CONSTRUCTION DRAWING

SCHEDULE OF DRAWINGS SCHEDULE OF DRAWINGS SCHEDULE OF DRAWINGS Friday, December 6, 2019

Subset Page Drawing Name Size Subset Page Drawing Name Size Subset Page Drawing Name Size

01 GENERAL INFORMATION 32 Window Schedule A3 61 Ground Floor Commercial Power Layout A3

01 Drawing Schedule A3 33 Window Schedule A3 62 2nd Floor Parking Power Layout A3

02 Vicinity Map and Lot Plan A3 34 Window Schedule A3 63 3rd Floor Parking Power Layout A3

03 Site Development Plan and Perspective A3 35 Window Schedule A3 64 4th Floor Parking Power Layout A3

04 Basement and Ground Floor Plan A3 05 FLOOR FINISHES 65 5th Floor Communal Power Layout A3
Basement & Ground Flr. Floor Finishes Key 66 6th-25th Typical Power Layout A3
05 2nd Flr and 3rd Flr Parking A3 24 A3
Plan
2nd & 3rd Flr. Parking Floor Finishes Key 67 26th Floor Penthouse Power Layout A3
06 4th Flr and 5th Flr A3 37 A3
Plan
4th Flr. Parking & 5th Flr. Communal Floor 68 Roof Deck Power Layout A3
07 6th-25th Flr A3 38 A3
Finishes
08 Penthouse and Roofdeck A3 39 6th-25th Flr. Floor Finishes Key Plan A3 10 PLANTER KEY PLAN
Penthouse and Roof Deck Floor Finishes Ground Floor and 2nd Floor Parking Planter
09 Roof Plan and Machine Room A3 40 A3 69 A3
Key Plan Key Plan
02 ELEVATIONS 06 WALL FINISHES 70 5th Floor and Roof Deck Planter Key Plan A3
Basement & Ground Flr. Wall Finishes Key 12 RAILING KEY PLAN
10 FRONT ELEVATION A3 41 A3
Plan
2nd & 3rd Flr. Parking Wall Finishes Key Ground Flr, 2nd-4th Parking- Railing Key
11 RIGHT ELEVATION A3 42 A3 71 A3
Plan Plan
4th Flr. Parking & 5th Flr. Communal Wall
12 LEFT ELEVATION A3 43 A3 72 5th Flr. and 6th Flr. Railing Key Plan A3
Finishes
7th-25th Typical and Penthouse Railing Key
13 REAR ELEVATION A3 44 6th-25th Flr. Wall Finishes A3 73 A3
Plan
Penthouse and Roof Deck Wall Finishes
14 Podium Detail A3 45 A3 74 Railing-A and Railing-B Detail A3
Key Plan
15 Front and Right Side Blow-up Elevation A3 07 CEILING FINISHES 75 Railing-C Detail A3

16 Left Side and Rear Blow-up Elevation A3 Basement & Ground Flr. Ceiling Finishes 76 Room Unit Balcony and Railing Detail A3
46 A3
Key Plan
17 Corner Unit Detail Elevation A A3 2nd & 3rd Flr. Parking Ceiling Finishes Key 77 Unit J Blow-up Plan A3
47 A3
Plan
18 Corner Unit Detail Elevation B A3 4th Flr. Parking & 5th Flr. Communal 78 Fins Detail A3
48 A3
Ceiling Finishes
19 Corner Unit Detail Elevation C A3 49 6th-25th Flr. Ceiling Finishes A3 15 STAIR DETAIL
20 Side Elevation Blow-up A3 Penthouse and Roof Deck Ceiling Finishes
50 A3 79 Fire Stairs-A Detail Plans A3
Key Plan
21 Crown Detail A3 80 Fire Stairs-A Detail Plan A3
08 LIGHTING & SWITCH KEY PLAN
03 SECTIONS 81 Fire Stairs-A Detail Section A3
51 Basement Lighting & Switch Key Plan A3
22 Section A A3 52 Ground Floor Lighting & Switch Key Plan A3 82 Fire Stairs-B Detail Plan A3

23 Section B A3 2nd Flr. and 3rd Flr. Lighting & Switch Key 83 Fire Stairs-B Detail Plan A3
53 A3
Plan
24 Section C A3 54 4th Floor Lighting & Switch Key Plan A3 84 Fire Stairs-B Detail Section A3

04 DOOR AND WINDOW SCHEDULE 55 5th Floor Lighting & Switch Key Plan A3 16 RAMP DETAILS
Basement and Ground Flr Door and
25 A3 56 6th Floor Lighting & Switch Key Plan A3 85 Ground Floor Ramp Details A3
Window Key Plan
2nd Flr & 3rd Flr Door and Window Key
26 A3 57 7th-25th Floor Lighting & Switch Key Plan A3 86 Second Floor Ramp Details A3
Plan
26th Floor Penthouse Lighting & Switch Key
27 4th Flr & 5th Flr Door and Window Key Plan A3 58 A3 87 Third Floor Ramp Detail A3
Plan
6th Flr and 7th Flr Door and Window Key
28 A3 59 Roof Deck Lighting & Switch Key Plan A3 GROUND FLOOR TOILET DETAIL
Plan
Penthouse and Roofdeck Door and Window
29 A3 09 POWER LAYOUT 88 GROUND FLOOR TOILET DETAIL PLAN A3
Key Plan
30 Door Schedule A3 60 Basement Power Layout 89 Layout
31 Door Schedule A3

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 01 GENERAL INFORMATION R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Drawing Schedule 01 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:0.75 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

THIS SITE

TECHNICAL LOT LOT 512-A-10


DESCRIPTION
1-2 S 51 ° 16 ' W , 7.91 M.
LOT 1456-B 2-3 N 21 ° 12 ' E , 13.17 M.
3-4 S 70 ° 06 ' E , 7.70 M.
1-2 S 19 ° 22 ' E , 20.58 M.
4-1 S 37 ° 53 ' W , 13.03 M.
2-3 S 68 ° 24 ' W , 18.66 M.
VICINITY MAP 3-4 N 41 ° 37 ' E , 22.70 M.
1 NOT TO SCALE LOT 7-A
4-1 N 70 ° 01 ' E , 27.25 M.
1-2 N 69 ° 38 ' E , 2.44 M.
N LOT 512-A-10 2-3 N 51 ° 16 ' E , 7.91 M.
3-4 S 26 ° 30 ' E , 7.46 M.
1

1-2 S 71 ° 03 ' W , 9.05 M.


.
5M
27.2
'E,
(OS
01
N7

4-5 S 24 ° 06 ' W , 4.93 M.
JON A BOU
MEN
3
S7

06 '
E ES
2-3 N 24 ° 06 ' W , 8.01 M.
S 19

5-6
, 7.7
0M
. AVE EVAR
S 68 ° 51 ' W , 11.31 M.
° 22

42
34 3-4 N 66 ° 18 ' E , 16.74 M.
'E,

NUE D)
L

6-1
M .

N 18 ° 57 ' W , 10.00 M.
03 M
.

20.5
M

.
3. 3
, 1 3.0
.17

8M

T.C.T. No. 51254 M.

4-1
T.C.T. No. 53849 M.
'E ,1

S 41 ° 37 ' E , 10.10 M.
, 13

LOT 512-A-6 LOT 1456-B


3 W

.
41
'E

°5 3'

°3
37 5
12

7
N 37 °

'E

,1
N2

2.
60

N
M

T.C.T. No. 53847 M.


.
41

LOT 512-A-9
°3

LOT 4
7

1 4
'E

M3 1
.
4 2
,2

LOT 512-A-9
1
.9 M.
N2

2.

,7 .74
70

'W , 16 4 M. .

M
.66
M

'W .7
6 18 E , 16 , 18
.

°1
30

6 ° ' 'W
51 S 6 6 ° 18 24
'


1-2 N 18 ° 57 ' E , 17.26M.
W

S N6 S6
, 7.4

4M
'E , 2.4 2
° 38
1-2 N 37 ° 53 ' E , 13.03 M.
6M

9 T.C.T. No. 53848 M.


N6 1 5
.

4 3 LOT 512-A-10
M. 5
3
2-3 N 68 ° 31 ' E , 11.31M.
N6

.88
, 10

2-3

LOT 7-A 'W


S 71
° 01
S 70 ° 06 ' E , 2.40 M.
12 '

3-4 S 24 ° 06 ' E , 3.00 M.


W

S2

.
53 5M 1
, 13

, 9.0 5

'W
M. ° 03
3-4 S 41 ° 37 ' E , 12.60 M.
.96

.31 M.
06

71 5
, 11 . S , 9.0
1M 3'E
M

'W
'E,

° 31 11.3 2 1°0
.

4-5 N 71 ° 03 ' W , 9.05 M.


8 , 7
S6 'E 4 N
3.0

31

S2

N6
0M

4-5 S 66 ° 18 ' W , 16.74 M.


2
.

39

5-6 S 21 ° 39 ' W , 13.96 M.


'E
, 13

LOT 4
5-1 N 26 ° 30 ' W , 7.46 M.
.96
M

6-1
.

S 69 ° 12 ' W , 21.29 M.
N1
8°5
7'W

6
, 17
.26
. M

M.
.29
E , 32
12 '

S6

LOT PLAN
2
1:450

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 01 GENERAL INFORMATION R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Vicinity Map and Lot Plan 02 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM VICINITY MAP, LOT PLAN, PERSPECTIVE, LOT BEARING, PARKING COMPUTATION
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:1.96, 1:450, ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
1:136.13, 1:2.36
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967

9,083 21,425

P R O P E R T Y L I N E

S E T B A C K
S E T B A C K
2,727

2,650

2,571

2,533
7

2,650
P
R
O
OUTLINE OF TOWER P
E
5,520

R
T
Y
L
I
N
UP E

6 4,204

9,713
P R O P E R T Y
18,532
8,163

L I N E

E
N
Ground Floor

I
3,954

7,854
Building Footprint

Y
T
R
E
4'

P
O
R
T Y L I N E

P
P R O P E R
4,144

4
47,083
8,144

14.87 %
20,380

18,788
3
P R O P E R T Y

P R O P E R T Y
UP
8,108

L I N E

L I N E
3,747
2
6.86 % PLANTER
ATM SHELTER

11.76 %

E
OP
9,050

SL
8,546

14.87 %

PERSPECTIVE
OUTLINE OF PARKING FLOOR ABOVE
2
1 P R O P E R T Y L I N E

4,350 11,863 4,608


3.60M WIDE
RAMP UP

Site Development Plan


1
1:250

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 01 GENERAL INFORMATION R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Site Development Plan and Perspective 03 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Site Development Plan, PERSPECTIVE, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:250, 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

REAR ELEVATION REAR ELEVATION


A A
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
3,500 900 27,002 14,565 9,083 21,425

S E T B A C K
PRESSURIZED ELEVATOR PRESSURIZED ELEVATOR

S E T B A C K
P R O P E R T Y L I N E P R O P E R T Y L I N E

B-34 B-35 B-36 SEISMIC INSTRUMENTATION SEISMIC INSTRUMENTATION


2,727

2,727

2,727

2,650

2,571
2,533

2,533
GARBAGE ROOM FIRE PRESSSURE
IN OUT OUTDOOR PARKING FOR SERVICE VEHICLES FIRE EXHAUST FIRE EXHAUST
Area: 5.75 m2 PLUMBING
PLUMBING PLUMBING
7 7

2,650
2,700
STP EQUIPMENT RM AUX ECE EE RM P GARBAGE ROOM
Area: 19.75 m2 R
12.75 m2 11.25 m2 O
P
5,520

5,520
E
B-33 B-32 B-31 10 R
T
Y
B UP B B B
PIPE CHASE UP
L
I
P N
R
6 O
6 E

RIGHT ELEVATION

RIGHT ELEVATION
P
E
P R O P E R T Y

P R O P E R T Y
R

9,713
9,674
PUMP RM T
Y
FIRE PRESSSURE Area: 14.00 m2
PLUMBING L

18,532
18,563

I
N
6M WIDE DRIVEWAY E
8,163

8,163
(36 PARKING)
B-29 B-30 9

ADMIN / SECURITY CENTER


L I N E

L I N E
RECEPTION PWD 27.50 m2
B-27 B-28 8 16.75 m2 5.75 m2
LEFT ELEVATION

LEFT ELEVATION
5 5

E
N
FEMALE CR

I
L
TOILET
3,954

3,954
5.25 m2

B-26

18.75 m2
FIRE COM

7,854
7,843
B-1 B-2 B-3 B-4 B-5 B-6

Y
1 13.75 m2

T
R
E
4' 4'

P
O
B-25 7

R
T Y L I N E
P R O P E R

P
4,144

4,144
B-7
B-24 MALE CR
16.25 m2

2
4 4
47,083

47,083
B-8 B-23
C FIRE TANK / CISTERN
C C C
6M WIDE DRIVEWAY
8,144

8,144
Area: 134.25 m2
B-9 B-22 6
(36 PARKING)

14.87 %
20,380
B-10 B-21

18,788
3 3
P R O P E R T Y

P R O P E R T Y
P R O P E R T Y

P R O P E R T Y
B-11
28,895

UP

27,241
UP
FIRE PRESSSURE
8,108

8,108
B-12 5 DISPLAY
CORNER
PLUMBING
L I N E

B-20

L I N E
L I N E

L I N E
B-13 3,012 4
3,747
2 FIRE PRESSSURE 2
PLUMBING

ATM SHELTER
6.86 % PLANTER

F
B-14 PLANTER

F
B-19 11.76 %

F
E
OP
9,050

9,050
SL

8,546
B-15 B-18

6,000

14.87 %
B-16 B-17 OUTLINE OF PARKING FLOOR ABOVE

1 P R O P E R T Y L I N E 1 4,350
P R O P E R T Y
11,863
L I N E
4,608
3.60M WIDE
RAMP UP
A A

FRONT ELEVATION FRONT ELEVATION


Basement Floor Plan Ground Floor Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 01 GENERAL INFORMATION R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Basement and Ground Floor Plan 04 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement Floor Plan, Ground Floor Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

REAR ELEVATION REAR ELEVATION


A A
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605
27,261 14,605

S E T B A C K
S E T B A C K

S E T B A C K
P R O P E R T Y L I N E PRESSURIZED ELEVATOR P R O P E R T Y L I N E PRESSURIZED ELEVATOR

FIRE PRESSSURE SEISMIC INSTRUMENTATION FIRE PRESSSURE SEISMIC INSTRUMENTATION

2,534

2,533
2,700

2,534
PLUMBING FIRE EXHAUST PLUMBING FIRE EXHAUST
PLUMBING PLUMBING

7 7
AUX ECE EE RM P GARBAGE ROOM AUX ECE EE RM P
R
GARBAGE ROOM
R O
13.50 m2 11.00 m2 O 13.50 m2 11.00 m2
P P

5,520
GENERATOR ROOM LVSG/ATS/AP/EMDP E
5,520

E R
2F-5 2F-4 2F-3 2F-2 2F-1 R Area: 54.50 m2 Area: 47.25 m2 T
T Y
Y
B B B UP L
B
L I
I N
N E
6

12,374
E
6

12,374

RIGHT ELEVATION
RIGHT ELEVATION

P R O P E R T Y
P R O P E R T Y

21,290
21,290

3F-3 3F-1
6M WIDE DRIVEWAY
(23 PARKING)

8,163
8,163

6M WIDE DRIVEWAY
(28 PARKING SLOTS)
3F-4 3F-2

L I N E
3F-23
L I N E

2F-28

3.60mts WIDE

LEFT ELEVATION
5
LEFT ELEVATION

5
RAMP DOWN TO
GROUND FLOOR

TRANSFORMER

3,954
3F-22
3,954

7,843
2F-27 3F-5 3F-6

7,843
Area: 60.75 m2
2F-6 2F-7 2F-8 2F-9 2F-10 2F-11

4' 2F-26 4' 3F-21

4,144
4,144

2F-12 2F-25 3F-7 3F-20

4 4

13.52 %

6M WIDE DRIVEWAY
47,083
47,083

6M WIDE DRIVEWAY

2F-13 2F-24 3F-8 3F-19

(23 PARKING)
(28 PARKING SLOTS)

C C C C

8,144
8,144

3F-9

13.52 %
2F-14 2F-23 3F-18

FIRE PRESSSURE 3F-10 FIRE PRESSSURE


2F-15 2F-22 3F-17

18,191
PLUMBING PLUMBING

P R O P E R T Y
3
P R O P E R T Y

3 3.60mts WIDE

26,453
26,453

RAMP UP TO

P R O P E R T Y
P R O P E R T Y

3F-11

24,798
4TH FLR PARKING
2F-16
UP
UP

8,108
8,108

2F-17 3F-12
13.52 %

L I N E
L I N E

3F-16

L I N E
2F-21
L I N E

2F-18 3F-13

2 2
2F-19 3F-14
5,607

9,050
3F-15
9,050

2F-20
S E T B A C K

S E T B A C K
3,443

2,443

2,443
2,443

1 P R O P E R T Y L I N E 1 P R O P E R T Y L I N E

15,966 4,663 15,966 4,663


A A

FRONT ELEVATION FRONT ELEVATION

2nd Floor Parking 3rd Floor Parking


1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 01 GENERAL INFORMATION R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
2nd Flr and 3rd Flr Parking 05 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 2nd Floor Parking, 3rd Floor Parking
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

REAR ELEVATION REAR ELEVATION


A A
A B C C' D E F G A B C C' D E F G
40,368 40,368
12,253 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605
27,194 3,197 11,408

S E T B A C K
PRESSURIZED ELEVATOR PRESSURIZED ELEVATOR

S E T B A C K
P R O P E R T Y L I N E P R O P E R T Y L I N E

SETBACK
FIRE PRESSSURE SEISMIC INSTRUMENTATION FIRE PRESSSURE SEISMIC INSTRUMENTATION
2,727

2,700

2,440
2,534

2,533
PLUMBING FIRE EXHAUST PLUMBING FIRE EXHAUST
PLUMBING BALCONY BALCONY PLUMBING
7 AUX ECE EE RM
7
Area: 11.00 m2
P
R
GARBAGE ROOM AUX ECE EE RM GARBAGE ROOM
Area: 13.50 m2

PIPE CHASE
O 12.75 m2 11.25 m2
P

6,243
GENERATOR ROOM
5,520

5,520
6,405

E
R
Area: 54.50 m2 4F-3 4F-2 4F-1 T FEMALE CR MALE CR 13 14
Y 28.50 m2 30.75 m2
B L
B B P
R B
DOUBLE VOLUME UP
I
N
O
P
E E
6 6

12,374
R

RIGHT ELEVATION

RIGHT ELEVATION
T
Y
P R O P E R T Y

P R O P E R T Y
L

21,290
STORAGE I
N
4.50 m2 E

6,224
8,163

8,163
6M WIDE DRIVEWAY
(28 PARKING SLOTS) 3.60mts WIDE
RAMP UP TO
1 BALCONY
L I N E

L I N E
4TH FLR PARKING
4F-28
12,158

12 11 10
LEFT ELEVATION

LEFT ELEVATION
5 5
3,954

3,954
4F-27

7,843
2 BALCONY

8,089
4F-4 4F-5 4F-6 4F-7 4F-8 4F-9
BALCONY BALCONY BALCONY

4' 4F-26 4'


9
4,144

4,144
BALCONY 3
4F-10 4F-25 BALCONY

4 4
6M WIDE DRIVEWAY
47,083

47,083
4F-11 4F-24 4
BALCONY 8
(28 PARKING SLOTS)

BALCONY
C C C C
8,144

8,144
13.84 %
4F-12 4F-23

BALCONY 7 5
4F-13 4F-22 BALCONY
2,086
P R O P E R T Y

3 3

P R O P E R T Y
26,453

26,495
P R O P E R T Y

P R O P E R T Y
4F-14

24,841
24,552
BALCONY 6 STORAGE
12.75 m2
UP 2,002
8,108

8,108
4F-15
L I N E

L I N E
6,052 4F-21
L I N E

L I N E
4F-16 FIRE PRESSSURE
PLUMBING
2 2 FIRE PRESSSURE

10,682
10,333
PLUMBING
4F-17 4F-20 COMMUNAL AREA
6,000 216.00 m2

4F-19
9,050

9,050
4F-18
S E T B A C K

SETBACK
400MM
2,443

2,443

2,400

2,400
20,647 ZOCALO WALL
FROM FFL
1 P R O P E R T Y L I N E 1 P R O P E R T Y L I N E

A A

FRONT ELEVATION FRONT ELEVATION


4th Floor Parking 5th Floor Communal Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 01 GENERAL INFORMATION R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
4th Flr and 5th Flr 06 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 4th Floor Parking, 5th Floor Communal Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

REAR ELEVATION REAR ELEVATION


A A
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
FIRE PRESSSURE 27,261 14,605 27,261 14,605
PLUMBING

S E T B A C K

S E T B A C K
PRESSURIZED ELEVATOR PRESSURIZED ELEVATOR

S E T B A C K
P R O P E R T Y L I N E P R O P E R T Y L I N E

1,482 SEISMIC INSTRUMENTATION FIRE PRESSSURE SEISMIC INSTRUMENTATION

2,440

2,440
2,566
FIRE EXHAUST PLUMBING FIRE EXHAUST
Q R S PLUMBING Q R S PLUMBING
7 7
9,627

4,341 AUX ECE EE RM GARBAGE ROOM 4,341 AUX ECE EE RM GARBAGE ROOM
12.50 m2 11.25 m2 12.50 m2 11.00 m2

PIPE CHASE
S E T B A C K S E T B A C K
5,520

5,520
F

F
Q R S Q R S
UP
B B B P B

F
P R
R O

17,577
6 6

12,520

12,520
P
1,600

RIGHT ELEVATION

RIGHT ELEVATION
P E
E R
P R O P E R T Y

P R O P E R T Y
R T
T Y
Y
L
I
L N
I E
N
E
F F
8,163

8,163
A

A
M A M
6,350

F
L I N E

L I N E
F

F
A
P O N P O N
LEFT ELEVATION

LEFT ELEVATION
5 5
F F

F F

P O N M P O N M
3,954

3,954
L

7,790

7,790
L B B

B
3,713

3,713
B
2,000
S E T B A C K

S E T B A C K

L
L

4' F

4'

F
P R O P E R T Y L I N E P R O P E R T Y L I N E
4,144

4,144
K C K C

C
K
K

C
2,015 2,015
4 4
F F F F

F F S E T B A C K F F
47,083

47,083
J D J D

D
J
J

D
C C C C
8,144

P R O P E R T Y
I E I E

E
2,373

I
I

S E T B A C K
2,150
22,895

16,252
3 3
F F
F
S E T B A C K F

21,241
F F

P R O P E R T Y
H H

H
28,895
H

L I N E

2,173

27,241
2,001
8,108

S E T B A C K
S E T B A C K
3,360
P R O P E R T Y

S E T B A C K

P R O P E R T Y

L I N E
G F G F

2 FIRE PRESSSURE 2 FIRE PRESSSURE


PLUMBING PLUMBING
G

G
F

F
L I N E

L I N E
F

F
2,905
9,050

9,050
S E T B A C K S E T B A C K

S E T B A C K
S E T B A C K
5,998

6,000

6,000

6,000
1 P R O P E R T Y L I N E
20,580
1 P R O P E R T Y L I N E
9,078 1,600 9,902

A A

FRONT ELEVATION FRONT ELEVATION


6th Floor Plan 7th-25th Typical Floor Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 01 GENERAL INFORMATION R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
6th-25th Flr 07 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 6th Floor Plan, 7th-25th Typical Floor Plan, 7th-25th Typical Floor Plan (With Beam)
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

REAR ELEVATION REAR ELEVATION


A A
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

PRESSURIZED ELEVATOR PRESSURIZED ELEVATOR

S E T B A C K
P R O P E R T Y L I N E P R O P E R T Y L I N E

S E T B A C K
SEISMIC INSTRUMENTATION SEISMIC INSTRUMENTATION

2,440

2,612
2,571
FIRE EXHAUST FIRE EXHAUST
DECK DECK DECK PLUMBING 4,379 PLUMBING
7 7 S E T B A C K

GARBAGE ROOM GARBAGE ROOM

STORAGE & PREPARATION


P
4,341 AUX ECE EE RM AUX ECE EE RM R
6.00 m2 11.25 m2 O
S E T B A C K P
5,520

5,520
E
WATER TANK R

Area: 34.75 m2
H T
Y
UP UP
B F P B B L
B
R I
O N
E
6 6

12,467
P
E

RIGHT ELEVATION

RIGHT ELEVATION
R
P R O P E R T Y

P R O P E R T Y
T
Y
21,290

L
I
N
G E
F

FEMALE CR
8,163

8,163
Area: 16.00 m2

DECK
S E T B A C K
F
A
L I N E

L I N E
R
MALE CR Outline of trellis
4,002 Area: 15.00 m2
LEFT ELEVATION

LEFT ELEVATION
5 5
S E T B A C K

W
F

E
N
I
DECK DECK DECK

L
DECK
DECK
3,954

3,954
7,843
S E T B A C K

3,387
3,550

Y
S E T B A C K

DECK
2,000

T
ROOF DECK

R
Area: 543.50 m2

E
4' 4'

P
O
R
P R O P E R T Y L I N E P R O P E R T Y L I N E

P
DECK
4,144

4,144
3,334
DECK

E 3,274
S E T B A C K
F

S E T B A C K
2,015
4 S E T B A C K 4

DECK
47,083

47,083
B
F
DECK

C C C C

8,144
DECK

26,608
DECK

D
F

2,354
16,252

P R O P E R T Y
3 S E T B A C K
3,314
3 Outline of trellis DOWN
S E T B A C K 3,403
Outline of roof slab
P R O P E R T Y

DECK
28,895

S E T B A C K
P R O P E R T Y

P R O P E R T Y
27,241

8,108

L I N E
F
L I N E

C
L I N E

L I N E
2 2 Outline of canopy
DECK

S E T B A C K
2,900
S E T B A C K
9,050

9,050

S E T B A C K
S E T B A C K
6,000

6,000
1 P R O P E R T Y L I N E
20,580
1 P R O P E R T Y L I N E

A A

FRONT ELEVATION FRONT ELEVATION


26th Penthouse Floor Plan Roof Deck Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 01 GENERAL INFORMATION R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Penthouse and Roofdeck 08 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 26th Penthouse Floor Plan, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

REAR ELEVATION REAR ELEVATION


A A
A B C C' D E F G A B C C' D E F G
40,368
12,253 1,829 4,379 10,292 5,648 5,967

P R O P E R T Y L I N E

Access for machine room


8,945 (ladder-type)

7 7
P
+3500mm from Roofdeck R
O
P
WATER TANK

5,520
E
R
BELOW T
Y
B B B MACHINE ROOM
Area: 39.00 m2 L
B
I
N

3,408
E
6 6

RIGHT ELEVATION

RIGHT ELEVATION
P R O P E R T Y

14,850
8,163
SLOPE SLOPE SLOPE SLOPE

L I N E

O u t l i n e
LEFT ELEVATION

LEFT ELEVATION
5 5

E
N
I
L
O u t l i n e o f R o o f d e c k

3,954

Y
o f

T
R
E
R o o f d e c k
4' 4'

