, JICA TCP II
and his Asst. Engineer, Mr. Feliciano P. Carpio, for their support and encouragement
throughout this activity.
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents vi
Chapter 1 Introduction
1.1 Background
The Department of Public Works and Highway, hereinafter referred to as "DPWH" and
Japan International Cooperation Agency, hereinafter referred to as "JICA", agreed in 2006 to
implement the project for Improvement of Quality Management for Highway and Bridge
Construction and Maintenance, hereinafter called as " Phase I", aiming to enhance the
engineering knowledge of the Engineers of DPWH.
For the implementation of the said project, the DPWH organized the Joint Coordinating
Under Phase I, the following manuals/guidelines were prepared and issued for road
construction and maintenance through the CWG's activities.
This manual, Road Project Management and Supervision Manual, Volume II: Sample
Forms and Ducuments, Second Edition, was prepared under Phase II through the revision
work done by CWG based on the Road Project Management and Supervision Manual,
Volume II: Appendices (Standard Form, Examples and References), 1st Edition as mentioned
above.
1.2 Purpose
Engineers of the DPWH concerned with road construction and management are the main
targets of this Manual. The CWG made efforts to make this Manual 2nd Edition easy to
understand by the Engineers, hence, it would be an effective tool related to the above areas.
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 1-1
Chapter 2 Plans and Drawings
2.1 Original Design Plan
Original design plan is prepared to determine the approximate amount of the road project
for procurement processes. It is a Detailed Engineering Design (DED) plan prepared by the
implementing office (RO/DEO) or by the Consultant after the conduct of feasibility or
preliminary engineering study, in accordance with the DPWH Design Guidelines, Criteria and
Standards, and DPWH Standard and Specifications.
It should include survey plan, horizontal and vertical alignments (plan and profile),
typical roadway section, detailed cross-sections, drainage cross-sections, detailed drawings
and schedule of all proposed structures, design standard drawings, among others.
Original/DED plan may be approved by the Secretary, Undersecretary/Assistant Secretary for
technical services, Regional Director and District Engineer, depending on the amount of the
project and/or delegated level of authority of each approving official. With the exception of
plans approved by concerned RO/DEO, all original plans shall be subject for review by the
Bureau of Design (BOD) and should be supported with documents as contained in the BOD
Checklist of Requirement shown in the following page.
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 2-1
Checklist of Supporting Document as per Requirement of Bureau of Design
BOD Ref No. __________
Date: _________________
MEMORANDUM
FOR : _______________
This Bureau
SUBJECT: ____________________________________________
____________________________________________
Forwarded herewith is a set of plan for the aforecited project with the following
supporting documents:
1. Pavement
a. Soil Data
b. Material Test Result
c. Traffic Data
d. Design Analysis and Calculation
e. Typical Section of Existing Pavement Structure
2. Drainage
a. Hydrologic Analysis
b. Hydraulic Design Calculation
c. Structural Analysis of Box Culverts
d. Topographic Map
3. Embankment
a. Soil/Material Test Result
b. Slope Stability Analysis
c. Foundation Stability Analysis
4. Cut Slope
a. Soil/Material Test Result
b. Slope Stability Analysis
5. Slope Protection Structures
a. Soil/Material Test Result
b. Design Analysis/Calculation
6. Road Safety Facilities
a. Traffic Design Proposal
b. Road Safety Audit Report
7. Quantity Estimates
a. Detailed Quantity Estimates of all Items of Work involved
8. Specifications
a. Material Specification of all Items of Work involved (DPWH Standards Specification
2013 Edition, Volume II – Highway, Bridges and Airports)
9. Others:
_____________________________
Division Chief
2-2 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
2.2 As-Staked Plan
As-Staked plan is prepared when, as a result of “as-stake” survey conducted jointly by
the Implementing Office and the Contractor, there was noted big discrepancy between what
was reflected in the original plan and the actual field condition that would result to major
changes in the original design and quantities of original items of work.
The As-Staked plan should reflect both the original and as-staked design and quantities,
and duly supported with detailed technical justification for all the changes from the original. If
there are no major changes between the original plan and actual field condition, it is no longer
necessary to prepare As-Staked plan. The approved As-Staked plan will be the basis in the
processing/issuance of variation order.
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 2-3
2-4
PROJECT TITLE/LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: S U B M I T T E D: REVIEWED AS PRESENTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.
CHECKED:
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR CHIEF, HIGHWAYS DIVISION, B.O.D DIRECTOR IV, B.O.D ASSISTANT SECRETARY UNDERSECRETARY
PROJECT ENGINEER (DPWH-RO) OIC-ASST. CHIEF PLANNING & DES. DIV. DATE: DATE: DATE: DATE: DATE: DATE:
Chapter 3 Procurement
3.1 Invitation to Bid
Invitation to Bid
Contract ID No.: ________________________________________________
________________________________________________
1. The Department of Public Works and Highways (DPWH), through the General
Appropriations Act intends to apply the sum of Php ____________ being the Approved
Budget for the Contract (ABC) to payments under the contract for
_______________________________. Bids received in excess of the ABC shall be
automatically rejected at the bid opening.
2. The Department of Public Works and Highways now invites bids for
______________________. The length of the road is _______ kms. to be made of
_____________, width of _____ meter (__ -lane at ___ m/lane) at ___ m thick.
Completion of the Works is ________ calendar days. Bidders should have completed a
single contract similar to the Project, equivalent to at least fifty percent (50%) of the ABC.
The description of an eligible bidder is contained in the Bidding Documents, particularly, in
Section II, Instruction to Bidders.
4. Contractors/applicants who are interested in the DPWH civil works are required to register
prior to the set schedule of submission of bid while those already registered shall keep their
records current and updated. Contractor’s eligibility to bid on the project will be
determined using the DPWH Contractor Profile Eligibility Process (CPEP) and subject to
further post- qualification. Information on registration can be obtained at DPWH website
www.dpwh.gov.ph or Central Procurement Office (CPO), ________________
_________________________, from ____________________.
5. Interested bidders shall be required to submit PCAB License applicable to the type and cost
of this contract and classification of contractors as Large “B” for road, and ISO9000
Certification as part of the technical documents under Item 12.1(b) (iv) of the Bid Data
Sheet. They may obtain further information from DPWH-______ and CPO and inspect the
bidding documents at the address given below from ________________________.
Page 1 of 2
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3-1
6. A complete set of Bidding Documents may be purchased by interested Bidders from the
address below and upon payment of a non-refundable fee for the Bidding Documents in the
amount of Php _______________. It may also be downloaded free of charge from the
website of the Philippine Government Electronic Procurement System (PhilGEPS) and the
website of the DPWH, provided that bidders shall pay the fee for the Bidding Documents
not later than the submission of their bids.
7. The Department of Public Works and Highways will hold a Pre-Bid Conference on
_____________ at ______________________________ which shall be open only to all
interested parties who have purchased the Bidding Documents.
8. Interested bidders may obtain further information from Department of Public Works and
Highways, Central Procurement Office (CPO) and inspect the Bidding Documents at the
address given below from _________ to __________.
9. Bids must be delivered on or before ____________________ at
_____________________________. All bids must be accompanied by a bid security in
any of the acceptable forms and in the amount stated in ITB Clause 18.1. Bids will be
opened in the presence of the bidders’ representatives who choose to attend at the aforesaid
address. Late bids shall not be accepted.
10. The DPWH reserves the right to accept or reject any bid, to annul the bidding process, and
to reject all bids at any time prior to contract award, without thereby incurring any liability
to the affected bidder or bidders.
