Table 4.

19: RC Column 1

REINFORCED CONCRETE COLUMN DESIGN


Compressive Stress f'c 28 Mpa
Yield Stress f'y 415 MPa
Design Parameter
Dead Load DL 2159.3 kN
Live Load LL 3000 kN
Steel Ratio ρ 0.02
Factored Load P 8123.02 kN
Computation for Column Properties
Gross Area of Column Ag 458683.053 mm^2
Size of Column S 700 mm
Area of Steel As 9172.488679 mm^2
Number of Reinforcement Steel N 20 pcs
Diameter of Reinforcement Steel ds 25 mm
Diameter of Tie dt 10 mm
Spacing of Stirrups s 400 mm
Table 4.20: Factor of Safety for Reinforced Concrete Structure

FACTOR OF SAFETY COMPUTATION


Loading P 8123.02 kN
Actual Stress Ơ 17.70943999 Mpa
FACTOR OF SAFETY FS 1.2

Mx My Pt Interaction Main
Size (mm) Material LC P (kN) Links
Level (kNm) (kNm) (%) Ratio Reinforcement
C25 :
1 TO 2 600 X 600 14 -98.58 -819.83 15.45 2.72 1 12-#29 + 4-#25 #10 @ 300
Fy420
C25 :
2 TO 3 600 X 600 14 5.2 -597.57 58.28 2.12 0.94 12-#25 + 4-#22 #10 @ 300
Fy420
C25 :
3 TO 4 600 X 600 14 71.51 542.25 -38.44 1.61 1 12-#22 + 4-#19 #10 @ 300
Fy420
C25 :
4 TO 5 600 X 600 14 107.58 446.55 -11.34 1.61 0.91 12-#22 + 4-#19 #10 @ 300
Fy420
C25 :
5 TO 6 600 X 600 8 150.69 311.67 33.97 1.18 0.79 12-#19 + 4-#16 #10 @ 250
Fy420
Mx My Pt Interaction Main
Size (mm) Material LC P (kN) Links
Level (kNm) (kNm) (%) Ratio Reinforcement
C25 :
1 TO 2 600 X 600 14 -98.58 -819.83 15.45 2.72 1 12-#29 + 4-#25 #10 @ 300
Fy420
C25 :
2 TO 3 600 X 600 14 5.2 -597.57 58.28 2.12 0.94 12-#25 + 4-#22 #10 @ 300
Fy420
C25 :
3 TO 4 600 X 600 14 71.51 542.25 -38.44 1.61 1 12-#22 + 4-#19 #10 @ 300
Fy420
C25 :
4 TO 5 600 X 600 14 107.58 446.55 -11.34 1.61 0.91 12-#22 + 4-#19 #10 @ 300
Fy420
C25 :
5 TO 6 600 X 600 8 150.69 311.67 33.97 1.18 0.79 12-#19 + 4-#16 #10 @ 250
Fy420

Mx My Pt Interaction Main
Level Size (mm) Material LC P (kN) Links
(kNm) (kNm) (%) Ratio Reinforcement
C25 : #10 @
1 TO 2 600 X 600 15 -499.97 796.13 -33.28 3.07 0.94 4-#32 + 12-#29
Fy420 300
C25 : #10 @
2 TO 3 600 X 600 9 46.44 542.11 -91.46 1.85 0.96 4-#25 + 12-#22
Fy420 300
C25 : #10 @
3 TO 4 600 X 600 15 -113.28 -482.81 83.04 1.61 0.97 12-#22 + 4-#19
Fy420 300
C25 : #10 @
4 TO 5 600 X 600 15 12.81 -403.43 71.27 1.39 0.98 4-#22 + 12-#19
Fy420 300
C25 : #10 @
5 TO 6 600 X 600 9 107.02 -270.59 92.27 1.18 0.73 12-#19 + 4-#16
Fy420 250
Mx My Pt Interaction Main
Level Size (mm) Material LC P (kN) Links
(kNm) (kNm) (%) Ratio Reinforcement
C25 :
1 TO 2 600 X 600 8 2449.09 -753.37 -35.59 2.72 0.97 12-#29 + 4-#25 #10 @ 300
Fy420
C25 :
2 TO 3 600 X 600 14 951.93 -551.64 -37.83 1.27 0.96 16-#19 #10 @ 300
Fy420
C25 :
3 TO 4 600 X 600 14 724.2 492.2 33.73 1.18 0.91 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
4 TO 5 600 X 600 14 523.23 400.38 30.53 1.18 0.89 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
5 TO 6 600 X 600 14 324.47 235.29 29.41 1.18 0.56 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
6 TO 7 600 X 600 11 22.03 126.01 -257.26 1.18 0.74 12-#19 + 4-#16 #10 @ 250
Fy420

Level Mx My Pt Interaction Main


Size (mm) Material LC P (kN) Links
(kNm) (kNm) (%) Ratio Reinforcement
C25 :
1 TO 2 600 X 600 15 529.78 689.4 -1.13 1.85 0.98 4-#25 + 12-#22 #10 @ 300
Fy420
C25 :
2 TO 3 600 X 600 17 411.86 0.23 -361.9 1.18 0.78 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
3 TO 4 600 X 600 14 573.97 367.18 49.44 1.18 0.72 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
4 TO 5 600 X 600 14 348.86 312.2 49.05 1.18 0.75 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
5 TO 6 600 X 600 8 322.99 290.61 106.03 1.18 0.71 12-#19 + 4-#16 #10 @ 250
Fy420

Mx My Pt Interaction Main
Level Size (mm) Material LC P (kN) Links
(kNm) (kNm) (%) Ratio Reinforcement
C25 :
1 TO 2 600 X 600 14 595.92 -653.96 -8.94 1.72 0.97 16-#22 #10 @ 300
Fy420
C25 :
2 TO 3 600 X 600 17 268.33 21.07 -338.41 1.18 0.78 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
3 TO 4 600 X 600 17 241.28 -21.66 304.73 1.18 0.67 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
4 TO 5 600 X 600 15 222.68 -231.5 40.16 1.18 0.59 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
5 TO 6 600 X 600 11 245.07 -43.69 195.37 1.18 0.47 12-#19 + 4-#16 #10 @ 250
Fy420

Mx My Pt Interaction Main
Level Size (mm) Material LC P (kN) Links
(kNm) (kNm) (%) Ratio Reinforcement
C25 :
1 TO 2 600 X 600 15 418.68 676.7 -22.38 1.85 0.99 4-#25 + 12-#22 #10 @ 300
Fy420
C25 :
2 TO 3 600 X 600 15 359.31 283.55 -47.82 1.18 0.64 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
3 TO 4 600 X 600 15 279.58 -274.46 43.46 1.18 0.61 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
4 TO 5 600 X 600 15 205.98 -255.56 32.39 1.18 0.65 12-#19 + 4-#16 #10 @ 250
Fy420
C25 :
5 TO 6 600 X 600 14 163.2 154.87 -21.48 1.18 0.4 12-#19 + 4-#16 #10 @ 250