P
O
R
P R O P E R T Y L I N E

P
4,144

16,417
4 4
SLOPE

47,083
C C C C

8,144

O u t l i n e
10,210

3 3

o f
P R O P E R T Y

R o o f d e c k
SLOPE

P R O P E R T Y
8,108

L I N E

L I N E
2 2

9,050
1 1 P R O P E R T Y L I N E

A A

FRONT ELEVATION FRONT ELEVATION


Roof Deck Plan Machine Room
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 01 GENERAL INFORMATION R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Roof Plan and Machine Room 09 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Roof Deck Plan, Machine Room
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
A B C C' D E F G CONSTRUCTION DRAWING
3,929 8,324 1,829 4,379
40,368
10,292 5,648 5,967
Friday, December 6, 2019

Lightning arrester

+100.34
Top of Machine Room Slab

2,400
Machine room +97.94
Machine Room

2,100
4,645 Crown to detail
+95.84

6,500
Roof Slab
Exterior wall in

3,500

3,500
outdoor paint finish
(raw concrete look)
+92.34
Fixed glass to
Roof Deck

3,540
window schedule
Mild steel railing See Detail Elevation A
to detail +88.80
26th Floor Penthouse

1,200

3,500
See Detail Elevation C
Mild steel railing
to detail +85.30
25th Floor

1,200
Fixed window to

3,500
See Detail Elevation B
window schedule
+81.80
24th Floor
1,200

1,200

3,500
Awning window to See Detail Elevation B
window schedule
+78.30
23rd Floor
1,200

1,200

3,500
See Detail Elevation A

Exterior wall in +74.80


Exterior wall in
outdoor paint finish 22nd Floor

1,200
outdoor paint finish
(raw concrete look)

3,500
(raw concrete look)
See Detail Elevation B

Decorative fin in
+71.30
21st Floor

1,200
rusty orange paint finish
(prefab to specialist

3,500
See Detail Elevation C
detail & specification)
Decorative fins in +67.80
dark gray paint finish 20th Floor

1,200
Structural deck for (prefab to specialist

3,500
See Detail Elevation A detail & specification)
condenser
+64.30
19th Floor

1,200

3,500
See Detail Elevation B
Decorative fin in +60.80
rusty orange paint
finish (prefab to
18th Floor

3,500
Fixed window to See Detail Elevation C specialist detail &
window schedule specification)
+57.30
Awning window to 17th Floor
window schedule

3,500
Awning window to See Detail Elevation A
window schedule
+53.80
16th Floor

3,500
See Detail Elevation B

Exterior wall in
+50.30
outdoor paint finish 15th Floor

103,540
(raw concrete look)

3,500
See Detail Elevation A

Decorative fin in +46.80


rusty orange paint finish 14th Floor
(prefab to specialist

3,500
detail & specification) See Detail Elevation B

+43.30
3,500
13th Floor
Structural deck for See Detail Elevation B
condenser
+39.80
12th Floor
3,500

See Detail Elevation C

+36.30
11th Floor
3,500

See Detail Elevation B

+32.80
Decorative fin in 10th Floor
rusty orange paint finish
3,500

(prefab to specialist See Detail Elevation A Decorative fins in dark


detail & specification) gray paint finish
(prefab to specialist +29.30
detail & specification)
9th Floor
3,500

See Detail Elevation C Decorative ledge in


dark gray paint finish
to architect's approval +25.80
8th Floor
3,500

Door to door See Detail Elevation B


schedule
+22.30
Fixed window to
window schedule Beam painted in 7th Floor Typical SOHO
matte black finish
3,500

1200mm high See Detail Elevation A


Exterior wall in
1,200

parapet wall in raw


concrete finish outdoor paint finish +18.80
(raw concrete look) 6th Floor
1,200
2,800

4,000

Glass railing to detail

+14.80
5th Floor Communal
1,200

1,200

Built-up lighted
3,300

signage to specialist
detail & specification
+11.50
4th Floor Parking
3,300

Podium to detail
18,800

FIREWALL
+8.20
3rd Floor Parking
14,800

14,800

3,300

+4.90
2nd Floor Parking
4,500

Fixed glass to window


schedule
Ramp up to detail +0.40
±0.00
Ground Floor Commercial
Natural Grade Line
3,200 400

BASEMENT
-3.20
Basement 1
Front Elevation
1
1:300
Project : Drawing Title : Approved: Sheet No. :
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP.
CONDOMINIUM FRONT ELEVATION 10
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
1 2 3
47,083
4 4' 5 6 7 CONSTRUCTION DRAWING
9,050 8,108 8,144 4,144 3,954 8,163 5,520 Friday, December 6, 2019
Lightning arrester
4,850 +100.34
Top of Machine Room Slab

2,600

2,400
4,700
Machine room +97.94
Machine Room

2,100

2,100
+95.84
Louvered window to
CROWN TO DETAIL Roof Slab
window schedule

3,500
Roof deck 1500mm height parapet
wall in raw concrete
finish +92.34
Decorative fin in Roof Deck

3,540
rusty orange paint finish
(prefab to specialist

1,200
detail & specification)
+88.80
26th Floor Penthouse

3,500
Awning window to
window schedule
+85.30
25th Floor

3,500
Backlit signage to
specialist detail & Mild steel railing to
specification detail +81.80
24th Floor

3,500
Fixed window to window
schedule
+78.30
23rd Floor

3,500
Awning window to
Mild steel railing to window schedule
detail +74.80
22nd Floor

3,500
Firewall in raw Exterior wall in raw
concrete finish concrete finish
+71.30
21st Floor

3,500
Decorative fins in Mild steel railing to
dark gray paint detail +67.80
finish (prefab to 20th Floor
specialist detail &

3,500
specification)
Decorative fin in +64.30
rusty orange paint finish 19th Floor
(prefab to specialist

3,500
Decorative ledge in detail & specification)
dark gray paint
finish to architect's +60.80
approval
18th Floor
Exterior wall in outdoor

3,500
paint finish (raw
concrete look)
100x200mm MS +57.30
hollow vertical strips
in black powder 17th Floor

3,500
coated finish SEE BLOW-UP
DETAIL A
100x175mm MS +53.80
hollow vertical strips
in black powder 16th Floor

3,500
coated finish

100x150mm MS +50.30
hollow vertical strips Decorative fin in 15th Floor
in black powder

103,540
rusty orange paint finish

3,500
coated finish (prefab to specialist
detail & specification)
100x125mm MS +46.80
hollow vertical strips 14th Floor
in black powder

3,500
coated finish SEE BLOW-UP
DETAIL B
100x100mm MS +43.30
hollow vertical strips 13th Floor
in black powder Fixed window to window

3,500
coated finish schedule
+39.80
12th Floor
Awning window to
Fixed window to

3,500
window schedule
window schedule
Decorative fin in +36.30
rusty orange paint finish 11th Floor
(prefab to specialist 3,500
Awning window to detail & specification)
window schedule
1,200

+32.80
Decorative fins in 10th Floor
dark gray paint
3,500

finish (prefab to
1,200

specialist detail &


specification) +29.30
Fixed window to window 9th Floor
schedule
3,500
1,200

+25.80
Awning window to
8th Floor
3,500

window schedule
1,200

+22.30
7th Floor Typical SOHO
3,500

Exterior wall in
outdoor paint finish
1,200

(raw concrete look) +18.80


Glass railing to detail 6th Floor
1,200

4,000

Door to door schedule


1,200

1,200

+14.80
5th Floor Communal
400

1200mm high parapet


wall in raw concrete
3,300

finish
+11.50
4th Floor Parking
SEE PODIUM DETAIL
3,300
10,650

FIREWALL +8.20
3rd Floor Parking
3,300

1,000
+4.90
2nd Floor Parking
Extended slab for
utilities
4,500
4,150

+0.40
±0.00
Ground Floor Commercial
Natural Grade Line
3,200 400

BASEMENT
-3.20
Basement 1
9,050 8,108 8,144 4,144 3,954 8,163 5,520

Right Side Elevation


1
1:300
Project : Drawing Title : Approved: Sheet No. :
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP.
CONDOMINIUM RIGHT ELEVATION 11
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
7 6 5 4' 4
47,083
3 2 CONSTRUCTION
1 DRAWING
5,520 8,163 3,954 4,144 8,144 8,108 9,050 Friday, December 6, 2019

Lightning arrester
+100.34
Top of Machine Room Slab

2,400
Machine room +97.94
Machine Room

2,100
CROWN TO DETAIL +95.84
Exterior wall in
outdoor paint finish Roof Slab

3,500
(raw concrete look)
Backlit signage to
detail & specification +92.34
Roof Deck

3,540
Fixed window to
window schedule
100x100mm MS +88.80
hollow vertical strips
in black powder 26th Floor Penthouse

3,500
coated finish
Mild steel railing to
detail 100x125mm MS +85.30
hollow vertical strips
in black powder 25th Floor

3,500
coated finish

100x150mm MS +81.80
Decorative fin in hollow vertical strips
rusty orange paint in black powder
24th Floor

3,500
finish (prefab to coated finish
specialist detail &
specification) 100x175mm MS +78.30
hollow vertical strips
in black powder
23rd Floor

3,500
coated finish
Awning window to
100x200mm MS
window schedule
hollow vertical strips
+74.80
in black powder 22nd Floor
coated finish

3,500
Exterior wall in
+71.30
outdoor paint finish Decorative fins in 21st Floor
(raw concrete look)

3,500
dark gray paint finish
(prefab to specialist
detail & specification) +67.80
50mm grooveline in
dark gray paint finish 20th Floor

3,500
to architect's
selection
+64.30
19th Floor
Awning window to

3,500
window schedule
1,200

+60.80
18th Floor
Fixed window to

3,500
window schedule
+57.30
17th Floor
1,200

3,500
Mild steel railing to
detail +53.80
16th Floor
1,200

Fixed window to

3,500
window schedule
+50.30
15th Floor
1,200

103,540
3,500
Awning window to
window schedule
Decorative fin in +46.80
Decorative fin in
rusty orange paint 14th Floor
rusty orange paint
finish (prefab to

3,500
finish (prefab to
specialist detail &
specialist detail &
specification)
specification) +43.30
13th Floor

3,500
Exterior wall in outdoor +39.80
paint finish (raw 12th Floor
concrete look)
3,500
+36.30
11th Floor
3,500

Decorative ledge in
dark gray paint finish
to architect's selection +32.80
10th Floor
3,500

+29.30
Decorative fin in dark 9th Floor
gray paint finish
3,500

(prefab to specialist
detail & specification)
+25.80
8th Floor
3,500

+22.30
7th Floor Typical SOHO
3,500

+18.80
Glass railing to detail 6th Floor
4,000

1200mm high
parapet wall in raw
concrete finish +14.80
5th Floor Communal
3,300

+11.50
4th Floor Parking
3,300

FIREWALL FIREWALL SEE PODIUM DETAIL


+8.20
3rd Floor Parking
3,300

1,000
+4.90
2nd Floor Parking
Extended structural
slab for utilities
4,500

93
+0.40
±0.00
Ground Floor Commercial
Natural Grade Line
3,200 400

BASEMENT
-3.20
Basement 1
5,520 8,163 3,954 4,144 8,144 8,108 9,050

Left Side Elevation


1
1:300
Project : Drawing Title : Approved: Sheet No. :
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP.
CONDOMINIUM LEFT ELEVATION 12
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
G F E 40,368
D C' C B A CONSTRUCTION DRAWING
5,967 5,648 10,292 4,379 1,829 8,100 4,153 Friday, December 6, 2019

Lightning arrester
+100.34
Top of Machine Room Slab

2,400
EXTERIOR WALL FINISH Machine room +97.94
Machine Room

2,100
+95.84
Location of water Roof Slab
Exterior wall in

3,500
Exterior wall in tank outdoor paint finish
outdoor paint finish (raw concrete look)
(raw concrete look) +92.34
Roof Deck
Fixed window to

3,540
window schedule
+88.80
26th Floor Penthouse

3,500
Awning window to
window schedule
Decorative fin in +85.30
rusty orange paint 25th Floor
finish (prefab to

3,500
specialist detail &
specification) MS railing to detail
+81.80
Decorative fin in 24th Floor
rusty orange paint

3,500
finish (prefab to
specialist detail &
specification)
+78.30
23rd Floor
MS railing to detail

3,500
+74.80
22nd Floor
Structural deck for

3,500
condenser
Structural deck for EXTERIOR WALL FINISH
condenser +71.30
21st Floor

3,500
1,200

Exterior wall in +67.80


outdoor paint finish 20th Floor
(raw concrete look)

3,500
1,200

+64.30
19th Floor

3,500
1,200

+60.80
EXTERIOR WALL FINISH 18th Floor

3,500
1,200

+57.30
17th Floor

3,500
Exterior wall in
outdoor paint finish
(raw concrete look) +53.80
16th Floor

3,500
+50.30
15th Floor

103,540
3,500
+46.80
14th Floor
Awning window to

3,500
window schedule
+43.30
13th Floor
Fixed window to 3,500
window schedule

+39.80
12th Floor
3,500

+36.30
11th Floor
3,500

+32.80
10th Floor
3,500

+29.30
9th Floor
3,500

+25.80
8th Floor
3,500

+22.30
1200mm high 7th Floor Typical SOHO
parapet wall in raw
3,500

concrete finish
1,200

+18.80
1,500 6th Floor
Louver window to
4,000
600

window schedule
1,800

EXTERIOR WALL FINISH +14.80


5th Floor Communal
3,300
2,400

Exterior wall in +11.50


outdoor paint finish 4th Floor Parking
(raw concrete look)
3,300

+8.20
3rd Floor Parking
3,300
1,200

+4.90
2nd Floor Parking
Awning window to
window schedule
4,500

Fixed glass to
window schedule +0.40
±0.00
Ground Floor Commercial
Natural Grade Line
3,200 400

OUT IN
(to basement
parking) -3.20
Basement 1
5,967 5,648 10,292 4,379 1,829 8,324 3,929

Rear Elevation
1
1:300
Project : Drawing Title : Approved: Sheet No. :
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP.
CONDOMINIUM REAR ELEVATION 13
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
CONSTRUCTION DRAWING
Friday, December 6, 2019
Pattern tilted at 6.71 deg
Mild steel railing to
detail

Structural column in
2nd Floor Parking Slab

400

100
dark gray paint finish

6.71° Built-up EIFS (color:) or


equivalent to architect's

2,443
400 2,549 400 2,549 400 2,549 400 2,549 400 2,549 400 2,549 400 2,549

2,043
approval
20,643

Podium Detail Plan


1
445
1:150
445 445
25 25 25 25
R20 R70 48 50 50 50 50 50 48 145 78 78 145 198 50 198

R100

47
50

50

123

50
216

226
65
376

376

376

376
R50

50

50

65
188
25
35 50

35 50
47
R100 R97 R172 R211 35 163 50 163 35
R150 123 50 100 50 123

+18.80
6th Floor

Column to detail
2,561

4,000
Glass railing to detail 56 445 56 445 56 445 56 445 56 445 56

Built-up lighted signage


to specialist detail &

400

47
specification
+14.80
5th Floor Communal LOGO A

400

376
SEE LOGO PATTERN
BLOW-UP

3,300
2,162 Built-up EIFS or

47
lightweight panel
equivalent in dark +11.50
400

gray paint finish


4th Floor Parking LOGO B

376
2,162

Structural beam in
matte black paint

3,300
11,050

finish

18,800

47
400

+8.20
2,162

2,162

2,163
3rd Floor Parking LOGO C

376
Steel pipe painted in
brown (SEE APPENDIX)
2,549 to detail 3,300
400

47
MS railing to detail
1,200

2,162

+4.90
2nd Floor Parking LOGO D

376
400

400 2,549 400 2,549 400 2,549 400 2,549 400 2,549 400 2,549 400 2,549
20,643
PROPERTY LINE

PROPERTY LINE

4,500

47
423
Ground Floor Line +0.40
±0.00
Ground Floor Commercial
Natural Grade Line
400

Podium Front Detail Elevation Logo Pattern Blow-up


2 3
1:150 1:20
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Podium Detail 14 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Podium Detail Plan, Podium Front Detail Elevation, Logo Pattern Blow-up, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:150, 1:20, ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
1:582.21, 1:10
CONSTRUCTION DRAWING
Friday, December 6, 2019
B C C' D E
30,472
8,324 6,208 10,292 5,648

Decorative fin in
Decorative fin in rusty
Exterior wall in dark rusty orange paint
Fixed window to orange paint finish Exterior wall in raw Awning window to Exterior wall in raw Awning window to Fixed window to Exterior wall in raw
brown paint finish to finish (prefab to
window schedule (prefab to specialist concrete finish window schedule concrete finish window schedule window schedule concrete finish
architect's selection specialist detail &
detail & specification)
specification) +25.80
8th Floor

650

150
150
500
Decorative fin in 1,000 1,000 1,000 3,000 1,200 2,400 1,200

950
rusty orange paint
finish (prefab to
specialist detail &

2,150
specification)

1,850

1,200

3,500
3,350

2,500

2,500

3,350
Railing to detail
Railing to detail

1,200

1,200

1,200
Structural deck for

1,000
condenser Structural deck for

350
condenser +22.30
7th Floor Typical SOHO

350

150
150
150 150 150 150 200
551 150 3,895 150 3,925 150 4,383 200 501 150 1,201 150 2,401 150 1,200 150 503 150 1,300 795 150 2,400 150 500 150 1,200 610 655 542

13,204 6,905 1,300 6,605 1,197


13,204 14,810 1,197

Typical Floor Blow-up Front Elevation


1
1:100
2 3 4 4' 5
38,033
8,108 8,144 4,144 3,954

100x175mm MS 100x150mm MS 100x125mm MS Decorative fins in rusty


Shear wall in Fixed window Exterior wall in
hollow vertical strips hollow vertical strips hollow vertical strips Awning window to orange paint finish
raw concrete to window raw concrete
in black powder in black powder in black powder window schedule (prefab to specialist
finish schedule finish
coated finish coated finish coated finish detail & specification)

Decorative fins in dark

500
gray paint finish 100x100mm MS 1,000 1,000 1,000 3,000
(prefab to specialist 1,200 2,000 1,200 2,000
hollow vertical strips
detail & specification) in black powder
coated finish
100x200mm MS

1,850

1,850
hollow vertical strips
in black powder

2,350
coated finish

Decorative ledge in

1,200

1,000

1,000
dark gray paint finish
to architect's approval

150

150
1,662 1,662 1,588 1,637 8,454 299 3,749 297 3,749 303 3,754

Typical Floor Blow-up Right Side Elevation


2
1:100
5 6 7

8,163 5,520

Exterior wall in Exterior wall in


Fixed window to Awning window to
raw concrete raw concrete
window schedule window schedule
finish finish

+25.80
4,600 Decorative fins in rusty 8th Floor
1,000 EQ EQ EQ EQ orange paint finish
950

(prefab to specialist
1,600
detail & specification)

3,500
2,400

Railing to detail

1,200
+22.30
7th Floor Typical SOHO
5,578 2,475 2,008 4,142 1,210

Typical Floor Blow-up Right Side Elevation


2
1:100
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Front and Right Side Blow-up Elevation 15 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Typical Floor Blow-up Front Elevation, Typical Floor Blow-up Right Side Elevation
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:100 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
7 6 5 4'
CONSTRUCTION
4
DRAWING
38,033
Friday, December 6, 2019
5,520 8,163 3,954 4,144

Decorative fin in rusty


Exterior wall in raw Fixed window to Awning window to Fixed window to orange paint finish Awning window to Fixed window to
concrete finish window schedule window schedule window schedule (prefab to specialist window schedule window schedule
detail & specification)

150
2,700

800

650
Decorative fin in rusty EQ EQ EQ

950
orange paint finish 1,600
(prefab to specialist
detail & specification)

2,150

1,700

1,700
3,650

2,400
Railing to detail

1,500
EQ EQ EQ

1,200

1,000

1,000
2,700
Structural deck for
condenser units

150

150
1,210 14,850 1,210
1,210 14,850

Typical Floor Blow-up Left Side Elevation


1
1:100
4 3 2

8,144 8,108

100x100mm MS 100x125mm MS 100x150mm MS 100x175mm MS


Fixed window to Exterior wall in raw Awning window to hollow vertical strips hollow vertical strips hollow vertical strips hollow vertical strips
window schedule concrete finish window schedule in black powder in black powder in black powder in black powder
coated finish coated finish coated finish coated finish
+25.80
Decorative fin in dark 8th Floor
1,000 2,000 2,000 1,200 2,000 1,200 gray paint finish
(prefab to specialist
detail & specification)

100x200mm MS
1,850

hollow vertical strips

3,500
in black powder

2,350
coated finish

Decorative ledge in dark


1,000

gray paint finish to


architect's approval
+22.30
7th Floor Typical SOHO

350

150
18,698 6,700 500
19,908 7,200

Typical Floor Blow-up Left Side Elevation


1
1:100

F E D C' C B
30,472
5,648 10,292 4,379 1,829 8,324

Decorative fin in rusty Decorative fin in rusty


orange paint finish Exterior wall in raw Exterior wall in raw Awning window to Fixed window to Exterior wall in raw orange paint finish
(prefab to specialist concrete finish concrete finish window schedule window schedule concrete finish (prefab to specialist
detail & specification) detail & specification)
150

+25.80
8th Floor
150

600

1,000 1,000 2,000 1,000 2,000


Exterior wall in raw
concrete finish
2,150

1,850

1,850

3,500
3,650

Railing to detail
Railing to detail
1,200

1,200

1,200
900

900
Structural slab for
condenser units +22.30

150
7th Floor Typical SOHO
150

150

1,397 4,839 6,616 1,251 800 1,698 3,923 8,015 671

Typical Floor Blow-up Rear Elevation


2
1:100
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Left Side and Rear Blow-up Elevation 16 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Typical Floor Blow-up Left Side Elevation, Typical Floor Blow-up Rear Elevation
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:100 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
1
Corner Unit Detail Elevation A

22nd FLR
14th FLR

16th FLR

19th FLR

26th FLR
6th FLR

9th FLR

3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,540 3,500 2,100 2,400
81,540
6th Floor
+18.80

7th Floor Typical SOHO


+22.30

8th Floor
+25.80

9th Floor
+29.30

10th Floor
+32.80

11th Floor
+36.30

12th Floor
+39.80

13th Floor
+43.30

14th Floor
+46.80

15th Floor
+50.30

16th Floor
+53.80

17th Floor
+57.30

18th Floor
+60.80

19th Floor
+64.30

20th Floor
+67.80

21st Floor
+71.30

22nd Floor
+74.80

23rd Floor
+78.30

24th Floor
+81.80

25th Floor
+85.30

26th Floor Penthouse


+88.80

Roof Deck
+92.34

Roof Slab
+95.84
Machine Room
+97.94
Top of Machine Room Slab
+100.34
1:300

15,410
300 200 150 3,600 150 500 150 1,200 150 1,005 150 950 150 2,400 150 2,400 150 1,005 150 200 300

150
3,600
EQ EQ EQ 1,200 1,200 1,200 1,200

3,650
3,350
150
Decorative fin in Exterior wall in dark
See Decorative Exterior wall in Exterior wall in dark Exterior wall in See Fin
dark gray paint Awning window to Fixed window to brown paint finish
Ledge Dimension outdoor paint finish brown paint finish to Railing to detail outdoor paint finish Dimension
finish to architect's window schedule window schedule to architect'
Detail (raw concrete look) architect's approval (raw concrete look) Detail
approval approval

Corner Unit Blow-up Detail Front Elevation A Fin Dimension Detail


2 4
1:50 1:174.50
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Corner Unit Detail Elevation A 17 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Corner Unit Detail Elevation A, Corner Unit Blow-up Detail Front Elevation A, Roof Deck Plan, Fin
Dimension Detail
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300, 1:50, ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
1:379.79, 1:174.50
CONSTRUCTION DRAWING
Friday, December 6, 2019
1

23rd FLR
10th FLR

12th FLR

13th FLR

15th FLR

18th FLR

24th FLR
21st FLR
7th FLR
Corner Unit Detail Elevation B

3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,540 3,500 2,100 2,400
81,540
6th Floor
+18.80

7th Floor Typical SOHO


+22.30

8th Floor
+25.80

9th Floor
+29.30

10th Floor
+32.80

11th Floor
+36.30

12th Floor
+39.80

13th Floor
+43.30

14th Floor
+46.80

15th Floor
+50.30

16th Floor
+53.80

17th Floor
+57.30

18th Floor
+60.80

19th Floor
+64.30

20th Floor
+67.80

21st Floor
+71.30

22nd Floor
+74.80

23rd Floor
+78.30

24th Floor
+81.80

25th Floor
+85.30

26th Floor Penthouse


+88.80

Roof Deck
+92.34

Roof Slab
+95.84
Machine Room
+97.94
Top of Machine Room Slab
+100.34
1:300

15,410
300 200 150 500 150 1,200 150 2,400 150 1,200 150 503 150 1,300 150 795 150 2,400 150 500 150 1,200 150 610 150 500
150

500
1,200 1,200 1,200 1,200 1,200 1,200
3,650

2,500
3,350

350
150

Decorative fin in
See Decorative Exterior wall in Exterior wall in dark Exterior wall in See Fin Exterior wall in dark
Fixed window to dark gray paint Fixed window to
Ledge Dimension outdoor paint finish brown paint finish to Railing to detail outdoor paint finish Dimension brown paint finish to
window schedule finish to architect's window schedule
Detail (raw concrete look) architect's approval (raw concrete look) Detail architect's approval
approval

Corner Unit Blow-up Detail Front Elevation B


2
1:50

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Corner Unit Detail Elevation B 18 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Corner Unit Detail Elevation B, Corner Unit Blow-up Detail Front Elevation B, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300, 1:50, ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
1:379.79
CONSTRUCTION DRAWING
Friday, December 6, 2019
1

17th FLR

20th FLR

25th FLR
11th FLR
8th FLR
Corner Unit Detail Elevation C

3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,500 3,540 3,500 2,100 2,400
81,540
6th Floor
+18.80

7th Floor Typical SOHO


+22.30

8th Floor
+25.80

9th Floor
+29.30

10th Floor
+32.80

11th Floor
+36.30

12th Floor
+39.80

13th Floor
+43.30

14th Floor
+46.80

15th Floor
+50.30

16th Floor
+53.80

17th Floor
+57.30

18th Floor
+60.80

19th Floor
+64.30

20th Floor
+67.80

21st Floor
+71.30

22nd Floor
+74.80

23rd Floor
+78.30

24th Floor
+81.80

25th Floor
+85.30

26th Floor Penthouse


+88.80

Roof Deck
+92.34

Roof Slab
+95.84
Machine Room
+97.94
Top of Machine Room Slab
+100.34
1:300

15,410
500 150 3,600 150 1,200 150 1,004 150 750 150 700 150 2,400 150 1,005 150 2,400 150 200 300

150
3,650
3,350
150
See Decorative Exterior wall in Decorative fin in dark Exterior wall in Exterior wall in dark See Fin
Fixed window to Fixed window to
Ledge Dimension outdoor paint finish gray paint finish to Railing to detail outdoor paint finish brown paint finish to Dimension
window schedule window schedule
Detail (raw concrete look) architect's approval (raw concrete look) architect's approval Detail