______________________________ ______________________________
Head of Office Chairman, BAC for _______________ Project
“Implementing Office, Address and Contact Details”
Page 2 of 2
3-2 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
3.2 Program of Work
Date: _______________
Program of Work
District/City: ____________ Road Width: _______________
Name of Project: ____________ Pavement Width: _______________
Location: ____________ Pavement Thickness: _______________
Appropriation: ____________ Type of Superstructure: _______________
Source of Funds: ____________ No. of Spans: _______________
Limits: ____________ Starting Date: _______________
Net Length: ____________ No. of Days to Complete: _______________
Number
Description of Works to be done % of Total Equipment
Needed Available
Adjusted
Item No. Description Unit Qty. Unit Cost Total Cost
Cost
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3-3
3.3 Detailed Unit Price Analysis
No. of No. of
Designation Hourly Rate Amount
Person Hours
A. Labor
No. of No. of
Name and Capacity Hourly Rate Amount
Unit Hours
B. Equipment
C. Total (A+B)
Materials
3-4 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
Total
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
Prepared/Submitted by: Recommending Approval: Approved:
3-5
3.5 Bill of Quantities
BILL OF QUANTITIES
Subtotal: ____________
Subtotal: ____________
Total: ____________
Total Amount in Words:
3-6 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
3.6 Resolution
RESOLUTION
WHEREAS, the Estimated Project Cost (EPC) is PhP (Estimated Project Cost);
WEREAS, all bids submitted were referred to the SBAC-Technical Working Group (TWG)
for correction of arithmetical errors, application of the discounts offered, evaluation, examination and
comparison of bids;
WHEREAS, based on the detailed examination, and comparison of the (No. of
Bids) ((Numeric)) bids and unconditional discounts offered applied, shown in the table below were the
corrected bid prices, ranked from lowest to highest;
Bid as Corrected/ Variance vs. EPC
Bidder Rank
Discounted (Php) (%)
Page 1 of 2
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3-7
WHEREAS, (Name of Construction Firm), with the lowest calculated bid, was subjected to
post-qualification evaluation based on the criteria in the bidding document, and found (Name of
Contractor) passing all the requirements for the Technical Experience, Average Annual Turnover, Net
Financial Contracting Capacity, Key Personnel and Equipment;
WHEREAS, the SBAC for Civil Works for (Implementing Office) during the meeting on (Date
of meeting), and after a careful deliberation, approved the findings of the SBAC-TWG and recommended
to award the contract for the (Name of Project) to (Winning Bidder), at its total bid price of PhP (Total Bid
Price) which is (Percentage) below the Estimated Project Cost.
NOW THEREFORE, for and in consideration of the foregoing premises, the herein Special
Bids and Awards Committee for Civil Works for (Foreign Assisted or Locally Funded Project) resolves as
it is hereby resolved the following:
a) To declare (Name of Contractor), as the Bidder with the Lowest Calculated Responsive Bid
(LCRB) for the above mentioned Contract; and
b) To recommend to (Approving Official), for approval, the award of the said Contract to (Name of
Contractor), at its Total Calculated Bid Price of (Amount in words and figures) .
___________________________________
(Chairperson)
___________________________________ ___________________________________
(Member) (Member)
___________________________________ ___________________________________
(Member) (Member)
Approved:
___________________________________
( Name )
Date of Approval: ________________________
Page 2 of 2
3-8 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
3.7 Contract Agreement
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
Contract Agreement
Contract ID No.: ________________________________________________
Contract Name: ________________________________________________
Location of the Contract: ________________________________________
1. In this CONTRACT AGREEMENT, words and expressions shall have the same meanings
as are respectively assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be attached, deemed to form, and be read and construed as
part of this CONTRACT AGREEMENT:
Page 1 of 2
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3-9
4. The ENTITY hereby covenants to pay the CONTRACTOR in consideration of the
execution and completion of the Works, the unit prices in the CONTRACTOR’s
Calculated Bid as applied to the actual quantities accomplished as certified by the
PROCURING ENTITY under the provisions of this CONTRACT AGREEMENT at the
times and in the manner prescribed by this CONTRACT AGREEMENT.
IN WITNESS whereof the parties thereto have caused this CONTRACT AGREEMENT
to be executed the day and year first before written.
[Addendum showing the corrections, if any, made during the Bid evaluation to arrive at the Calculated Bid should
be attached with this CONTRACT AGREEMENT]
Acknowledgement
Republic of the Philippines)
City of _______________ S.S.
This instrument, consisting of ____ pages, including this page on which this
acknowledgement is written, have been signed on the margin of each and every page thereof by
____________ and ____________ and their instrumental witnesses, and sealed with my notarial
seal.
IN WITNESS WHEREOF, I have hereunto set my hand the day, month, year and place
above written.
NOTARY PUBLIC
Page 2 of 2
3 - 10 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
3.8 Notice of Award
Notice of Award
Date: _______________
_______________________
_______________________
_______________________
Dear __________________:
We hereby accept your bid for the above stated Contract and therefore award the Contract to you
as the Bidder with the Lowest Calculated Responsive Bid at a total Contract Price equivalent to
___________________________________________.
You are required within ______ days from your receipt of this Notice of Award to submit to us (a)
this Notice with your signed "Conforme" thereon, (b) the required Performance Security, (c) the
required credit line or cash deposit certificate and (d) the PERT/CPM diagram and Bar Chart with
S-curve, all of which will form part of the Contract Agreement in accordance with the Bidding
Documents. You are also required, within the said ______ days, to formally sign the Contract
Agreement.
Your failure to comply with these requirements shall constitute a sufficient ground for the
cancellation of this award and the forfeiture of your Bid Security.
_____________________________
Regional Director/District Engineer
Received by:
_________________________
Date Received:
_________________________
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3 - 11
3.9 Bid Security
Gentlemen:
WHEREAS, (Name of Bidder), hereinafter called “The Bidder”, with address at (Address of
Bidder) has undertaken to submit to you a bid for the above stated contract and whereas, you have
stipulated in the instruction to bidders for the said contract that the bidder shall furnish you with an
irrevocable standby letter of credit for a sum specified therein as bid security for the faithful
compliance of the following obligations of the bidder:
1. The bidder shall not withdraw its bid for the abovementioned contract during the period bid validity
specified in the instructions to bidders.
2. The bidder shall accept the corrections to be made by the bids and awards committee on any arithmetical or
computational errors in its bid prices in accordance with the instructions to bidders.
3. If the bidder received your Notice of Award for the contract, it shall submit to you, within ten (10) days
from receipt of the said notice, (a) its written “Conforme” on the Notice of Award, (b) Performance Security, (c) Credit
Line/Cash Certificate/Deposit Certificate, and (d) Pert/CPM, and shall execute the contract agreement in accordance
with the instructions to bidders and general conditions of the contract.
THEREFORE, We (Insurer and Address) hereby affirm that we are guarantors and
responsible to you on behalf of the bidder thus, we hereby issue our Irrevocable Standby Letter of
Credit up to the total amount of Pesos: (Coverage Amount in Words ) (Php (Coverage Amount in
Figures)) and we undertake to pay you, upon your first notarized written demand declaring the bidder
to be in default under the instructions to bidders and without cavil or argument, any sum or sums
within the limits of Pesos ________________________________ (Php __________ ) as aforesaid,
without your needing to prove or show grounds or reasons for your demand for the sum specified
therein.
Page 1 of 2
3 - 12 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
This Irrevocable Standby Letter of Credit is valid until _________calendar days after the
date of opening of bids for the said Contractor until ____________ (the “expiry date”), whichever
comes earlier.
This Irrevocable Standby Letter of Credit is being issued in favor of the said bidder in
connection with your requirements of the bidding for the said contract. We are aware that any false
statements issued by us make us liable to perjury.
This Irrevocable Standby Letter of Credit is issued subject to the uniform customs and
practice for documentary credits (2007 Revision) International Chamber of Commerce Publication no.
600.
___________________________________________
(Insurer)
____________________________
Bank’s Authorized Officer
Page 2 of 2
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3 - 13
3.10 Performance Security
THEREFORE, we hereby affirm that we are guarantors and responsible to you, on behalf of
the Contractor, up to the total amount of (Amount of Guarantee) and we undertake to pay you, upon
first written demand declaring the Contractor to be in default under the Contract and without cavil, or
argument, any sum or sums within the limits of (Amount of Guarantee) as aforesaid without you
needing to prove or to show grounds or reasons for your demand for the sum specified therein.
The right to institute action on this guarantee pursuant to Act No. 3688 of any individual,
firm, partnership, corporation and association supplying the Contractor with labor and materials for the
prosecution of the works is hereby acknowledged and confirmed.
