INSTRUCTIONS FOR INSTALLATION & MAINTENANCE OF GEARED COUPLING

Geared couplings are delivered without lubricant. The coupling parts MAINTENANCE
should be stored in dry surroundings. For oil lubricated couplings, the oil must be renewed every 8000
Before installation, all parts of the coupling should be thoroughly cleaned. hours of operation. In addition, regular (6 months) checks should be
Use light oil for cleaning, to remove rust preventive agent and to pre- made between oil changes to ensure that the correct oil level is main-
vent foreign matters mingling therein. Damage to lip seals, O-rings and tained . For grease lubricated couplings, the level should be checked at
the metal sealing surfaces should be strictly avoided. 8000 hours and at regular intervals (6 months) to ensure correct levels.
It is recommended that grease be renewed at 2 years interval.
INSTALLATION
1. Mounting of hubs with rectangular, tangential or tapered keyed The first oil/grease change should take place before 3 months
connections. in operation.
Grease pack the lip seal in the end cover and slide it into To exchange lubricating oil for the first time, dismantle the coupling after
the correct position on the hub which should then be drawn onto the three month - throughly clean away inside to remove used oil and abra-
shaft ends to the desired installation position. With normal fits (H7/m6 sive powder etc. reassemble it so that same teeth before dismantling
or k6) the need for axial locations to the hubs can often be eliminated. are meshed each other again. Thereafter supplement or exchange oil
from the oil plug hole every six months.
2. Mounting the hubs with shrink fit.
Push the end cover with a seal to the correct installation When using grease, ensure that the recommended quantity of
position to the shaft in such away that the seals are not touched or grease is applied on the coupling teeth (internal & external) to such an
damaged by the hot hubs. Heat hubs (About 140 C max.) either in an oil amount that their addendum cannot be seen any more and assemble
bath or by induction heater or on a heating plate or by means of ring them in. After tightening the coupling casing, fill the casing with speci-
burner until they can easily be pushed on to the shafts. Avoid heating of fied amount of grease from the oil plug hole by the use of grease gun
teeth surfaces directly with flame. etc.

3. Installation of the housings When exchanging grease dismantle the coupling and exchange
Oil or grease the teeth of the teeth of the hubs and the the entire used grease.
housing. Push the housing on to the hub in away that distance “N” oth-
erwise the complete tooth contact of Hub and Housing will not be en-
Grease lubrication is inferior or the oil lubrication in its lubricat-
sured thereby reducing the life of the coupling.
ing performance.

4. Alignment
Axial displacement of the housing part should also be checked
Axial distance “N” (feeler gauge) and straight alignment of
during all inspections. If it is not easily movable, a check can be made
the two hubs (straight edge, light-cap-free contact) to be checked at
with end covers loosened. Re-alignment should be carried out as nec-
different points on the circumference (fig.1, fig.2). Completely assembled
essary.
coupling is to be also checked, (as Shown fig.2.).
It is very much essential to align the coupling accu-
rately. The coupling’s life depends on the amount of misalign- Damaged seals (lip type or O-rings) must be replaced. Split
ment. In case of large misalignment coupling’s life will be reduced replacement seals are available which can be glued together after be-
considerably. ing placed over the shaft. For replacement, the lubricating medium must
be drained and the end covers loosened. Before reassembly. all metal
sealing surfaces should be cleaned and treated with a sealing com-
5. Connecting the housing halves.
pound wherever necessary.
Push the housing halves together and connect by means of
the fitted bolts. The housing should be able to move easily without the
end cover. Maintenance Checks:
1. Check for vibration and noise
2. Check for leakage
6. Mounting the connected end cover.
3. Check for damages on gear teeth
Cover the sealing surface of the end cover with sealing
4. Check for damages and deterioration of ‘O’ ring
compound and affix to the housing.
5. Check for deterioration of oil

7. Exchanging a sealing
Checks mentioned above in 1 & 2 can be made by observing
Disconnect the end cover with the damage seal from the
from outside after comparing with condition under normal operation.
housing. Push the housing as far as possible on the second hub. Re-
The other checks should be carried out every six months by
move the damaged seal. Glue the new seal (split) over the hub.
dismantling the coupling.
Before re-mounting the end covers the metal sealing sur-
In case of high ambient temperature, frequent overloaded con-
faces should be cleaned and covered with sealing compound.
dition, frequent reversion operation, large parallel misalignment and
angular misalignment, ensure that the checking intervals are short-
8. Lubrication ened.
Before putting the coupling into operation, it must be filled
with the correct amount of oil/grease as indicated in the chart. After
Note:
filling, the filler holes must be plugged with the screw threads treated
Correct initial installation, accurate alignment, usage of
with a suitable compound to give good sealing. It is also recommended
right quantity and quality of lubricant will ensure longer life and
that keyways be sealed either by a sealing compound like Bond silicon,
smooth/trouble free operation of the coupling.
Hermoseal SS60F or an end cap with fitted ‘O’ ring.
RECOMMENDED QUANTITY OF OIL/GREASE

Size 63 112 190 300 560 900 1500 2240 3000 3750 5600
of oil or grease (liters)
MInimum quantity

BZWG 0.07 0.10 0.18 0.31 0.13 0.15 0.23 0.37 0.52 0.70 0.80

BZGR 2*0.35 2*0.05 2*0.09 2*0.16 2*0.06 2*0.08 2*0.12 2*0.19 2*0.26 2*0.35 2*0.40

BZWE 0.02 0.048 0.048 0.077 0.065 0.06 0.12 0.15 0.25 0.35 0.40
max. speed oil = 160 140 140 130 120 110 100 90 90 90 90
min. speed grease