Corner Unit Blow-up Detail Front Elevation C


2
1:50
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Corner Unit Detail Elevation C 19 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Corner Unit Detail Elevation C, Corner Unit Blow-up Detail Front Elevation C, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300, 1:50, ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
1:379.79
CONSTRUCTION DRAWING
Friday, December 6, 2019

100x200mm MS 100x175mm MS 100x150mm MS 100x125mm MS 100x100mm MS


hollow vertical hollow vertical hollow vertical hollow vertical hollow vertical
strips in black strips in black strips in black strips in black strips in black
powder coated powder coated powder coated powder coated powder coated
finish finish finish finish finish

Exterior wall in

500 150
outdoor paint finish
(raw concrete look) 1,200 2,000 1,200 2,000

5
Awning window to
window schedule

Decorative fin in

3,350
dark gray paint

2,500
finish to architect's
approval (prefab to
specialist detail &
specification) FIXED FIXED

350
150
50
300 200 100 1,562 100 1,562 100 1,488 100 1,537 100 33
7,233

Corner Unit Blow-up Right Side Elevation


1
1:50

100x100mm MS 100x125mm MS 100x150mm MS 100x175mm MS 100x200mm MS


hollow vertical hollow vertical hollow vertical hollow vertical hollow vertical
strips in black strips in black strips in black strips in black strips in black
powder coated powder coated powder coated powder coated powder coated
finish finish finish finish finish

Decorative Ledge Dimension Detail


150
Exterior wall in
outdoor paint finish
(raw concrete look)

Awning window to
window schedule

3,650
3,350
FIXED FIXED Decorative fin in

1:140.30
dark gray paint
finish to architect's
approval (prefab to
specialist detail &
specification)

150
33 100 1,537 100 1,488 100 1,562 100 1,562 100 50 200 300
7,233

Corner Unit Blow-up Left Side Elevation


2
1:50

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Side Elevation Blow-up 20 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Corner Unit Blow-up Right Side Elevation, Corner Unit Blow-up Left Side Elevation, Roof Deck
Plan, Decorative Ledge Dimension Detail
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:50, 1:400.07, ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
1:140.30
CONSTRUCTION DRAWING
Friday, December 6, 2019

100

100

100

100

100

100

100 100x150mm MS
hollow vertical strips
100 in black powder
coated finish
100

100

6,500
100

6,111
5,756
100

5,401
5,047
100

4,692
4,338
100 Glass cutting &

3,983
connection detail

3,628
by specialist
200 100

3,274
2,919
2,564
2,210
1,855
1,500

100x150mm MS
hollow vertical
strips in black
powder coated
finish

550 1,024 1,022 1,022 1,022 1,022 1,022 1,022 1,022 1,022 1,022 1,022 1,022 1,022 1,022 550
15,410

Front Crown Blow-up Detail


1
1:75

100x100mm MS 100x125mm MS 100x150mm MS 100x175mm MS 100x200mm MS


hollow vertical hollow vertical hollow vertical hollow vertical hollow vertical
1500mm high
strips in black strips in black strips in black strips in black strips in black
parapet wall
powder coated powder coated powder coated powder coated powder coated
finish finish finish finish finish

Glass cutting &


connection detail
1,500

by specialist

100 EQ 100 EQ 100 EQ 100 EQ 100

6,833 400
7,233

Left Side of Crown Blow-up Detail


2
1:75

100x200mm MS 100x175mm MS 100x150mm MS 100x125mm MS 100x100mm MS


hollow vertical hollow vertical hollow vertical hollow vertical hollow vertical
strips in black strips in black strips in black strips in black strips in black
powder coated powder coated powder coated powder coated powder coated
finish finish finish finish finish

6,550
EQ EQ EQ EQ

100x150mm MS
hollow vertical strips
6,500

in black powder
coated finish
5,797

5,073

4,381

Glass cutting &


3,667

connection detail by
specialist

150 100 EQ 100 EQ 100 EQ 100 EQ 100

400 6,833
7,233

Right Side of Crown Blow-up Detail


3
1:75
Front Left Side Right Side
4 5 6
1:500 1:500 1:500
Project : Drawing Title : Approved: Sheet No. :
A PROPOSED 26 STOREY ECONOMIC 02 ELEVATIONS R.G. PINO REALTY CORP.
CONDOMINIUM Crown Detail 21
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:75, 1:500, Date: 12/6/2019
GSPublisherVersion 0.0.100.47
1:337.62
7 6 5 4' 4 3 2 1CONSTRUCTION DRAWING
47,083
5,520 8,163 3,954 4,144 8,144 8,108 9,050 Friday, December 6, 2019
Lightning
Arrester
+100.34
Top of Machine Room Slab

2,400
MACHINE

4,740
ROOM +97.94
Machine Room

+95.84

LINE

LINE

5,600
Roof Slab
3,500

PROPERTY

PROPERTY
ROOF DECK +92.34
750

Roof Deck

3,540
2,750

AUX ECE HALLWAY 1-BEDRM C 1-BEDRM B 2-BEDRM C 2-BEDRM B


+88.80
750

26th Floor Penthouse

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+85.30
750

25th Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
2,574 6,000 +81.80
750

24th Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+78.30
750

23rd Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+74.80
750

22nd Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+71.30
750

21st Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+67.80
750

20th Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+64.30
750

19th Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+60.80
750

18th Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+57.30
750

17th Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+53.80
750

16th Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+50.30
750

15th Floor

103,540
3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+46.80
750

14th Floor

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+43.30
750

13th Floor
3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+39.80
750

12th Floor
3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+36.30
750

11th Floor
3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+32.80
750

10th Floor
3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+29.30
750

9th Floor
3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+25.80
750

8th Floor
LINE

LINE

3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
PROPERTY

PROPERTY

+22.30
750

7th Floor Typical SOHO


3,500
2,750

AUX ECE HALLWAY UNIT M UNIT L UNIT K UNIT J UNIT I UNIT H UNIT G
+18.80
750

6th Floor
4,000
3,250

AUX ECE HALLWAY COMMERCIAL COMMERCIAL COMMERCIAL COMMUNAL AREA


+14.80
750

5th Floor Communal


400

3,300
2,550

AUX ECE DRIVEWAY PARKING AREA PARKING AREA PARKING AREA PARKING AREA
+11.50
750

4th Floor Parking


3,300
2,550

AUX ECE DRIVEWAY PARKING AREA PARKING AREA PARKING AREA DRIVEWAY
+8.20
750

3rd Floor Parking


3,300
2,550

AUX ECE DRIVEWAY PARKING AREA PARKING AREA PARKING AREA DRIVEWAY
+4.90
750

2nd Floor Parking


4,500
3,750

AUX ECE RECEPTION RENTABLE RENTABLE RENTABLE


+0.40
±0.00
Ground Floor Commercial
Natural Grade Line
3,200 400
750
3,000

GARBAGE
2,450

MRF DRIVEWAY PARKING AREA PARKING AREA PARKING AREA


RM.
-3.20
Basement 1
200

Section A
1
1:300
Project : Drawing Title : Approved: Sheet No. :
A PROPOSED 26 STOREY ECONOMIC 03 SECTIONS R.G. PINO REALTY CORP.
CONDOMINIUM Section A 22
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
A B C C' 34,401
D E F CONSTRUCTION DRAWING
4,153 8,100 1,829 14,671 5,648 Friday, December 6, 2019

Lightning
Arrester
+100.34
Top of Machine Room Slab

2,400
4,700
MACHINE ROOM +97.94
Machine Room

2,100
+95.84
Roof Slab

790 3,500

3,500
FIRE LOCATION OF

LINE
STORAGE ELEVATOR
STAIRS WATER TANK
+92.34

PROPERTY
Roof Deck

3,540
FIRE AUX

2,750
2-BEDRM D 1-BEDRM D ELEVATOR
STAIRS ECE
+88.80

750
26th Floor Penthouse

3,500
2,750 FIRE AUX
UNIT Q UNIT R UNIT S ELEVATOR
STAIRS ECE
+85.30
750

25th Floor

3,500
2,750

FIRE AUX
UNIT Q UNIT R UNIT S ELEVATOR
STAIRS ECE
4,351 +81.80
750

24th Floor

3,500
FIRE AUX
2,750

UNIT Q UNIT R UNIT S ELEVATOR


STAIRS ECE
+78.30
750

23rd Floor

3,500
FIRE AUX
2,750

UNIT Q UNIT R UNIT S ELEVATOR


STAIRS ECE
+74.80
750

22nd Floor

3,500
FIRE AUX
2,750

UNIT Q UNIT R UNIT S ELEVATOR


STAIRS ECE
+71.30
750

21st Floor

3,500
2,750

FIRE AUX
UNIT Q UNIT R UNIT S ELEVATOR
STAIRS ECE
+67.80
750

20th Floor

3,500
2,750

FIRE AUX
UNIT Q UNIT R UNIT S ELEVATOR
STAIRS ECE
+64.30
750

19th Floor

3,500
FIRE AUX
2,750

UNIT Q UNIT R UNIT S ELEVATOR


STAIRS ECE
+60.80
750

18th Floor

3,500
FIRE AUX
2,750

UNIT Q UNIT R UNIT S ELEVATOR


STAIRS ECE
+57.30
750

17th Floor

3,500
FIRE AUX
2,750

UNIT Q UNIT R UNIT S ELEVATOR


STAIRS ECE
+53.80
750

16th Floor

3,500
2,750

FIRE AUX
UNIT Q UNIT R UNIT S ELEVATOR
STAIRS ECE
+50.30
750

15th Floor

103,540
3,500
2,750

FIRE AUX
UNIT Q UNIT R UNIT S ELEVATOR
STAIRS ECE
+46.80
750

14th Floor
3,500
2,750

UNIT Q FIRE UNIT R UNIT S AUX


ELEVATOR
STAIRS ECE
+43.30
750

13th Floor
3,500
2,750

FIRE AUX
UNIT Q UNIT R UNIT S ELEVATOR
STAIRS ECE +39.80
750

12th Floor
3,500

FIRE AUX
2,750

UNIT Q UNIT R UNIT S ELEVATOR


STAIRS ECE
+36.30
750

11th Floor
3,500
2,750

UNIT Q FIRE UNIT R UNIT S AUX


ELEVATOR
STAIRS ECE
+32.80
750

10th Floor
3,500

FIRE AUX
2,750

UNIT Q UNIT R UNIT S ELEVATOR


STAIRS ECE
+29.30
750

9th Floor
3,500
2,750

FIRE AUX
UNIT Q UNIT R UNIT S ELEVATOR
STAIRS ECE
+25.80
750

8th Floor
LINE

3,500
2,750

FIRE AUX
UNIT Q UNIT R UNIT S ELEVATOR
STAIRS ECE
PROPERTY

+22.30
750

7th Floor Typical SOHO


3,500

FIRE AUX
2,750

UNIT Q UNIT R UNIT S ELEVATOR


STAIRS ECE
+18.80
750

6th Floor
750 3,250

4,000

FEMALE MALE FIRE AUX


COMMERCIAL ELEVATOR
CR CR STAIRS ECE
+14.80
5th Floor Communal
3,300
2,550

FIRE AUX
PARKING AREA ELEVATOR
STAIRS ECE +11.50
750

4th Floor Parking


3,300
2,550

GENERATOR ROOM FIRE LVSG/ATS/AP/EMDP AUX


ELEVATOR
STAIRS ECE +8.20
750

3rd Floor Parking


3,300
2,550

PARKING PARKING FIRE AUX


PARKING AREA ELEVATOR
AREA AREA STAIRS ECE
+4.90
2nd Floor Parking
3,750 750

4,500

FIRE AUX
RENTABLE RENTABLE ELEVATOR
STAIRS ECE
+0.40
±0.00
Ground Floor Commercial
Natural Grade Line
3,200 400
750

FIRE
DRIVEWAY DRIVEWAY PARKING AREA ELEVATOR
STAIRS
-3.20
Basement 1

Section B
1
1:300
Project : Drawing Title : Approved: Sheet No. :
A PROPOSED 26 STOREY ECONOMIC 03 SECTIONS R.G. PINO REALTY CORP.
CONDOMINIUM Section B 23
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
C C' D E F CONSTRUCTION DRAWING
22,148 Friday, December 6, 2019
1,829 14,671 5,648

+100.34
Top of Machine Room Slab

2,400
LINE

LINE
+97.94
Machine Room

2,100
PROPERTY

PROPERTY
+95.84
Roof Slab

4,090

3,500
750
ROOF DECK +92.34
Roof Deck

3,540
2,750
2-BEDRM C HALLWAY 2-BEDRM A
+88.80

800
26th Floor Penthouse

3,500
2,700
UNIT J HALLWAY UNIT D
+85.30

800
25th Floor

3,500
2,700
UNIT J HALLWAY UNIT D
2,169 2,041 +81.80

800
24th Floor

3,500
2,700
UNIT J HALLWAY UNIT D
+78.30

800
23rd Floor

3,500
2,700 UNIT J HALLWAY UNIT D
+74.80
800

22nd Floor

3,500
2,700

UNIT J HALLWAY UNIT D


+71.30
800

21st Floor

3,500
2,700

UNIT J HALLWAY UNIT D


+67.80
800

20th Floor

3,500
2,700

UNIT J HALLWAY UNIT D


+64.30
800

19th Floor

3,500
2,700

UNIT J HALLWAY UNIT D


+60.80
800

18th Floor

3,500
2,700

UNIT J HALLWAY UNIT D


+57.30
800

17th Floor

3,500
2,700

UNIT J HALLWAY UNIT D


+53.80
800

3,500 16th Floor


2,700

UNIT J HALLWAY UNIT D


+50.30
800

15th Floor
103,540
3,500
2,700

UNIT J HALLWAY UNIT D


+46.80
800

14th Floor
3,500
2,700

UNIT J HALLWAY UNIT D


+43.30
800

13th Floor
3,500
2,700

UNIT J HALLWAY UNIT D


+39.80
800

12th Floor
3,500
2,700

UNIT J HALLWAY UNIT D


+36.30
800

11th Floor
3,500
2,700

UNIT J HALLWAY UNIT D


+32.80
800

10th Floor
3,500
2,700

UNIT J HALLWAY UNIT D


+29.30
800

9th Floor
3,500
2,700

UNIT J HALLWAY UNIT D


2,169 2,041 +25.80
800

8th Floor
3,500
2,700

UNIT J HALLWAY UNIT D


LINE

LINE

+22.30
800

7th Floor Typical SOHO


3,500
PROPERTY

PROPERTY
2,700

UNIT J HALLWAY UNIT D +18.80


800

6th Floor
750 3,200

4,000

HALLWAY
DECK COMMERCIAL COMMERCIAL DECK
+14.80
5th Floor Communal
3,300
2,550

PARKING PARKING
DRIVEWAY
AREA AREA
+11.50
750

4th Floor Parking


RAMP UP
3,300
2,550

PARKING PARKING
DRIVEWAY
AREA AREA
+8.20
750

3rd Floor Parking


RAMP UP
3,300

PARKING PARKING
2,550

DRIVEWAY
AREA AREA
+4.90
2nd Floor Parking
3,750 750

RAMP UP
4,500

RENTABLE HALLWAY RENTABLE

+0.40
±0.00
Ground Floor Commercial
Natural Grade Line
3,200 400
750

PARKING PARKING FIRE TANK/


DRIVEWAY
AREA AREA CISTERN
-3.20
Basement 1

Section C
1
1:300
Project : Drawing Title : Approved: Sheet No. :
A PROPOSED 26 STOREY ECONOMIC 03 SECTIONS R.G. PINO REALTY CORP.
CONDOMINIUM Section C 24
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 14,671 5,648 5,967
3,500 900 27,002 14,565
2,727

2,727

2,533
D8 D8

D8
VW-1 W5 AW-1 W5 AW-1 W3 AW-1 AW-1

7 7

D7
2,700
D7 VW-2
5,520

5,520
D5 D5 D7
D6 D6
6 6

9,674
D1

D1
D7

D2
18,563
8,163

8,163

D3-B
D3-A
5 5
3,954

3,954
VW-3

7,843
4' D3-C 4'
4,144

4,144
D3-A

4 4
47,083

47,083
8,144

8,144

14.87 %
3 3

D5
28,895

D5

27,241
8,108

8,108

W4
D1
W1 W2 W3
2 2
6.86 %

11.76 %
9,050

9,050

14.87 %
1 1

Basement Door and Window Key Plan Ground Floor Door and Window Key Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Basement and Ground Flr Door and Window Key Plan 25 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement Door and Window Key Plan, Ground Floor Door and Window Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605 27,261 14,605
2,700

2,534

2,534

2,533
7 7

D7

D7
VW-4 VW-4 VW-1
5,520

5,520
D5 D7 D5 D7

6 6

12,374

12,374
D8 D8
21,290

21,290
D6 D6
8,163

8,163
D8

5 5
3,954

3,954
7,843

7,843
4' 4'
4,144

4,144
4 4

13.52 %
47,083

47,083
8,144

8,144

13.52 %
18,191
3 3
26,453

26,453

24,798
D5

D5
8,108

8,108
13.52 %

2 2
5,607
9,050

9,050
3,443
2,443

2,443

2,443
1 1
15,966 4,663 15,966 4,663

2nd Flr Parking Door and Window Key Plan 3rd Flr Parking Door and Window Key Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
2nd Flr & 3rd Flr Door and Window Key Plan 26 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 2nd Flr Parking Door and Window Key Plan, 3rd Flr Parking Door and Window Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 14,671 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967

P R O P E R T Y L I N E

SETBACK
AW-3 W15 AW-3

7 7

D7

D7
VW-4 VW-4 VW-5 VW-5 W8
5,520

5,520
P
R
D5 D7 D7 O
P
D3-A D3-A D5 D4-A D4-A E
6 6 R
T
Y

P R O P E R T Y
L

21,290
D6 D6

AW-2
I
D4-A N
E
D7

D4-B
D4-A
8,163

8,163
D4-A D4-A

L I N E

W3
D4-AD4-A
5 5

D4-B
D4-B
3,954

3,954

W6
W7 W6 W6

D4-A
D4-B D4-B
4' 4'

D4-B

D4-B
D4-A
4,144

4,144

W6

W6
D4-A
4 4

D4-A

D4-B
47,083

47,083

W6

D4-A

W6
D4-B
8,144

8,144
13.84 %

D4-B
D4-B

D4-A

W6
W6

D4-A
2,086
3 3

P R O P E R T Y

D4-A
26,495

P R O P E R T Y
W6
D7
D5

D5
2,002

D4-B
8,108

8,108

L I N E
D4-A

L I N E
2 2
9,050

9,050

SETBACK
2,400
1 1 P R O P E R T Y L I N E

4th Flr Parking Door and Window Key Plan 5th Flr Communal Door and Window Key Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
4th Flr & 5th Flr Door and Window Key Plan 27 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 4th Flr Parking Door and Window Key Plan, 5th Flr Communal Door and Window Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605 27,261 14,605
1,482

2,440

2,440
2,566
W8 W8 W15 AW-4 W8 AW-3 W8 AW-4 W15 AW-4

7 7

D7

D7
9,627

AW-3 AW-4
4,341 4,341
5,520

5,520

W11
W11

D3-D
D3-D
D7 D7

D3-D
D3-D

D3-D

D3-D
D2 D5 D2 D5 D2 D2

17,577
6 D2
6

12,520

12,520
1,600

D2

D3-D D3-D D3-D D3-D D3-D D3-D


D6 D6
AW-2

AW-2

AW-2

AW-2
D3-D D3-D D3-D D3-D D3-D D3-D D3-D D3-D
D2
8,163

8,163
D3-D

D3-D

D3-D
D3-D

D2
D2 D2 D2 D2 D2

D2
D3-D
D3-D

W16
D3-D

D3-D
D3-D

D3-D
D3-D

W16
D3-D

D2

D2
6,350

W11

W11

AW-3
D3-D
D3-D

D4-C
W9
5 W9 W9 W9
5

D3-D

D3-D

D2
D2

D2
W10
D2
3,954

3,954

AW-3 W8
W10 W10 W10 AW-7 W8 AW-3 W8 AW-3 W8 AW-3 AW-7 D3-D

7,790

7,790
D3-D
D3-D
3,713

3,713
D4-C D4-C D4-C D3-D
2,000

AW-7
AW-7

D4-C
W9
4' D3-D 4' D3-D D3-D
D4-C

W9

W8 AW-3

D3-D
W10
D3-D

D3-D

D3-D
4,144

4,144

AW-3 W8
D3-D
W10

D2

D2
D4-C
D2

W9
D2

2,015 2,015
4 4
D4-C

D2
W8 AW-3

D2
D2

D2
W9
47,083

47,083
W10

AW-3 W8
D3-D

D3-D
D3-D

D3-D

D3-D
D3-D D3-D D3-D
W10

D4-C
W9
8,144

D3-D D3-D D3-D


D4-C

W9

W8 AW-3

D3-D
D3-D

D3-D

D3-D

AW-3 W8
W10

D3-D
W10

2,373

D2
D2
2,150
D2
D2

D4-C
22,895

16,252
W9

3 3

21,241
D4-C

W8 AW-3

D2
W9

D2

D3-D

28,895
D3-D

D3-D
W10

D3-D
D5

D5
2,173

27,241
2,001
8,108

3,360
D3-C D3-C D3-C D3-C
AW-5 W12

AW-5 W12

AW-5 W12

AW-5 W12
D3-C
D2

D2
D2

D2
D2

2 2
AW-5 W12

AW-5 W12

AW-5 W12

AW-5 W12
D2 AW-6 AW-6
D3-C

2,905
W14 W12 W13 W13 W12 W13 W12 W13 W12
9,050

9,050
5,998

6,000

6,000

6,000
1 20,580
1
9,078 1,600 9,902

6th Flr Door and Window Key Plan 7th-25th Typical Door and Window Key Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
6th Flr and 7th Flr Door and Window Key Plan 28 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 6th Flr Door and Window Key Plan, 7th-25th Typical Door and Window Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

2,440
2,571
W8 AW-3 W8 AW-4 W15 AW-4
4,379
7 7

D3-C

D7

D7

D7
4,341
5,520

5,520
W11

D3-C D7
D3-C

D3-C
D5 D2 D5 D7
6 6

12,467
D3-D

D7
21,290

D6 D6

AW-2
D2

D3-D

D9-A
W17
8,163

8,163

VW-3
D3-D

D3-C

D3-C

W16
D2

D3-A
D9-B

D2
W17 W17
W11

D3-A
AW-3

VW-3
D3-D 4,002

5 5
D3-C
D3-C
3,954

3,954
D3-C

AW-3 W8
W8 AW-3 W8 AW-3 W8 AW-3 AW-7 D3-C

7,843
3,550

2,000

AW-7

D3-C
4' D3-D 4'
W8 AW-3

D3-C
D3-C
4,144

4,144
AW-3 W8
D2

D3-C
2,015
4 4
W8 AW-3

D3-C
47,083

47,083
AW-3 W8
D2

D3-C

8,144
D3-D D3-D
W8 AW-3

D3-C
AW-3 W8
D2

2,354 D3-C
16,252

3 3,314
3
W8 AW-3

D5
D3-C
28,895

D5

27,241

8,108
D3-C

D3-C D3-C
AW-5 W12

AW-5 W12

D2
D3-C
D2

2 2
AW-5 W12

AW-5 W12

AW-6
D3-C

2,900

W14 W12 W13 W13


9,050

9,050
6,000

1 20,580
1

26th Flr Penthouse Door and Window Key Plan Roofdeck Door and Window Key Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Penthouse and Roofdeck Door and Window Key Plan 29 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 26th Flr Penthouse Door and Window Key Plan, Roofdeck Door and Window Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

1,800
900 900 900 1,000

900 800 700

ELEVATION
2,400

2,400

2,400
2,100

2,100

2,100
FFL FFL FFL FFL FFL FFL

DOOR ID D1 D2 D3-A D3-B D3-C D3-D

LOCATION Main entrance, Ground floor rentables Common toilet, room units door, Admin office Public toilets entrance PWD toilet Basement toilet, room unit toilets Room units showers and toilets

SIZE (mm)WxH 1,800×2,400 900×2,100 900×2,400 1,000×2,400 800×2,100 700×2,100

QUANTITY 3 392 6 1 67 759

12mm thk. clear frameless glass pivot door c/w pivot pole system, Single-leaf solid timber door c/w solid timber Marine plywood both sides c/w water-proofing Marine plywood both sides c/w water-proofing Marine plywood both sides c/w water-
DESCRIPTION Marine plywood both sides c/w water-proofing flush door
locking mechanism and handle to architect's approval frame flush door flush door proofing flush door
Door pivot mechanism, Pullhandle c/w lockset w/ key lock to Door hinge, lockset, hinges, lever handle to Door hinge, lockset, hinges, lever
HARDWARE Door hinge, lockset, handle to architect's approval Door hinge, lockset, handle to architect's approval Door hinge, lockset, hinges, lever handle to architect's approval
architect's approval architect's approval handle to architect's approval
Door Schedule
1
1:1

900 800
1,500
800 900 750 750 900
2,400

2,400

2,100

2,100
2,100

2,100
FFL FFL FFL FFL FFL FFL

D4-A D4-B D4-C D5 D6 D7

5th flr communal units entrance door 5th flr communal units to balcony 6th flr units to balcony Fire Exit Door Pipe chase AUX & Electrical Room

900×2,400 800×2,400 800×2,100 900×2,100 1,500×2,100 900×2,100

17 12 12 56 28 61
12mm thk. clear frameless glass pivot door c/w 12mm thk. clear frameless glass pivot door c/w 12mm thk. clear frameless glass pivot door c/w
Single-leaf MS/aluminum louver door powder coated gray to Single leaf MS/aluminum louver door powder
pivot pole system, locking mechanism and handle pivot pole system, locking mechanism and handle pivot pole system, locking mechanism and handle Fire door c/w panic hardware to specialist detail & specification
specialist detail & specification coated gray to specialist detail & specification
to architect's approval to architect's approval to architect's approval
Door hinge, lockset, handle to architect's approval Door hinge, lockset, handle to architect's approval Door hinge, lockset, handle to architect's approval Panic hardware and hinges to specialist detail & specification Door hinge, lockset, handle to architect's approval Door hinge, lockset, handle to architect's approval

Door Schedule
2
1:1

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Door Schedule 30 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Door Schedule
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:1 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

1,600 5,250

2,400

2,400
FFL FFL

D8 D9-A

Garbage room, Generator room, STP equipment room, LVSG/ATS, Transformer Roofdeck elevator lobby to roofdeck function room

1,600×2,400 5,250×2,400

6 1

Double-leaf MS/aluminum louver door powder coated gray to specialist detail &
12mm thk. clear tempered glass sliding and folding partition to specialist detail and specification
specification

Door hinge, lockset, handle to architect's approval Door pivot mechanism, Handle c/w lockset w/ key lock to architect's approval

Door Schedule
1
1:1

9,841
2,400

FFL

D9-B

Roofdeck elevator lobby to outdoor area

9,841×2,400

12mm thk. clear tempered glass sliding and folding partition to specialist detail and specification