This irrevocable guarantee is valid until the issuance by you of the Certificate of Acceptance
of the completed works.
This certification is being issued in favor of the said Contractor in connection with the
requirements of the bidding by (Name of the Procuring Entity) for the above-mentioned Contract.
We are aware that any false statements issued by us make us liable for perjury.
Page 1 of 2
3 - 14 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
Name and Signature of Authorized
Financing Institution Officer: _____________________________
Official Designation: _____________________________
Concurred By:
Note:
The amount committed should be machine validated.
ACKNOWLEDGMENT
Notary Public
Until 31 December 20_____
PTR No. _______________
Issued at: _______________
Issued on: _______________
TIN No. _______________
Doc. No. _______
Page No. _______
Book No. _______
Series of _______.
Page 2 of 2
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3 - 15
3.11 Surety Bond
WHEREAS, the above bounded Principal has a contract with the Obligee to fully & faithfully
guarantee the Contract for (Complete description of project and location).
WHEREAS, the Obligee requires the above bounded principal to give a good and sufficient bond in the
above stated sum to secure the full and faithful performance on its part of said Obligee.
NOW, THERFORE, if the above bounded Principal shall in all respects duly and fully observe and
perform all and singular the aforesaid covenant conditions and agreements to the true intent and meaning thereof,
then this obligation shall be null and void, otherwise to remain in full force and effect.
Liability of surety on this bond will expire on co-terminus with the final acceptance of the project.
This bond will be considered automatically cancelled ten (10) days after expiration, unless surety is notified by any
existing obligations thereunder and the latter signifies in wrong in content to act as surety for the continuance of
any existing obligations hereunder.
IN WITNESS WHEREOF, we have set our hands and signed our names on this (Date) day of (Month),
20_____.
ATTESTED:
______________________________
Principal
3 - 16 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
3.12 Contractor's All Risks Insurance
CONTRACTOR’S ALL RISKS POLICY
WHEREAS THE INSURED named in the Schedule hereto has made to the
________________ (hereinafter called “the Insured” a written proposal by completing a
Questionnaire which together with any other statements made in writing by the Insured for
the purpose of this Policy deemed to be incorporated herein.
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3 - 17
b) MAINTAINED PERIOD
If a maintenance period is specified in the Schedule, the liability of the Insurers
during this period shall be limited to any loss or damage caused by the Insured
Contactor(s) in the course of the operations carried out by him for the purpose of
complying with his obligations under the Maintenance ______ of the Contract.
GENERAL CONDITIONS
1) The due observance and fulfillment of the Terms of this Policy in SO FAR as they
relate to anything to be done or complied with by the Insured shall ____ condition
precedent to any liability of the Insurers to make any payment under this Policy;
2) The Schedule and the Section(s) shall be deemed to be incorporated and in form part of
this Policy and the expression “this Policy” wherever used in contract shall be read as
including the Schedule and Section(s). Any work or expression to which a specific
meaning has been attached in any part of Policy or of the Schedule or of the Section(s)
shall bear such meaning wherever it may appear;
3) The Insured shall give notice to the Insurers of any insurance or insurances already
effected, or which may subsequently be effected, covering any of property hereby
insured, and unless such notice be given and the particulars of such insurance or
insurances be stated in or endorsed on this policy by or behalf of the Insurers before the
occurrence of any loss or damage, all benefits under this Policy shall be forfeited;
4) The Insured shall take all reasonable precautions to prevent loss, damage or liability
and to comply with sound engineering practice, statutory requirement and
manufacturer’s recommendations and maintain in efficient condition all contract
works, construction plant, equipment and construction machine insured by this Policy;
5) The Insured shall immediately notify the Insurers in writing of any material change in
the risk hereunder; the scope of cover and/or the premium shall, if necessary, be
adjusted accordingly;
6) Representatives of the Insurers shall at any reasonable time have access to the site or
premises and to all pertinent data, documents, drawings, etc. and shall have the right to
inspect any property Insured;
7) In the event of any occurrence which might give rise to a claim under this Policy, the
Insured shall:
a) Immediately notify the Insurers by telephone or telegram as well as in writing;
b) Take all steps within his power to minimize the extent of the loss or damage;
c) Preserve the damaged parts and make them available for inspection by a
representative or surveyor of the __________;
Page 2 of 9
3 - 18 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
d) Furnish all such information and documentary evidence as the Insurers may
require;
e) Inform the police authorities in case of loss or damage due to theft, burglary or
sabotage.
The Insurers shall not in any case be liable for loss, damage or liability of which no
notice has been received by the Insurers within 14 days of its occurrence.
Upon notification being given to the Insurers under this condition, the Insured may
carry out the repairs or replacement of any minor damage; in other cases a
representative of the insurers shall have the opportunity of inspecting the loss or
damage before any repairs or alterations are effected. ______ thing herein shall
prevent the Insured from taking such steps as are absolutely necessary for the security
and continuation of the contract work. If a representative of the Insurers does not
carry out the inspection with a period of time which could be considered as adequate
under the circumstances insured is entitled to proceed with the repairs or replacement.
8) The Insured shall at the expense of the Insurers do and concur in doing and permit to
be done all such acts and things as may be necessary or required the Insurers in the
interest of any rights or remedies, or of obtaining relief for indemnity from parties
(other than those insured under this Policy) to who the Insurers shall be or would
become entitled or subrogated upon their paying for or making good any loss or
damage under this Policy, whether ___ acts and things shall be or become necessary or
required before or after the Insured’s Indemnification by the Insurers.
9) All differences arising out of this Policy with respect to the amount of liability shall be
referred to the decision of an Arbitrator to be appointed in writing by the parties in
difference or if they cannot agree upon a single Arbitrator to the decision of two
Arbitrators, one to be appointed in writing by each the parties, within one calendar
month after having been required in writing so to do by either of the parties, or in case
the Arbitrators do not agree, of Umpire to be appointed in writing by the Arbitrators
before entering upon the reference. The Umpire shall sit with the Arbitrators and
preside at the meetings. The Arbitrators and the Umpire shall be qualified Engineer.
The making of an award shall be a condition precedent to any right of act against the
Insurers.
Page 3 of 9
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3 - 19
10) If a claim is in any respect fraudulent, or if any false declaration is made or used in
support thereof, or if any fraudulent means or devices are used in support thereof, or if
fraudulent means or devices by the Insured or anyone acting on his behalf to obtain
any benefit under this Policy, or claim is made and rejected and no action or suit is
commenced within twelve months after such rejection or, in case of arbitration taking
place as provided herein, within twelve months after the Arbitrator or Arbitrators or
Umpire have made their award, all benefit under this Policy shall be forfeited.
11) Any claim arises under the Policy there be any other insurance covering the same loss,
damage of liability the Insurers shall not be liable _____ contribute more than their
ratable proportion of any claim for such loss or damage.
Section 1
PROPERTY INSURED
(Material Damage)
THE INSURERS HEREBY AGREE with the insured that if at any time during the period of
insurance stated in the Schedule, or doing any further period of extension thereof the property
or any part thereof described in the Schedule shall suffer any unforeseen loss or damage from
any cause, other than the specifically excluded, in a manner necessitating repair or
replacement, the Insurers will pay or make good all such loss or damage up to an amount not
exceed in respect of each of the items specified in the Schedule the sum set opposite thereto
and not exceeding in all the total sum expressed in the said Schedule insured hereby.
The Insurers will also reimburse the Insured for the cost of clearance of the debris of the
insured property following upon any event giving rise to a claim under this Policy but not
exceeding all the sum set opposite thereto in the Schedule.
