You are on page 1of 24

SNI IEC 61439-2

Hal yang Dipertimbangkan dalam Desain Panel LV

Webinar – Fadjar Widjaja / Hedi S


30 Mei 2017

Confidential Property of Schneider Electric


Webinar – May 2017
Hal-hal yang Penting dalam Desain Panel terkait SNI IEC 61439-2

• Standard dan Peranan Standard bagi Perancang


• SNI dan IEC
• IEC 60439 dan IEC 61439
• Spesifikasi untuk Panel LV
• Offer yang tersedia di Pasar
• Bahan Referensi
• Tanya - Jawab

Confidential Property of Schneider Electric |


Confidential Property of Schneider Electric | Page 3
Kuisioner
Selama webinar terkait berlangsung 30 Mei 2017 10.00 – 11.30

• PERTANYAAN
A. Apa nama Standar Nasional Indonesia (SNI) terkait Rakitan Perangkat Sakelar & Kendali
Voltage Rendah ?
B. Solusi Schneider terkait dengan SNI di atas adalah _________ dan _________

Kirim SMS ke 0816 131 9299 dengan tagar :


nama, perusahaan, no.telp, jawaban A, jawaban B
Contoh : Hendry, meconsultant, 08129211795, SNIxxxx, aaaa dan bbbb

Confidential Property of Schneider Electric | Page 4


USING THE STANDARDS
How It Brings Values to Stakeholders

Confidential Property of Schneider Electric | Page 5


Specification according to the standards
For Specifiers

• The Standard is a guarantee of:


• Safety
• Continuity of service
• Conformity to their requirements

• They should ask for


• Complete certifications from a recognized
certification body (ASEFA,KEMA,…)
• One single test certificate is not enough. The
certificate has to cover the complete system

• Select a Panel builder able to:


• Comply with IEC 61439-1 & 2
• Help you to specify your needs according the
definitions of the standard
• Deliver routine verification reports
Standard IEC : Rujukan Internasional
Standar penting terkait bangunan dan instalasi LV electrical
Installations:
IEC 60364
& local
standards

Switchboard:
Old: IEC 60439-1
New: IEC 61439-
1/2

Busbar trunking:
Old: IEC 60439-2
New: IEC 61439-6

Switchgear &
controlgear:
IEC 60947-x
SNI dan IEC
Main evolutions of the ASSEMBLY Standard
From IEC 60439-1 to IEC 61439-1&2
The International ASSEMBLY standards
From IEC 60439-1 to IEC 61439-1&2
OLD IEC 60439-X Power switchgear and controlgear assemblies
LV switchgear TTA and PTTA (Also used as a general rules standard) 60439-1
& controlgear Busbar Distribution ASS. for ASSEMBLIES
Assemblies Trunkings Boards for construction for public
(ASSEMBLIES) Systems unskilled pers. sites networks
60439-2 60439-3 60439-4 60439-5

NEW IEC 61439-X General rules


LV switchgear 61439-1 (2009)
& controlgear Power switchgear Distribution ASS. for ASSEMBLIES Busbar
Assemblies and controlgear Boards for construction for public Trunkings
(ASSEMBLIES) assemblies Ordinary pers. sites networks Systems
61439-2 (2009) 61439-3 61439-4 61439-5 61439-6

● IEC 61439-2 is to be read in conjunction with IEC 61439-1, instead of IEC 60439-1 alone
● Structure aligned with Standard for protection devices IEC60947
● Tests identical to those in IEC 60439-1 do not need to be repeat

Schneider Electric – Building and IT– IEC – 2016 10


IEC61439-1&2 Standard

Why a new standard ?

● 80% of the ASSEMBLIES worldwide do not comply with the


standard
●Requirements not always clear
●Role of Switchboard System manufacturer and Panel Builder not
clear enough

● A Partially Type Tested ASSEMBLY (PTTA) concept abused and


misused

Schneider Electric – Building and IT– IEC – 2016 11


IEC61439-1&2 Standard

Main Changes

● Recognition of Original Manufacturer (Switchboard


System manufacturer) and ASSEMBLY Manufacturer
(Panel Builder)

● PTTA/TTA concepts replaced with verified ASSEMBLY

● Clarified & reinforced requirements

Schneider Electric – Building and IT– IEC – 2016 12


IEC61439-1&2 Standard

Clear Definitions of Roles


● ASSEMBLY Manufacturer (Panel Builder)
● Takes the responsibility for the final Assembly
● Carries out routine verifications Specifier
Certification
● Original Manufacturer (System body
Project Specification
manufacturer)
● Carries out the original design
● Carries out the design verifications that can be
certified through a certification body (ASEFA, Assembly
Original Assembly
ASTA, KEMA,…) system Manufacturer
Manufacturer
(Panel Builder)
● ASSEMBLY System
● Full range of mechanical & electrical components
(functional units, switching devices, enclosures…) Tested assembly
designed by the Original Manufacturer to be
assembled according to his instructions

● Specifier (design office, End user,…) User


● Specifies or selects the ASSEMBLY

Schneider Electric – Building and IT– IEC – 2016 13


Clear Definitions of Roles

● ASSEMBLY Manufacturer

● Organization taking the responsibility for the completed ASSEMBLY


● The ASSEMBLY manufacturer may be a different organization to the Original Manufacturer
● For an ASSEMBLY verified by an Original Manufacturer and manufactured or assembled by a
separate ASSEMBLY Manufacturer, design verification do not need to be repeated,
provided all the Original Manufacturer’s instructions are met in full
● In respect of his own arrangements, including the selection of the appropriate components from
the ASSEMBLY system, the ASSEMBLY Manufacturer is deemed to be the Original Manufacturer

Schneider Electric – Building and IT– IEC – 2016 14


End User’s Added Values
Forms of Internal Separation

Schneider Electric – Building and IT– IEC – 2016 16


The main 10 Functions

Schneider Electric – Building and IT– IEC – 2016 17


The main 10 Functions

Schneider Electric – Building and IT– IEC – 2016 18


Overview of the routine verifications
Routine Verification Visual Tests
inspection
Degree of protection of enclosures x
Clearances x If D < value (14mm): impulse withstand test
If D < 1,5 times value (21mm): measurement
Creepage distances x or measurement if visual inspection not applicable

Protection against electric shock and integrity x Random verification of tightness of the connections of protective
of protective circuits circuit
Incorporation of built-in components x
Internal electrical circuits and connections x Or Random verification of tightness

Terminals for external conductors Number, type and identification of terminals

Mechanical operation x effectiveness of mechanical actuating elements locks and


interlocks, including those associated with removable parts
Dielectric properties Power-frequency dielectric test or verification of insulating
resistance (From 250A)
Wiring, operational performance and function x Verification of completeness of information & markings,
inspection of wiring and Function test where relevant

Schneider Electric – Building and IT– IEC – 2016 19


Guides Catalogues
Specifier tools

Specification Sheets

Schneider Electric – Building and IT– IEC – 2016 20


IEC 61439 and Schneider Electric Solutions

Schneider Electric – Building and IT– IEC – 2016 21


IEC 61439 and Schneider Electric Solutions

Schneider Electric – Building and IT– IEC – 2016 22


Tanya - Jawab