Door pivot mechanism, Handle c/w lockset w/ key lock to architect's approval

Door Schedule
2
1:1

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Door Schedule 31 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Door Schedule
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:1 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

FFL

FFL
1,000 1,200

750
1,000
1,600

650
1,000 EQ EQ

EQ
EQ

1,850
FIXED FIXED

1,850

3,500
EQ
FIXED
ELEVATION

3,500

2,850
EQ
2,400

2,400
FIXED

EQ
FIXED

EQ
1,000

900
1,000

350
FFL FFL FFL FFL
FFL

WINDOW ID AW-1 AW-2 AW-3 AW-4 AW-5

LOCATION Ground floor rentable Hallways Room units (except Q,R,S) Units Q, R, S Corner units

SIZE (mm) 1,000×1,400 1,600×2,400 1,000×1,850 1,000×1,850 1,200×2,500

QUANTITY 4 41 263 42 84

Panelized awning window system w/ glass infill lockset Panelized awning window system w/ glass infill lockset mechanism to Panelized awning window system w/ glass infill lockset mechanism to Panelized awning window system w/ glass infill lockset Panelized awning window system w/ glass infill lockset
DESCRIPTION
mechanism to specialist detail specialist detail specialist detail mechanism to specialist detail mechanism to specialist detail

1,800
900 EQ
1,000
1,600 5,500
EQ EQ 5,500

FIXED
1,850
EQ

2,850

2,400
2,400

2,400
EQ

1,000

FFL
FFL FFL FFL

AW-6 AW-7 VW-1 VW-2

Front hallway to aircon condenser deck Units L and M Basement parking Garbage room

1,600×1,200 1,800×1,850 5,500×2,400 1,000×2,400

21 42 2 1

Panelized awning window system w/ glass infill lockset mechanism Panelized awning window system w/ glass infill lockset mechanism to Powder coated black aluminum louver window to
Powder coated black aluminum louver window to specialist detail and specifications
to specialist detail specialist detail specialist detail and specifications

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Window Schedule 32 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:1 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

3,500 1,500 2,700


900 3,500 EQ EQ 2,700
600

600
2,400

2,400

2,400

2,400
1,800

1,800
FFL FFL FFL FFL

VW-3 VW-4 VW-5 W1

Generator room Public toilets Ground floor rentable

900×600 3,500×2,400 1,500×600 2,700×2,400

3 4 2 1

Powder coated black aluminum louver window to Powder coated black aluminum louver window to specialist detail
Powder coated black aluminum louver window to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications
specialist detail and specifications and specifications

2,350 4,500 3,900


EQ EQ 4,500 EQ EQ EQ EQ
2,400

2,400

2,400
FFL FFL FFL

W2 W3 W4

Ground floor entrance Ground floor rentable Ground floor rentable

2,350×2,400 4,500×2,400 3,900×2,400

1 3 1

Panelized clear glass window system to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Window Schedule 33 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:1 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

2,000 3,000 7,300


EQ EQ 3,000 7,300
2,400

2,400

2,400
FFL FFL FFL

W5 W6 W7

Ground floor rentable 9 5th floor communal units Unit 12 of 5th floor communal

2,000×2,400 3,000×2,400 7,300×2,400

2 10 1

Panelized clear glass window system to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications Panelize

FFL

2,000 800 2,700 2,700


EQ EQ EQ

750
EQ EQ 2,700
750

1,850
1,850

1,850
3,500
2,850

2,850
2,850

Outline of door to
2,100

door schedule
1,000

900
1,000

FFL FFL FFL


FFL

W8 W9 W10 W11

Room units of typical floor 6th floor units Room units (6th Flr) Room units P & Q

2,000×1,850 800×750 2,700×1,850 2,700×1,850

263 12 11 42

Panelized clear glass window system to specialist detail and


Panelized clear glass window system to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications
specifications

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Window Schedule 34 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:1 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

3,600
2,000 2,400 3,600
1,200 EQ EQ EQ EQ
2,500

2,500

2,500

2,500
2,850

2,850

2,850

2,850
350

350

350

350
FFL FFL FFL FFL

W12 W12 W13 W14

Corner units of the typical floors Corner units of the typical floors Corner units of the typical floors Corner unit of typical floors

1,200×2,500 2,000×2,500 2,400×2,500 3,600×2,500

39 84 42 12

Panelized clear glass window system to specialist detail and


Panelized clear glass window system to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications
specifications

3,600
EQ EQ EQ EQ
1,000
5,250
EQ EQ EQ EQ EQ
1,850
1,850

2,850
2,850

2,400
1,000
1,000

FFL FFL
FFL

W15 W16 W17

Unit S of the room units Unit A of the room units Roof deck function room

1,000×1,850 3,600×1,850 5,250×2,400

22 21 3

Panelized clear glass window system to specialist detail


Panelized clear glass window system to specialist detail and specifications Panelized clear glass window system to specialist detail and specifications
and specifications

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 04 DOOR AND WINDOW SCHEDULE R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Window Schedule 35 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:1 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
3,500 900 27,002 14,565 9,083 21,425

2,727

2,727

2,727

2,650

2,571
2,533

2,533
GARBAGE ROOM
Area: 5.75 m2

7 7

2,650
2,700
STP EQUIPMENT RM AUX ECE EE RM
Area: 19.75 m2 12.75 m2 11.25 m2
5,520

5,520
10

PIPE CHASE

6 6

9,713
9,674
PUMP RM
Area: 14.00 m2

18,532
18,563
8,163

8,163
9

RECEPTION ADMIN / SECURITY CENTER


8 PWD 27.50 m2
16.75 m2 5.75 m2
-50mm
-50mm
5 5

FEMALE CR
TOILET
3,954

3,954
5.25 m2

18.75 m2
FIRE COM

7,854
7,843
1 13.75 m2

-50mm
4' 4' 7

-50mm
4,144

4,144
MALE CR
16.25 m2

2
4 4
47,083

47,083
FIRE TANK / CISTERN
8,144

8,144
Area: 134.25 m2
6
3

14.87 %
20,380

18,788
3 3
28,895

27,241
8,108

8,108
5

3,012 4
3,747
2 2
6.86 %

PLANTER
11.76 %
9,050

9,050
8,546

6,000

14.87 %
1 1 4,350 11,863 4,608

Basement Floor Finishes Key Plan Ground Flr. Floor Finishes Key Plan
1 2
1:300 1:300
600mm x 600mm non-slip homogeneous off
FLOOR FINISHES LEGEND: white tiles or equivalent to archt's and client's
approval & selection Parking Floor in raw concrete finish c/w floor
600mm x 600mm homogeneous gray terrazo 600mm x 600mm homogeneous off white tiles hardener or equivalent to specialist detail &
tiles or equivalent to archt's and client's or equivalent to archt's and client's approval & specification
approval & selection selection 600mm x 600mm flamed gray granite tiles or
300mm x 300mm machuca tiles or equivalent to equivalent to archt's and client's approval &
Floor in raw concerete finish or equivalent to selection
archt's and client's approval and selection specialist detail & specification
600mm x 600mm homogeneous terrazo tiles or
equivalent to archt's and client's approval & White floor tile in running bond pattern c/w Tile set-out
selection painted lettering to specialist detail &
specification

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 05 FLOOR FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Basement & Ground Flr. Floor Finishes Key Plan 24 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement Floor Finishes Key Plan, Ground Flr. Floor Finishes Key Plan, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605 27,261 14,605

2,700

2,534

2,534

2,533
7 7
AUX ECE EE RM
13.50 m2 11.00 m2
5,520

5,520
GENERATOR ROOM LVSG/ATS/AP/EMDP
Area: 54.50 m2 Area: 47.25 m2

6 6

12,374

12,374
21,290

21,290
8,163

8,163
5 5
TRANSFORMER
3,954

3,954
7,843

7,843
Area: 60.75 m2

4' 4'
4,144

4,144
4 4
47,083

47,083
8,144

8,144

13.52 %
18,191
3 3
26,453

26,453

24,798
8,108

8,108
2 2

5,607
9,050

9,050
3,443
2,443

2,443

2,443
1 1
15,966 4,663 15,966 4,663

2nd Flr. Parking Floor Finishes Key Plan 3rd Flr. Parking Floor Finishes Key Plan
1 2
1:300 1:300
600mm x 600mm non-slip homogeneous off
FLOOR FINISHES LEGEND: white tiles or equivalent to archt's and client's
approval & selection Parking Floor in raw concrete finish c/w floor
600mm x 600mm homogeneous gray terrazo 600mm x 600mm homogeneous off white tiles hardener or equivalent to specialist detail &
tiles or equivalent to archt's and client's or equivalent to archt's and client's approval & specification
approval & selection selection 600mm x 600mm flamed gray granite tiles or
300mm x 300mm machuca tiles or equivalent to equivalent to archt's and client's approval &
Floor in raw concerete finish or equivalent to selection
archt's and client's approval and selection specialist detail & specification
600mm x 600mm homogeneous terrazo tiles or
equivalent to archt's and client's approval & White floor tile in running bond pattern c/w Tile set-out
selection painted lettering to specialist detail &
specification

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 05 FLOOR FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
2nd & 3rd Flr. Parking Floor Finishes Key Plan 37 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 2nd Flr. Parking Floor Finishes Key Plan, 3rd Flr. Parking Floor Finishes Key Plan, Roof Deck
Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
12,253 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605
27,194 3,197 11,408

2,727

2,700

2,440
2,534

2,533
BALCONY BALCONY
7 AUX ECE EE RM
7
Area: 13.50 m2 Area: 11.00 m2 AUX ECE EE RM

PIPE CHASE
12.75 m2 11.25 m2

6,243
GENERATOR ROOM
5,520

5,520
6,405

Area: 54.50 m2 FEMALE CR MALE CR 13 14


28.50 m2 30.75 m2

-50mm
-50mm

-50mm
6 6

12,374

21,290
STORAGE
4.50 m2

6,224
-50mm
8,163

8,163
1 BALCONY
12,158

12 11 10

5 5 -50mm
3,954

3,954

7,843
2 BALCONY

8,089

-50mm

-50mm

-50mm
BALCONY BALCONY BALCONY

4' 4' -50mm -50mm


9
4,144

4,144
BALCONY 3
BALCONY

4 4 -50mm
47,083

47,083
BALCONY 8 4
BALCONY
8,144

8,144
13.84 %
-50mm

-50mm -50mm

BALCONY 7 5
BALCONY
2,086
3 3
26,453

26,495

24,841
24,552
BALCONY 6 STORAGE
12.75 m2
2,002
8,108

8,108
-50mm

-50mm
6,052

2 2

10,682
10,333
COMMUNAL AREA
6,000 216.00 m2
9,050

9,050
2,443

2,443

2,400

2,400
20,647
1 1

4th Flr. Parking Floor Finishes Key Plan 5th Flr. Communal Floor Finishes
1 2
1:300 1:300
600mm x 600mm non-slip homogeneous off
FLOOR FINISHES LEGEND: white tiles or equivalent to archt's and client's
approval & selection Parking Floor in raw concrete finish c/w floor
600mm x 600mm homogeneous gray terrazo 600mm x 600mm homogeneous off white tiles hardener or equivalent to specialist detail &
tiles or equivalent to archt's and client's or equivalent to archt's and client's approval & specification
approval & selection selection 600mm x 600mm flamed gray granite tiles or
300mm x 300mm machuca tiles or equivalent to equivalent to archt's and client's approval &
Floor in raw concerete finish or equivalent to selection
archt's and client's approval and selection specialist detail & specification
600mm x 600mm homogeneous terrazo tiles or
equivalent to archt's and client's approval & White floor tile in running bond pattern c/w Tile set-out
selection painted lettering to specialist detail &
specification

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 05 FLOOR FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
4th Flr. Parking & 5th Flr. Communal Floor Finishes 38 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 4th Flr. Parking Floor Finishes Key Plan, 5th Flr. Communal Floor Finishes, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605 27,261 14,605

1,482

2,440

2,440
2,566
Q R S Q R S
7 7
9,627 4,341 AUX ECE EE RM 4,341 AUX ECE EE RM
12.50 m2 11.25 m2 12.50 m2 11.00 m2

PIPE CHASE
5,520

5,520
Q R S Q R S

-50mm
-50mm -50mm -50mm -50mm -50mm -50mm

-50mm
17,577
6 6

12,520

12,520
1,600

-50mm

-50mm

-50mm

-50mm

-50mm

-50mm
-50mm

-50mm

-50mm

-50mm
-50mm

-50mm

-50mm

-50mm
8,163

8,163
-50mm -50mm -50mm -50mm

A
-50mm -50mm -50mm -50mm
-50mm -50mm

A
M A M
6,350

A
P O N P O N

-50mm

-50mm
-50mm

-50mm
-50mm

5 -50mm 5 -50mm

P O N M P O N
-50mm

-50mm

-50mm
M
3,954

3,954
L

7,790

7,790
L B B

B
3,713

3,713
B
-50mm -50mm

2,000

L
L

-50mm

-50mm
4' 4'
-50mm

-50mm

-50mm

-50mm

-50mm
-50mm
4,144

4,144
K C K C

C
-50mm -50mm -50mm -50mm

K
K

C
-50mm
2,015 2,015
4 -50mm
4
47,083

47,083
J D J D

D
J
J

D
-50mm -50mm -50mm -50mm

-50mm

-50mm

-50mm

-50mm
8,144

-50mm

-50mm

-50mm

-50mm

-50mm
-50mm

I E I E

E
2,373
-50mm -50mm -50mm -50mm

I
I

E
2,150
22,895

16,252
-50mm

3 3

21,241
-50mm

H H

H
28,895
H

-50mm -50mm

2,173

27,241
2,001
8,108

-50mm

-50mm
3,360
-25m m -25m m
-25mm

-25mm

-25mm

-25mm
m -25m m -25m

G F G F

2 2
G

G
F

F
2,905
9,050

9,050
5,998

6,000

6,000

6,000
1 20,580
1
9,078 1,600 9,902

6th Flr. Floor Finishes Key Plan Typical 7th - 25th Flr. Floor Finishes Key Plan
1 2
1:300 1:300
600mm x 600mm non-slip homogeneous off
FLOOR FINISHES LEGEND: white tiles or equivalent to archt's and client's
approval & selection Parking Floor in raw concrete finish c/w floor
600mm x 600mm homogeneous gray terrazo 600mm x 600mm homogeneous off white tiles hardener or equivalent to specialist detail &
tiles or equivalent to archt's and client's or equivalent to archt's and client's approval & specification
approval & selection selection 600mm x 600mm flamed gray granite tiles or
300mm x 300mm machuca tiles or equivalent to equivalent to archt's and client's approval &
Floor in raw concerete finish or equivalent to selection
archt's and client's approval and selection specialist detail & specification
600mm x 600mm homogeneous terrazo tiles or
equivalent to archt's and client's approval & White floor tile in running bond pattern c/w Tile set-out
selection painted lettering to specialist detail &
specification

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 05 FLOOR FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
6th-25th Flr. Floor Finishes Key Plan 39 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 6th Flr. Floor Finishes Key Plan, Typical 7th - 25th Flr. Floor Finishes Key Plan, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

2,440

2,612
2,571
4,379
7 7
4,341
5,520

5,520

-50mm
-25mm -25mm

6 6

12,467
-50mm

-50mm
-50mm
mm

mm
-25

-25
21,290

-50mm
-50mm

-25m
mm

-50mm
-25

m
8,163

8,163
-50mm -25mm -25mm

-50mm

-50mm
-50mm

4,002

-50mm
5 -25
5

-25mm
mm
3,954

3,954
7,843

3,387
3,550

-25mm
-25

2,000
mm

4' 4'

-50mm
4,144

4,144
m
3,334

-25mm
-25m

3,274

2,015
4 4
47,083

47,083
-25mm
mm
-25

-50mm

8,144
-50mm

26,608
m

-25mm
-25m

2,354
16,252

3 3,314
3 -50mm
3,403
28,895

-25mm

27,241
mm
-25

8,108
-25m m
-25mm

-25mm

m -25m

2 2
2,900
9,050

9,050
6,000

6,000
1 20,580
1

26th Flr. Penthouse Floor Finishes Key Plan Roof Deck Floor Finishes Key Plan
1 2
1:300 1:300
600mm x 600mm non-slip homogeneous off
FLOOR FINISHES LEGEND: white tiles or equivalent to archt's and client's
approval & selection Parking Floor in raw concrete finish c/w floor
600mm x 600mm homogeneous gray terrazo 600mm x 600mm homogeneous off white tiles hardener or equivalent to specialist detail &
tiles or equivalent to archt's and client's or equivalent to archt's and client's approval & specification
approval & selection selection 600mm x 600mm flamed gray granite tiles or
300mm x 300mm machuca tiles or equivalent to equivalent to archt's and client's approval &
Floor in raw concerete finish or equivalent to selection
archt's and client's approval and selection specialist detail & specification
600mm x 600mm homogeneous terrazo tiles or
equivalent to archt's and client's approval & White floor tile in running bond pattern c/w Tile set-out
selection painted lettering to specialist detail &
specification

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 05 FLOOR FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Penthouse and Roof Deck Floor Finishes Key Plan 40 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 26th Flr. Penthouse Floor Finishes Key Plan, Roof Deck Floor Finishes Key Plan, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
3,500 900 27,002 14,565
9,083 21,425

2,727

2,727

2,533
GARBAGE ROOM

2,727
EW 1

2,650
EW 1 EW 1

2,571

2,533
EW 1
Area: 5.75 m2

7 W2 7

2,700
STP EQUIPMENT RM

2,650
W12 W12 W12
Area: 19.75 m2 AUX ECE EE RM
12.75 m2 11.25 m2
5,520

W16 EW 1

5,520
W16 W16
10
W2 PIPE CHASE W16 W12
W12
6 6
W12

9,674
W6 W6 W6 W6 PUMP RM EW 1

9,713
W2 Area: 14.00 m2
W12 W10 W6 W6 W6 W6
W5 W5 W5
W10 W5 W5 W5 W2
18,563

18,532
W16
8,163

W2

8,163
W2 9
W2 W2
W8 ADMIN / SECURITY CENTER
W16 RECEPTION PWD
8 W1 27.50 m2
W4 16.75 m2
W2 5.75 m2 W7

5 W2 5 W8
W12

W2

FEMALE CR
TOILET
3,954

5.25 m2

7,843
W2

3,954

18.75 m2
FIRE COM

7,854
W2 W2 1 13.75 m2
W4 EW 1
4' 4' 7 W2
W7

W2 W4
4,144

4,144
W1 W8
EW 1 W4 MALE CR
16.25 m2

4 4 2
47,083

47,083
W2 W2
FIRE TANK / CISTERN
8,144

Area: 134.25 m2
W4 W2

8,144
6
W2 3 W4

14.87 %
EW 1 W1

20,380
EW 1

18,788
W2
3 3
W2
W2 W12
W12
28,895

W9

27,241
W2
8,108

8,108
5
W2
W2 W11
W1 W2
3,012 4 W1
W10
2 2
3,747

6.86 %

PLANTER
11.76 %
EW 1
9,050

9,050
W2

8,546

6,000

14.87 %
W2

W2
1 1 4,350 11,863 4,608

Basement 1 Wall Finishes Key Plan Ground Floor Commercial Wall Finishes Key Plan
1 2
1:300 1:300
WALL FINISHES 600mm x 600mm homogeneous
off white wall tiles or equivalent to
archt's and client's approval &
Wall in bronze finish (similar
Concrete column with red bricks selection Green wall to archt's & client's
W1 W5 finish of the elevator) to archt's W13
to archt's & client's approval W9 approval
& client's approval Wood paneling to detail

W2 Concrete finish to archt's & W14 Concrete w/ painting works to detail


W6 Wood strips/ bamboo strips to W10 Window/ door to schedule
client's approval
archt's & client's approval
Accent screen to archt's & W15 Glass blocks
W3 W7 W11 Wood screen to detail
client's approval Mural/ artwork to artist's detail

White subway tile to archt's & 600mm x 600mm homogeneous Off white paint finish to archt's & W16 Bare finish wall
W4 W8 off white wall tiles or equivalent to W12
client's approval client's approval
archt's and client's approval & Exterior wall in outdoor paint
selection EW1 finish "raw concrete look"
W9

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 06 WALL FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Basement & Ground Flr. Wall Finishes Key Plan 41 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement 1 Wall Finishes Key Plan, Ground Floor Commercial Wall Finishes Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605 27,261 14,605

2,700
EW 1 EW 1 EW 1 EW 1 EW 1 EW 1

2,534

2,534

2,533
EW 1 EW 1

7 7 W12
W12
W2 W12 W2 AUX
W12 ECE EE
W12 RM W2 W2 AUX ECE EE RM
W12
13.50 m2 11.00 m2 13.50 m2 11.00 m2
EW 1 EW 1
5,520

5,520
GENERATOR ROOM LVSG/ATS/AP/EMDP
Area: 54.50 m2 Area: 47.25 m2

W12 W12

6 6

12,374

12,374
EW 1 W6 W6 W6 W6 EW 1 W6 W6 W6 W6
21,290

21,290
W2 W2 W2 W2
W5 W5 W5 W5 W5 W5
W2 W2
8,163

8,163
W2 W2

5 W2
5 W2
TRANSFORMER
3,954

3,954
7,843

7,843
Area: 60.75 m2
EW 1 EW 1
W2 W2
4' W2
4' W2
4,144

4,144
EW 1 EW 1

4 4

13.52 %
47,083

47,083
W2 W2
W2 W2
8,144

8,144
W2 W2

13.52 %
EW 1 EW 1
EW 1 EW 1

18,191
3 W2
3 W2
26,453

26,453
W12 W12

24,798
W2 W2
8,108

8,108
13.52 %

W2 W2

2 2

5,607
EW 1 W2 EW 1 W2
W2 W2
9,050

9,050
3,443
2,443

2,443

2,443
1 1
15,966 4,663 15,966 4,663

2nd Floor Parking Wall Finishes Key Plan 3rd Floor Parking Wall Finishes Key Plan
1 2
1:300 1:300
WALL FINISHES 600mm x 600mm homogeneous
off white wall tiles or equivalent to
archt's and client's approval &
Wall in bronze finish (similar
Concrete column with red bricks selection Green wall to archt's & client's
W1 W5 finish of the elevator) to archt's W13
to archt's & client's approval W9 approval
& client's approval Wood paneling to detail

W2 Concrete finish to archt's & W14 Concrete w/ painting works to detail


W6 Wood strips/ bamboo strips to W10 Window/ door to schedule
client's approval
archt's & client's approval
Accent screen to archt's & W15 Glass blocks
W3 W7 W11 Wood screen to detail
client's approval Mural/ artwork to artist's detail

White subway tile to archt's & 600mm x 600mm homogeneous Off white paint finish to archt's & W16 Bare finish wall
W4 W8 off white wall tiles or equivalent to W12
client's approval client's approval
archt's and client's approval & Exterior wall in outdoor paint
selection EW1 finish "raw concrete look"
W9

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 06 WALL FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
2nd & 3rd Flr. Parking Wall Finishes Key Plan 42 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 2nd Floor Parking Wall Finishes Key Plan, 3rd Floor Parking Wall Finishes Key Plan, Basement 1
Wall Finishes Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
12,253 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605
27,194 3,197 11,408

S E T B A C K

S E T B A C K
P R O P E R T Y L I N E P R O P E R T Y L I N E

SETBACK
2,727

2,700
EW 1 EW 1 EW 1 EW 1 EW 1

2,440
2,534

2,533
EW 1

BALCONY BALCONY
7 AUX ECE EE RM
7 W12
W2 W12 W2 Area: 11.00 m2
P
R AUX ECE EE RM
Area: 13.50 m2
W12 W12 W8 W8 W12 W12 W12

PIPE CHASE
O 12.75 m2 11.25 m2
P EW 1 EW 1

6,243
GENERATOR ROOM
5,520

5,520
6,405

E
R
Area: 54.50 m2 4F-3 4F-2 4F-1 T FEMALE CR MALE CR 13 14
W12 Y 28.50 m2 30.75 m2 P
W12 W12 R
DOUBLE VOLUME UP L
I W12 O
N P
E E
6 6

12,374
R
T
Y
P R O P E R T Y

P R O P E R T Y
EW 1 EW 1 W2
W6 W6 W6 W6 W6 W6 W6 W6 L

21,290
W2 W2 STORAGE W14 I
W12 W6 W2 W5 W5 W5 N
W5 W5 W5 4.50 m2 E
W2

6,224
W2 W10
8,163

8,163
W2 6M WIDE DRIVEWAY W10 W10 W10
(28 PARKING SLOTS) 3.60mts WIDE W12 W10
RAMP UP TO
1 W12 BALCONY
L I N E

L I N E
4TH FLR PARKING
4F-28
12,158

12 11 10 W2 W10
W12

5 W2
5 W12
3,954

3,954
4F-27

7,843
W10 2 W12 BALCONY

8,089
4F-4 4F-5 4F-6 4F-7 4F-8 4F-9
EW 1 BALCONY BALCONY BALCONY EW 1
W2
4' W2
4F-26 4' W12 W2
W2
9
W12
4,144

4,144
EW 1 EW 1 BALCONY W10 3
4F-10 4F-25 BALCONY
W10

4 4 W10

6M WIDE DRIVEWAY
47,083

47,083
W12
4F-11 4F-24 W12
BALCONY 8W10 4
(28 PARKING SLOTS)
BALCONY
W2
W2
8,144

8,144
13.84 %
4F-12 4F-23 W2 W2
W2
W12
EW 1 EW 1 BALCONY W12 W10
EW 1 7 5 EW 1
4F-13 4F-22 BALCONY
W10
2,086
P R O P E R T Y

3 3

P R O P E R T Y
W2
26,453

26,495
W2 W12

P R O P E R T Y

P R O P E R T Y
4F-14 W12 W12

24,841
W12 W10

24,552
BALCONY 6 STORAGE
12.75 m2
W2 UP 2,002
W2
8,108

8,108
4F-15
L I N E

L I N E
W7
W6 W13 W6
6,052 4F-21
L I N E

L I N E
4F-16
W2

2 2

10,682
10,333
4F-17 4F-20 W6 COMMUNAL AREA W6
6,000 216.00 m2 W2
EW 1 W2 EW 1
W2 W2
4F-19
9,050

9,050
4F-18

W2
S E T B A C K

SETBACK
2,443

2,443

2,400

2,400
20,647
1 P R O P E R T Y L I N E 1 P R O P E R T Y L I N E

4th Floor Parking Wall Finishes Key Plan 5th Floor Communal Wall Finishes Key Plan
1 2
1:300 1:300
WALL FINISHES 600mm x 600mm homogeneous
off white wall tiles or equivalent to
archt's and client's approval &
Wall in bronze finish (similar
Concrete column with red bricks selection Green wall to archt's & client's
W1 W5 finish of the elevator) to archt's W13
to archt's & client's approval W9 approval
& client's approval Wood paneling to detail

W2 Concrete finish to archt's & W14 Concrete w/ painting works to detail


W6 Wood strips/ bamboo strips to W10 Window/ door to schedule
client's approval
archt's & client's approval
Accent screen to archt's & W15 Glass blocks
W3 W7 W11 Wood screen to detail
client's approval Mural/ artwork to artist's detail