EXCLUSIONS TO SECTON 1
The Insurers shall not, however, be liable for:
(a) the deductibles stated in the Schedule to be borne by the Insured in any one
occurrence other than fire, lightning or explosion;
(b) consequential loss of any kind or description whatsoever including penalties, losses
due to delay, lack of performance, loss of contract;
(c) loss or damage due to faulty design;
(d) cost of replacement or rectification of defective material and/or workmanship, but
this exclusion shall be limited to the items immediately affected shall not be
deemed to exclude loss or damage resulting from an accident due to such defective
material and/or workmanship;
Page 4 of 9
3 - 20 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
(e) wear and tear, corrosion, oxidation, deterioration due to lack of use and normal
atmospheric conditions:
(f) mechanical and or electrical breakdown or derangement of construction plant,
equipment and construction machinery;
(g) loss of or damage to vehicles licensed for general road use or waterborne vessels or
aircraft;
(h) loss or damage to files, drawings, accounts bills, currency, stamps, deeds evidences
of debt, notes, securities or cheques;
(i) loss discovered only at the time of taking an inventory.
PROVISIONS APPLYING TO SECTION 1
MEMO1. SUM INSURED It is a requirement of this insurance that the amounts of
insurance stated in the Schedule shall:
Not be less than for item 1 The full value of the contract works at the completion of
the construction, inclusive of materials, wages, freight,
custom duties, dues and materials or items supplied by the
Principal;
For items 2 & 3: The replacement value of construction plant, equipment
and construction machinery;
The Insured undertakes to notify the Insurers of any fact effecting a material increase or
decrease of the sums insured provided always that such increase/decrease take effect only
after the same has been recorded on the Policy by the Insurers, before the occurrence of any
claim hereunder.
If, in the event of loss or damage, it is found that the sum insured is less than the amount
required to be insured, then the amount recoverable by the Insured under this Policy shall,
before taking into account the deductibles stated in the Schedule, be reduced in such
proportion as the sum insured bears to amount required to be insured.
MEMO 2. BASIS OF LOSS SETTLEMENT: In the event of any loss or damage the basis of
any settlement under this Policy shall be:
(a) In the case of any damage which can be repaired – the cost of repairs necessary to
restore the insured property to its condition immediately before occurrence of the
damage less salvage, or
Page 5 of 9
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3 - 21
(b) In the case of a total loss – the actual value of the insured property immediately before
the occurrence of the loss less salvage provided always that the provisions and
conditions have been complied with.
The Insurers will make payments only after being satisfied by production of the necessary
bills and documents that the repairs have been effected or replacement has taken place, as the
case may be.
All damage which can be repaired shall be repaired, but if the cost of repairing any damage
equals or exceeds the value of the Insured property immediately before the occurrence of the
damage, the settlement shall be made on the basis provided for in (b) above.
The cost of any provisional repairs will be borne by the Insurers if such repairs constitute part
of the final repairs and do not increase the total repair expenses.
The cost of any alterations, additions and/or improvements shall not be recoverable under this
Policy.
MEMO 3. EXTENSION OF COVER: Extra charges for overtime, night work, work on
public holidays, express freight, etc. are covered by this Insurance or if previously and
specially agreed upon.
Section 11
THIRD PARTY LIABILITY
The Insurers will indemnify the insured against all sums which the Insured shall become
legally liable to pay as damages consequent upon :
a) Accidental bodily injury of illness (whether fatal or not) to third parties
b) Accidental loss or damage to property belonging to third parties occurring in direct
connection with the performance of the contract insured by this Policy and happening
on or in the immediate vicinity of the Contract Site during the Period of Insurance.
In respect of a claim for compensation to which the indemnity provided herein applies the
insurers will in addition indemnify the Insured against.
a) All costs and expenses of litigation recovered by any claimant from the Insured; and
b) All costs and expenses incurred with the written consent of the insurers.
The Liability of the Insurers under this section shall not exceed the limits of indemnity stated
in the Schedule (Section 11).
Page 6 of 9
3 - 22 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
EXCLUSIONS TO SECTION 11
The Insurers will not indemnify the Insured in respect of
1. Expenditure incurred in doing or redoing or making good or repairing or replacing
any work or property covered or coverable under Section 1 of the Policy.
2. Damage to any property or land or building caused by subsidence collapse, vibration
or by the removal or weakening of support or injury or damage to any person or
property occasioned by or resulting from any such damage.
3. Liability consequent upon
(a) Bodily injury to or illness of employees or workmen of the Contractor(s) or the
Principal or any other firm connected with the contract work or members of their
families;
(b) Loss of or damage to property belonging to or held in care, custody or control of
the Contractor(s), the Principal or any other firm connected with the contract
work or an employee or workman of anyone of the aforesaid.
(c) Any accident caused by vehicles licensed for general road use or by waterborne
vessels or aircraft;
(d) Any agreement by the Insured to pay any sum by way of indemnity or otherwise
unless such liability would have attached in the absence of such agreement.
SPECIAL CONDITIONS APPLYING TO SECTION 11
1. No admission, offer, promise, payment or indemnity shall be made or given by or on
behalf of the Insured without the written consent of the Insurers who shall be entitled if
they so desire to take over and conduct in the name of the insured the defense or
settlement of any claim or to prosecute for their own.
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3 - 23
Description of the Insured Items
Section 1 - Property Insured Sum Insured
1. Contract Works 1.
Permanent and Temporary Works, including all
Materials to be incorporated therein)
(a) Contract Price (a) ____________
(b) Materials or items supplied by the Principal (b) ____________
2. Construction Plant and Equipment 2.
3. Construction Machinery according to attached list 3.
4. Installation of Machinery and Equipment forming 4.
part of Permanent Contract Work.
TOTAL
Limit of indemnity under this Policy in respect of Clearance of Debris
DEDUCTIBLES:
Amounts to be borne by the Insured in respect of each
and every occurrence for loss of or damage to contract
works and/or construction plant and equipment
(Schedule Section 1 Items 1 and 2) arising out of
(a) earthquake, storm, typhoon, cyclone, flood, the first
inundation, subsidence, landslide, collapse
(b) any other cause, except fire lightning and the first
explosion
Amounts to be borne by the Insured in respect of each
and every occurrence for loss of or damage to
construction machinery (Schedule Section 1 item (3)
arising out of
(a) earthquake storm, typhoon, cyclone, flood the first
inundation, subsidence, landslide, collapse
(b) any other cause, except fire lightning and the first
explosion
Page 8 of 9
3 - 24 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
IN WITNESS WHEREOF the Undersigned being duly authorized by the Insurers and on
behalf of the Insurers has/have hereunto set his/their hand(s) this (Date) Day of (Month)
at (Place) .
Page 9 of 9
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 3 - 25
Chapter 4 Contract
Implementation
4.1 Notice to Proceed
Notice to Proceed
Date: _______________
_______________________
_______________________
_______________________
Dear __________________:
As the attached Contract Agreement with you for the above stated Contract has been approved, we
hereby instruct you to proceed with implementation of the said Contract which shall be effective
on _________________.
You shall execute the Contract works in accordance with the terms and conditions of the Contract
Agreement, including the Conditions of Contract, Specifications, Drawings, Bill of Quantities and
PERT/CPM network diagram.
Please acknowledge receipt and acceptance of this Notice by signing both copies thereof
in the space provided below. Keep one copy and return the other to us.
_____________________________
Regional Director/District Engineer
__________________________________________________
Name and Signature of Contractor's Authorized representative
__________________________________________________
Position
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 4-1
4.2 Variation Order
To: ______________________________________________
Contractor
You are hereby directed to make the described changes from the Plans and Specifications,
or do the following described work as per approved revised plans and specifications.
___________________________
Asst. Regional Director
Prepared by: Submitted by Approved by
4-2 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
ITEMIZED COST OF REVISION
Project:
Limit:
Contractor:
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
Original sum involved in the revision: ____________________
New Sum involved in this change: ____________________
Difference in cost: ____________________
4-3
Project Engineer Chief, Construction Division Asst. Regional Director Regional Director
4.3 Suspension Order
Date: ______________________________________________
Contractor: ______________________________
______________________________
______________________________
You are hereby directed to suspend all construction activities effective ___________
due to ___________________________________________________________ .
Please acknowledge receipt of this order by dating, signing and returning three (3) of the
attached copies. The other copy is for your file.
________________________ ________________________
Project Engineer Regional Director
________________________
Contractor
Date: ___________________
4-4 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
4.4 Resume Order
Date: ______________________________________________
Contractor: ______________________________
______________________________
______________________________
You are hereby directed to resume all construction activities effective ______________ .