Size 7500 10600 14000 18000 21200 26500 30000 35500 45000 56000 67000
of oil or grease (liters)
MInimum quantity

BZWG 0.9 1.25 1.65 1.75 2.5 2.8 3.0 3.2 4.5 5.0 5.5

BZGR 2*0.45 2*0.63 2*0.83 2*0.88 2*1.25 2*1.4 2*1.4 2*1.6 2*2.25 2*2.5 2*2.75

BZWE 0.45 0.65 0.85 0.85 1.2 1.4 1.55 1.75 2.5 - -
max. speed oil = 80 75 70 70 65 65 60 60 65
min. speed grease

For these couplings oil lubrication should only be used up to this speed.
At higher speeds an oil ring is formed and the necessary fitting level could result
in leakage through the keyway when the coupling is at rest. It is planned to grease
lubricate below this speed, then the coupling must be entirely grease packed. For
verticle installations greae/Oil requirements available on request.

RECOMMENDED OIL/GREASE

OIL TYPES INDIAN OIL INDROL (CASTROL)


+10 C TO +80C
o
SERVOMEHS CASTROL ALPHA
ISO VG 680 SP 680 LS680

SERVOGEM CASTROL
GREASE TYPE
EP-2 BALL BEARING
MULTI PURPOSE
EPL-2
GREASE WITH

EP-ADDITIONS

TEMP.RANGE

-20C TO +100C

Note :
In case of high amblent temperature, frequent overloaded condition, frequent reversing operation,
large parallel and angular misaligment, it is recommended to use high viscous gear oil of 70-110 cst at 100c.
CORPORATE OFFICE
Elecon Engineering Company Ltd.
Anand Sojitra Road, Vallabh Vidyanagar - 388120, Gujarat, India.
Phone : 91-2692-31170, 31070, 31120, Fax : 91-2692-36559
E-mail: Gear division : bjbabaria@mhe.elecon.com
MHE division : jnshah@gear.elecon.com

SINGAPORE OFFICE E-mail: elecon_sing@eleconsingapore.elecon.com


Elecon Singapore Pte. Ltd. INTERNATIONAL BUSINESS DIVISION
10 Anson Road, #19-13 International Plaza, Singapore -
Elecon Engineering Company Ltd.
079903.
418, 4th floor, World Trade Centre, Babbar Road, New Delhi - 110
Phone : 65-227-8258, 65-227-8425, Fax : 65-227-8942

001.
Phone : 11-341-4339, 341-4341, 341-4069, 341-4634,
Fax : 11-370-9046 E-mail: sales@delemtici.elecon.com.

SELLING AGENT
EMTICI Engineering Ltd.,
Phone : +91-2692-30168, 31082, 31419, 31125
Fax : +91-2692-36508
E-Mail : sales_emtici@emtici.elecon.com

EAST ZONE WEST ZONE SOUTH ZONE

CALCUTTA AHMEDABAD CHENNAI


Phone : +91-33-4761861, 4760876, Ph. No. : +91-79-6406683,84,85,86 Phone : +91-44-4349237, 4349497, 4349643,
4760904, 4760926 Fax No. : +91-79-6401363 4322455
Fax : +91-33-4761831 E-mail : sales@ahdemtici.elecon.com Fax : +91-44-4349643
E-Mail : sales@calemtici.elecon.com E-mail : sales@cheemtici.elecon.com

ASANSOL MUMBAI BANGALORE


Phone : +91-341-205901, 202038, 211726 Phone : +91-22-2821315, 2820725, Phone : +91-80-2260219, 2281834, 2250082
Fax : +91-341-202038 2821365, 2870792, 2815693 Fax : +91-80-2281834
E-Mail : sales@asnemtici.elecon.com Fax : +91-22-2870791 E-Mail : sales@blremtici.elecon.com
E-Mail : sales@bomemtici.elecon.com

DHANBAD PUNE SECUNDERABAD


Phone : +91-326-306283, 302320 Phone : +91-20-4330646 Phone : +91-40-7844748, 7845250, 7846984
Fax : +91-326-302320 Fax: +91-20-4330646 Fax : +91-40-7848317
E-Mail : sales@dhnemtici.elecon.com Email : sales@puneemtici.elecon.com E-Mail : sales@secemtici.elecon.com

JAMSHEDPUR VALLABH VIDYANAGAR


Phone : +91-657-428138, 435382 Phone : +91-2692-30168, 31082, NORTH ZONE
Fax : +91-657-428015 31419, 31125
E-Mail : sales@jsremtici.elecon.com Fax : +91-2692-36508 NEW DELHI
E-Mail : sales_emtici@emtici.elecon.com Phone : +91-11-3414339,
3414341, 3414069, 3414634
BILASPUR Fax : +91-11-3709046
Phone : +91-7752-47347, 28922, 24122 CENTRAL ZONE E-Mail : sales@delemtici.elecon.com
Fax : +91-7752-23188
NAGPUR
E-Mail : sales@bspemtici.elecon.com
Phone : +91-712-540771, 531601
Fax : +91-712-531450
E-Mail : sales@ngpemtici.elecon.com

3000/1/2001 Manual No. 04/G/1/2001

You might also like