White subway tile to archt's & 600mm x 600mm homogeneous Off white paint finish to archt's & W16 Bare finish wall
W4 W8 off white wall tiles or equivalent to W12
client's approval client's approval
archt's and client's approval & Exterior wall in outdoor paint
selection EW1 finish "raw concrete look"

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 06 WALL FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
4th Flr. Parking & 5th Flr. Communal Wall Finishes 43 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 4th Floor Parking Wall Finishes Key Plan, 5th Floor Communal Wall Finishes Key Plan, Basement
1 Wall Finishes Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605 27,261 14,605

1,482

2,440
EW 1 EW 1

2,566

2,440
EW 1 EW 1

Q R S Q R S
7 9,627
W12 EW 1 7 W12 EW 1
4,341 W12 W12 AUX ECE EE RM 4,341 W12 W12 AUX ECE EE RM
W12 W12 m2
12.50 W12
11.25 m2 W12 W12 m2
12.50 W12
11.00 m2

PIPE CHASE
5,520

5,520
Q R S Q R S
W8 W8 W8 W12 W8 W8 W8 W12

17,577
12,520
6
1,600

12,520
W2 W2
W14 W14 W14 W6 W6 W6 W6 W14 W14 W14 W14 W6 W6 W6 W6 W14
W14 W2 W14 W5 W5 W5 W14 W2 W14 W5 W5 W5
8,163

8,163
W8 W12 W8 W12
EW 1 W14 EW 1 W14
W14 W8 A
W14 W8

A
W8 W8 M A W8 M
6,350

W8 W8 W8

A
P O N W12 P O N W12
W12 W12 W12 W12 W12 W12
W14 W14
5 5
P O N M W8 W8 W12 P O N M W8 W8 W12
3,954

3,954
7,790
L B L

7,790
B

B
3,713

3,713
2,000
EW 1 W12 EW 1 W12

L
W14 EW 1 W14 EW 1
4' 4'
W12 W12
W12 W12
4,144

4,144
K C K C

C
K
W14

K
W14

C
W8 W8 W8 W8
2,015 2,015
4 EW 1
4
W12 EW 1
47,083

W12

47,083
W8 W8 W8 W8
J W14 D J W14 D

D
J

J
D
W12 W12
8,144

W12 W12
W12I E W12I E

E
2,373 W14
I

I
W14

E
W8 W8 W8 W8
2,150
22,895

16,252
3 3

21,241
W14 W14
W8 W12 W8 W12
H W14 H W14

H
H

28,895
2,173 W12 EW 1 EW 1

27,241
2,001 W12
8,108

3,360
W14 W12 W14 W12
W12G F W12G F
EW 1 W8 W2 W8 W8 W2 W8
EW 1
2 2
G
F

G
F
W10 W12 W12 W10 W12 W12
W10 W10

2,905
9,050

9,050
EW 1 EW 1
5,998

6,000

6,000

6,000
1 20,580
1
9,078 1,600 9,902

6th Floor Wall Finishes Key Plan Typical 7th - 25th Floor Wall Finishes Key Plan
1 2
1:300 1:300
WALL FINISHES 600mm x 600mm homogeneous
off white wall tiles or equivalent to
Wall in bronze finish (similar
archt's and client's approval &
W5 finish of the elevator) to archt's
Concrete column with red bricks selection Green wall to archt's & client's
W1 & client's approval W13
to archt's & client's approval W9 approval
Wood paneling to detail
Concrete finish to archt's & W6 Wood strips/ bamboo strips to
W2 W14 Concrete w/ painting works to detail
client's approval archt's & client's approval W10 Window/ door to schedule

Accent screen to archt's & W7 Mural/ artwork to artist's detail W15 Glass blocks
W3 W11 Wood screen to detail
client's approval
600mm x 600mm homogeneous
White subway tile to archt's & W8 off white wall tiles or equivalent to Off white paint finish to archt's & W16 Bare finish wall
W4 archt's and client's approval & W12
client's approval client's approval
selection Exterior wall in outdoor paint
W9 EW1 finish "raw concrete look"

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 06 WALL FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
6th-25th Flr. Wall Finishes 44 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 6th Floor Wall Finishes Key Plan, Typical 7th - 25th Floor Wall Finishes Key Plan, Basement 1
Wall Finishes Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

2,440

2,612
EW 1 EW 1 EW 1 EW 1

2,571
4,379
7 W12 EW 1
7 EW 1
4,341 W12 W12 W12 W12 W12 W12
W12 W12 W12
W12
5,520

5,520
W8 W8 W8 W12 W12

6 6

12,467
W12
W2
W6 W6 W6 W6 W14 W6 W6 W6 W6
21,290

W2 W5 W5 W5 W2 W2
W5 W5 W5
8,163

8,163
W12 W12 W8
EW 1 EW 1
W8
W8 W8 W8
W8
W12 W12 W10 W10
W12 4,002 W8 W7
5 5
W8 W8 W12
3,954

3,954
7,843

3,387
3,550

W12
2,000
EW 1 EW 1
EW 1 EW 1
4' 4'
EW 1
W8 W12
4,144

4,144
3,334
3,274
W12 W8
2,015
4 EW 1
4 EW 1
W8
47,083

47,083
W12
W8
W12
EW 1

8,144
W12

26,608
W8 W12
W13
W8
2,354
16,252

3 3,314
3
W8 W12 3,403
W12
28,895

W15
W12 EW 1 EW 1

27,241

8,108
W2
EW 1
W12 W12
W8 W8 W15
EW 1 W12 EW 1
2 2 EW 1

W12 W12
W10 W12
W10 EW 1
2,900
9,050

9,050
EW 1 EW 1
6,000

6,000
1 20,580
1

26th Flr. Penthouse Wall Finishes Key Plan Roof Deck Wall Finishes Key Plan
1 2
1:300 1:300
WALL FINISHES Wall in bronze finish (similar
600mm x 600mm homogeneous
off white wall tiles or equivalent to
W5 finish of the elevator) to archt's archt's and client's approval &
Concrete column with red bricks & client's approval selection Green wall to archt's & client's
W1 W13
to archt's & client's approval W9 approval
Wood paneling to detail
W6 Wood strips/ bamboo strips to
W2 Concrete finish to archt's & archt's & client's approval W14 Concrete w/ painting works to detail
client's approval W10 Window/ door to schedule
W7 Mural/ artwork to artist's detail
Accent screen to archt's & W15 Glass blocks
W3 W11 Wood screen to detail
client's approval 600mm x 600mm homogeneous
W8 off white wall tiles or equivalent to
White subway tile to archt's & Off white paint finish to archt's & W16 Bare finish wall
W4 archt's and client's approval & W12
client's approval selection client's approval
W9 Exterior wall in outdoor paint
EW1 finish "raw concrete look"

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 06 WALL FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Penthouse and Roof Deck Wall Finishes Key Plan 45 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 26th Flr. Penthouse Wall Finishes Key Plan, Roof Deck Wall Finishes Key Plan, Basement 1 Wall
Finishes Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
3,500 900 27,002 14,565 9,083 21,425

2,727

2,727

2,727

2,650

2,571
2,533

2,533
GARBAGE ROOM
Area: 5.75 m2

7 7

2,650
2,700
STP EQUIPMENT RM AUX ECE EE RM
Area: 19.75 m2 12.75 m2 11.25 m2
5,520

5,520
10

PIPE CHASE

6 6

9,713
9,674
PUMP RM
4,800 4,800 4,800 4,850 4,660 5,020 Area: 14.00 m2 3,000 3,000 3,000 3,000 3,000 3,000

18,532
18,563
8,163

8,163
9

2,500
RECEPTION ADMIN / SECURITY CENTER
8 PWD 27.50 m2
16.75 m2 5.75 m2

6,019

2,500
5 5

FEMALE CR
TOILET
3,954

3,954
5.25 m2

2,500
18.75 m2
FIRE COM

7,854
7,843
1 13.75 m2

4' 4' 7

6,019
4,144

4,144
MALE CR
16.25 m2

2
4 4
47,083

47,083
6,019

FIRE TANK / CISTERN


8,144

8,144
Area: 134.25 m2
6
3

14.87 %
20,380

18,788
3 3
6,019
28,895

27,241
8,108

8,108
5

3,012 4
6,019

3,747
2 2
6.86 %

PLANTER
11.76 %
5,019
9,050

9,050
8,546

6,000

14.87 %
1 1 4,350 11,863 4,608

Basement 1 Ceiling Finishes Key Plan Ground Floor Commercial Ceiling Finishes Key Plan
1 2
1:300 1:300

CEILING FINISHES Gypsum board in raw concerete finish or


equivalent to specialist detail & specification &
Exposed ceiling in raw concerete finish or to archts approval
equivalent to specialist detail & specification
Bamboo trellis or equivalent to specialist
detail & specification & to archts approval
Gypsum board in matte white finish or
equivalent to archts approval Synthetic rattan in solihiya pattern c/w light
oak finish wood framing or equivalent to
Moisture resistant Gypsum board in matte specialist detail & specification & to archts
white finish or equivalent to archts approval approval

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 07 CEILING FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Basement & Ground Flr. Ceiling Finishes Key Plan 46 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement 1 Ceiling Finishes Key Plan, Ground Floor Commercial Ceiling Finishes Key Plan,
Basement 1 Power Layout
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605 27,261 14,605

2,700

2,534

2,534

2,533
7 7
AUX ECE EE RM AUX ECE EE RM
13.50 m2 11.00 m2 13.50 m2 11.00 m2
5,520

5,520
GENERATOR ROOM LVSG/ATS/AP/EMDP
Area: 54.50 m2 Area: 47.25 m2

6 6

12,374

12,374
21,290

21,290
4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800 4,800
8,163

8,163
7,270

7,270
5 5
TRANSFORMER
3,954

3,954
7,843

7,843
Area: 60.75 m2

4' 2,019
4'
4,144

4,144
6,019

6,019
6,081

4 4

13.52 %
47,083

47,083
2,019
8,144

8,144
6,019

6,019

13.52 %
18,191
6,081

3 3
26,453

26,453
6,019

6,019

24,798
2,019
8,108

8,108
13.52 %
6,019

6,019
5,991

2 2

5,607
9,050

9,050
5,130 5,130 5,130

3,443
2,443

2,443

2,443
1 1
15,966 4,663 15,966 4,663

2nd Floor Parking Ceiling Finishes Key Plan 3rd Floor Parking Ceiling Finishes Key Plan
1 2
1:300 1:300

CEILING FINISHES Gypsum board in raw concerete finish or


equivalent to specialist detail & specification &
Exposed ceiling in raw concerete finish or to archts approval
equivalent to specialist detail & specification
Bamboo trellis or equivalent to specialist
detail & specification & to archts approval
Gypsum board in matte white finish or
equivalent to archts approval Synthetic rattan in solihiya pattern c/w light
oak finish wood framing or equivalent to
Moisture resistant Gypsum board in matte specialist detail & specification & to archts
white finish or equivalent to archts approval approval

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 07 CEILING FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
2nd & 3rd Flr. Parking Ceiling Finishes Key Plan 47 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement 1 Power Layout, 2nd Floor Parking Ceiling Finishes Key Plan, 3rd Floor Parking Ceiling
Finishes Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G A B C C' D E F G
40,368 40,368
12,253 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605
27,194 3,197 11,408

2,727

2,700

2,440
2,534

2,533
BALCONY BALCONY
7 AUX ECE EE RM
7
Area: 13.50 m2 Area: 11.00 m2 AUX ECE EE RM
4,800

PIPE CHASE
12.75 m2 11.25 m2

6,243
GENERATOR ROOM
5,520

5,520
6,405

Area: 54.50 m2 FEMALE CR MALE CR 13 14


28.50 m2 30.75 m2

6 6

12,374
3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000

21,290
STORAGE
4,800 4,800 4,800 4,800 4,800 4,800 4,800 4.50 m2

3,000

6,224
8,163

8,163
1 BALCONY

3,000
12,158

12 11 10

5 5

3,000
3,954

3,954

7,843
2 BALCONY

8,089
BALCONY BALCONY BALCONY

4' 4'

3,000
9
4,144

4,144
BALCONY 3
BALCONY

3,000
4 4
47,083

47,083

3,000
BALCONY 8 4
BALCONY
8,144

8,144
13.84 %

3,000
BALCONY 7 5
BALCONY
2,086

3,000
3 3
26,453

26,495

24,841
24,552
BALCONY 6 STORAGE
12.75 m2
2,002
8,108

8,108
6,052

2 2
COMMUNAL AREA
6,000 216.00 m2
9,050

9,050
2,443

2,443

2,400

2,400
1 1

4th Floor Parking Ceiling Finishes Key Plan 5th Floor Communal Ceiling Finishes Key Plan
1 2
1:300 1:300

CEILING FINISHES Gypsum board in raw concerete finish or


equivalent to specialist detail & specification &
Exposed ceiling in raw concerete finish or to archts approval
equivalent to specialist detail & specification
Bamboo trellis or equivalent to specialist
detail & specification & to archts approval
Gypsum board in matte white finish or
equivalent to archts approval Synthetic rattan in solihiya pattern c/w light
oak finish wood framing or equivalent to
Moisture resistant Gypsum board in matte specialist detail & specification & to archts
white finish or equivalent to archts approval approval

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 07 CEILING FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
4th Flr. Parking & 5th Flr. Communal Ceiling Finishes 48 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement 1 Power Layout, 4th Floor Parking Ceiling Finishes Key Plan, 5th Floor Communal
Ceiling Finishes Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605 27,261 14,605

1,482

2,440

2,440
2,566
Q R S Q R S
7 7
9,627

4,341 AUX ECE EE RM 4,341 AUX ECE EE RM


12.50 m2 11.25 m2 12.50 m2 11.00 m2

PIPE CHASE
5,520

5,520

F
Q R S Q R S

F
17,577
6 6

12,520

12,520
1,600

3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000

2,545

2,545
F
8,163

8,163
A

A
M A M
6,350

3,000

3,000
F

F
F
A
P O N P O N

5 5
F

3,000

3,000
F

P O N M P O N M
3,954

3,954
L

7,790

7,790
L B B

B
3,713

3,713
B
2,000

L
L

3,000

3,000
4' 4'

F
4,144

4,144
K C K C

C
K
K

3,000

3,000
C
2,015 2,015
4 4
F F

F F

3,000

3,000
47,083

47,083
J D J D

D
J
J

D
8,144

3,000

3,000
I E I E

E
2,373

I
I

E
2,150
3,000

3,000
22,895

16,252
3 3
F
F

21,241
F
3,000

3,000
H H

H
28,895
H

2,173

27,241
2,001
8,108

3,360
3,000

3,000
G F G F

2 2
G

G
F

F
F

F
2,905
9,050

9,050
5,998

6,000

6,000

6,000
1 20,580
1
9,078 1,600 9,902

6th Floor Ceiling Finishes Key Plan 7th Floor Typical SOHO Ceiling Finishes Key Plan
1 2
1:300 1:300
CEILING FINISHES Gypsum board in raw concerete finish or
equivalent to specialist detail & specification &
Exposed ceiling in raw concerete finish or to archts approval
equivalent to specialist detail & specification
Bamboo trellis or equivalent to specialist
detail & specification & to archts approval
Gypsum board in matte white finish or
equivalent to archts approval Synthetic rattan in solihiya pattern c/w light
oak finish wood framing or equivalent to
Moisture resistant Gypsum board in matte specialist detail & specification & to archts
white finish or equivalent to archts approval approval

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 07 CEILING FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
6th-25th Flr. Ceiling Finishes 49 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement 1 Power Layout, 6th Floor Ceiling Finishes Key Plan, 7th Floor Typical SOHO Ceiling
Finishes Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G A B C C' D E F G
40,368
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

2,612
2,440
2,571
4,379
DECK DECK DECK
7 7

STORAGE & PREPARATION


4,341 AUX ECE EE RM
AUX ECE EE RM 6.00 m2 11.25 m2

5,520
5,520

WATER TANK

Area: 34.75 m2
H

6 6

12,467
21,290

3,000 3,000 3,000 3,000 3,000 3,000 3,000


G

2,476
FEMALE CR

8,163
8,163

Area: 16.00 m2

DECK
F

3,000
A
MALE CR
4,002 Area: 15.00 m2

5 5

3,000
DECK DECK DECK

DECK

3,954
DECK
3,954

7,843

3,387
3,550

DECK
ROOF DECK
2,000

Area: 543.50 m2

3,000
4' 4'

DECK

4,144
3,334
4,144

DECK

E 3,274

3,000
4
2,015
4

47,083
3,000

DECK
47,083

B
DECK

8,144
3,000

26,608
DECK
DECK

D
3,000

2,354
16,252

3 3,314
3
3,403
DECK

3,000
28,895

27,241

8,108
C
2 2
DECK

2,900

9,050
9,050

6,000
6,000

1 1
20,580

26th Floor Penthouse Ceiling Finishes Key Plan Roof Deck Ceiling Finishes Key Plan
1 2
1:300 1:300
CEILING FINISHES Gypsum board in raw concerete finish or
equivalent to specialist detail & specification &
Exposed ceiling in raw concerete finish or to archts approval
equivalent to specialist detail & specification
Bamboo trellis or equivalent to specialist
detail & specification & to archts approval
Gypsum board in matte white finish or
equivalent to archts approval Synthetic rattan in solihiya pattern c/w light
oak finish wood framing or equivalent to
Moisture resistant Gypsum board in matte specialist detail & specification & to archts
white finish or equivalent to archts approval approval

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 07 CEILING FINISHES R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Penthouse and Roof Deck Ceiling Finishes Key Plan 50 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement 1 Power Layout, 26th Floor Penthouse Ceiling Finishes Key Plan, Roof Deck Ceiling
Finishes Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D 40,368 E F G
3,929 8,324 1,829 4,379 10,292 5,648 5,967

P R O P E R T Y L I N E

B-34 B-35 B-36

2,727
IN OUT OUTDOOR PARKING FOR SERVICE VEHICLES

S1
7 S1- Fire Exit stair lighting
to admin main switch

SWITCH LEGEND:
S1
5,520 B-33 B-32 B-31 S1 - SINGLE GANG SWITCH
UP
P
S2 - DOUBLE GANG SWITCH
R
6 O
P
E
S3 - TRIPLE GANG SWITCH
P R O P E R T Y R

4,800 4,800 4,800 4,850 4,660


S1
5,020
T
Y S4 - QUADRUPLE GANG SWITCH
L
I
N NOTE: ELECT'L ENGR. TO DESIGN THE CIRCUITS
6M WIDE DRIVEWAY S3- Parking lightingEto admin main switch
SUCH THAT THE LOOPING OF SWITCHES ARE AS
8,163

(36 PARKING)
B-29 B-30Parking & elevator lighting to admin main
S4-
switch PER INDICATED IN THE DRAWING.
L I N E

B-27 B-28

6,019
5 NOTE:
ELECT'L ENGR. TO DESIGN THE CIRCUITS
3,954

B-26
B-1 B-2 B-3 B-4 B-5 B-6
S1 SUCH THAT THE LOOPING OF SWITCHES ARE
4' B-25
PER INDICATED IN THE DRAWING.

6,019
4,144

B-7
B-24

4
47,083

B-8 B-23

6,019

6M WIDE DRIVEWAY
LIGHTING LEGEND
8,144

B-9 B-22

(36 PARKING)
T5 FLOURESCENT LIGHT OR LED EQUIVALENT
B-10 B-21 TO ARCHITECT'S APPROVAL (DAYLIGHT)

3 S1- Fire Exit stair lighting


SINGLE 10 WATTS SURFACE MOUNTED LED
6,019
P R O P E R T Y

to admin main switch

P R O P E R T Y
B-11 DOWNLIGHT (WARM WHITE)

UP
8,108

B-12 WALL MOUNTED LED UP LIGHT (WARM WHITE) TO


SPECIALIST RECOMMENDATION
L I N E

B-20

L I N E
B-13
6,019

2
NOTE:
B-14
B-19 REFER TO LIGHTING CONSULTANTS FINAL
COMPUTATION AND SPECIFICATION
5,019
9,050

B-15 B-18

B-16 B-17

1 P R O P E R T Y L I N E

Basement Lighting & Switch Key Plan


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 08 LIGHTING & SWITCH KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Basement Lighting & Switch Key Plan 51 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement Lighting & Switch Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

SWITCH LEGEND:
S1 - SINGLE GANG SWITCH
S2 - DOUBLE GANG SWITCH
A B C C' D E F G S3 - TRIPLE GANG SWITCH
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 S4 - QUADRUPLE GANG SWITCH
NOTE: ELECT'L ENGR. TO DESIGN THE CIRCUITS
SUCH THAT THE LOOPING OF SWITCHES ARE AS
PER INDICATED IN THE DRAWING.

NOTE:
7 S1- Fire Exit stair lighting
to admin main switch
ELECT'L ENGR. TO DESIGN THE CIRCUITS
S1
SUCH THAT THE LOOPING OF SWITCHES ARE
5,520

PER INDICATED IN THE DRAWING.


6 S1
S4- Hallway and elevator lighting to admin main switch
S1- cove lighting to admin main switch
S4- Hallway lighting to admin main switch
3,000 3,000 3,000 3,000 3,000 3,000 LIGHTING LEGEND

S2
8,163

PROVISION FOR LIGHTING STUB-OUT

2,500
S1 T5 FLOURESCENT LIGHT OR LED EQUIVALENT

2,500
TO ARCHITECT'S APPROVAL (DAYLIGHT)
5 S4
S4 S4- lighting to admin S3
main switch
3,954

2,500
CIRCULAR RECESSED LED (WARM
WHITE) TO ARCHITECT'S & CLIENT'S
4' S4 S3- lighting to admin main switch
APPROVAL
S4- lighting to admin
main switch S2
4,144

10 WATTS LED BULB IN WARM WHITE C/W DOME


TYPE REFLECTOR, EXTERNAL CASING PAINTED IN
MATTE BLACK FINISH OR EQUIVALENT
4 S4 S3- lighting to admin
47,083

main switch

S4 SINGLE 10 WATTS SURFACE MOUNTED LED


DOWNLIGHT (WARM WHITE)
8,144

WALL MOUNTED LED UP LIGHT (WARM WHITE) TO

14.87 %
SPECIALIST RECOMMENDATION

S4
3 S3
S1- Fire Exit stair lighting
PENDANT LIGHT TO ARCHITECT'S SELECTION
to admin main switch
S2

T5 LED COVE LIGHTING IN WARM WHITE


8,108

DISPLAY
CORNER

SIGNAGE LED LIGHTING TO LIGHTING


3,012 SPECIALIST & SPECIFICATION
S3- lighting to admin main switch
S4- lighting to admin S2- lighting to admin main switch

2 main switch

LIGHTED SIGNAGE IN ACRYLIC CUT OUT OR


6.86 %
EQUIVALENT TO LIGHTING SPECIALIST &
F

S4- lighting to admin main switch


PLANTER S1- lighting to admin main switch SPECIFICATION
F

11.76 %
F

LED STRIP LIGHT FOR FOOD STALL OR


9,050

EQUIVALENT TO LIGHTING SPECIALIST &


SPECIFICATION
6,000

14.87 %

PROVISION FOR STUB-OUT ELECTRICAL


CONNECTION POINT
1

NOTE:
REFER TO LIGHTING CONSULTANTS FINAL
COMPUTATION AND SPECIFICATION
Ground Floor Lighting & Switch Key Plan
1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 08 LIGHTING & SWITCH KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Ground Floor Lighting & Switch Key Plan 52 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Ground Floor Lighting & Switch Key Plan, Basement Lighting & Switch Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967

S E T B A C K

S E T B A C K

S E T B A C K
P R O P E R T Y L I N E P R O P E R T Y L I N E

7 S1- Fire Exit stair lighting


to admin main switch
7 S1- Fire Exit stair lighting
to admin main switch
AUX ECE EE RM P
R AUX ECE EE RM P
R
13.50 m2 11.00 m2 O 13.50 m2 11.00 m2 O
S1 P S1 P
5,520

5,520
E
R
GENERATOR ROOM LVSG/ATS/AP/EMDP E
R
2F-5 2F-4 2F-3 2F-2 2F-1 T Area: 54.50 m2 Area: 47.25 m2 T
Y Y
L UP L
I I
N N
E E
6 S1 S1 S3- Parking lighting to main switch
S3- Parking & elevator lighting to main 6 S1 S1 S2- Parking lighting to admin main switch
S2- Parking & elevator lighting to admin main
P R O P E R T Y

P R O P E R T Y
switch
adminmain switch switch

4,800 4,800 4,800 4,800 4,800 4,800 4,800 3F-3 4,800 3F-1 4,800 4,800 4,800 4,800 4,800 4,800
6M WIDE DRIVEWAY
(23 PARKING)
8,163

8,163
6M WIDE DRIVEWAY
(28 PARKING SLOTS)
3F-4 3F-2
L I N E

L I N E
2F-28 3F-23

7,270

7,270
3.60mts WIDE
S1
5 5
RAMP DOWN TO
GROUND FLOOR

TRANSFORMER
3,954

3,954
2F-27 3F-5 3F-6 3F-22
2F-6 2F-7 2F-8 2F-9 2F-10 2F-11 Area: 60.75 m2

4' 2,019
2F-26 4' 3F-21
4,144

4,144
6,019

6,019
2F-12 2F-25 3F-7 3F-20
6,081

4 4

13.52 %

6M WIDE DRIVEWAY
47,083

47,083
2F-13 6M WIDE DRIVEWAY 2F-24 3F-8 3F-19
(28 PARKING SLOTS)

(23 PARKING)
2,019
8,144

8,144
6,019

6,019
2F-14 3F-9

13.52 %
2F-23 3F-18

2F-15 2F-22 3F-10 3F-17


P R O P E R T Y

P R O P E R T Y
6,081

3 S1- Fire Exit stair lighting


3 S1- Fire Exit stair lighting 3.60mts WIDE
to admin main switch to admin main switch RAMP UP TO

P R O P E R T Y

P R O P E R T Y
6,019

6,019
2F-16 3F-11 4TH FLR PARKING

UP UP
2,019
8,108

8,108
2F-17 13.52 % 3F-12
L I N E

L I N E
3F-16
2F-21
L I N E

L I N E
2F-18 3F-13
6,019

6,019
5,991

2 2
2F-19 3F-14
9,050

9,050
2F-20 3F-15
5,130 5,130 5,130
S E T B A C K

S E T B A C K
1 P R O P E R T Y L I N E 1 P R O P E R T Y L I N E

Second Floor Lighting & Switch Key Plan 3rd Floor Lighting & Switch Key Plan
1 1
1:300 1:300
10 WATTS LED BULB IN WARM WHITE C/W DOME
LIGHTING LEGEND TYPE REFLECTOR, EXTERNAL CASING PAINTED IN SWITCH LEGEND:
MATTE BLACK FINISH OR EQUIVALENT
S1 - SINGLE GANG SWITCH
PROVISION FOR LIGHTING STUB-OUT S2 - DOUBLE GANG SWITCH
SINGLE 10 WATTS SURFACE MOUNTED LED
DOWNLIGHT (WARM WHITE) S3 - TRIPLE GANG SWITCH
T5 FLOURESCENT LIGHT OR LED EQUIVALENT NOTE:
TO ARCHITECT'S APPROVAL (DAYLIGHT)
S4 - QUADRUPLE GANG SWITCH
WALL MOUNTED LED UP LIGHT (WARM WHITE) TO
ELECT'L ENGR. TO DESIGN THE CIRCUITS
NOTE: ELECT'L ENGR. TO DESIGN THE CIRCUITS
SPECIALIST RECOMMENDATION SUCH THAT THE LOOPING OF SWITCHES ARE AS SUCH THAT THE LOOPING OF SWITCHES ARE
CIRCULAR RECESSED LED (WARM PER INDICATED IN THE DRAWING. PER INDICATED IN THE DRAWING.
WHITE) TO ARCHITECT'S & CLIENT'S NOTE:
APPROVAL REFER TO LIGHTING CONSULTANTS FINAL COMPUTATION AND
SPECIFICATION
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 08 LIGHTING & SWITCH KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
2nd Flr. and 3rd Flr. Lighting & Switch Key Plan 53 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Second Floor Lighting & Switch Key Plan, Basement Lighting & Switch Key Plan, 3rd Floor
Lighting & Switch Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967