Please acknowledge receipt of this order by dating, signing and returning three (3) of the
attached copies. The other copy is for your file.
________________________ ________________________
Project Engineer Regional Director
________________________
Contractor
Date: ___________________
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 4-5
Chapter 5 Field Inspection and
Quality Control
5.1 Quality Control Program
NAME OF PROJECT :
STATION LIMITS :
LOCATION :
APPROPRIATION :
_____________________________________________ _____________________________________________
_____________________________________________ _____________________________________________
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5-1
Republic of the Philippines
5-2
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
Project : Province/City :
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
_____________________________________ _____________________________________ _____________________________________
Laboratory Kind of Quantity Original Source of Materials Kind of Spec. Sampled and Tested REMARKS
Number Materials Represented Test Item No. By Date At
5.2.2 Summary of Laboratory/Field Control Tests
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
PREPARED BY: CERTIFIED CORRECT: ATTESTED BY:: NOTED BY:
Material Enginer (Contractor) Materials Engineer (DPWH) Project Engineer (DPWH) Chief, QAD/QAS
5-3
5.3 Certificate of Quality Control Assurance Report
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
STATION: _______________________________________________________________
CONTRACTOR: _______________________________________________________________
_______________ _______________
Materials Engineer (DPWH) Project Engineer (DPWH)
5-4 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.4 Laboratory/Field Control Test Reports
5.4.1 California Bearing Ratio Test
Project :
Location :
Kind of Material :
Tested By :
(Name and Designation) (Date)
Computed By :
(Name and Designation) (Date)
Lab. No. :
3
MDD = kg/m
150
0.30
0.40
0.50
100
RESULTS :
Load CBR Value
CBR Value @ 0.10 0.00
50
Penetration, in
Swell, %
Page 1 of 4
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5-5
Letterhead of the Accredited Laboratory
WORKSHEET FOR CBR TEST (2/4)
Project :
Location :
Kind of Material :
Tested By :
(Name and Designation) (Date)
Computed By :
(Name and Designation) (Date)
Lab. No. :
MDD = kg/m3
150
0.30
0.40
0.50
100
RESULTS :
Load CBR Value
CBR Value @ 0.10 0.00
50
Penetration, in
Swell, %
Page 2 of 4
5-6 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
Letterhead of the Accredited Laboratory
WORKSHEET FOR CBR TEST (3/4)
Project :
Location :
Kind of Material :
Tested By :
(Name and Designation) (Date)
Computed By :
(Name and Designation) (Date)
Lab. No. :
MDD = kg/m3
150
0.30
0.40
0.50
100
RESULTS :
Load CBR Value
CBR Value @ 0.10 0.00
50
Penetration, in
Swell, %
Page 3 of 4
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5-7
Letterhead of the Accredited Laboratory
WORKSHEET FOR CBR TEST (4/4)
Project :
Location :
Kind of Material :
Tested By :
(Name and Designation) (Date)
Computed By :
(Name and Designation) (Date)
Lab. No. :
70.00
68.00
66.00
64.00
62.00
60.00
58.00
56.00
54.00
52.00
50.00
48.00
CBR Value, %
46.00
44.00
42.00
40.00
38.00
36.00
34.00
32.00
30.00
28.00
26.00
24.00
22.00
20.00
18.00
16.00
14.00
12.00
10.00
1940 1960 1980 2000 2020 2040 2060 2080
Laboratory Technician Materials Engineer (Contractor) Materials Engineer (DPWH) Project Engineer (DPWH)
Page 4 of 4
5-8 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.4.2 Grading Test
Project:
Kind of Material: Spec's Item No.
Sampled at:
Original Source:
Sampled by:
Tested by: Computed by:
(Date) (Date)
Lab. No.
Dry Unit mass, kg/m3 Loose Mass of Sample, g
Rodded Mass of Oven dried, g
Moisture Content, % Mass of washed oven
dried sample
Fineness Modulus . Mass of materials passing
0.075 mm, g
Remarks: __________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
Laboratory Technician Materials Engineer (Contractor) Materials Engineer (DPWH) Project Engineer (DPWH)
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5-9
5.4.3 Atterberg Limit Test
Sampled By Date
Tested By Date
Laboratory Report No.
SIEVE ANALYSIS
MOISTURE CONTENT, %
40
Sieve size
35 2.0
0.425
30 0.75
Liquid Limit
25 Plastic Limit
Plasticity Index
20 Group Index
Soil Classification
6 10 15 20 25 30 35 40
NUMB ER OF BLOWS
Remarks/Recommendations: ___________________________________________________________
___________________________________________________________
___________________________________________________________
Laboratory Technician Materials Engineer (Contractor) Materials Engineer (DPWH) Project Engineer (DPWH)
5 - 10 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.4.4 Laboratory Compaction Test
Sampled by:
(Name & Designation) (Office) (Date)
Tested by:
(Name & Designation) (Office) (Date)
Computed by:
(Name & Designation) (Office) (Date)
Trial Number 1 2 3 4 5 6 7
Water added in C.C,
Weight : Mold+Wet Soil
In : Mold
Kilograms : Wet Soil
Wet Density, kg/m3
Can Number
Weight : Can+Wet Soil
: Can+Dry Soil
In : Water
: Can
Grams : Dry Soil
Moisture Content, %
Dry Density, kg./m3
Remarks/Recommendation:
1800
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Moisture Content, %
Laboratory Technician Materials Engineer (Contractor) Materials Engineer (DPWH) Project Engineer (DPWH)
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5 - 11
5.4.5 Field Density Test
Remarks/Recommendations: ___________________________________________________________
___________________________________________________________
___________________________________________________________
Prepared by: Submitted by: Verified Correct: Concurred by:
Laboratory Technician Materials Engineer (Contractor) Materials Engineer (DPWH) Project Engineer (DPWH)
5 - 12 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.4.6 Soil Aggregates
5.4.6.1 Abrasion Test
Project:
(Number) (Name) (City/Province)
Source of Mixture:
(Give accurate location as possible)
Original Source:
(Pit, Quarry, River, etc., location)
Sampled By:
(Name & Designation) (Office) (Date)
Tested By:
(Name & Designation) (Office) (Date)
Computed By:
(Name & Designation) (Office) (Date)
Remarks/Recommendations: ___________________________________________________________
___________________________________________________________
___________________________________________________________
Laboratory Technician Materials Engineer (Contractor) Materials Engineer (DPWH) Project Engineer (DPWH)
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5 - 13
5.4.6.2 Composite Aggregates
Project :
Kind of material :
Sample identification :
Quantity represented :
Sampled at :
Original source :
Supplied by :
Proposed use :
Spec's Item No. :
Sampled by :
(Name & Designation) (Office) (Date)
Submitted by :
(Name and Designation) (Office) (Date Received)
Remarks: __________________________________________________________________________
__________________________________________________________________________
Tested by: Checked by
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
5 - 14 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.4.7 Bituminous Material Test
5.4.7.1 Asphalt Cement
Sample identification :
Quantity represented :
Sampled at :
Original source :
Grade :
Supplied by :
Proposed use :
Spec's Item No. :
Sampled by :
(Name & Designation) (Office) (Date)
Submitted by :
(Name & Designation) (Office) (Date Received)
Lab. No. ___________________
Remarks: __________________________________________________________________________
__________________________________________________________________________
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5 - 15
5.4.7.2 Emulsified Asphalt
Project :
Sample Identification :
Quantity represented :
Sampled at :
Type and Grade :
Original Source :
Supplied by :
Proposed Use :
Spec's Item No. :
Sampled by :
(Name & Designation) (Office) (Date)
Submitted by :
(Name & Designation) (Office) (Date Received)
Remarks: __________________________________________________________________________
__________________________________________________________________________
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
5 - 16 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.4.7.3 Cutback Asphalt
o
I. Viscosity (Kinematic) at _______ C, cSt: _____________________
o
II. Flash Point (TOC): ___________________ C
III. Specific Gravity
a. Mass of Pycnometer, g.: _____________________
b. Mass of Pycnometer + water, g.: _____________________
c. Mass of Pycnometer + sample, g.: _____________________
Specific Gravity = (c-a)/(b-a): _____________________
IV. Distillation
Volume of Sample, ml. = mass of sample/sp. Gravity: _____________________
Temperature Volume of Distillate % by volume
o o
190 C (374 F)
o o
225 C (437 F)
o o
260 C (500 F)
o o
315 C (600 F)
o o
360 C (680 F)
Residue, % by volume: _____________________
V. Test on Residue
o
1. Penetration at 25 C, 100g, 5s: _____________________
o
2. Ductility at 25 C, 5cm/min, cm: _____________________
3. Solubility in Trichloroethylene: _____________________
