You are on page 1of 6

E -Engineering Ltd.

Project - Development infrastructure / Support facilities for Operation of Payra Deep Sea Port

Legend: E : Estimated, P: Practical

Pakshi Sand Stone M.S rod (Kg)


Sylhet Sand (Cft) Local sand (Cft) Brick chips (Cft)
Sl No Item of work Cement (Bag) P/E (cft) Chips
P/E P/E P/E (P/E)
P/E (Cft)
1 A B A B A B A B A B E/P A B
2 C.C work 7/9 6/8 40/34 30/35 68/65 60/58
3 Footing 30/44 28/41 15/55 14/51 35/0 30/0 78/55 52/75 220/210 205/200 315/337 309/332
4 Short Column 6/9 7/10 0/11 0/12 6/0 7/0 21/12 13/22 45/45 50/50
5 Grade Beam 23/33 22/32 12/42 40/11 30/0 29/0 48/41 40/47 165/170 160/165 682/721 525/565
6 Long column 17/21 19/24 8/26 10/29 18/0 19/0 38/28 41/31 105/105 120/120 922/966 928/990
8 Roof slab 65/86 55/74 33/107 27/92 74/0 65/0 125/108 107/93 435/425 380/370 1620/1654 1462/1567
9 G.F slab 17/29 15/26 0/36 0/32 17/0 15/0 66/36 56/32 152/145 135/130 235/272 201/235
10 Pl brick work 4/7 4/6 35/53 35/45
11 Super structure brick work 29/34 28/33 230/224 226/220
12 Plaster work (R.C.C surface) 7/9 6.5/8 49/42 53/45
13 Plaster work (brick surface) 48/54 47/53 370/348 380/355
14 Patent stone - G.F+roof 29/35 26/31 0/44 0/39 95/44 85/39

15 Mosque Pile 27/36 80/71 145/141


16 School Pile 26/35 78/69 140/137
17 Septic R.C.C work 17/30 0/37 70/38 135/150 165/231
18 Septic brick work 8/13 72/103
19 Soakwell brick work 5/7 42/55
Bricks (Nos)
(P/E)

A B

67

1230/2026 1151/1782
6960/7480 6890/7400

2570/3250
1525/1910
Sl No Item of work Cement (Bag) Sylhet Sand (Cft)
1 A B A
Estimated Practical Saving Estimated Practical Saving Estimated
2 C.C work 9 7 2 8 6 2
3 Footing 44 30 14 41 28 13 55
4 Short Column 9 6 3 10 7 3 11
5 Grade Beam 33 23 10 32 22 10 42
6 Long column 21 17 4 24 19 5 26
8 Roof slab 86 65 21 74 55 19 107
9 G.F slab 29 17 12 26 15 11 36
10 Pl brick work 7 4 3 6 4 2

11 Super structure 34 29 5 33 28 5
brick work

Plaster work 9 7 2 8 7 1
12 (R.C.C surface)
13 Plaster work 54 48 6 53 47 6
(brick surface)
Patent stone - 35 29 6 31 26 5 44
14 G.F+roof
88 82
Cement (Tk)
Sand (tk)

Sylhet Sand (Cft) Pakshi Sand (cft) Local sand (Cft)


A B A B A
Practical Estimated Practical Estimated Practical Estimated Practical Estimated Practical
34 40
15.00 51 14 0 35.00 0 30/0 55 78
0.00 12 0 0 6.00 0 7/0 12 21
12.00 40 11 0 30.00 0 29/0 41 48
8.00 29 10 0 18.00 0 19/0 28 38
33.00 92 27 0 74.00 0 65/0 108 125
0.00 32 0 0 17.00 0 15/0 36 66
53 35

224 230

42 49

248 370

0.00 39 0 44 95

68 62 180 0 1195
Local sand (Cft) Brick chips (Cft) M.S rod (Kg) (P/E)
B A B A B
Estimated Practical Estimated Practical Estimated Practical Estimated Practical Estimated
30/35 68/65 60/58
52/75 220/210 205/200 315/337
13/22 45/45 50/50
40/47 165/170 160/165 682/721
41/31 105/105 120/120 922/966
107/93 435/425 380/370 1620/1654 1462/1567
56/32 152/145 135/130 235/272
35/45

226/220

53/45

380/355

85/39

0
(P/E) Bricks (Nos)
B A B
Practical Estimated Practical Estimated Practical

309/332

525/565
928/990
1462/1567
201/235
1230/2026 1151/1782

6960/7480 6890/7400

You might also like