S E T B A C K

S E T B A C K
P R O P E R T Y L I N E

SWITCH LEGEND:

7 S1- Fire Exit stair lighting S1 - SINGLE GANG SWITCH


to admin main switch AUX ECE EE RM
4,800 Area: 13.50 m2 Area: 11.00 m2
P
R
O
S2 - DOUBLE GANG SWITCH
S1
S3 - TRIPLE GANG SWITCH
P
GENERATOR ROOM
5,520
E
R
Area: 54.50 m2 4F-3 4F-2 4F-1 T
Y
L
S4 - QUADRUPLE GANG SWITCH
DOUBLE VOLUME UP
I
N
E NOTE: ELECT'L ENGR. TO DESIGN THE CIRCUITS
6 S1 S3- Parking lighting to admin main switch
S3- Parking & elevator lighting to admin main switch SUCH THAT THE LOOPING OF SWITCHES ARE AS
P R O P E R T Y PER INDICATED IN THE DRAWING.
4,800 4,800 4,800 4,800 4,800 4,800 4,800
NOTE:
8,163

6M WIDE DRIVEWAY
(28 PARKING SLOTS) 3.60mts WIDE
RAMP UP TO ELECT'L ENGR. TO DESIGN THE CIRCUITS
L I N E

4TH FLR PARKING


4F-28
SUCH THAT THE LOOPING OF SWITCHES ARE
5 PER INDICATED IN THE DRAWING.
3,954

4F-27
4F-4 4F-5 4F-6 4F-7 4F-8 4F-9

LIGHTING LEGEND
4' 4F-26
4,144

4F-10 4F-25 PROVISION FOR LIGHTING STUB-OUT

4 T5 FLOURESCENT LIGHT OR LED EQUIVALENT

6M WIDE DRIVEWAY
47,083

4F-11 4F-24 TO ARCHITECT'S APPROVAL (DAYLIGHT)

(28 PARKING SLOTS)


8,144

13.84 %
4F-12 4F-23 CIRCULAR RECESSED LED (WARM
WHITE) TO ARCHITECT'S & CLIENT'S
APPROVAL
4F-13 4F-22
P R O P E R T Y

10 WATTS LED BULB IN WARM WHITE C/W DOME


3 S1- Fire Exit stair lighting TYPE REFLECTOR, EXTERNAL CASING PAINTED IN
to admin main switch
MATTE BLACK FINISH OR EQUIVALENT

P R O P E R T Y
4F-14
UP
8,108

4F-15 SINGLE 10 WATTS SURFACE MOUNTED LED


L I N E

DOWNLIGHT (WARM WHITE)

4F-21

L I N E
4F-16
WALL MOUNTED LED UP LIGHT (WARM WHITE) TO
SPECIALIST RECOMMENDATION
2
4F-17 4F-20

4F-19 NOTE:
9,050

4F-18

REFER TO LIGHTING CONSULTANTS FINAL


S E T B A C K

COMPUTATION AND SPECIFICATION


1 P R O P E R T Y L I N E

4th Floor Lighting & Switch Key Plan


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 08 LIGHTING & SWITCH KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
4th Floor Lighting & Switch Key Plan 54 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Basement Lighting & Switch Key Plan, 4th Floor Lighting & Switch Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

SWITCH LEGEND:
S1 - SINGLE GANG SWITCH
A B C C' D E F G S2 - DOUBLE GANG SWITCH
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
S3 - TRIPLE GANG SWITCH
S4 - QUADRUPLE GANG SWITCH
NOTE: ELECT'L ENGR. TO DESIGN THE CIRCUITS
SUCH THAT THE LOOPING OF SWITCHES ARE AS
PER INDICATED IN THE DRAWING.

7 S1- Fire Exit stair lighting


to admin main switch
NOTE:
S1
ELECT'L ENGR. TO DESIGN THE CIRCUITS
5,520

S2- Hallway lighting to admin main switch


SUCH THAT THE LOOPING OF SWITCHES ARE
6 S4
S2
S3 S1 S4 S1 S4
S1 S3- Hallway lighting to admin main switch
PER INDICATED IN THE DRAWING.
3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000

S3- Hallway lighting to main switch

3,000
S3 S1 S3 S1
S3
LIGHTING LEGEND
8,163

S1
S3
PROVISION FOR LIGHTING STUB-OUT

3,000
S3
S1

5 T5 FLOURESCENT LIGHT OR LED EQUIVALENT


TO ARCHITECT'S APPROVAL (DAYLIGHT)

3,000
3,954

S3
S1 CIRCULAR RECESSED LED (WARM
4' WHITE) TO ARCHITECT'S & CLIENT'S

3,000
APPROVAL
S3 S1
4,144

S1 S3
10 WATTS LED BULB IN WARM WHITE C/W DOME

3,000
TYPE REFLECTOR, EXTERNAL CASING PAINTED IN
4 MATTE BLACK FINISH OR EQUIVALENT
47,083

3,000
S3 S3
S1 S1 SINGLE 10 WATTS SURFACE MOUNTED LED
DOWNLIGHT (WARM WHITE)
8,144

3,000
S3 S3
S1 S1 WALL MOUNTED LED UP LIGHT (WARM WHITE) TO
SPECIALIST RECOMMENDATION
3,000
3 S1- Fire Exit stair lighting
to admin main switch
PENDANT LIGHT TO ARCHITECT'S SELECTION
S1
S3
S1
8,108

S4- Communal lighting to admin main switch


SIGNAGE LED LIGHTING TO LIGHTING
S3 S2- Communal lighting to admin main switch SPECIALIST & SPECIFICATION

WALL SCONCE TOP & BOTTOM THROW LIGHTS ON


S1
LOW WALL TO ARCHITECT'S & CLIENT'S
2 APPROVAL

LED DIRECTIONAL SPOT LIGHT OR TRACK LIGHT


IN BLACK COLORED CASING OR EQUIVALENT TO
ARCHITECT'S & CLIENT'S APPROVAL
9,050

LIGHTED SIGNAGE IN ACRYLIC CUT OUT OR


EQUIVALENT TO LIGHTING SPECIALIST &
SPECIFICATION
lighted signage to admin
main switch
1
NOTE:
REFER TO LIGHTING CONSULTANTS FINAL
COMPUTATION AND SPECIFICATION
5th Floor Lighting & Switch Key Plan
1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 08 LIGHTING & SWITCH KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
5th Floor Lighting & Switch Key Plan 55 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 5th Floor Lighting & Switch Key Plan, Basement Lighting & Switch Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
SWITCH LEGEND:
S1 - SINGLE GANG SWITCH
S2 - DOUBLE GANG SWITCH
S3 - TRIPLE GANG SWITCH
7 S1- Fire Exit stair lighting
to admin main switch
S4 - QUADRUPLE GANG SWITCH
+3500mm +3500mm +3500mm NOTE: ELECT'L ENGR. TO DESIGN THE CIRCUITS
S1 SUCH THAT THE LOOPING OF SWITCHES ARE AS
5,520

F
PER INDICATED IN THE DRAWING.

F
6 S3
S2
+2700mm

S3
S2
+2700mm S2
+2700mm

S3
S1 NOTE:
S4- Hallway lighting to admin main
3,000 3,000
+2700mm
3,000 3,000 3,000 3,000 3,000
+2700mm
3,000 switch ELECT'L ENGR. TO DESIGN THE CIRCUITS
SUCH THAT THE LOOPING OF SWITCHES ARE

2,545
S3 S3 S3 F
8,163

S3
PER INDICATED IN THE DRAWING.
+2700mm
S2 S2+2700mm +2700mm
S2 +2700mm S2 +3500mm
S2

+2700mm
3,000
F

F
F

+3500mm +2700mm
S3

LIGHTING LEGEND
5
F
+3500mm +3500mm +3500mm
S2+2700mm

3,000
S2 F

S3
+3500mm
3,954

+2700mm
+3500mm
S2 PROVISION FOR LIGHTING STUB-OUT
S2

3,000
4'

F
T5 FLOURESCENT LIGHT OR LED EQUIVALENT
+3500mm
TO ARCHITECT'S APPROVAL (DAYLIGHT)
4,144

S2 S2

3,000
+2700mm +2700mm
S3 S3 CIRCULAR RECESSED LED (WARM
WHITE) TO ARCHITECT'S & CLIENT'S
4
F F

+3500mm F F
S1 APPROVAL
S3 S3+2700mm

3,000
47,083

+2700mm +3500mm
S2 S2
10 WATTS LED BULB IN WARM WHITE C/W DOME
TYPE REFLECTOR, EXTERNAL CASING PAINTED IN
8,144

3,000
+3500mm MATTE BLACK FINISH OR EQUIVALENT
+3500mm
S2 S2
+2700mm +2700mm
S3 3,000 S3 SINGLE 10 WATTS SURFACE MOUNTED LED
DOWNLIGHT (WARM WHITE)
3
F
F

+3500mm
F
S1- Fire Exit stair lighting
+2700mm

S3
+2700mm to admin main switch

WALL MOUNTED LED UP LIGHT (WARM WHITE) TO


3,000

S2 SPECIALIST RECOMMENDATION
8,108

LED DIRECTIONAL SPOT LIGHT OR TRACK LIGHT


3,000

+3500mm S1 S2 +3500mm IN BLACK COLORED CASING OR EQUIVALENT TO


S2 S2 ARCHITECT'S & CLIENT'S APPROVAL
+2700mm +2700mm
S2
2 S3 S3
+3500mm

NOTE:
REFER TO LIGHTING CONSULTANTS FINAL
F

F
9,050

COMPUTATION AND SPECIFICATION

6th Floor Lighting & Switch Key Plan


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 08 LIGHTING & SWITCH KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
6th Floor Lighting & Switch Key Plan 56 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 6th Floor Lighting & Switch Key Plan, Basement Lighting & Switch Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967

SWITCH LEGEND:
S1 - SINGLE GANG SWITCH
7 S1- Fire Exit stair lighting
to admin main switch
S2 - DOUBLE GANG SWITCH
+3500mm +3500mm +3500mm
S1 S3 - TRIPLE GANG SWITCH

F
S4 - QUADRUPLE GANG SWITCH

F
+2700mm
S2 S2 S2 +2700mm NOTE: ELECT'L ENGR. TO DESIGN THE CIRCUITS
6 S3
+2700mm
S3 S3
S1
S4- Hallway lighting to admin main
SUCH THAT THE LOOPING OF SWITCHES ARE AS
13,683

3,000 3,000 3,000 3,000 3,000 3,000 3,000 3,000


PER INDICATED IN THE DRAWING.
switch
+2700mm +2700mm

NOTE:

2,545
S3 S3 S3 F

+2700mm +2700mm +3500mm


+2700mm +2700mm
S3
S2 S2 S2
S2
S2 ELECT'L ENGR. TO DESIGN THE CIRCUITS

+2700mm
3,000
F

F
F
SUCH THAT THE LOOPING OF SWITCHES ARE
+3500mm
S3
+2700mm

5 +3500mm +3500mm +3500mm


S2 S2
F

PER INDICATED IN THE DRAWING.

3,000
F

S3
+2700mm
3,954

+3500mm S2
S2

3,000
+3500mm

4' LIGHTING LEGEND

F
+3500mm
4,144

+3500mm
S2 S2

3,000
+2700mm
+2700mm
PROVISION FOR LIGHTING STUB-OUT
S3 S3
4
F F

F F
S1 T5 FLOURESCENT LIGHT OR LED EQUIVALENT
S3 S3

3,000
47,083

+3500mm +2700mm +2700mm TO ARCHITECT'S APPROVAL (DAYLIGHT)


S2 S2
+3500mm
CIRCULAR RECESSED LED (WARM
8,144

3,000
+3500mm WHITE) TO ARCHITECT'S & CLIENT'S
+3500mm APPROVAL
S2 S2
+2700mm +2700mm

3,000
S3 S3 10 WATTS LED BULB IN WARM WHITE C/W DOME
3
F
F

F
S1- Fire Exit stair lighting TYPE REFLECTOR, EXTERNAL CASING PAINTED IN

+2700mm
S3 to admin main switch MATTE BLACK FINISH OR EQUIVALENT
+3500mm +2700mm
3,000
S2
SINGLE 10 WATTS SURFACE MOUNTED LED
8,108

DOWNLIGHT (WARM WHITE)


3,000

+3500mm S1 S2
S2 S2
+2700mm +2700mm
+3500mm
WALL MOUNTED LED UP LIGHT (WARM WHITE) TO
S2 SPECIALIST RECOMMENDATION
2 S3 S3
LED DIRECTIONAL SPOT LIGHT OR TRACK LIGHT
+3500mm
IN BLACK COLORED CASING OR EQUIVALENT TO
ARCHITECT'S & CLIENT'S APPROVAL
F

PENDANT LIGHT TO ARCHITECT'S SELECTION


9,050

NOTE:
REFER TO LIGHTING CONSULTANTS FINAL
1 COMPUTATION AND SPECIFICATION

7th-25th Floor Lighting & Switch Key Plan


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 08 LIGHTING & SWITCH KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
7th-25th Floor Lighting & Switch Key Plan 57 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 7th-25th Floor Lighting & Switch Key Plan, Basement Lighting & Switch Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
SWITCH LEGEND:
S1 - SINGLE GANG SWITCH
S2 - DOUBLE GANG SWITCH
S3 - TRIPLE GANG SWITCH
7 S1- Fire Exit stair lighting
to admin main switch
S4 - QUADRUPLE GANG SWITCH
S1 +3500mm
NOTE: ELECT'L ENGR. TO DESIGN THE CIRCUITS
+3500mm +3500mm +3500mm S1 SUCH THAT THE LOOPING OF SWITCHES ARE AS
5,520
PER INDICATED IN THE DRAWING.

S2
+2700mm S2+2700mm
NOTE:
6 S2
S1
S1+2700mm
S3
S1 +3500mm
S4- Hallway lighting to main switch
S2
3,000 +2700mm
3,000 3,000 3,000 3,000 3,000 +2700mm
3,000
ELECT'L ENGR. TO DESIGN THE CIRCUITS
S1
SUCH THAT THE LOOPING OF SWITCHES ARE

2,476
S1 S1 +2700mm
+2700mm
8,163

S2 S1
PER INDICATED IN THE DRAWING.
+2700mm
S1 S2
S3
S2

3,000
+3500mm +3500mm
+3500mm +3500mm +3500mm
S1+2700mm

+2700mm

5 S2 S2 LIGHTING LEGEND

3,000
S1

+2700mm
S1
S1
3,954

+3500mm S2
+2700mm +3500mm PROVISION FOR LIGHTING STUB-OUT

3,000
4' S1
S1+2700mm T5 FLOURESCENT LIGHT OR LED EQUIVALENT
+3500mm TO ARCHITECT'S APPROVAL (DAYLIGHT)
4,144

S2
+2700mm +3500mm

3,000
S3 S1 CIRCULAR RECESSED LED (WARM
S1
4 WHITE) TO ARCHITECT'S & CLIENT'S
APPROVAL
S1 S2

3,000
47,083

+3500mm
+3500mm
S2
+2700mm S1 10 WATTS LED BULB IN WARM WHITE C/W DOME
S2 TYPE REFLECTOR, EXTERNAL CASING PAINTED IN
8,144

+2700mm

3,000
S1+2700mm S2 MATTE BLACK FINISH OR EQUIVALENT
+2700mm
+3500mm S2
+3500mm S3 S1 +3500mm
SINGLE 10 WATTS SURFACE MOUNTED LED

3,000
DOWNLIGHT (WARM WHITE)
3
+2700mm
S2 S1- Fire Exit stair lighting
to admin main switch
+3500mm
WALL MOUNTED LED UP LIGHT (WARM WHITE) TO
3,000

S2 SPECIALIST RECOMMENDATION
8,108

S2 lighted signage to admin


+2700mm +2700mm
main switch LED DIRECTIONAL SPOT LIGHT OR TRACK LIGHT
S1 S2 S2 +3500mm
IN BLACK COLORED CASING OR EQUIVALENT TO
+3500mm
S3 ARCHITECT'S & CLIENT'S APPROVAL
S1
2 S3
+3500mm
OUTDOOR BACKLIT LIGHTED SIGNAGE OR
EQUIVALENT TO LIGHTING SPECIALIST DETAIL &
SPECIFICATION
9,050

NOTE:
REFER TO LIGHTING CONSULTANTS FINAL
1 COMPUTATION AND SPECIFICATION

26th Floor Penthouse Lighting & Switch Key Plan


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 08 LIGHTING & SWITCH KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
26th Floor Penthouse Lighting & Switch Key Plan 58 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 26th Floor Penthouse Lighting & Switch Key Plan, Basement Lighting & Switch Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
SWITCH LEGEND:
S1 - SINGLE GANG SWITCH
S2 - DOUBLE GANG SWITCH
S3 - TRIPLE GANG SWITCH
S4 - QUADRUPLE GANG SWITCH
7 S1- Fire Exit stair lighting
to admin main switch
NOTE: ELECT'L ENGR. TO DESIGN THE CIRCUITS
SUCH THAT THE LOOPING OF SWITCHES ARE AS
S2 PER INDICATED IN THE DRAWING.
lighted signage to admin
main switch

NOTE:
6
S3- lighting to
S4- lighting to
admin main switch
S3- Hallway lighting to admin main switch
S3- Roof deck lighting to admin main switch
ELECT'L ENGR. TO DESIGN THE CIRCUITS
S1 admin main switch
S2- Roof deck lighting to admin main switch
SUCH THAT THE LOOPING OF SWITCHES ARE
S2
PER INDICATED IN THE DRAWING.
S2
LIGHTING LEGEND

5
T5 FLOURESCENT LIGHT OR LED EQUIVALENT
TO ARCHITECT'S APPROVAL (DAYLIGHT)

CIRCULAR RECESSED LED (WARM


4' WHITE) TO ARCHITECT'S & CLIENT'S
APPROVAL

10 WATTS LED BULB IN WARM WHITE C/W DOME


4 TYPE REFLECTOR, EXTERNAL CASING PAINTED IN
MATTE BLACK FINISH OR EQUIVALENT

SINGLE 10 WATTS SURFACE MOUNTED LED


Roof deck lighting
to main switch DOWNLIGHT (WARM WHITE)

WALL MOUNTED LED UP LIGHT (WARM WHITE) TO


SPECIALIST RECOMMENDATION
3 S1- Fire Exit stair lighting
to admin main switch
WALL SCONCE TOP & BOTTOM THROW LIGHTS ON
LOW WALL TO ARCHITECT'S & CLIENT'S
APPROVAL
lighted signage to admin
main switch LED OUTDOOR BULB STRING LIGHTING TO
LIGHTING SPECIALIST DETAIL & SPECIFICATION

OUTDOOR SPIKE LIGHT FOR LANDSCAPE AREA


2 (WARM WHITE) BY LANDSCAPE SPECIALIST

OUTDOOR BACKLIT LIGHTED SIGNAGE OR


EQUIVALENT TO LIGHTING SPECIALIST DETAIL &
SPECIFICATION

NOTE:
1 REFER TO LIGHTING CONSULTANTS FINAL
COMPUTATION AND SPECIFICATION

Roof Deck Lighting & Switch Key Plan


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 08 LIGHTING & SWITCH KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Roof Deck Lighting & Switch Key Plan 59 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Roof Deck Lighting & Switch Key Plan, Basement Lighting & Switch Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
9,083 21,425

2,727

2,650

2,571

2,533
7 POWER LEGEND

2,650
AUX ECE EE RM
ST 12.75 m2 11.25 m2 PANEL BOARD C/W CIRCUIT
BREAKERS TO ELECTRICIAN'S
5,520
10 SPECIFICATIONS

TEL
PROVISION FOR POWER

TEL
ST
6 STUB-OUT

9,713
2
ST 2 DOUBLE POWER SOCKET WALL
MOUNTED
18,532

2F
8,163

9 FLOOR MOUNTED
OUTLET
2
L

2
2F TEL 2F TE
RECEPTION ADMIN / SECURITY CENTER

2
8 PWD 27.50 m2
ST
2
16.75 m2 5.75 m2 ACU AIRCON POWER POINT

2
TEL 2 ST
WALL MOUNTED
5 2F
2 TEL
2W

AIRCON POWER POINT

FEMALE CR
ST 2 ACUF

2
2
FLOOR STANDING

2WCH
3,954

18.75 m2
FIRE COM

7,854
1

2
13.75 m2

2WCH
2W C H 2W C H

2WCH
2F
DOUBLE SOCKET WEATHER
4' 7 ST 2
2W C H PROOF OUTLET (COUNTER
HEIGHT) MOUNTED 200mm

2WCH
2F
4,144

ABOVE FINISH COUNTER LEVEL

2W
2W
2WCH
MALE CR
2 TEL

2 16.25 m2
2 TEL
2 DOUBLE POWER SOCKET WALL
2
4 2F
MOUNTED

2WCH
TEL 2
47,083

2
ST 2
DOUBLE SOCKET WEATHER
2W PROOF OUTLET WALL MOUNTED
2WCH

2F 2 ST
300mm ABOVE FLOOR FINISH
8,144

6 LEVEL

2WCH
3
2WCH

14.87 %
2WCH
F
20,380

FRIDGE POWER POINT

18,788
2 2 TEL 2
2 ST

3 TEL ST
WH
WATER HEATER POWER SOCKET
300MM BELOW CEILING FINISH
LEVEL
2
2WCH

TEL TELEPHONE POINT TO


8,108

5 DISPLAY
CORNER ENGRS SPECIFICATIONS
ST
2

DOUBLE SOCKET WEATHER


2 2

3,012 4
2 TEL 2W C O PROOF OUTLET WALL MOUNTED
3,747 1000mm ABOVE FLOOR FINISH
2 LEVEL
6.86 %
F ATM ATM ATM

2W
PLANTER
F

11.76 %
W WASHING MACHINE
F

POWER POINT
9,050
8,546

6,000

14.87 %

NOTE: POWER LAYOUT IS FOR


1 ELECTRICAL ENGR'S REFERENCE
4,350 11,863 4,608
FOR ELECTRICAL LOADING
COMPUTATION.

Ground Floor Commercial Power Layout


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 09 POWER LAYOUT R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Ground Floor Commercial Power Layout 61 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Ground Floor Commercial Power Layout
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

2,700

2,534
POWER LEGEND
7
AUX ECE EE RM PANEL BOARD C/W CIRCUIT
13.50 m2 11.00 m2
5,520 BREAKERS TO ELECTRICIAN'S
SPECIFICATIONS

ST PROVISION FOR POWER


STUB-OUT
6

12,374
2 DOUBLE POWER SOCKET WALL
21,290

2W
MOUNTED
2F
FLOOR MOUNTED
8,163

OUTLET

ACU AIRCON POWER POINT


WALL MOUNTED
5 ACUF AIRCON POWER POINT
FLOOR STANDING
3,954

7,843
DOUBLE SOCKET WEATHER
PROOF OUTLET (COUNTER
4' 2W C H
HEIGHT) MOUNTED 200mm
ABOVE FINISH COUNTER LEVEL
4,144

2 DOUBLE POWER SOCKET WALL


4 MOUNTED

2W

13.52 %
DOUBLE SOCKET WEATHER
47,083

2W PROOF OUTLET WALL MOUNTED


300mm ABOVE FLOOR FINISH
8,144

LEVEL

F
FRIDGE POWER POINT

18,191
WATER HEATER POWER SOCKET
3 WH
300MM BELOW CEILING FINISH
26,453

LEVEL

TEL TELEPHONE POINT TO


ENGRS SPECIFICATIONS
8,108

13.52 %
DOUBLE SOCKET WEATHER
2W C O PROOF OUTLET WALL MOUNTED
1000mm ABOVE FLOOR FINISH
2 LEVEL
2W

5,607
W WASHING MACHINE
POWER POINT
9,050

NOTE: POWER LAYOUT IS FOR

3,443
2,443

ELECTRICAL ENGR'S REFERENCE


1
FOR ELECTRICAL LOADING
15,966 4,663
COMPUTATION.

2nd Floor Parking Power Layout


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 09 POWER LAYOUT R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
2nd Floor Parking Power Layout 62 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 2nd Floor Parking Power Layout, Ground Floor Commercial Power Layout
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

2,534

2,533
7 POWER LEGEND
AUX ECE EE RM PANEL BOARD C/W CIRCUIT
13.50 m2 11.00 m2
BREAKERS TO ELECTRICIAN'S
5,520

GENERATOR ROOM LVSG/ATS/AP/EMDP


Area: 54.50 m2 Area: 47.25 m2 SPECIFICATIONS

ST PROVISION FOR POWER


6 STUB-OUT

12,374
2 DOUBLE POWER SOCKET WALL
21,290

2W
MOUNTED
2F
8,163

FLOOR MOUNTED
OUTLET

ACU AIRCON POWER POINT


WALL MOUNTED
5 ACUF AIRCON POWER POINT
TRANSFORMER FLOOR STANDING
3,954

7,843
Area: 60.75 m2

DOUBLE SOCKET WEATHER


4' 2W C H PROOF OUTLET (COUNTER
HEIGHT) MOUNTED 200mm
ABOVE FINISH COUNTER LEVEL
4,144

2 DOUBLE POWER SOCKET WALL


4

2W
MOUNTED
47,083

DOUBLE SOCKET WEATHER


2W PROOF OUTLET WALL MOUNTED
300mm ABOVE FLOOR FINISH
8,144

LEVEL

13.52 %
F
FRIDGE POWER POINT

WATER HEATER POWER SOCKET


3 WH
300MM BELOW CEILING FINISH
26,453

LEVEL

24,798
TEL TELEPHONE POINT TO
8,108

ENGRS SPECIFICATIONS

DOUBLE SOCKET WEATHER


2W C O PROOF OUTLET WALL MOUNTED
1000mm ABOVE FLOOR FINISH
2 LEVEL
2W

W WASHING MACHINE
POWER POINT
9,050

NOTE: POWER LAYOUT IS FOR


2,443

2,443

1 ELECTRICAL ENGR'S REFERENCE


FOR ELECTRICAL LOADING
15,966 4,663
COMPUTATION.