a. Mass of sample, g: _____________________
b. Mass of crucible, empty, g: _____________________
c. Mass of crucible + residue, g: _____________________
Solubilty, % = 100- [(c-b)/A x 100]: _____________________
4. Spot Test: _____________________
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5 - 17
5.4.8 Bituminous Mix
Project :
Sample identification :
Quantity represented :
Sampled at :
Original source :
Supplied by :
Proposed use :
Spec's Item No. :
Sampled by :
(Name & Designation) (Office) (Date)
Submitted by :
(Name & Designation) (Office) (Date Received)
Remarks: __________________________________________________________________________
__________________________________________________________________________
Tested by: Checked by
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
5 - 18 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.4.9 Pre-formed Expansion Joint Filler
Project :
Kind of material :
Sample identification :
Quantity represented :
Sampled at :
Original source :
Supplied by :
Proposed use :
Spec's Item No. :
Sampled by :
(Name & Designation) (Office) (Date)
Submitted by :
(Name & Designation) (Office) (Date Received)
Remarks: __________________________________________________________________________
__________________________________________________________________________
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5 - 19
5.4.10 Portland Cement
Project :
Sample identification :
Quantity represented :
Sampled at :
Manufactured by :
Brand :
Supplied by :
Spec's Item No. :
Sampled by: :
(Name & Designation) (Office) (Date)
Submitted by :
(Name & Designation) (Office) (Date Received)
Remarks: __________________________________________________________________________
__________________________________________________________________________
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
5 - 20 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.4.11 Reinforcing Steel Bar
Remarks: __________________________________________________________________________
__________________________________________________________________________
Tested by: Checked by
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5 - 21
5.4.12 Concrete Joint Sealant
o
Safe heating temperature, C -
o
Pour point temperature, C 211 Max.
Flow at 60 o C, mm 5 Max.
o
Penetration at 25 C, 150g, 5 sec. 90 Max.
Remarks: __________________________________________________________________________
__________________________________________________________________________
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
5 - 22 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.4.13 Paint
Non-volatile vehicle, %
by wt. of vehicle 18 Min.
Pigment, % 39 Min.
Titanium Dioxide, %
by wt.of pigment 30 Min.
Drying Time:
Set to touch, mins. 10-15
Dry hard, h 1 Max.
Remarks: __________________________________________________________________________
__________________________________________________________________________
Tested by: Checked by
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5 - 23
5.4.14 Thermoplastic Traffic Paint
Project :
Kind of material :
Sample identification :
Quantity represented :
Sampled at :
Original source :
Supplied by :
Proposed use :
Spec's Item No. :
Sampled by :
(Name & Designation) (Office) (Date)
Submitted by :
(Name & Designation) (Office) (Date Received)
Remarks: __________________________________________________________________________
__________________________________________________________________________
Tested by: Checked by
________________________ ________________________
Laboratory Technician Laboratory Supervisor
Witnessed by: Attested by:
5 - 24 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.5 Accreditations
5.5.1 Application for Accreditation of Asphalt/Concrete Batching Plant (Per
DO. No. 253, series of 2003)
BRS Form No. 2
APPLICATION FOR ACCREDITATION OF BATCHING PLANT
The Director
Bureau of Research and Standards
Department of Public Works and Highways
EDSA, Quezon City
Sir:
In accordance with the “Guidelines for the Accreditation of Asphalt and Portland Cement
Concrete Batching Plants” issued by DPWH, we hereby apply for assessment as a DPWH accredited
_________ batching plant.
In the event that a certificate of accreditation is granted, we hereby agree to comply with the
“Guidelines for the Accreditation of Asphalt and Portland cement Concrete Batching plants” and to abide
by the rules and regulations promulgated by the DPWH for the accreditation of batching plants.
_________________________
(Signature)
President/Manager/Duly Authorized Representative
Subscribed and sworn to before me this ___________ day of _____________ 20__, affiant
exhibiting to me his/her Residence Certificate No. ________________ issued at ___________ on
20____.
____________________________
Notary Public
Doc. No.: ___________
Page No.: __________
Book No.: __________
Series of : __________
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5 - 25
5.5.2 Application for Accreditation of Materials Engineer (Per D.O. No. 184,
Series of 1999)
APPLICATION FORM
Application Number □□□□ 2" x 2" Photo
□ New Applicant
□ Accredited Materials Engineer I,
________________________________
Signature over printed name
________________________________
Date
5 - 26 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
5.5.3 Application for Accreditation of DPWH Materials Engineer (Per D.O.
No. 12, Series of 2013)
APPLICATION FORM
____________
2" x 2" Photo
Date of Examination
________________________________
Signature over printed name
________________________________
Date
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 5 - 27
5.5.4 Instructions for Application for Accreditation of Materials Engineers
1. Type or print the data on each space clearly.
2. Attach to this Application Form the following requirements:
a. Xeroxed copy of valid Professional Regulation Commision (PRC) Identification
Card
b. Two 2” x 2” photographs (one to be pasted in the Application Form and the other
is for Notice of Examination Schedule)
c. One 1” x 1” photograph
3. Submit the Application Form and the requirements to:
The Chief
Quality Assurance Division
Any Regional Office of the Department of Public Works and Highways
4. Application forms must be submitted at least forty (40) days before the scheduled
accreditation examination.
5. Applicants shall obtain the Notice of Examination Schedule from the DPWH Office
where the application was filed within, one (1) week before the scheduled examination.
The notice shall confirm the date, time and place of examination. This notice must be
presented to the DPWH examination proctor during the examination.
EXAMINATION COVERAGE
5 - 28 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
Chapter 6 Payments
6.1 Advance Payment
6.1.1 Disbursement Voucher
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
DISBURSEMENT VOUCHER
MODE OF PAYMENT DV No.:
□MDS Check □Commercial Check □ADA □Others Date:
Payment/Office: TIN/Employee No.: OR/BUR No.:
Date:
Bank Account No.: Responsibility Center
Address: Title: Code:
Account
Explanation Amount
Code
Advance to Contractors P
Due to BIR
_______________ payment in connection with the Contract ID#
________________
Contract Amount P -
_____x___________
-
Less: P ________________-
12 % VAT P ________________ -
P -
Net Amount Due to - - - - - - - - - - P -
□
A. Certified
E
A □
B. Approved for Payment
A
E
A
□Cash Available
□Subject to ADA (where applicable)
□Supporting documents complete
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6-1
6.1.2 Background Information
Date: ____________________
FOR: _________________________________
The Regional Director/District Engineer
FROM: ___________________________________________
___________________________________________
SUBJECT: ___________________________________________
BACKGROUND:
REMARKS: __________________________________________________
__________________________________________________
_____________________
Project Engineer
6-2 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.1.3 Executive Summary
_____________________
Project Engineer
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6-3
6.1.4 Billing Summary
Date: ____________________
BILLING SUMMARY
PAYEE: _________________________________________________________
PAYMENT BREAKDOWN
REMARKS:
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
NOTED:
_____________________
Project Engineer
6-4 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.1.5 Request for the Release of 15% Advance Payment
CONSTRUCTION
COMPANY CO., LTD.
Date: _____________________
_______________________________________
THE REGIONAL DIRECTOR/DISTRICT ENGINEER
U
_______________________________________
Thru: ___________________
Chief, Construction Division/Section
Sir:
In accordance with the conditions of contract, we have complied with all your
guidelines and requirements, that is; a.) The Form of Agreement was executed by and between
the both parties, b.) The Performance Security was provided by us and still valid, c.) The
Warranty in a form of Bank Guarantee in the amounts equal to Advance payment.