3rd Floor Parking Power Layout


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 09 POWER LAYOUT R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
3rd Floor Parking Power Layout 63 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 3rd Floor Parking Power Layout, Ground Floor Commercial Power Layout
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
12,253 1,829 4,379 10,292 5,648 5,967
27,261 14,605

2,727

2,700

2,534
POWER LEGEND
7 AUX ECE EE RM PANEL BOARD C/W CIRCUIT
Area: 13.50 m2 Area: 11.00 m2 BREAKERS TO ELECTRICIAN'S
GENERATOR ROOM SPECIFICATIONS
5,520
6,405
Area: 54.50 m2

ST PROVISION FOR POWER


STUB-OUT
6

12,374
2 DOUBLE POWER SOCKET WALL
2W MOUNTED
2F
FLOOR MOUNTED
8,163

OUTLET

ACU AIRCON POWER POINT


12,158

WALL MOUNTED

AIRCON POWER POINT


5 ACUF
FLOOR STANDING
3,954

8,089
DOUBLE SOCKET WEATHER
2W C H PROOF OUTLET (COUNTER
4' HEIGHT) MOUNTED 200mm
ABOVE FINISH COUNTER LEVEL
4,144

2 DOUBLE POWER SOCKET WALL


MOUNTED
4

2W
DOUBLE SOCKET WEATHER
47,083

2W PROOF OUTLET WALL MOUNTED


300mm ABOVE FLOOR FINISH
LEVEL
8,144

13.84 %
F
FRIDGE POWER POINT

WH
WATER HEATER POWER SOCKET
300MM BELOW CEILING FINISH
3 LEVEL
26,453

24,552
TEL TELEPHONE POINT TO
ENGRS SPECIFICATIONS
8,108

DOUBLE SOCKET WEATHER


6,052 2W C O PROOF OUTLET WALL MOUNTED
1000mm ABOVE FLOOR FINISH
LEVEL
2
2W

6,000 W WASHING MACHINE


POWER POINT
9,050

NOTE: POWER LAYOUT IS FOR


2,443

2,443
ELECTRICAL ENGR'S REFERENCE
1 FOR ELECTRICAL LOADING
COMPUTATION.

4th Floor Parking Power Layout


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 09 POWER LAYOUT R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
4th Floor Parking Power Layout 64 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 4th Floor Parking Power Layout, Ground Floor Commercial Power Layout
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967

27,194 3,197 11,408

2,440
2,533
BALCONY BALCONY
7 2 2
AUX ECE EE RM
POWER LEGEND

PIPE CHASE
12.75 m2 11.25 m2

6,243
5,520

ST
ST
FEMALE CR MALE CR 13 14 PANEL BOARD C/W CIRCUIT

2
28.50 m2 30.75 m2
BREAKERS TO ELECTRICIAN'S

TEL 2

2 TEL
SPECIFICATIONS
6 2W 2W
ST PROVISION FOR POWER
STUB-OUT
2
21,290
STORAGE 2
4.50 m2
2 DOUBLE POWER SOCKET WALL

6,224
MOUNTED
8,163

BALCONY 2F
1 FLOOR MOUNTED

ST

ST
ST

2
OUTLET
2

12 11 10

TEL 2

2 TEL

2
2 TEL
ST
2 TEL
ACU AIRCON POWER POINT
5 WALL MOUNTED
2 2 2 2
2
3,954

7,843
2 BALCONY ACUF AIRCON POWER POINT

2
BALCONY BALCONY BALCONY
2 TEL ST FLOOR STANDING
ST 2 TEL

4' DOUBLE SOCKET WEATHER


9 TEL 2
PROOF OUTLET (COUNTER
ST
4,144

2W C H

2
BALCONY 3
BALCONY HEIGHT) MOUNTED 200mm

2
2 2 ABOVE FINISH COUNTER LEVEL
4 2 2 2 DOUBLE POWER SOCKET WALL
47,083

4
MOUNTED
BALCONY 8

2
BALCONY

2
ST ST DOUBLE SOCKET WEATHER
TEL 2 2 TEL
8,144

2W PROOF OUTLET WALL MOUNTED


2 TEL
ST ST
TEL 2 300mm ABOVE FLOOR FINISH
LEVEL
BALCONY 7 5
BALCONY

2
2

2 2 F
2,086 FRIDGE POWER POINT
3
26,495

WATER HEATER POWER SOCKET


2

2
WH

24,841
BALCONY 6 STORAGE 300MM BELOW CEILING FINISH
2

12.75 m2
2,002 ST LEVEL
TEL 2
8,108

TEL TELEPHONE POINT TO

2W
ENGRS SPECIFICATIONS
2W

DOUBLE SOCKET WEATHER


2WCO

2WCO

2W
2W C O PROOF OUTLET WALL MOUNTED
2WCO

2WCO
1000mm ABOVE FLOOR FINISH
COMMUNAL AREA LEVEL
216.00 m2
2W
9,050

W WASHING MACHINE
2W 2W 2W 2W POWER POINT
2,400

2,400

1 NOTE: POWER LAYOUT IS FOR


ELECTRICAL ENGR'S REFERENCE
FOR ELECTRICAL LOADING
COMPUTATION.

5th Floor Communal Power Layout


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 09 POWER LAYOUT R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
5th Floor Communal Power Layout 65 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 5th Floor Communal Power Layout, Ground Floor Commercial Power Layout
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

2,440
Q R S
7 2 2 2
POWER LEGEND
4,341 AUX ECE EE RM
12.50 m2 11.00 m2

2
PANEL BOARD C/W CIRCUIT

TEL 2

2 TEL
TEL 2
5,520

F W 2WCH ST
Q R S

2
BREAKERS TO ELECTRICIAN'S
SPECIFICATIONS

ST 2WCHW F
FW 2W C H ST
F

F
WH

WH

WH
PROVISION FOR POWER

17,577
6

12,520
ST
STUB-OUT
2
2
2
DOUBLE POWER SOCKET WALL
F
MOUNTED

ST 2WCH W F

ST 2WCH W F
F W 2WCH ST
WH WH WH
8,163

2 ST 2WCH W F 2

WH
2F
A FLOOR MOUNTED

A
WH
M OUTLET

F
F

2
P O N

TEL 2

TEL 2

2
2 TEL

2
2

2
TEL 2
ST 2WCHW F 2 ACU AIRCON POWER POINT
5 2 2 2 WALL MOUNTED
F

WH
F
2
FW 2WCH ST 2
P O N M ACUF AIRCON POWER POINT
3,954

7,790
B

B
2
FLOOR STANDING
3,713

F ST 2WCH

2
WH
L
2 TEL TEL 2

4' DOUBLE SOCKET WEATHER

F
TEL 2 2 TEL
2W C H PROOF OUTLET (COUNTER
HEIGHT) MOUNTED 200mm

WH
4,144

WH
K C

C
K

2
ABOVE FINISH COUNTER LEVEL

2
2 FW 2WCH ST ST 2WCHW F 2
2,015
4
F F

2 DOUBLE POWER SOCKET WALL


F F

2 2WCH WF ST F W2WCH ST 2
MOUNTED
47,083

J D

D
J
DOUBLE SOCKET WEATHER

2
2

WH

WH
2 TEL TEL 2 2W PROOF OUTLET WALL MOUNTED
300mm ABOVE FLOOR FINISH
TEL 2 2 TEL LEVEL

WH

WH
I E

E
I
2

2
F
2,150 2 FW 2WCH ST ST 2WCH W F 2 FRIDGE POWER POINT
16,252

3
F
F

2
F

2WCH WF ST WH
WATER HEATER POWER SOCKET

2
300MM BELOW CEILING FINISH
H LEVEL
H
28,895

WH

27,241
2,001 2 TEL
TEL TELEPHONE POINT TO
2 2 2WCH
2 ENGRS SPECIFICATIONS
WH

WH
2WCH
G F DOUBLE SOCKET WEATHER
2 2 2
2W C O PROOF OUTLET WALL MOUNTED
2 TEL 2 2 TEL 1000mm ABOVE FLOOR FINISH
LEVEL
G

ST 2WCH F
F
F 2WCH ST
F

W WASHING MACHINE
9,050

POWER POINT
6,000

NOTE: POWER LAYOUT IS FOR


1 ELECTRICAL ENGR'S REFERENCE
9,078 1,600 9,902
FOR ELECTRICAL LOADING
COMPUTATION.

6th-25th Typical Power Layout


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 09 POWER LAYOUT R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
6th-25th Typical Power Layout 66 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 6th-25th Typical Power Layout, Ground Floor Commercial Power Layout
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

2,440
2,571
DECK DECK DECK
7 2 2 2
POWER LEGEND

2
4,341 AUX ECE EE RM
PANEL BOARD C/W CIRCUIT

2 TEL
2

2
5,520 H BREAKERS TO ELECTRICIAN'S
2

2
SPECIFICATIONS

2W C H W F
F

2
2WCH 2WCH
PROVISION FOR POWER
6

12,467
WH WH ST
STUB-OUT

ST
ST
21,290

2WCH W F
2 DOUBLE POWER SOCKET WALL
G
F

WH WH ST MOUNTED
8,163

2 2WCH 2

FW
2F
2WCH 2WCH

DECK
2 TEL
F FLOOR MOUNTED

2 TEL
A OUTLET
TEL 2
2 2

2WCH
2

2
2
W ST 2 ACU AIRCON POWER POINT

2WCH
5 WALL MOUNTED

W
2 2 2

F
WH
DECK DECK DECK

DECK
AIRCON POWER POINT
2
DECK ACUF
3,954

7,843
FLOOR STANDING
3,550

2
DECK

2WCH
2,000

2
2 2

WH
4' DOUBLE SOCKET WEATHER
PROOF OUTLET (COUNTER

WH
2W C H
TEL 2

DECK
2WCH
HEIGHT) MOUNTED 200mm

2
4,144

DECK
E

2
ABOVE FINISH COUNTER LEVEL

W F
2

F
2 2WCH ST
2,015
4 2 DOUBLE POWER SOCKET WALL
2 W 2WCH ST 2
MOUNTED

DECK
47,083

F
DECK

2
DOUBLE SOCKET WEATHER
2

WH

TEL 2
2
2W PROOF OUTLET WALL MOUNTED

2WCH
300mm ABOVE FLOOR FINISH

TEL 2

WH
LEVEL

DECK
2WCH

2
DECK
2

2
D F
FRIDGE POWER POINT
W F
2

F
2,354 2 2WCH ST
16,252

3 2 3,314 WH
WATER HEATER POWER SOCKET
300MM BELOW CEILING FINISH
DECK

LEVEL
28,895

WH

27,241
2

2WCH

TEL TELEPHONE POINT TO


F
ENGRS SPECIFICATIONS
2WCH

2
2WCH W F ST
2WCH
WH

WH

DOUBLE SOCKET WEATHER


2

2 2
C
2W C O PROOF OUTLET WALL MOUNTED
2 1000mm ABOVE FLOOR FINISH
TEL

2
LEVEL
DECK

2 2
2

2,900
W WASHING MACHINE
9,050

POWER POINT
6,000

NOTE: POWER LAYOUT IS FOR


1 20,580 ELECTRICAL ENGR'S REFERENCE
FOR ELECTRICAL LOADING
COMPUTATION.

26th Floor Penthouse Power Layout


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 09 POWER LAYOUT R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
26th Floor Penthouse Power Layout 67 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 26th Floor Penthouse Power Layout, Ground Floor Commercial Power Layout
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967

2,612
4,379
7 POWER LEGEND

STORAGE & PREPARATION


AUX ECE EE RM
6.00 m2 11.25 m2
PANEL BOARD C/W CIRCUIT

5,520
WATER TANK
BREAKERS TO ELECTRICIAN'S

Area: 34.75 m2
SPECIFICATIONS
PROVISION FOR POWER
6 ST
STUB-OUT

2W ACUF
2 2

2 DOUBLE POWER SOCKET WALL


ACUF

MOUNTED
FEMALE CR
8,163

Area: 16.00 m2 2F
2W FLOOR MOUNTED
OUTLET
MALE CR
4,002 Area: 15.00 m2
ACU AIRCON POWER POINT
WALL MOUNTED
5 2W

ACUF AIRCON POWER POINT


3,954

2W
FLOOR STANDING
3,387
ROOF DECK
Area: 543.50 m2

4' DOUBLE SOCKET WEATHER


PROOF OUTLET (COUNTER
2W C H

2W
HEIGHT) MOUNTED 200mm
4,144

3,334
3,274 ABOVE FINISH COUNTER LEVEL

2W

2W
4 2 DOUBLE POWER SOCKET WALL
MOUNTED
47,083

DOUBLE SOCKET WEATHER


2W PROOF OUTLET WALL MOUNTED
2W
8,144

300mm ABOVE FLOOR FINISH


LEVEL

2W
2W
26,608

F
2W 2W FRIDGE POWER POINT

3 WH
WATER HEATER POWER SOCKET
3,403 300MM BELOW CEILING FINISH
LEVEL

TEL TELEPHONE POINT TO


8,108

ENGRS SPECIFICATIONS
2W 2W

DOUBLE SOCKET WEATHER


2W C O PROOF OUTLET WALL MOUNTED
2 1000mm ABOVE FLOOR FINISH
LEVEL

W WASHING MACHINE
9,050

POWER POINT
6,000

NOTE: POWER LAYOUT IS FOR


1 ELECTRICAL ENGR'S REFERENCE
FOR ELECTRICAL LOADING
COMPUTATION.

Roof Deck Power Layout


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 09 POWER LAYOUT R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Roof Deck Power Layout 68 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Roof Deck Power Layout, Ground Floor Commercial Power Layout
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A
A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
9,083 21,425

S E T B A C K
PRESSURIZED ELEVATOR

S E T B A C K
P R O P E R T Y L I N E

SEISMIC INSTRUMENTATION

2,727

2,650

2,571

2,533
FIRE PRESSSURE
FIRE EXHAUST
PLUMBING
PLUMBING
7

2,650
AUX ECE EE RM P GARBAGE ROOM
R
12.75 m2 11.25 m2 O
P

5,520
E
10 R
T
Y
B B
L
UP I
N

6 E

P R O P E R T Y

9,713
POTTED PLANTS ONLY

18,532
8,163
9

ADMIN / SECURITY CENTER

L I N E
RECEPTION PWD 27.50 m2
8 16.75 m2 5.75 m2

E
N
FEMALE CR

I
L
3,954

18.75 m2
FIRE COM

7,854
Y
1 13.75 m2

T
R
E
4'

P
O
7

R
T Y L I N E
P R O P E R

P
4,144

MALE CR
16.25 m2

2
4
47,083

C C
8,144

6
3

14.87 %
20,380

18,788
3

P R O P E R T Y

P R O P E R T Y
UP
FIRE PRESSSURE
8,108

5 DISPLAY
CORNER
PLUMBING

L I N E

L I N E
3,012 4
3,747
2
ATM SHELTER

6.86 % PLANTER
F

PLANTER
F

11.76 %
PLANTER WITH SOIL
F

E
OP
9,050

SL
8,546

6,000

14.87 %
OUTLINE OF PARKING FLOOR ABOVE

1 4,350
P R O P E R T Y
11,863
L I N E
4,608
3.60M WIDE
RAMP UP
A

Ground Floor Planter Key Plan


1
1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 10 PLANTER KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Ground Floor and 2nd Floor Parking Planter Key Plan 69 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Ground Floor Planter Key Plan, 2nd Floor Parking Planter Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

A A
A B C C' D E F G A B C C' D E F G
40,368 40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 3,929 8,324 1,829 4,379 10,292 5,648 5,967

27,194 3,197 11,408


P R O P E R T Y L I N E PRESSURIZED ELEVATOR P R O P E R T Y L I N E PRESSURIZED ELEVATOR

SETBACK

S E T B A C K
FIRE PRESSSURE SEISMIC INSTRUMENTATION SEISMIC INSTRUMENTATION

2,612
2,440
2,533
PLUMBING FIRE EXHAUST FIRE EXHAUST
BALCONY BALCONY PLUMBING 4,379 PLUMBING
7 7 S E T B A C K

GARBAGE ROOM GARBAGE ROOM

STORAGE & PREPARATION


AUX ECE EE RM AUX ECE EE RM P
R

PIPE CHASE
12.75 m2 11.25 m2 6.00 m2 11.25 m2 O
P

6,243

5,520
5,520

E
WATER TANK R

Area: 34.75 m2
FEMALE CR MALE CR 13 14 T
28.50 m2 30.75 m2 UP Y
B P
R B B L
B
O I
P N
E E
6 R
T
Y
6

P R O P E R T Y
P R O P E R T Y

L
21,290

STORAGE I
N
4.50 m2 E

6,224
FEMALE CR

8,163
8,163

Area: 16.00 m2 S E T B A C K

1 BALCONY

L I N E
L I N E

12 11 10 MALE CR Outline of trellis


4,002 Area: 15.00 m2

5 5
S E T B A C K

E
N
I
L
POTTED

3,954
3,954

7,843
2 BALCONY PLANTS ONLY

3,387

Y
T
BALCONY BALCONY BALCONY ROOF DECK

R
Area: 543.50 m2

E
4' 4'

P
O
R
P R O P E R T Y L I N E
9

P
4,144
4,144

BALCONY 3 PARAPET WALL @ 3,334


BALCONY 3,274
1500MM HEIGHT FROM S E T B A C K
S E T B A C K
FLL
4 4
POTTED

47,083
47,083

BALCONY 8 4 PLANTS ONLY


BALCONY
C C C C

8,144
8,144

PARAPET WALL @

26,608
BALCONY 7 5 1500MM HEIGHT FROM
BALCONY FLL
2,086

P R O P E R T Y
3 3
P R O P E R T Y

Outline of trellis
26,495

DOWN
3,403
P R O P E R T Y

Outline of roof slab

24,841
BALCONY 6 STORAGE S E T B A C K
12.75 m2 POTTED
2,002

P R O P E R T Y
PLANTS ONLY

8,108
8,108

L I N E
L I N E

L I N E

L I N E
2 FIRE PRESSSURE 2 Outline of canopy

PLUMBING
COMMUNAL AREA
216.00 m2 S E T B A C K PARAPET WALL @
1500MM HEIGHT FROM
POTTED PLANTS ONLY POTTED PLANTS ONLY FLL

9,050
9,050

PARAPET WALL @

S E T B A C K
1500MM HEIGHT FROM POTTED

6,000
FLL PLANTS ONLY
SETBACK

400MM POTTED
2,400

2,400

POTTED PLANTS ONLY POTTED PLANTS ONLY ZOCALO WALL PLANTS ONLY
FROM FFL
1 P R O P E R T Y L I N E 1 P R O P E R T Y L I N E

A A

5th Floor Communal Planter Key Plan Roof Deck Planter Key Plan
1 2
1:300 1:300

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 10 PLANTER KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
5th Floor and Roof Deck Planter Key Plan 70 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 5th Floor Communal Planter Key Plan, Roof Deck Planter Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
9,083 21,425

2,727

2,650

2,571

2,533
7 7

2,650
5,520

6 6

9,713
18,532
8,163

5 5
3,954

7,854
4' 4'
4,144

4 4
47,083
8,144

13.84 %
14.87 %
20,380

18,788
3 3
8,108

3,747
2 2
6.86 %

11.76 %
9,050
8,546

See Railing-A Detail


14.87 %

19,629

1 4,350 11,863 4,608


1
See Railing-B Detail

Ground Floor Railing Key Plan 2nd-4th Floor Typical Railing Key Plan
1 2
1:300 1:300

RAILING LEGEND:
MILD STEEL RAILING
POWDER COATED IN MATTE
BLACK FINISH TO
SPECIALIST DETAIL
STAINLESS STEEL
RAILING C/W GLASS
PANELS TO SPECIALIST
DETAILS

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 12 RAILING KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Ground Flr, 2nd-4th Parking- Railing Key Plan 71 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Ground Floor Railing Key Plan, 2nd-4th Floor Typical Railing Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G

See Railing-D Detail See Railing-D Detail

7 7

6 6

5,333
5 5

3,902
834

2,026
4,225 3,900 3,920

4' 4'
See Railing-B Detail

3,898

3,896
4 4

3,898

3,898
3,946

4,121
3 3

4,200
2 2
10,682
10,333

1,600

See Railing-B Detail

20,647
1 1
See Railing-C Detail

5th Floor Communal Railing Key Plan 6th Floor Railing Key Plan
1 2
1:300 1:300

RAILING LEGEND:
MILD STEEL RAILING
POWDER COATED IN MATTE
BLACK FINISH TO
SPECIALIST DETAIL
STAINLESS STEEL
RAILING C/W GLASS
PANELS TO SPECIALIST
DETAILS

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 12 RAILING KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
5th Flr. and 6th Flr. Railing Key Plan 72 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 5th Floor Communal Railing Key Plan, 6th Floor Railing Key Plan, 2nd-4th Floor Typical Railing
Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A B C C' D E F G A B C C' D E F G

7 7

6 6

5 5

4' 4'

4 4
See Railing Detail D

3 3

2 2

1,600

1 1

7th-25th Floor Typical SOHO Railing Key Plan 26th Floor Penthouse Key Plan
1 2
1:300 1:300

RAILING LEGEND:
MILD STEEL RAILING
POWDER COATED IN MATTE
BLACK FINISH TO
SPECIALIST DETAIL
STAINLESS STEEL
RAILING C/W GLASS
PANELS TO SPECIALIST
DETAILS

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 12 RAILING KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
7th-25th Typical and Penthouse Railing Key Plan 73 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 7th-25th Floor Typical SOHO Railing Key Plan, 26th Floor Penthouse Key Plan, 2nd-4th Floor
Typical Railing Key Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:300 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
RAILING-B Friday, December 6, 2019
RAILING-A

1,500 A

2,251
2,552
752
300

300
5,126

40x40mm tubular mild


Drop-off Detail Plan 10mm ø round bar spaced 40x40mm tubular mild
steel bolted on floor
1 @ 100mm on center in steel handrail painted in
painted in graphite dark
1:50 graphite dark gray finish to
architect's approval
graphite dark gray finish
to architect's approval
gray finish to architect's
approval

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

10mm ø round bar spaced 40x40mm tubular mild


Fixed glass to window @ 100mm on center in steel handrail painted in

40
schedule graphite dark gray finish to graphite dark gray finish
architect's approval to architect's approval

2,831
200 1,000 1,000 300 300
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
40

1,030
1,200
40x40mm tubular mild
steel handrail painted in
graphite dark gray finish
to architect's approval
1,110

1,030
1,200

40x40mm tubular mild

40
steel bolted on floor
painted in graphite dark

90
gray finish to architect's
approval

2nd-4th Flr. Parking Railing Detail Elevation B


3
1,110

1:20
1,200

Structural beam
NOTE: REFER TO
40
90

+0.40
Ground Floor Commercial
RAILING KEY PLAN FOR
90

200

EXACT LENGTH OF
400

RAILING
200

90

±0.00
Natural Grade Line

Drop-off Railing Detail Elevation


2
1:20
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 12 RAILING KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Railing-A and Railing-B Detail 74 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Drop-off Detail Plan, Drop-off Railing Detail Elevation, 2nd-4th Flr. Parking Railing Detail Elevation
B, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:50, 1:20, ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
1:486.90
CONSTRUCTION DRAWING
RAILING-C Friday, December 6, 2019
A B C C' D E F G

7
50mm diameter stainless
steel handrail to specialist
detail & specification

100
6

50
10mm diameter stainless

200
50
steel support rod to
specialist detail &
specification

50
5 900x50mm & 10mm thk
solid stainless steel
support to specialist detail
& specification
4'
1200x1200mm & 12mm

900
thk clear tempered glass

900
4

1,400
w/ flat polished edges to
architect's selection &
approval
OUTER SIDE INNER SIDE
30mm diameter stainless
steel glass clip to
specialist detail &
3 specification

100
zocalo in concerete finish

300
to architect's approval

200
2
10,682
10,333

FFL

Section A
5
1
20,647
1:20

5th Floor Communal Railing-C Key Plan


3 1200x1200mm & 12mm
1:500 900x50mm & 10mm thk
solid stainless steel
30mm diameter
stainless steel glass
Zocalo in concrete
50mm diameter
stainless steel
thk clear tempered glass
finish to architect's w/ flat polished edges to
support to specialist detail clip to specialist handrail to specialist
approval architect's selection &
& specification detail & specification detail & specification
approval

1,200 100 1,200 100 1,200


100
100

NOTE: REFER TO
RAILING KEY PLAN FOR
50

EXACT LENGTH OF
RAILING
950
1,400

1,300
100
200

5th Floor Communal Railing-C Detail Elevation


4
1:20
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 12 RAILING KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Railing-C Detail 75 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 5th Floor Communal Railing-C Detail Elevation, Section A, 5th Floor Communal Railing-C Key
Plan, Roof Deck Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:20, 1:500, ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
1:436.49
CONSTRUCTION DRAWING
RAILING-D Friday, December 6, 2019
A B C C' D E F G
Floor in raw concerete
finish or equivalent to
Floor Drain
specialist detail &
specification

150

50
6

50
NOTE: Railing on

50
this side to face

50 50

50
opposite direction

50 50

50
400

50
50
50
5

50

50
50
5
50 0 50 5

50
4' 50 50
50 0 50 5

50
50
50 0 50 5

1,210
50
50
50 0 50 5
50

50
50 0 50 5
4

ELEVATION B
50
50 0 50 5

50
50
50 0 50 5

50
50
50 0 50 5

50
50
50 0 50 5

50
50
50 0 50 5

50
50
50mm x 50mm mild steel 50 0 50 5
50
50 0 50 5

50
in graphite dark gray finish 50
50 0 50 5

50
3 to architect's approval 50
50 0 50 5

50
10mm x 50mm mild steel 50
spaced @ 50mm in 50 0 50 5
50
graphite dark gray finish to 50 0 50 5

50
50
architect's approval 50 0 50 5
50
50 0
50
50
2 3,749
Decorative fin in
rusty orange paint
1,600
finish to archt's
approval
ELEVATION A

1
Plan
7th-25th Floor Typical SOHO Railing Key Plan 2
1 1:20
1:500

10mm x 50mm mild steel


50mm x 50mm mild steel
spaced @ 50mm in
in graphite dark gray finish
graphite dark gray finish to
to architect's approval
architect's approval

49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49
43 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 49 47
6 5 26

50
1,200
1,150
Elevation A
3
1:20

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 12 RAILING KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Room Unit Balcony and Railing Detail 76 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 7th-25th Floor Typical SOHO Railing Key Plan, Plan, Elevation A, Railing Perspective
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:500, 1:20, 1:2.22 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
600mm x 600mm
homogeneous off white
tiles or equivalent to Kitchen counter to detail
archt's and client's
approval & selection 6,105
400 150 454 1,400 2,124 2,127
E1 F

A
A B C C' D E F G

325
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967

600
27,261 14,605
S E T B A C K

P R O P E R T Y L I N E PRESSURIZED ELEVATOR
FIRE PRESSSURE SEISMIC INSTRUMENTATION

2,440
PLUMBING FIRE EXHAUST
Q R S PLUMBING
7
4,341
S E T B A C K
AUX ECE
12.50 m2
EE RM
11.00 m2
GARBAGE ROOM
Floor in raw Wall painted in Off Door to door
5,520

Q R S

concerete finish or
UP
B B

white finish to archt's &


P
F

R
O
17,577

6
schedule
P
E
12,520
R

equivalent to
P R O P E R T Y

client's approval
Y
L
I
N
E
F

specialist detail &


8,163

A
A

M
F

F
L I N E

P O N

specification

1,174
5
F

P O N M
3,954

L
7,790

B
B
3,713

S E T B A C K

4'
F

Window
P R O P E R T Y L I N E
4,144

K C
C
K

1,017 1,010
to window
2,015
4
F F

F F
47,083

J D
D
J

schedule
C C

J 600mm x 600mm
I E
E

homogeneous off white


I

3,898

3,898
J
2,150
16,252

3
F
S E T B A C K F

tiles or equivalent to
P R O P E R T Y

3,573
H
H
28,895

27,241

2,001
S E T B A C K

Wall painted in Off archt's and client's


-50m m

1,050
P R O P E R T Y

white finish to archt's &


L I N E

G F

2 FIRE PRESSSURE
PLUMBING
client's approval
approval & selection
G
F
L I N E

F
9,050

S E T B A C K
S E T B A C K
6,000

Railing to detail 600mm x 600mm non-

2,124
1 P R O P E R T Y L I N E
9,078 1,600 9,902

A slip homogeneous off

327
white tiles or equivalent

-50m m
Key Plan Wall painted in Wall painted in to archt's and client's
1 Raw concrete
finish to archt's
Off white finish to
archt's & client's approval & selection
approval

747
& client's
approval
E1
Decorative fin in
rusty orange
paint finish to 150 3,978 1,627 500
archt's approval 6,105
E2 E2
600mm x 600mm non- 600mm x 600mm
#Hotlink and Element ID slip homogeneous off homogeneous off white
white tiles or equivalent tiles or equivalent to
to archt's and client's archt's and client's
approval & selection approval & selection

Unit J Blow-up Plan


2
1:50

Toilet & bath Common Area


3 4

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 12 RAILING KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Unit J Blow-up Plan 77 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Key Plan, Unit J Blow-up Plan, Toilet & bath, Common Area, Facade
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:50, 1:3.17, ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
1:3.22, 1:1.76
CONSTRUCTION DRAWING
FIN DETAIL Friday, December 6, 2019

A
A B C C' D E F G Floor in raw concerete
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967 finish or equivalent to
Floor Drain
27,261 14,605 specialist detail &
specification

S E T B A C K
P R O P E R T Y L I N E PRESSURIZED ELEVATOR
FIRE PRESSSURE SEISMIC INSTRUMENTATION

2,440
PLUMBING FIRE EXHAUST
Q R S PLUMBING
7
4,341 AUX ECE EE RM GARBAGE ROOM
12.50 m2 11.00 m2
S E T B A C K
150
5,520

Q R S
UP

50
B P B

F
R

50
O
17,577

12,520
P
E
R
P R O P E R T Y

50
Y

50 50
L

50
I
N
E

50 50

50
F

400
8,163

50
A

A
M
F

F
L I N E

50
P O N

50
5
F

50

50
F

P O N

50
M
3,954

7,790
B

B
5
50 0 50 5
3,713

50
S E T B A C K

50
L

50
4' 50 0 50 5

50
F

50
50 0 50 5
P R O P E R T Y L I N E

1,210
50
50
50 0 50 5
4,144

K C

C
K

50

50
50 0 50 5

ELEVATION B
50
50 0 50 5
2,015

50
4
F F

50
50 0 50 5
F F

50
47,083

50
J D
50 0 50 5
D

50
J

50
50 0 50 5
C C

50
50
50 0 50 5

50
50
50mm x 50mm mild steel 50 0 50 5
50
50 0 50 5

50
I E
E
I

in graphite dark gray finish 50


50 0 50 5

50
2,150
16,252

3 to architect's approval 50
50 0 50 5
F
S E T B A C K F

50
F

10mm x 50mm mild steel 50


50 0 50 5
P R O P E R T Y

spaced @ 50mm in 50
50 0 50 5
H
H
28,895

graphite dark gray finish to

50
50
50 0 50 5
27,241
2,001
architect's approval 50
50 0
S E T B A C K

50
P R O P E R T Y

L I N E

G F 50
3,749
2 FIRE PRESSSURE
PLUMBING Decorative fin in
G
F

rusty orange paint


L I N E

finish to archt's
9,050

S E T B A C K
S E T B A C K

approval
6,000

ELEVATION A

1 P R O P E R T Y L I N E

PLAN
9,078 1,600 9,902

A
2
1:20
KEY PLAN
1
Structural slab in
rusty orange paint
finish to archt's
approval
4,049
1,210
3,998 Structural slab in
+25.80
150

+25.80 rusty orange paint

150
8th Floor 8th Floor
finish to archt's
approval
500

550 3,000 349

Decorative fin in
rusty orange paint Decorative fin in
finish (prefab to rusty orange paint
specialist detail & finish (prefab to

2,300
specification specialist detail &
specification
1,850

3,500
3,500

3,350
Railing to detail
1,200
Railing to detail
1,000

+22.30 +22.30
7th Floor Typical SOHO 7th Floor Typical SOHO

ELEVATION A ELEVATION B
3 4
1:50 1:50

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 12 RAILING KEY PLAN R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Fins Detail 78 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM KEY PLAN, PLAN, ELEVATION A, ELEVATION B, FACADE
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:20, 1:50, 1:2.27 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
A B C C' D E F G Friday, December 6, 2019

6,655
7 1,452 5,203

2,727
6

675
280 280 280 280 280 280 280

5
4'

4 23 22 21 20 19 18 17 16
15

14

4,776
3,500
1 2 3 4 5 6 7 8 9 10 11 12 13

3 1-A
FIRE STAIRS- A

1,495 4,860
2

601
Key Plan
1 GROUND FLR. Fire Stairs-A Detail Plan
1:500 3
1:50
5,202 5,203

600

600
275 275 275 275 275 275 275 275 1,390
275 275 275 275 275 275 275 275 275 275 1,535

19 18 17 16 15 14 13 12 11 10 17 16 15 14 13 12 11 10
9
9
3,575
4,775

3,575
4,775
1 2 3 4 5 6 7 1 2 3 4 5 6 7 8
8

1-A 1-A UP

UP

275 275 275 275 275 275 275 1,535 1,587 275 275 275 275 275 275 275 1,390
600

600
BASEMENT Fire Stairs-A Detail Plan 2ND-5TH FLR. Fire Stairs-A Detail Plan
2 4
1:50 1:50
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 15 STAIR DETAIL R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Fire Stairs-A Detail Plans 79 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Key Plan, BASEMENT Fire Stairs-A Detail Plan, GROUND FLR. Fire Stairs-A Detail Plan, 2ND-
5TH FLR. Fire Stairs-A Detail Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:500, 1:50 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019

6,406
6,380
5,110 1,296
5,085 1,295

150

150
275 275 275 275 275 275 275 275 275 275 1,500
275 275 275 275 275 275 275 275 275 1,775

21 20 19 18 17 16 15 14 13 12 11 19 18 17 16 15 14 13 12 11 10

3,975
3,825
1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9

3,825
1A 1A 1A 1A

UP

1,890 275 275 275 275 275 275 275 275 275 1,740
2,406 275 275 275 275 275 275 275 275 1,500

400
5TH-6TH FLR. Fire Stairs-A Detail Plan TYPICAL 6TH-26TH FLR. Fire Stairs-A Detail Plan
1 2
1:50 1:50
6,405
5,110 1,295

400
150
275 275 275 275 275 275 275 275 275 275 1,500

19 18 17 16 15 14 13 12 11 10

3,675
1 2 3 4 5 6 7 8 9

1A 1A

2,405 275 275 275 275 275 275 275 275 1,500

150
400
26TH FLR. PENTHOUSE TO ROOFDECK Fire Stairs-A Detail Plan
3
1:50
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 15 STAIR DETAIL R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Fire Stairs-A Detail Plan 80 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 5TH-6TH FLR. Fire Stairs-A Detail Plan, TYPICAL 6TH-26TH FLR. Fire Stairs-A Detail Plan,
26TH FLR. PENTHOUSE TO ROOFDECK Fire Stairs-A Detail Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:50 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
6,905
2,405
500 150 6,055 200
9th Flr +29.30 +95.84
9th Floor Roof Slab

3,500

3,500
3,390
40mm ø mild steel
round bar handrail
painted in graphite
dark gray finish to
1,840 architect's approval
2,405
8th Flr +25.80 Roofdeck +92.34
8th Floor Roof Deck

600
10mm ø mild steel
round bar spaced @
100mm on center
painted in graphite

3,500

3,540
dark gray finish to
architect's approval

2,790
2,405 2,405
26th Flr
7th Flr +22.30 +88.80
Penthouse 275 275 275
7th Floor Typical SOHO 26th Floor Penthouse

175 175 175


600
175 175 175

40mm ø mild steel


round bar handrail
painted in graphite Concrete screed
dark gray finish to finish c/w brass stair
3,500 architect's approval nosing

3,500
2,750
2,405 2,405
6th Flr +18.80 275 275 275 +85.30
25th Flr
6th Floor 25th Floor

10mm ø mild steel


round bar spaced @
100mm on center

3,500
painted in graphite 1,500
4,000

dark gray finish to


architect's approval

2,405
24th Flr +81.80
1,890
24th Floor
5th Flr +14.80
5th Floor Communal

3,500
1,390
3,300

1,568 23rd Flr +78.30


4th Flr +11.50 23rd Floor
4th Floor Parking
600

150
Fire Stairs A-Detail Section
2
1:100
3,300

40mm ø mild steel


2,550

round bar handrail


painted in graphite
dark gray finish to
architect's approval
1,568
275 275
3rd Flr +8.20
3rd Floor Parking
183 183 183
600

10mm ø mild steel


round bar spaced @
100mm on center
painted in graphite
3,300

dark gray finish to


2,550

architect's approval

Concrete screed
finish c/w brass stair
1,587 nosing
2nd Flr +4.90
2nd Floor Parking
700
188 188 188

1,000

Basement Stairs-A Ground Flr Stairs-A


3 5
4,500
3,375

40mm ø mild steel


round bar handrail
painted in graphite
280 280 280
dark gray finish to
1,495 architect's approval
Ground Flr +0.40
Ground Floor Commercial
±0.00
700

Natural Grade Line


400
1,350

180 180 180

150
10mm ø mild steel round
350 bar spaced @ 100mm on
1,280

center painted in graphite


1,535 dark gray finish to
architect's approval
3,200

Concrete screed
2,100

finish c/w brass stair


nosing

1,442
Basement 275 275 275 -3.20
Basement 1

Fire Stairs-A Detail Section 2nd Flr Stairs-A Typical


1 4 6
1:100
Basement-Ground Flr: Riser= 180mm; 2nd Flr-5th Flr: Riser= 183mm; Typical 6th-26th Penthouse: Riser= 175mm;
Treads= 275mm Treads= 275mm Treads= 275mm
Stair railing height: 1000mm
Ground Flr-2nd Flr: Riser= 188mm; 5th Flr-6th Flr: Riser= 182mm; 26th Penthouse-Roofdeck: Riser= 177mm;
Treads= 280mm Treads= 275mm Treads= 275mm

Project : Drawing Title : Approved: Sheet No. :


A PROPOSED 26 STOREY ECONOMIC 15 STAIR DETAIL R.G. PINO REALTY CORP.
CONDOMINIUM Fire Stairs-A Detail Section 81
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:100 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
CONSTRUCTION DRAWING
Friday, December 6, 2019

4,255
3,755 500

2-A

300
A B C C' D E F G

1,775

1,783
7
2,727

9
FIRE STAIRS- B

10 8
6

275

275
11 7

4,275

275

275
5,205
12 6

275

275
13 5
5 B-33

275

275
14 4

6,045
4'

275

275
15 3

275

267 275
4
16 2

275
17 1

275
18 UP

3 19

630

2,255
2

1,200
1,200

1
Key Plan 1,200 2,556 500
1
1:500
2-A

BASEMENT Fire Stairs-B Detail Plan


2
1:50
4,255 4,255
3,755 500 150 3,605 500

2-A 2-A
300

1,687

1,687
1,500

12 11

13 10
8
280

280

280

14 9
9 7
280

280

280

15 8
10 6
280

280

16 7
560

11 5
280

280

17 6 2F-3
12 4
280

280

2,545

280
5,955

6,405

18 5
13 3
280

280

280

19 4
14 2
280

280

280

20 3
15 1
280

280

21 2
16
280

280

22 1
17
280

23
280

24
1,934

1,823
1,350
150

2-A 2-A

GROUND FLR. Fire Stairs-B Detail Plan 2ND-5TH FLR. Fire Stairs-B Detail Plan
3 4
1:50 1:50

Project : Drawing Title : Approved: Sheet No. :


A PROPOSED 26 STOREY ECONOMIC 15 STAIR DETAIL R.G. PINO REALTY CORP.
CONDOMINIUM Fire Stairs-B Detail Plan 82
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:500, 1:50 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
CONSTRUCTION DRAWING
Friday, December 6, 2019

4,255 4,255
3,755 500 4,255

1,783

1,783
2,050
9
11 10

275

275
12 9 10 8

4,250
4,725

275

275

275
13 8 11 7
275

275

275
14 7 12 6
275

275

275
15 6 13 5

6,405
6,400
275

275

275
16 5 14 4
6,900

6,900
6,900
6,895
275

275

275
17 4 15 3
275

275

275
18 3 16 2
275

275

275
19 2 17 1
275

275
UP
20 1 18

275
275

UP
21 19

2,617
2,350
2,175

495

495
5TH-6TH FLR. Fire Stairs-B Detail Plan TYPICAL 6TH-26TH FLR. Fire Stairs-B Detail Plan
1 2
1:50 1:50

NOTE: 6TH-26TH FLR HAS A FLOOR


TO FLOOR HEIGHT OF 3500MM; 26TH
FLR TO ROOFDECK AT 3540MM
(SLIGHT DIFFERENCE IN RISER
HEIGHT)

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 15 STAIR DETAIL R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Fire Stairs-B Detail Plan 83 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM 5TH-6TH FLR. Fire Stairs-B Detail Plan, TYPICAL 6TH-26TH FLR. Fire Stairs-B Detail Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:50 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
6,800
150 6,450 200
+95.84
Roof Slab

3,500
40mm ø mild steel
round bar handrail
10mm ø mild steel round painted in graphite
bar spaced @ 100mm dark gray finish to
on center painted in architect's approval
graphite dark gray finish
1,960 300
to architect's approval
Roofdeck +92.34
40mm ø mild steel round Roof Deck

750
600
bar handrail painted in
graphite dark gray finish 10mm ø mild steel
to architect's approval round bar spaced @
100mm on center
painted in graphite

3,540
1,775 dark gray finish to
architect's approval

2,790
Brass stair nosing
175

Concrete screed finish 2,625 350


Penthouse +88.80
26th Floor Penthouse

750
600
275
Concrete screed
275 275 275 finish c/w brass stair
nosing

3,500
1,783

2,750

175 175
175

2,617
25th Flr +85.30
25th Floor

3,500
Spot Detail A
4
1:5
24th Flr +81.80
NOTE: 26TH FLR TO 24th Floor
ROOFDECK FLOOR TO
FLOOR HEIGHT IS AT
3540mm

3,500
2,408
4th Flr +11.50
4th Floor Parking
600

300

23rd Flr +78.30


23rd Floor
3,300
2,550

Concrete screed 2,617


finish +29.30
9th Flr
2,383 9th Floor
300
3rd Flr +8.20
3rd Floor Parking 350
750
600

Existing structural
beam

3,500
3,300

1,687
2,550

8th Flr +25.80


2,408 8th Floor
2nd Flr +4.90
600

2nd Floor Parking


350
600

10mm ø mild steel


200
round bar spaced @
280 280
180 180

100mm on center
3,500

1,783
painted in graphite
2,750

dark gray finish to Concrete screed


architect's approval finish c/w brass stair
4,500

nosing
SPOT DETAIL A
3,750

2,617
7th Flr +22.30
40mm ø mild steel
round bar handrail 7th Floor Typical SOHO
600

painted in graphite
dark gray finish to 350 10mm ø mild steel
architect's approval round bar spaced @
1,935
200 100mm on center
Ground Flr +0.40
275 275 275 painted in graphite
Ground Floor Commercial
3,500

±0.00 1,783 dark gray finish to


600

180 180

Natural Grade Line architect's approval


400

2,750

175 175 175

1,500 2,617
6th Flr +18.80
3,200
2,850

6th Floor
Concrete screed
600

finish c/w brass stair


nosing 40mm ø mild steel
350
round bar handrail
2,255 painted in graphite
Basement -3.20 dark gray finish to
275 275 architect's approval
Basement 1
4,000

1,775
3,250

Fire Stairs-B Detail Section


1
1:100
2,350
Basement-Ground Flr: Riser= 180mm; 5th Flr-6th Flr: Riser= 182mm; +14.80
5th Flr
Treads= 275mm Treads= 275mm Stair railing height: 1000mm 5th Floor Communal

Ground Flr-2nd Flr: Riser= 188mm; Typical 6th-26th Penthouse: Riser= 175mm; 300
Treads= 280mm Treads= 275mm
Fire Stairs-B Detail Section
2nd Flr-5th Flr: Riser= 183mm; 26th Penthouse-Roofdeck: Riser= 177mm; 2
Treads= 275mm Treads= 275mm 1:100

Project : Drawing Title : Approved: Sheet No. :


A PROPOSED 26 STOREY ECONOMIC 15 STAIR DETAIL R.G. PINO REALTY CORP.
CONDOMINIUM Fire Stairs-B Detail Section 84
PATRICK U. GO
380 Jones Avenue, Cebu City, Philippines 6000
Tel: 253-9417, HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:100, 1:5 Date: 12/6/2019
GSPublisherVersion 0.0.100.47
S E T B A C K
S E T B A C K
SEISMIC INSTRUMENTATION

2,650

2,571
FIRE PRESSSURE
FIRE EXHAUST

CONSTRUCTION DRAWING
PLUMBING
PLUMBING

AUX ECE EE RM P GARBAGE ROOM


R

Friday, December 6, 2019


12.75 m2 11.25 m2 O
P
E
10 R
T
Y
B
L
UP I
N
E
P R O P E R T Y

ADMIN / SECURITY CENTER


L I N E

RECEPTION PWD 27.50 m2


8 16.75 m2 5.75 m2

E
N
FEMALE CR

I
L
18.75 m2
FIRE COM

Y
1 13.75 m2

T
R
E
P
O
7

R
T Y L I N E
P R O P E R

P
MALE CR
16.25 m2

C C
6
3

14.87 %
P R O P E R T Y

P R O P E R T Y
UP
FIRE PRESSSURE
5 DISPLAY
CORNER
PLUMBING
L I N E

L I N E
3,012 4
3,747
ATM SHELTER

6.86 % PLANTER
F

PLANTER
F

11.76 %
F

E
OP
SL
6,000

14.87 %

OUTLINE OF PARKING FLOOR ABOVE


NOTE: REFER TO STRUCTURAL
ENGINEERING DRAWINGS
4,350
P R O P E R T Y
11,863
L I N E
4,608 REGARDING BEAMS
Ground Floor Plan
3
1:500 Ramp in raw concrete finish or
32,950
equivalent c/w tactile or equivalent
8,089 8,142 finish to specialist specification 8,001 9,158

GROUND FLOOR LEVEL


2ND FLOOR LEVEL

4,631

Typical 2nd - 4th Fire Stair Plan


1
1:100

Raw concrete screed 32,950


finish to archt's and
client's approval
SECOND FLOOR FINISH LEVEL
Ramp in raw concrete finish
750

or equivalent c/w tactile or


600

equivalent finish to
specialist specification

14.87%
slope
CLEARANCE
3,750

3,750

GROUND FLOOR FINISH LEVEL

Typical 2nd - 4th Fire Stair Section


2
1:100
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 16 RAMP DETAILS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Ground Floor Ramp Details 85 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Typical 2nd - 4th Fire Stair Plan, Typical 2nd - 4th Fire Stair Section, Ground Floor Plan
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:100, 1:500 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
A B C C' D
A
E F G
CONSTRUCTION DRAWING
40,368
Friday, December 6, 2019
3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

S E T B A C K

S E T B A C K
P R O P E R T Y L I N E PRESSURIZED ELEVATOR

FIRE PRESSSURE SEISMIC INSTRUMENTATION

2,700

2,534
PLUMBING FIRE EXHAUST
PLUMBING
7
AUX ECE EE RM P
R
GARBAGE ROOM
13.50 m2 11.00 m2 O
P
5,520

E
2F-5 2F-4 2F-3 2F-2 2F-1 R
T
Y
B L
B
I
N
E
6

12,374
P R O P E R T Y
21,290
8,163

6M WIDE DRIVEWAY
(28 PARKING SLOTS)
L I N E

2F-28
24,495
3.60mts WIDE

5
RAMP DOWN TO
GROUND FLOOR
8,090 8,140 8,000
3,954

2F-27

7,843
2F-6 2F-7 2F-8 2F-9 2F-10 2F-11 Ramp in raw concrete finish or
equivalent c/w tactile or equivalent
4' 2F-26
finish to specialist specification
4,144

2F-12 2F-25

13.52 %
47,083

6M WIDE DRIVEWAY

2F-13 2F-24
(28 PARKING SLOTS)

C C
8,144

2F-14 2F-23

2ND FLOOR LEVEL


3RD FLOOR LEVEL
2F-15 FIRE PRESSSURE
2F-22

18,191
PLUMBING
P R O P E R T Y

4,553
26,453

P R O P E R T Y
2F-16
UP
8,108

2F-17
13.52 %
L I N E

2F-21
L I N E

2F-18

2
2F-19

5,607
9,050

2F-20
S E T B A C K

Typical 2nd - 4th Fire Stair Plan


3,443
2,443

1 1
1:100
P R O P E R T Y L I N E

15,966 4,663
A

NOTE: REFER TO STRUCTURAL


ENGINEERING DRAWINGS
2nd Floor Parking
3 REGARDING BEAMS
1:500

Raw concrete screed


finish to archt's and 24,495 6,310
client's approval
150

THIRD FLOOR FINISH LEVEL Ramp in raw concrete finish


or equivalent c/w tactile or
equivalent finish to
750
600

specialist specification

13.52%
slope

3,300
CLEARANCE
2,545
2,550

Raw concrete screed Raw concrete screed


finish to archt's and finish to archt's and
client's approval client's approval
SECOND FLOOR FINISH LEVEL Ramp in raw concrete finish SECOND FLOOR FINISH LEVEL
or equivalent c/w tactile or

750

750
equivalent finish to
specialist specification

CLEARANCE

2,832

CLEARANCE

3,780
GROUND FLOOR FINISH LEVEL

Typical 2nd - 4th Fire Stair Plan


2
1:100

Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 16 RAMP DETAILS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Second Floor Ramp Details 86 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Typical 2nd - 4th Fire Stair Plan, 2nd Floor Parking, 3rd Floor Parking
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:100, 1:500 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com
CONSTRUCTION DRAWING
Friday, December 6, 2019
A
A B C C' D E F G
40,368
3,929 8,324 1,829 4,379 10,292 5,648 5,967
27,261 14,605

S E T B A C K
P R O P E R T Y L I N E PRESSURIZED ELEVATOR

FIRE PRESSSURE SEISMIC INSTRUMENTATION

2,534

2,533
PLUMBING FIRE EXHAUST
PLUMBING
7
AUX ECE EE RM P
R
GARBAGE ROOM
13.50 m2 11.00 m2 O
P
5,520

GENERATOR ROOM LVSG/ATS/AP/EMDP E


R
Area: 54.50 m2 Area: 47.25 m2 T
Y
B UP L
B
I
N
E
6

12,374
P R O P E R T Y
21,290

3F-3 3F-1
6M WIDE DRIVEWAY
(23 PARKING) 24,400
8,163

3F-4 3F-2
8,089 8,143 7,999
L I N E

3F-23

Ramp in raw concrete finish or


5 equivalent c/w tactile or equivalent
TRANSFORMER
3,954

3F-22 finish to specialist specification

7,843
Area: 60.75 m2 3F-5 3F-6

4' 3F-21
4,144

3F-7 3F-20

4
6M WIDE DRIVEWAY
47,083

3F-8 3F-19

3RD FLOOR LEVEL


(23 PARKING)

C C

4TH FLOOR LEVEL


8,144

3F-9

13.52 %
3F-18

4,552
3F-10 FIRE PRESSSURE
3F-17
PLUMBING
P R O P E R T Y

3 3.60mts WIDE
26,453

RAMP UP TO
P R O P E R T Y

3F-11

24,798
4TH FLR PARKING

UP
8,108

3F-12
L I N E

3F-16
L I N E

3F-13

2
3F-14
9,050

3F-15

Typical 2nd - 4th Fire Stair Plan


S E T B A C K

1
2,443

2,443

1 P R O P E R T Y L I N E 1:100
15,966 4,663
A

NOTE: REFER TO STRUCTURAL


3rd Floor Parking ENGINEERING DRAWINGS
3 REGARDING BEAMS
1:500

Raw concrete screed


finish to archt's and
client's approval
24,400 6,861
FOURTH FLOOR FINISH LEVEL

Ramp in raw concrete finish


750

600

or equivalent c/w tactile or


equivalent finish to
specialist specification
13.52%
slope
CLEARANCE

CLEARANCE

3,300
CLEARANCE
2,550

2,700

Raw concrete screed Raw concrete screed


finish to archt's and finish to archt's and
client's approval client's approval
THIRD FLOOR FINISH LEVEL THIRD FLOOR FINISH LEVEL
Ramp in raw concrete finish

750

750
or equivalent c/w tactile or
equivalent finish to
specialist specification

CLEARANCE

CLEARANCE
2,450

2,550
Raw concrete screed
finish to archt's and
client's approval
SECOND FLOOR FINISH LEVEL

Typical 2nd - 4th Fire Stair Plan


2
1:100
Project : Drawing Title : Approved: Sheet No. : Note : © 2019 Architect Patrick Lendel Go.
A PROPOSED 26 STOREY ECONOMIC 16 RAMP DETAILS R.G. PINO REALTY CORP. This drawing is copyright. There shall not be any re-production of any kind without
Third Floor Ramp Detail 87 proper authorization from the architect. Contractors shall work from figured
CONDOMINIUM Typical 2nd - 4th Fire Stair Plan, 3rd Floor Parking
PATRICK U. GO dimensions only. Contractors must check all dimensions on site. Any discrepancies
380 Jones Avenue, Cebu City, Philippines 6000
Architects: Patrick Lendel Go , Leizle Marie Go Scale: 1:100, 1:500 ADDRESS: CEBU CITY, CEBU Date: 12/6/2019 must be highlighted immediately to the architect.
Tel: 253-9417,
GSPublisherVersion 0.0.100.47 HP: 0917-630-0700 / 0917-318-0000 Email: lendelgo@gmail.com

You might also like