Accordingly, may we request your good office to release advance payment, 15% of
contract amount, exclusively for the costs of mobilization of the above-mentioned project.
_________________________
Contractor
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6-5
6.1.6 Required Certification for Processing of Payments
As per D.O. 55 series of 1988
Date: ____________________
CERTIFICATION
U
This is to certify further that all requirements and supporting papers pursuant to
Department Order No. 55 series of 1988 have been complied with, reviewed and found to be in
order.
______________________________
Chief, Construction Division/Section
6-6 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.1.7 List of Minimum Required Equipment
Date: ____________________
1) ___________________________________________________________________
2) ___________________________________________________________________
3) ___________________________________________________________________
4) ___________________________________________________________________
5) ___________________________________________________________________
6) ___________________________________________________________________
7) ___________________________________________________________________
8) ___________________________________________________________________
9) ___________________________________________________________________
10) ___________________________________________________________________
PHOTOGRAPHS
______________________________
Project Engineer
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6-7
6.1.8 Checklist of Supporting Document
6-8 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.2 First Progress Billing
6.2.1 Background Information
Date: ____________________
FOR: _________________________________
The Regional Director/District Engineer
FROM: _________________________(The Project Engineer)
___________________________________________
SUBJECT: First Billing
U
BACKGROUND:
REMARKS: __________________________________________________
__________________________________________________
_____________________
Project Engineer
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6-9
6.2.2 Executive Summary
_____________________
Project Engineer
6 - 10 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.2.3 Billing Summary
Date: ____________________
BILLING SUMMARY
PAYEE: _________________________________________________________
PAYMENT BREAKDOWN
REMARKS:
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
NOTED:
_____________________
Project Engineer
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6 - 11
6.2.4 Request for Release of First Partial Billing
CONSTRUCTION
COMPANY CO., LTD.
Date: _____________________
_______________________________________
THE REGIONAL DIRECTOR/DISTRICT ENGINEER
U
_______________________________________
Thru: _____________________________
Chief, Construction Division/Section
Sir:
We are submitting herewith our First Partial Billing for the above-mentioned project, in
the amount of _____________________________ (P______________________) only. We have
accomplished the work satisfactorily in accordance to the terms and conditions of the contract. We
also certify that the Performance Security of Contractors Comprehensive All Risk Insurance
(CARI) is valid and premiums have been paid on time. Detailed Quantity Calculation, supporting
papers and pertaining documents are hereto attached for your review and approval.
We hope that the above is in order and request your preferential attention thereof.
_________________________
Contractor
6 - 12 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
CERTIFICATE OF PAYMENT
For the period : ______________________________
Payment Certificate No. __
PROJECT NAME:
CONTRACTOR:
ORIGINAL CONTRACT AMOUNT: P 9. I hereby certify that the attached statement of work is CHECKED AND VERIFIED:
REVISED CONTRACT AMOUNT P correct and just and does not include items and/or
portions thereof for which payment has already been
6.2.5 Certificate of Payment
A. 10% Retention P
Recoupment from Advance P AMO/Contractor's Representative
Sub-Total P
B. 2% Withholding Tax P 10. We hereby certify that the materials incorporated in this RECOMMENDED FOR PAYMENT:
5% VAT P certificate for payment have been verified and tested
Others (Specify) in accordance with specifications.
Sub-total P
TOTAL DEDUCTIONS P
5. Amount received for payment: P Assistant Regional Director
6. Add: Request No.___ for materials currently on hand Chief, QAD/QAS
7. Less: Request No.___for previous payment
materials on hand P
8. Net amount Due to Contractor P
11. I hereby certify that the quantity of work approved for APPROVED FOR PAYMENT:
payment in the attached statement have been
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
accomplished; that the quantities including materials
Schedule Physical Progress: % brought to site but not incorporated in the work are
Actual Physical Progress: % correct and consistent with all previous recommendations
Slippage (+) % for payment and the work quantities and amounts are
Original Expiry Date: consistent with the requirements of the contract. Regional Director
6 - 13
Project Engineer (DPWH)
6 - 14
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
TO TAL
Submitted by: Checked by: Verified by: Recommending Approval by: Approved by:
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
Contractor Project Engineer Chief, Construction Division Assistant Regional Director Regional Director
6.2.7 Statement of Time Elapsed
Date: ____________________
STATEMENT OF TIME ELAPSED AND WORK ACCOMPLISHED
Certified by:
_____________________
Project Engineer
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6 - 15
6.2.8 Certification of Clearance for Equipment Rental and/or Lease
Date: ____________________
CERTIFICATION OF CLEARANCE FOR
EQUIPMENT RENTALS AND/OR LEASE
LIMITS: ___________________________________________________
LOCATION: ___________________________________________________
______________________________
Project Engineer
6 - 16 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.2.9 Certification of Labor and Materials Payment
Date: ____________________
CERTIFICATION OF CLEARANCE FOR
LABOR AND MATERIALS PAYMENT
LIMITS: ___________________________________________________
LOCATION: ___________________________________________________
______________________________
Project Engineer
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6 - 17
6.2.10 Detailed Quantity Calculation
6 - 18 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.2.11 Checklist of Supporting Documents and Attachments for DoTS
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6 - 19
6.3 Interim Progress Billing
6.3.1 Request for Release of Interim Billing
CONSTRUCTION
COMPANY CO., LTD.
Date: _____________________
_______________________________________
THE REGIONAL DIRECTOR/DISTRICT ENGINEER
U
_______________________________________
Thru: _____________________________
Chief, Construction Division/Section
Sir:
With reference to our contract for the above-mentioned project, we would like to request
for the _______ partial payment of work accomplished in the amount of
_________________________ (P _________________). We have accomplished the work
satisfactorily in accordance to the terms and conditions of the contract. Attached herewith are the
Detailed Quantity Calculation, Statement of Work Accomplished and other documents for your
review and approval.
_________________________
Contractor
6 - 20 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.3.2 Checklist of Supporting Documents And Attachments for DoTS
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6 - 21
6.4 Final Billing
6.4.1 Property Clearance
This is to certify that as per records of this office, (Name of the Contractor),
U U
contractor of the (Project Name), has no property and/or money accountability with the
U U
_________________________________
Supply Officer, Administrative Division/Section
_________________________________
Chief, Administrative Division/Section
6 - 22 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.4.2 Regional Equipment Clearance
Date: ______________
Contractor: ___________________________________________________________
___________________________________________________________
Project ID: ___________________________________________________________
Project Name: ___________________________________________________________
Description: ___________________________________________________________
Location : ___________________________________________________________
(This will include unreturned equipment, attachments and accessories, estimated cost of repairs, etc.)
REMARKS: ___________________________________________________________
___________________________________________________________
(State the present condition of the equipment together with your comment
and/or recommendation).
____________________________________ ____________________________________
Chief Accountant
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6 - 23
6.4.3 Certificate of Completion
CERTIFICATION OF COMPLETION
This is to certify that the above-stated project has been satisfactorily completed on
_____________________ in accordance with the Plans and Specifications of the Contract
based on the Final Inspection Report of the Inspectorate Team dated ___________________.
This Certificate does not relieve the Contractor of his obligations and
responsibilities in undertaking repair works on any defect or failure that may occur on any
section of the Project during the defects liability period starting from the date of completion
as herein stated. Neither is he relieved of his obligations and responsibilities pursuant to the
provisions of R.A. 9184.
______________________________
Regional Director/District Engineer
Comforme:
______________________________
Contractor
6 - 24 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.4.4 Inspection Report
This is to certify that the above-stated project has been satisfactorily completed on
_____________________ in accordance with the Plans and Specifications of the Contract
based on the Final Inspection Report of the Inspectorate Team dated ___________________.
This Certificate does not relieve the Contractor of his obligations and
responsibilities in undertaking repair works on any defect or failure that may occur on any
section of the Project during the defects liability period starting from the date of completion
as herein stated. Neither is he relieved of his obligations and responsibilities pursuant to the
provisions of R.A. 9184.
______________________________ ______________________________
Representative Representative
Construction Division/Section Planning & Design Division/Section
______________________________ ______________________________
Representative Representative
Maintenance Division/Section QA Division/Section
NOTED BY:
______________________________
Asst. Regional Director/Asst. District Engineer
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6 - 25
6.4.5 Checklist of Supporting Documents and Attachments for DoTS
6 - 26 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.5 Retention Money
6.5.1 Description
Progress payments are subject to retention of ten percent (10%) referred to as the
“retention money”. Such retention shall be based on the total amount due to the contractor
prior to any deduction and shall be retained from every progress payment until fifty percent
(50%) of the value of works, as determined by the procuring entity, are completed. If, after
fifty percent (50%) completion, the work is satisfactorily done and on schedule, no additional
retention shall be made; otherwise, the ten percent (10%) retention shall be imposed.
The total “retention money” shall be due for release upon acceptance of the works. The
contractor may, however, request the submission of the retention money for each progress
billing with irrevocable standby letters of credit from a commercial bank, bank guarantees or
surety bonds callable on demand, of amounts equivalent to the retention money substituted for
and acceptable to DPWH, provided that the project is on schedule and is satisfactorily
undertaken. Otherwise, the ten percent (10%) retention shall be made. Said irrevocable
standby letters of credit, bank guarantees and/or surety bonds, to be posted in favor of the
DPWH shall be valid for a duration to be determined by the concerned implementing
office/agency or procuring entity and will answer for the purpose of which the ten percent
(10%) retention is intended, i.e. to cover uncorrected noted defects and third party liabilities.”
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6 - 27
6.5.2 Request for the Release of Retention
CONSTRUCTION
COMPANY CO., LTD.
Date: _____________________
_______________________________________
THE REGIONAL DIRECTOR/DISTRICT ENGINEER
U
_______________________________________
Thru: _____________________________
Chief, Construction Division/Section
Sir:
With reference to our contract for the above-mentioned project, we would like to request
for the release of Retention in the amount of _____________________ (P _________________).
_________________________
Contractor
6 - 28 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
6.5.3 Statement of 10% Retention
Contractor: __________________________________________________
Name of the Project: __________________________________________________
Total
Certified Corrected:
_________________________________
Accountant
Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents 6 - 29
6.5.4 Checklist of Supporting Documents and Attachments for DoTS
6 - 30 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
Chapter 7 Project Completion and
Acceptance
7.1 Final Inspection for Completion
7.1.1 QAU or Regional Inspectorate Team Report
I. PROJECT INFORMATION
Location: ____________________________________________________
Contract Amount: ____________________________________________________
Contractor: ____________________________________________________
Submitted by:
QAU/RO TEAM
_________________________________ _________________________________
_________________________________ _________________________________
Noted by:
_________________________________
Chief, QAD
Road Project Management and Supervision Manual Vol. II:Sample Forms and Documents 7-1
7.1.2 Pre-final Inspection (Punch List)
Date: ___________________
Pre-final Inspection
(PUNCHLIST)
NAME OF PROJECT: _______________________________________________________
STATION LIMITS : _______________________________________________________
LOCATION: _______________________________________________________
CONTRACTOR: _______________________________________________________
FINDINGS:
1. ________________________________________________________________________
2. ________________________________________________________________________
3. ________________________________________________________________________
4. ________________________________________________________________________
5. ________________________________________________________________________
6. ________________________________________________________________________
7. ________________________________________________________________________
8. ________________________________________________________________________
9. ________________________________________________________________________
10. ________________________________________________________________________
11. ________________________________________________________________________
12. ________________________________________________________________________
13. ________________________________________________________________________
14. ________________________________________________________________________
15. ________________________________________________________________________
Prepared by:
__________________________________ __________________________________
Project Facilitator Project Engineer
Received by:
__________________________________
Contractor
7-2 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
7.1.3 Final Inspection Report
Date: ____________________
FINAL INSPECTION REPORT
PROJECT/LOCATION: ___________________________________________________
___________________________________________________________
CONTRACTOR: ___________________________________________________________
___________________________________________________________
_____________________________________ _____________________________________
Chief, Planning and Design Division/Section Chief, Construction Division/Section
_____________________________________ _____________________________________
Chief, Maintenance Division/Section Chief, Quality assurance Division/Section
____________________________________________________
Assistant Regional Director/Assistant District Engineer
Road Project Management and Supervision Manual Vol. II:Sample Forms and Documents 7-3
7.2 Certificate of Completion
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
Date: ____________________
CERTIFICATE OF COMPLETION
PROJECT/LOCATION: ___________________________________________________
___________________________________________________________
___________________________________________________________
CONTRACTOR: ___________________________________________________________
___________________________________________________________
This is to certify that the above-stated project has been satisfactorily completed on
___________________ in accordance with the Plans and Specifications of the Contract based on
the Final Inspection Report of the Inspectorate Team dated ____________________________.
This certification does not relieve the Contractor of his obligations and responsibilities
in undertaking repair works on any defect or failures that may occur in any section of the project
during the one-year Warranty Period starting from the date of completion as herein stated.
Neither is he relieved of his obligations and responsibilities pursuant to the provisions of
PD 1759.
_____________________________________
Regional Director/District Engineer
Comforme:
_____________________________________
Contractor
7-4 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
7.3 Post-evaluation Report (Post-audit)
Republic of the Philippines
COMMISSION ON AUDIT
TECHNICAL and INFORMATION TECHNOLOGY SERVICES
VALIDATION REPORT
FOR INFRASTRUCTURE PROJECTS
DATE
PROJECT:
LIMITS/LOCATION:
CONTRACTING PARTIES :
CONTRACT DURATION : NOTICE TO PROCEED:
EFFECTIVITY DATE: TARGET DATE OF COMPLETION:
DATE OF INSPECTION: ACTUAL DATE OF COMPLETION:
A. OBJECTIVE
To validate the reported accomplishment and determine compliance with plans specification
B. SCOPE
Progress accomplishment as to physical and technical aspect.
C. REFERENCE DOCUMENTS
SUBMITTED DATE AMOUNT
DOCUMENTS REMARKS
YES NO NA YY MM DD (PhP)
1 Original Contract
1.1 Plans
1.2 Specifications
3.2 Specifications
3.3 Cost Breakdown
8 As-built Plans
9 Others
D. METHODOLOGY
1 Studied plans and specifications
2 Prepared inspection working paper.
3 Conducted physical/ocular inspection
4 Conducted technical evaluation (actual measurements)
Page 1 of 2
Road Project Management and Supervision Manual Vol. II:Sample Forms and Documents 7-5
Page 2 of 2
7-6 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents
7.4 Acceptance Report
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
Date: ____________________
ACCEPTANCE REPORT
PROJECT/LOCATION: ___________________________________________________
___________________________________________________________
CONTRACTOR: ___________________________________________________________
___________________________________________________________
_____________________________________ _____________________________________
Chief, Planning and Design Division/Section Chief, Construction Division/Section
_____________________________________ _____________________________________
Chief, Maintenance Division/Section Chief, Quality assurance Division/Section
____________________________________________________
Assistant Regional Director/Assistant District Engineer
Road Project Management and Supervision Manual Vol. II:Sample Forms and Documents 7-7
7.5 Certificate of Acceptance
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGWAYS
Implementing Office
Date: ____________________
CERTIFICATE OF ACCEPTANCE
PROJECT/LOCATION: ___________________________________________________
___________________________________________________________
___________________________________________________________
CONTRACTOR: ___________________________________________________________
___________________________________________________________
This is to certify that the above-stated project has been accepted as of ( date ) .
Based on the Acceptance Report of the Inspectorate Team dated ( date ) , the
Project is free from failures and defects which are traceable to poor workmanship, use of poor quality
materials and non-compliance with Plans and Specifications of Contract.
_____________________________________
Regional Director/District Engineer
Comforme:
_____________________________________
Contractor
7-8 Road Project Management and Supervision Manual Vol. II: Sample Forms and Documents